Loading...
HomeMy WebLinkAbout2017-00361 - new townhome City of Orono CERTIFICATE OF OCCUPANCY This Certificate is issued pursuant to the requirements of Section 110 of the International Building Code certifying that at the time of issuance this structure was in compliance with the various ordinances of the local jurisdiction regulating building construction or use. For the following: Building Address: 797 BRIDGEWATER DR PIN: 33-118-23-12-0021 Legal Description: Stonebay Fourth Addition Block 001 Lot 010 Zoning District: Permit No: 2017-00361 Work Activity: Townhome Construction Type: V B Occupancy: IRC-3 Occupant Load: Fire Sprinkler: Y Applicant: Wooddale Builders Inc. Applicant Address: 6117 Blue Cr Dr City,State,Zip: Minnetonka, MN 55343- Owner Name: Wooddale Builders Owner Address: 6117 Blue Circle Drive City,State,Zip: Minnetonka,MN 55343- FOR YOUR INFORMATION For any police,fire or medical emergency-Call:911 Posting of your assigned street number is required In purchasing a new home, file for your homestead at the City offices.Register your address for voting,drivers license and automobile registration. City water and sewer is billed quarterly. Septic inspection fees are billed annually. Permits are required for any additions or alterations on your property or for construction of any garages, deck,dock or other accessory structure. Special regulations prohibit any excavation,filling,grading,dredging,tree removal,or construction of any kind within 75 feet of any lakeshore or within 26 feet of any wetlands. oivau Zonmg Administrator Date .0•ding(J tt rcial Date • CITY OF ORONO * 2 0 1 7 - 0 0 3 6 1 * 2750 KELLEY PARKWAY DATE ISSUED: 05/17/2017 ORONO,MN 55356- (952)249-4600 FAX: (952) 249-4616 ADDRESS : 797 BRIDGEWATER DR PIN : 33-118-23-12-0021 LEGAL DESC : STONEBAY FOURTH ADDITION : LOT O10 BLOCK 001 PERMIT TYPE : NEW STRUCTURE PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : TOWNHOME ACTIVITY : 102-SINGLE FAMILY HOUSES,ATTACHED VALUATION : $ 350,000.00 NOTE: SEPARATE PERMITS REQUIRED:PLUMBING,MECHANICAL,FIREPLACE,WATER CONNECTION,SEWER CONNECTION, ELECTRICAL(STATE) NOTE:PLEASE SEE AND INITIAL NEW BUILDER ACKNOWLEDGEMENT FORM APPLICANT PERMIT FEE SCHEDULE 2,684.92 WOODDALE BUILDERS INC. STATE SURCHARGE(VALUATION) 175.00 6117 BLUE CR DR S.A.C. 2,485.00 MINNETONKA,MN 55343- TOTAL 5,344.92 (952)345-0543 Payment(s) Minnesota State License#: BUIL-BC002926 CHECK 87106 5,344.92 OWNER Wooddale Builders 6117 BLUE CIRCLE DRIVE MINNETONKA,MN 55343- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable Ciry approvals,and the State Building Code. This permit is for only the work described and dces not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified hereia This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced: The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This pertnit may be revoked at any time for due cause. '' .f""�/?- 1 ,�-� �.�.,�Sv � 1 � 1 � � A � rmite ignature Date Issued By Signature Date . ���� �� ����� � ��I��O�� ����I� ����������� . FOR NEW STRUC°TUR�S OR �1DDITIONS � MailingAddress .:.::::::::: :...�:?::::.:,::,:.::<,•:;. _ �-�� PO Box 66 �tiPermit;numb'er:"�":;.;'`` f.�:;�'�.��.':• : . .... ....... .. :... ::&��.� . ..:. `.::�;. `Q Crystal Bay, MN 55323-0066 �;Date received; ;l.�/=` . ' /�?, : � �. ;;s;:;::, .. ` � StreetAddress:' � Fteceived by` ' CM- ���. ; . -� �� � 2750 Kelley Parkway � „Plan_review•fee: �. 7�.J�, C� . �q:.�. . �,�� Orono,MN 55356 ;,... ....�O/7—D�.3�v ' ) !��st�o :o a - Main: 952-249-4600 = Fax. -2-249-4616 www.ci.orono.mn.us This application;form riiust.be�completed.�in�fu,ll;arid'ali;requi�ed,:information�:must:b�e,;submiited; Incomplete applicafions:will�be returnetl: (Please print) ��vYVaG� S�/Irr��`� GENERAL INFORMATIOM: Job Site Address: 7 �t� a�� Will this be a Parade of Homes, Remodelers Showcase Home or other Display Home? ❑Yes No lf yes,a specia/event permit is required with Police Depa�tment and Cify Council approva160 days prior fo the event Shuttle bus seivice will be required unless applicant demonstrates sufficienf on-site parking is available. Non-permitfed evenfs will notbe allowed. CONTRACTOR/APPLICANT INFORMATION: Name: t,�`•�,79�� gt,°il�'�?�S ti�:G. State License# �b()2 92� Expiration Date: 3��i•-ZbJ� Phone: (celq�f�- �,�-35�8 (office) 95Z -�5--c35�3 Mailing Address: i 1�7 g L�3�Gitut.,� D�.�1� Cit : .,!Ja,�-��,q ZIP: � $ Contact Person: �-rr �4'� Applicant is: oritractor Homeowner (Circle One) Email and/or Fax: �i u�,�ru$ �d w� q ���:i�s �t�� PROPERTY OWNER INFORMATION; Name: ���. Phone(day): � Address: City: ZIP: Email and/or Fax ARCHITECT/ENGINEER 1NFORMATION: � Name: S A;v�� I Phone(day): Address: City: ZIP: Email and/or Fax: PROJECT INFOf2MATION: Descri tion of ro"ect: 1.Type of Project 2.Proposed Use 3.Structure Type 4.Sewage Disposal& Water Supply �New Construcfion ❑Singie Family wifh �Residence ❑Addition attached garage ❑Garage/Accessory Bidg. °,�(Public Sewer ❑Accessory Building ❑ Single Family with ❑ Deck ❑Relocation detached garage ❑Office/Commercial ❑Privafe Sewer ❑Other:(specify) �Multiple Family/Condo ❑Warehouse ❑Pubiic ❑Storage �'Public Water �:.�1ny earth►novernen4 mdy a�sa�cy�ira ❑Commarcial ❑Other(specify) MCWD review&permits. ❑Industrial : ❑Private Weli Minnehaha Creek Watershed District(MCWD) ❑Othef:(speCify) 18202 Minnetonka Blvd Deephaven,MN 55391 Phone: 952-471-0590 Fax: 952-471-0682 www.minnehaha creek.or Estimafed Construction Valuation (excluding land) � 3.5�� �'�J . r�tc:tr�V�� A�R 14 2017 � ���'�F ORONO " ST'RUCTUR� INFORiVIA`TION: 1.Structure Dimensions 1.Sfiructure Dimensions(continued) 2.Type ofi Construction ��� a. Length(ft.)= �(�3 Number of bedrooms= � �// ' /� ,/ b.Width(ft.)= ��_ Number of garage stalls: �G�,��n� � � Areas in square feet Attached= � . ^ �-CJ`� �� �� 7. c.Basement= ���'�. � Detached= � .—..- . d. 1S�Story = O.�f✓�' � - � e.2°d Story= . f. %z Story = � — ,�: g.Total Area= 3 3 � S REQUIRED SUBMITTALS: All of the information must be submitted in order for your application to be processed: . .. �i�lot°:.:::::: . . . �:'`:;.; _ �. ....... ` 'Enctosed; .. ,.:.y><:,::....���:,:.:,.: . . .�: . . . �. .:_�:::::A~; IicabTe:�`.;: :: . .. .. ,: . .,.. .... . . . . � ❑ Permit A lication �[ ❑ Pro osed Buildin Plans � ❑ MN State Ener Code Calculations and Mechanicai Code Re uirements Form ❑ 8urve meetin all re uirements ❑ ❑ Stormwater Pollution Prevention Plan ❑ ❑ Hardcover Calculation s i ❑ ❑ Se tic S stem Site Evaluation Re ort ❑ ❑ Access Permit i � ❑ Wetland Buffer Im rovement Plan � ❑ En ineered Plans for Retainin Walls 4 feef or above ❑ Minnehaha Creek Watershed District Permit s ❑ Plan Review Fee ❑ ❑ Application Escrow&Agreement ❑ ❑ Other: APPLICANT/OyllNEl�ACKNOWLEDGEMENT: • Agrees to provide all information required or requested by the Building Departmenf; • Agrees to pay the City of Orono for engineering c�onsultant review cosfs in excess of$500; • Certifies that the information supplied is frue and correct to the best of his/her knowiedge. The applicant recognizes that they are solely responsible for submitting a complete application being aware thaf upon failure to do so, the staff has no alternative but to reject it until it is complete; • Acknowledges the Escrow Agreement is compieted and signed; • Understands some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public buf can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If you refuse to supply the information,fhe application may not be issued. . _ ... .. ..:: : . ....... .. .. .. . •• Agrees.ttiat:.in:the.:evenf.tfiaE:weather or:other�conditions,prevent,tfie compietion'.of;an'�as-tiuilt:sucvey:`at:tiie;time:;tlie . �. .•..,.. . .... ..- _ . .... .. . � ..... , : Certificate;of::Occupancy:is:requested;,'a,temporary;Certificate�of.';Occupancy;may.�6e issued:�:upon;receipf of.=a$1O;OD0 eserow.to�ensure.complefion.:of;ttie:as-tiuilt survey:and all sife improvements: Applicant's Signature: d�" Date: ���•���' Owner's Signature: Date: � I . PLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS Address: "� 1 �r� i V 1� . �- ��� �� Permit No.: �1�7 'W�� Description of work: N �VYv� Date Rec'd: ���"T-� � Septic review by: ��,w'�t� '�- �rV►TW Date Approved: Zoning review by: Date Approved: �/ �Ic/��� Building review by: �" � � Date Approved: C7� � Grading review by: Date Approved: IZ r�+�'1 �� Zoning District: Zoning File#: ^~ Resolution? Yes Reso#: — Reso Date: Signed: Yes No Resolution� � Zoning: Lot Area: L2. S /AC Width:�� Structural Coverage: �_SF �—' % Survey Submitted: �Yes � No Date of Survey: �'�� '�� Revised date(?): Landscape plan submitted? � Yes Landscaper: ��(I� QC��{lY�� � No/None proposed Pro osed Setbacks: Front�) Rear(S�) (� S E W ) ( N � E W ) Other Buildings Wetland Side Side L� , , , 3Z Buildinq Heiqht Analvsis: Distance Between First Floor and defined Top of �a� � Roof See "buildin hei ht" definition : First Floor Elevation from buildin lans : (b) !,�1;-�, ;. Highest Existing ground level (per survey) or 10' above lowest round level, whichever is lower: ��� I�- . ". .' Difference between b and c : (d) �i , � � i f�!. Defined Buildin Hei ht(a -(d): �e� �; +":".: ����� Shoreland District MCWD Permit � Average Lakeshore Setback g�uff Met? � Yes �No Permit Number: r"� ... ' � Yes � No �N/A � Ye No � N/A-see attached Setback: Stormwater Quality Existing Proposed Overlay District Tier Hardcover Hardcover Variance Required CUP Required circle one % and s % and s � Yes No � Yes No 1 2 3 4Q 5 �,�-�"—' Type(s): Type(s): Updated: October 2016 v:\forms\plan review checklist 10-2016.docx . Fees to be Char ed YES NO • Permit � Plan Review V���' State Surcharge �/' Investigation Fee � SAC—Number of SAC Units j Other(specify) i�-� S uare Foota e $ er S uare Foota e Basement X = $ 1� Floor X = $ 2nd FIo01' X = $ Garage X = $ Estimated Construction Value: $ ��1�/,/[,f 1/� � . Orono Inspections Required Work Requiring Separate Permits Footing • � Site Plumbing 0 Grading/Filling Poured Wall Silt Fence/Erosion Control � Mechanical � Fire Foundation Survey � Hardcover Removal � Fireplace �Water Connection � Framing � Other(specify) 0 Masonry ��Sewer Connection �Waterproofing/Drain tile ��Mfg. � � Lawn Irrigation � Foundation Waterproofing � Other(specify) � Landscaping Framing � � Insulation Y ' As-Built Survey ' inal Lathe Required State Permits 0 Other(specify) � + � Well Electrical �' REMARKS (in-house): OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: �See Builder Acknowledgement Form � � Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. Updated: October 2016 v:\forms�plan review checklist 10-2016.docx � � Builder Acknowledgement Form Permit #2017-00361 / 797 Brid ewater Drive Builder Representative Name: .rc J�f I"d c li lG Permit Conditions: Initials **NOTE CHANGE** Before scheduling an exterior insulation and/or drain tile inspection,a �... foundation as-built survey must be submitted and approved by the City or a Stop Work order will be issued. Schedule a minimum of one hour for the framing inspection. L"" ! Erosion control mechanisms must be installed and inspected by the City prior to any land /J�.�. disturbing activities. The contractor must provide a minimum of a 24 hour notice prior to y inspection. � Erosion control shall be installed and maintained throughout the entire project and must �` remain until vegetation has been established. � A haul route shall be submitted to the City Engineer for approval and inspection prior to commencement of hauling from the site.The property owner shall be responsible for cleaning f'� and repair of roadways for any adverse impacts. Prior to the issuance of a Certificate of Occupancy an as-built survey must be submitted and � approved. In the event of winter or other extended unfavorable weather conditions(which prevent the � completion of the exterior improvements and/or as-built survey)a Temporary Certificate of 9 Occupancy(TCO) may be necessary. l If retaining walls exceed 4 feet or are closer than two times the lower wall height,engineering is � required and city review prior to construction. Advisory Comments Any changes to the exterior/landscaping improvements, i.e. patios,grading,sidewalks, retaining walls,etc. not currently shown on the approved survey and landscaping plan will require a �� separate Zoning Permit application to be submitted and approved prior to the work commencing. Any retaining walls that are over 4-feet in height or tiered walls not separated by twice of the � height of the lower wall require engineered plans and a building permit to be submitted and approved prior to construction. w:\street files\bridgewater drive\797\builder acknowledgement form 2017-00361.docx � Permit Application: Self-Checklist for Com�leteness Please note, the applicant must initial in the boxes below to acknowledge the minimum required information is included with the submittal. If not, the application will NOT be accepted. Call 952.249.4620 to schedule a meeting with stafF if you have questions on application submittal requirements. Completed Application � Plan Review Fee Paid ,• Signed Escrow Agreement & Escrow Payment Plans (to scale) x2 Certificate of Survey (to scale) showing the proposed project & meeting all requirements x2 , Hardcover Calculations (if applicable) I am aware that Orono will not issue a building permit without a copy of MCWD permits (or documentation from the MCWD stating the proposed project does not trigger their permitting requirements). I will contact the MCWD at 952-471-0590 regarding � project. Signed by: '�� Address: 7G' ? j����C� �J�-� ��.,v� Permit #: `_�� (j - (�(j 5�-�( W:\Applications,License or Permit Applications\Zoning Applications\Permit Application Completeness Checklist 2015.docx D,41'A PRIVACY ADVISORY In accordance with Minnesota State Statute 13.04 Rights of Subjects of Data, Subd. 2, "Tennessen warning", we would like to inform you that your request for a permit or license from the City of Orono or any of its departments may require you to furnish certain private or confidenfial information. You are notified that: 1. The information you furnish will be used to determine your qualification for the permit or license requested. 2. You may refuse to supply data, but refusal may require that the City deny the permit or license. 3. The information may be shared with other local, state or federal agencies to the exfent necessary to process the permit or license. 4. If your requested permit or license requires Council action to approve, some information may become public. 5. You have certain rights under Minnesota State Statute 13.04 (see following page) to review private data on yourself. 6. Your full name is required to process this application or permit. ��'I��rr �� � u v�� First Middle Last �OI j 7 t3L�U`� �1fZGL.� �D�'V� Address ►iVl i��J�-h�,J K(� irn.�.3 553`13 City State Zip Phone I understand my rights as stated above. ���� Signature PacketLastUpdated: January2015 Page 7 �lew Construction Ener Code Com liance Certificate ��� 9Y p �� ��� Date Certificate Pos � Per R401.3 Certificate.A building certificate shall be posted on or in the eledrical distribution panel. Place your Mailing Address of the Dwelling or Dwelling Unit R City 797 Brid ewater Drive Orono logo here Name of Residential Contractor MN License Number Wooddale Builders BC002926 THERMAL ENVELOPE RADON CONTROL SYSTEM � /� � /'�C��`C�� Type:Check All That Apply Passive(No Fan) C o u, or other system monitoring ��( �� � � F �, N Location(or future location)of Fan: � T � V C y N _ m d ..�. o 'a 3 � U � 0 n� n � �0 � U � -o � Q o0 m � � y -o c > � N N � a � � o Insulation Location � �� Z `—° f6 v O m w y m o m �' E E � -o a m � c a� a� @ � � . r � z � � � �i � � � Other Please Describe Here Below Entire Slab x Foundation Wall R-15 X R10 e�.&r5 Int. Perimeter of Slab on Grade x Rim Joist(1 st Floor) R-2o X Spray Foam Rim Joist(2nd Floor+) X Wall R-21 X Ceiling,flat R-as X Ceiling,vaulted R-49 x Bay Windows or cantilevered areas R-38 x 3ia��Foam Below Floors over unconditioned area Describe other insulated areas Building envelope air tightness: Duct system air tightness: Windows 8 Doors Heating or Cooling Ducts Outside Conditioned Spaces Average U-Factor(exc/udes skylights and one door)U: 0.31 x Not applicable,all ducts located in conditioned space Solar Heat Gain Coefficient(SHGC): 0.29 R-value MECHANICAL SYSTEMS Make-up Air Select a Type Domestic Water Appliances Heating System Heater Cooling System x Not required per mech.code Fuel Type Natural Gas Electric Electric Passive Manufacturer Rheem Rheem Rheem Powered Interlocked with exhaust device. Describe: Model R92PA0601317MSA Pro E 50 RA1336AJ1NA Input in 56000 Capacity in 50 Output 3 Other,describe: BTUS: Gallons: in Tons: Rating or Size AFUE or g2 g5 SEER 13 SEER Location of duct or system: Efficiency HSPF% /EER Heating Loss Heating Gain Cooling Load Residential Load Calculati 48794 33680 34200 cfm's "round duct OR MECHANICAL VENTILATION SYSTEM "metal duct Describe any additional or combined heating or cooling systems if installed:(e.g.two furnaces or air Combustion Air Select a Type source heat pump with gas back-up furnace): x Not required per mech.code Se/ect Type Passive X Heat Recover Ventilator(HRV) Capacity in cfms: Low: 75 High: 150 Other,describe: Energy Recover Ventilator(ERV)Capacity in cfms: Low: High: Location of duct or system: Balanced Ventilation capacity in cfms: Location of fan(s),describe: Cfm's Capacity continuous ventilation rate in cfms: 66 CFM "round duct OR Total ventilation(intermittent+continuous)rate in cfms: 132 CFM "metal duct Builders Associaton of Minnesota version 101014 var�urzo i� 10:11 Riccar Heating �A�q763 754 0132 P.0021098 � ,. � -R . •..Resldentt�l•�41�iQ• �n I:HVA• Load's '�Ike:8chws. •D'evol'dp'ii4'ir�,)nb. .—, fti�cer Fleetlnp;and Cooling .y. � kYooddeb.tiagan Inside:Unil �kh"ovec 9 P e 1 Pro ect Re art . �i��. �c . Project Title: Wooddale Hogan Inside Unit Designed BY� Kurt Aroject Date: 4/10h 7 Project Comment: 797 Bridgewater Or.,Orono, MN Clfent Name: Wooddale Buflders Company Name: RPccar Heating And Air C.ompany Repreaen#ative: Kurt Com�any Addrass: 2387 Station Parkway NW Company Cfty: Andover,MN 55304 Company Phane: 7g3-754-4ppp Company Fax: 783-754-0132 Company E-Mail Address: Kurt�riccarhvac.com Company Website: riccafivac.com eference City: Minneapolis/SG Paul AP, Minnesot� Building Ori�ntation: �rortt doot faces East Daily Temperature RanBe: Medlum Latitude: 44 Degrees � Elevation: 8� � Alt�ude�actw: 0.970 Outdoor Outdoor Outdoor Indoor Indoor C3rains Drv Bulb Wet Bulb Rel•Hum Rel.Hum p�y sulb Winter. -16 -11.42 n/a 30% 70 �25.�53 Summer: 88 71 4496 5096 75 24 Total Buiiding Supply CFM: 1,348 CFM Per Square ft.: 0.378 8qu��ft.of Room Ar�e: 3,582 Volume(ft'): 31,730 Totai Heatinq Required Including Ventllatiar�Alr: 48,794 Btuh 48.794 MBH Total SensiWe Gain: 29,501 Btuh 88 y, Total Latent Gain: 4,180 Btuh 12 96 Total CooCng Required Including Ventilatbn Air: 33,680 Btuh Rhvac is an ACCA spproved AAanual J and ual D oompute�program, � Calculations are pe�formed per ACCA Manual J 8th Editlon,Version 2,aad ACCA Manual D. All computed results are esdmates as iwiding use and weather may vary. 8e sure to sslect a unit that meets both sensible and latent loads acvor�fing to the manufacturer's performance data at your design c�nditione. C:\...1Wooddal8 Hogan 797 8ridewater.rh9 Monday,Apri) 10,2017, 8:51� ' 04l1012017 10:11 Riccar Heating �A�763 754 0132 P.003l008 RMlec-R`,�"s�.nd�;S•:Ught Gorimm6rLt�l HVAC Ldads - Ellta Sbttwa[� .. elbpfit@�1t,INL: Rla�r H�Ung a�nd Cooling � liVooddale Hogen�lnside.11nit Andolrer N �53Q4 F 2� Total Buildin Summa Loads Ca�mponant Se�i Lst Sen 1�1 . � � t��l Cain p , 4A-6-d: (szinp-bouble pane lovwe(e=0.20 or less), 118.4 3,321 Q 2,540 2,54p hi�h perFormance,sildinq glass door,e=0.05 on surFace 2,any frame,outdopr insect sc�en with 50% coverage, u-value 0.33,SHGC 0.33 Andersen:Glazing-operable window,waod sash,u-value 277.5 6,842 0 6,694 6,894 0.28,SHGC 0.32 Andersea:Glazing-aperable window,wood sash,outdoor 80.5 1,984 0 2,439 2,439 Insect screen with 50%coverage, u-value 0.29, SHGC 0.32 11 N: Door-Metel-Polystyrene Core �.a 1,321 0 373 373 12F-0sw:Wall-Frame, R-21 (nsulatlon In 2 x 6 stud 2590.2 14,312 U 2,240 2,240 cavity, no board Insulation, siding finish,wood studs 15B0-8sf-8:WeN-Basement, ,R-$boerd insulation to 399 2,257 0 9g gg floor, no interior finish,8'floor depth 168-50: Roof/Ceilfng-Under Attic with Ingulation an Attic 17$1 3,028 0 1,710 1,790 Fioor(also use for Knee Walis end P�rtition Ceilings),Vented Attic, No Radiant Barris�, Dark Asphalt Shingte$or Dark Metal,Tar and Gravel or Membrane, R�0 insulation 21A-32: Floo�-Basement, Conc�te slab,any thickness,2 1789 3,028 q p p o�more feet below grade,no insulatbn below�loor, __ a�n r_floor oovert shortest side of floor slab is 32'wide _ ._..._.------ __..._.. .. . .....---- -.... SubtotaEs for strucEure: . 36,093 0 16,092 9 g,pg2 People: 5 1,000 1,95D 2,950 Equipment 722 7,070 7,792 Lighting: 0 0 Q Duciwork: 0 0 0 p Infi(tration:Wlnter CFM:53, Summer CFM:26 4,798 a10 367 777 Ventilation:Winter CFM: 'f 32,Summer CFM: 132 �,790 2,048 733 2,780 Exhaust:Winter CFM; 132,Summer CFM: 132 Mumidlflcatfcn(Winter�8.�9 gal/day: 3,413 0 0 p AED Excursion: _..0 . . . _0 4,Q89 4,089 Total 8uilding Load Tatals: 48,794 4,180 29,501 33,680 i� - ,- Total Buflding Supply CFM: 1,348 er Square ft.: 0.378 Square i�.of Room Area: 3,562 Volume(fN): 31,730 4�o��1"s Totai HeaNng Required Including Ventllatlon Air: 48,794 Btuh 48. 94 M H Total Sensible Gain: 29,5d1 Btuh 8g gf, 7otel Latent Gain: 4,18Q Btuh 72 96 To#al Cooling Requirec!Including Ventilation Air: 33,680 Btuh s ' Rhvac is an ACCA approved Msnual J and Manual D computer program. Calculations are performed per ACCA RAanual J 8th Edi�on,Versian 2,and ACCA Manual D. � AII computed results are estimates as building use and weather may vary. He sure to select a unit that meets both sensible and latent loads according to the manufac#u�er's performance data at your design conditions. C:1...IWooddale Hogan 797 Bridewater.rh8 Monday,Apri(10,2017, 9:51 AM ��i i u�c��i �u:i z Riccar Meating �A�763 754 0131 P.004l�08. �tivac-Resldsndal�W�lit'.� ' riie7ciel M7�/AG Lo�ds " . Rl�arMsaN�fp and CooNng � -. are; �v"slopm�f�t..liia .9+wiiover MN 553Q� Wboddal�•Hogan•1ns�e Und E ui ment Data � S sfem 1 - Furnace �I nd Air �3 Cooling System Type: Standard Alr Conditioner Dutdoar Madel: 13AJN36A01 Tradename: Rheem Outdoor Manufacturer: Rheem Mfg. Indoor Manufacturer: Rheem Mfg. Description: 3 ton AC Capacity: 34200 Efficiency: 13 SEER � Heating System Type: Natural Gas Fumace Model: R92PAb601317MSA 7radename: Rh�em Manufacturer: Rhoem AAfg. Description: 9296 upflow 56000 btu fumace ���'= 52080 Efflclency: 92 A�UE C:1...1Wooddale Hogan 797 Bridewater.rh9 Monday,April 10,2p17, $;61 AM Christine Mattson From: Adam Edwards Sent: Friday, May 12, 2017 8:30 AM To: Christine Mattson Subject: RE:797 &799 Bridgewater Drive/#2017-00361 &2017-00362 Chris, I've reviewed the plans and offer the following comments: 2017-00361/ 797 Bridgewater-Stamped approved 2017-00362/799 Bridgewater-The survey depicts tiered walls with a cumulative height greater than 4 feet. Walls greater than 4' in height must be designed by a licensed professional,and plans must be submitted to the City for review prior to the approval of the permit. Tiered walls are considered one wall unless they are separated by at least twice the height of the lower wall. Adam Adam T. Edwards, P.E. Director of Public Works/City Engineer City of Orono (952)249-4661 aedwards@ci.orono.mn.us From:Christine Mattson Sent:Tuesday, May 09,20171:38 PM To:Adam Edwards<aedwards@ci.orono.mn.us> Subject: RE:797&799 Bridgewater Drive/#2017-00361&2017-00362 Adam, We received updated surveys. Please review. Chris^' PS—Per the newly adopted code, 78-1405(a)(5.1)(b) retaining walls over 2-feet in height less than 5-feet from the property are permitted with a building permit. Unless I'm not reading this correctly. From:Adam Edwards Sent:Thursday,April 20, 2017 1:15 PM � r To:Christine Mattson<CMattson@ci.orono.mn.us> Subject: RE: 797&799 Bridgewater Drive/#2017-00361&2017-00362 Chris, I've reviewed the subject Grading Plans and offer the following comments: 1. The grading plan should be updated to show the proposed Sediment/erosion control plan. 2. The plan depicts proposed retaining walls but does not call out the top and bottom of wall elevations in accordance with the city survey standards. Based on the nearest proposed spot elevations it appears that some of the wall will exceed 4 ft in height. Walls 4'or greater in height must be designed by a licensed professional,and plans must be submitted to the City for review prior to the approval of the permit.Tiered walls are considered one wall unless they are separated by at least twice the height of the lower wall. 3. One of the walls is depicted on the property line. Walls over 2 feet must be set back 5 feet from the property line. 4. A separate utility permits will be required for the sewer and water connections. Adam From:Christine Mattson Sent: Monday,April 17,2017 10:10 AM To:Adam Edwards<aedwards@ci.orono.mn.us> Subject:797&799 Bridgewater Drive/#2017-00361&2017-00362 Adam, We received building permit applications for two new townhomes. Please review and provide comments. Thank you! Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway I Orono 0 MN I 55356(physica/addressJ PO Box 66 � Crystal Bay I MN I 55323-0066(mailing address) '� 952.249.4620 � 8 952.249.4616 �cmattson@ci.orono.mn.us � � www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm PLEASE NOTE: Summer Office Hours start Monday, May 22,2017 Monday-Thursday: 7:30 am to 5 pm/Friday 7:30 to 11:30 am OUR OFFICE WILL BE CLOSED: Monday, May 29,2017(Memorial Day) 2 � Christine Mattson From: Christine Mattson Sent: Tuesday, May 02, 2017 3:08 PM To: 'mjuvrud@wooddalebuilders.com' Subject: 797 &799 Bridgewater Drive/#2017-00361 &2017-00362 Hi Matt, The City Engineer has reviewed the applications and has the following comments: 1. The grading plan should be updated to show the proposed sediment/erosion control plan. 2. The plan depicts proposed retaining walls but does not call out the top and bottom of wall elevations in accordance with the city survey standards. Based on the nearest proposed spot elevations it appears that some of the wall will exceed 4 ft in height. Walls 4'or greater in height must be designed by a licensed professional, and plans must be submitted to the City for review prior to the approval of the permit. Please note,tiered walls are considered one wall unless they are separated by at least twice the height of the lower wall. Please don't hesitate to contact me if you have any questions. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway � Orono � MN E 55356(physical addressJ PO Box 66 � Crystal Bay � MN I 55323-0066(mailing address) '� 952.249.4620 � 8 952.249.4616 � cmattson@ci.orono.mn.us � �i www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm PLEASE NOTE: Summer Office Hours start Monday,May 22,2017 Monday-Thursday: 7:30 am to 5 pm/Friday 7:30 to 11:30 am OUR OFFICE WILL BE CLOSED: Monday, May 29,2017(Memoria/DayJ 1 r Christine Mattson From: Adam Edwards Sent: Thursday,April 20, 2017 1:15 PM To: Christine Mattson Subject: RE: 797 &799 Bridgewater Drive/#2017-00361 &2017-00362 Chris, I've reviewed the subject Grading Plans and offer the following comments: 1. The grading plan should be updated to show the proposed Sediment/erosion control plan. 2. The plan depicts proposed retaining walls but does not call out the top and bottom of wall etevations in accordance with the city survey standards. Based on the nearest proposed spot elevations it appears that some of the wall will exceed 4 ft in height. Walls 4'or greater in height must be designed by a licensed professional, and plans must be submitted to the City for review prior to the approval of the permit.Tiered walls are considered one wall unless they are separated by at least twice the height of the lower wall. 3. One of the walls is depicted on the property line. Walls over 2 feet must be set back 5 feet from the property line. 4. A separate utility permits will be required for the sewer and water connections. Adam From:Christine Mattson Sent: Monday,April 17, 2017 10:10 AM To:Adam Edwards<aedwards@ci.orono.mn.us> � Subject:797&799 Bridgewater Drive/#2017-00361&2017-00362 Adam, We received building permit applications for two new townhomes. Please review and provide comments. Thank you! Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway I Orono 0 MN � 55356(physica/addressJ PO Box 66 I Crystal Bay I MN 0 55323-0066 (mailing address) '� 952.249.4620 I 8 952.249.4616 � cmattson@ci.orono.mn.us � � www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm PLEASE NOTE: Summer Office Hours start Monday, May 22,2017 Monday-Thursday: 7:30 am to 5 pm/Friday 7:30 to 11:30 am OUR OFFICE W/LL BE CLOSED: Monday, May 29,2017(Memorial DayJ 1 - � . . � � • . . • p f ff 1016.3 �/ ������� � � � � x,�,�.� S88 58 44 E � 132.15 ,� \ \ X 1017.0 X 1016.4 1016.5 \ X 1016.1 � MAY � y �,� � � � � Lowest floor elevation per grading plan : 1020.0 - \ ` (� � /�� Al O �� V/ W M X 1017�i/�`�. �� X 1017.4 (1017.0) 17.47 - -78.00 x�an.z X 1016.8 - -x.;a��_ 36.6�._ -(� 6.5) �`'�'�/oF 'L� o �•-, N ......................... .... ..................................... House elevations �Proposed) / A -buil \ o ' �� oie.s � Q c� � > >on.i � ' ' � ..- /14.00 ' I r----------� tn �� ��?i.:��t . ' N � � � " � Lowest Floor Elevation :(1020.0) / / �.s, . F---------_--- J,� •♦ : � f� z b ■�����������i��■ ♦ � Top Of Foundation Elev. :(1028.7) / ' \ / Q�s. -� o I o p/ �3.0�t021 s.� --- - --h ,��f��� ''""-�� �+-i � " �m / �` ,!�_ `y o2rS.a- p / t o ♦ �• tw=(1 0 7 9.5) �j O .� C j v Garage Slab Elev. � Door ;s(1027.3)�/ Drop 1.0 ft. O o o �� � iozz. _ � � � � - r� � 1016.5 `� C� "' �►� a a � / �- � � 1�22 � "� � �o 0 ioza.s Q` � ioza.s X �1� Q� � � c � / ,#o,e 4.0o x,o +.e �02 •� � tw=(,oz3.o) � � � r, ��' on.a � . to.00 � x toza.9 -- 25.00 --� 4 ` � �� � � •� ��O / ioza.3� � bw= 1019.0 � � � o �- ^ � x�o�s2 r� / � ♦ �� ( V O � � c� o �ois.� . �� � r-� io2�.zoi � � ` / �..� O � � � tw=(1028.0) t}.I � „��i � � �, � / 1� o°°x, 5.a � ; - � . - � �� ,-. � 2.00 ° _`` ; M � ,a�,��. bW-c,oz4.a, 4" - •�-' � o a a, � � � o�^ °� � • �' a / �'� � ,000 Q �, o N � � / , X,�2Q8 � � � � ; � �''� � ��h . / � 1025.1 ` i X 25.2o X 102 . N r �� � � . Edge of wetlond ,�o�� � ••Ngg�j�¢�."yy���o2� c�i �/ � � .15 � `L� � x i qza.s � �/ -�' per plat j � �oie-e•'�� �- 3t.50 _ oza.s 76.00 � �o .a � �� \ � � � ,�,6.� .. - ------ ------ ,0 S d \ : . x � .e 12•}2 • i�•� �i �o �i� 72.50 � �2\ �°�e�+� � � � • _ / �•x s. i L a o io s � : x iozs.a O � v 18.7 .'�• I� d� 1025' X 102 � N) ��., \ / a.. I 1016.8 r�� ^ �� 1.6 7p�23.8 /�� i /� 1025. � h Q 3 K 5.5X � v�i • : � 9.50 4.p� v� �"��rT� ; o ri o a> ''� � � '�- a� !^7 �o ; � � O � 4 7 ; (.� X 1 5.7 N � o.` I� �� � � C •J ' o I� co� a� �� \ • a`o Q �o2a.a ; N Wetland Buffer- Q�' � N i � � o �m ` � � - .� ,ozs.s ,` ,: � � ���1 � ia.o . �� a ot� V � � � • Z � v o ,o,�.� : � � � ° _ �-- -- � M�p �Y\,oza.s � ^F �N � � �� v � o � 3sa 6.00 oza porch � , x�ozs.o / � io2s.ax � \ . �Q Xio�e.s �n x�oi .� x�ozs.� � GjJ . � ze N88°58�44��W � M � io2s.i ,`. i3.00 � �' �i �� x i s.3 a.i x ioza.� � �G� a c �o=' U Q • ... c �i x i .s x ioz � -=132.15 � 7.35 `9 , .• �� .e � � N� o o� . 1 42.�50_- 2o.so --, 51.50 ^.�o2�v..................� ' 4� � � �oza., .\ -� ^ � tw=(�o2s.o) o >; �;w � . 74.�1 �/ �026.o z /-% bw=(1026.0) � ��' V+� � +� , � �aza. z.o ,oz44 023.8 � NO CO � � � 3 ..� 1 / � LF ... .. . .. .. ///111��\ � � GF O G DOOR� �'o �� 023.8 � �O ` � ��� � 1026.2 � 3 02�3.5 N V � L � / � O . 'N � � .. ��...�.. �.�/ � � 02 � � -- �r � m � �, x' �Q � � � 7 � W o O� Q p 'a rn cn m / � � Existing :ozs:a � � �W � � °�' o o � House 27.13 5�O �q N �_G R A D I N G P� J p �+� �t = rrj r.r) . . .��. - 24.1. 1023.5 � � _ ., , - �S / ,oz3.5 � VED � r cn -v = o� ' � L ^ / �� i � o �s, 1024.° P OVED WITH RE�N�� r F�-LS Ccuc� c°� � I � / '-- � � DIS PPR , ED y Fr oF A�.t,. a ; � . I ' i � � i G.,oS��t `teM+�1 � i 46.63 - � - ' I - - - - - - � � - _i �. - _ � � 2X T1i�c4�t.2 Q I --�022.4 DATE /5�M s,dk-c.'s rlt�c.M�i , � `,� r � Denotes iron pipe �`4�^�`~t�~ ls IuQ•�J1�J, Construction Notes: �'� Denotes service 4 GtT� 1Zt��''� � ` �OCo � 1. Install rock construction entrance. � Denotes television box Lot #10 area = 5022 SF Lot #11 area = 5682 SF ��p� i� � 10� 20� p.; � °'�u s 2. Install silt fence as needed for erosion control. � Denotes electric box House area = 2471 SF House area = 2422 SF ��5�..,i�T'� ' � ��� � 3. Sidewalks shall droin away from house a minimum of 1.0%. � Denotes telephone box Porch area = 260 SF Porch area = 261 SF `O`�� 3 4. Contractor must verify driveway design. x 000.0o Denotes existing elevation Sidewalk areo = 84 SF Sidewalk area = 108 SF �� ^^c `� 5. Contractor must verify service elevation prior to construction. •� a `O�°� p 6. Add or remove foundation ledge as required. ( 000.00 ) Denotes proposed elevation Driveway area = 523 SF Driveway area = 208 SF � Total Im ervious Area = 3338 SF Total Impervious Area = 2999 SF Scale: 1" = 20� ;�3 � Denotes drainage flow direction P � Der,otes sp�ke Impervious Coverage = 66.5% Impervious Coverage = 52.8% o n�.w 3 � General Notes: 1. G r a d i n g p l o n b y n/a l a s t d a t e d n/a w a s u s e d t o d e t e r m i n e p r o p o sed ■������ Denotes proposed retaining wall Benchmark: ; � elevations shown herein. designe d an d bui l t by o t hers. L Top Nut Hydront z v 2. This survey does not purport to show improvements or encroachments, ......... Denotes proposed erosion control We hereby certify to Wooddale Builders that this survey, plan or report Lot 14 Block 1 /� � � o except as shown, as surveyed by me or under my direct supervision. was prepared by me or under my direct supervision, and that I am a Elevation = 1030.30 F'�"'� �:, � 3. Proposed building dimensions shown are for horizontal location of ���tQ1�6�sed rock construction entronce duly licensed Land Surveyor under the laws of the State of Minnesota, �T 1 x � structures on the lot only. Contact builder prior to construction for anning 8�ZOfliflg Pl2n ReVif:'W �� dated 03/31/17. w � >� o Z o approved construction plans. � .15• _ tte�is�ons: a p� �; � . 4. No specific soils investigation hos been performed on this lot by the Site PIBn Revlew Date:�- Signed: P' neer ineerin P.A. I.)o4-o5-]7Preliminary �t N 9 g' 2J 04-07-17 Drop garages �-.� cD G surveyor. The suitability of soils to support the specific house proposed is � � not the responsibility of the surveyor. �PPROVED � 3.)04-10-17Proposedelev's E''x 5. This certificate does not purport to show easements other than those p qppROVED WITH REV�S�ONS(se�no�) 4.)OS-03-ll City revisions � ,x �y � BY: 5.)OS-09-17 Revise walls W o shown on the recorded plat. ❑DENIED Peter J. Hawkinson, Professional Land Surveyor �� _ N c .a"i � 6. Bearings shown are based on on assumed datum. /� Minnesota License No. 42299 email-phawkinsonC�Dpioneereng.com ^ � ��„� o ( Staff: � -'t � Y+� � a �i7- �D� ��l�`l� � , � �a � � �-, � � � fi`�� � � � i��...� MINNEHAHA CREEK WATERSHED DISTRICT QUALITY OF WATER QUALITY OF LIFE Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information contained in the permit application, correspondence, plans, maps, and all other supporting data submitted by the applicant, and made a part hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant named below for use and development of land in the Minnehaha Creek Watershed District. �� ' f X�3(0 Issued to: Stonebrook Dev LLC. Permit No: 17-154 Location: 799 & 797 Bridqewater Drive, Orono Puraose: Erosion Control-Single Family Home Date of Issuance: 4/24/2017 Date of Ex iration:•4/24/2018 By Order of the Board of Managers Rachel Workin Permitting Technician This permit is not transferable without District approval, and is valid to the date of expiration. No activity is authorized beyond the expiration date. If the permittee requires more time to complete the project, an application for renewal of the permit must be received by the District at least 30 days before expiration. The applicant is responsible for compliance with all District Rules and for the action of their representatives, contractors, and employees. Conditions: Project to be completed as described in plans submitted to the MCWD office on April 14'h, 2017 according to the provisions of this permit. • Properly install and maintain all required erosion control measures until the disturbed areas are re-stabilized • Notify MCWD in writing upon completing installation of perimeter and sedimentation controls • When the site is re-stabilized and the MCWD staff has performed a final inspection, all perimeter control must be removed (Statement concerning fees for inspections, violations, etc... on following page) We collaborate with public and private partners to protect and improve land and water for current and future generations. ...................................................................................................................................................................................... . .................................................................................................................................................................................. ....................................................................................................................................................................................... ....................................................................................................................................................................................... 15320 Minnetonka Boulevard,Minnetonka,MN 55345 • (952)471-0590 • Fax:(952)471-0682 • www.minnehahacreek.org I �\ � � �V! �� 1 i�� MINNEHAHA CREEK WATERSHED DISTRICT QUALITY OF WATER QUALITY OF LIFE InspectionlAnalvsis/Monitorinq Fees A site inspection and monitoring by District staff will be performed where the activity involves: • a commercial/industrial/multi-family residential development • a single family residential development greater than 5 acres or of any size if within the Minnehaha Creek subwatershed • any alteration of a floodplain or wetland • dredging within the beds, banks or shores of any protected water or wetland • a violation • any project which in the judgment of the District staff should be inspected due to project location, scope, or construction techniques In these cases, the applicant shall pay to the District a fee equal to the actual costs of field inspection of the work, including investigation of the area affected by the work, analysis of the work, and any subsequent monitoring of the work, which in the case of a violation shall be at least $35. Standard Fee Schedule District professional staff $ 65.51* District interns $ 40.35'` District clerical staff $ 46.69* Consulting Senior Engineer $ contracted rate Consulting Engineer/Technician $ contracted rate District Counsel $ contracted rate Application fee $ 10.00 Copy costs $ .25 + actual staff time Color copy costs $ 1.00 + actual staff time * Hourly We collaborate with public and private partners to protect and improve land and warer for current and future generations. 15320 Minnetonka Boulevard,Minnetonka,MN 55345 • (952)471-0590 • Fax:(952)471-0682 • www.minnehahacreek.org _ � .�`�� DATE TIME CRY OF ORONO cn�� � ir, INSPECTION NOTICE � �I scHeouLED _��� , PERMR NO. COMPLETED �_ �'� ADDRESS OWNER TELEPHONE NO. 'a` '" CONTRACTOR ��-� �'' DESCRIPTION � "� ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL � Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLI O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP W ❑ AS BWLT-SURVEY ❑ WER HOOK-UP ❑ FOUNDATION/REMOVAL _ v ❑ DEMO-SITE EPTIC INSTALL Q OMINERICONTRACTOR TO MEET YWl: YES_NO � COMMENT� � 4 ri'�T Gz�4 Q�JA P�/" o�i j 0 � �✓'/v1S Gb �i�IP��Pa� 0 Q �,'-�, ;/ �`i�A,� '� G�'/`/ I�SD lici , n.ti � �2 / � �:� O��'P�rl/P�TIa•�v /'/°✓n��' , � j W K SATbFACTORY`.PROCEED ❑PROJECT COMPLETE � CORRECT WORK 3 PROCEED ❑ISSUE CERTIFlCATE OF OCCUPANCY 0 ❑COFiRECT WORK����R REINSPECTION TEMPORARY V BEFORE CONERIN(i PERMANENT �CORRECTUNSAFECONDITIONWRHIN HWRS. p pHOTOTAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR O GTATION ISSUED O INSPECTION REdU1RED.CALL TO ARRANGE ACCESS. Caq tor u�e next tnspectlon 2a taurs in advsnce. (952) 249-4600 on site: �nspector /��7G•�� G—• VVhit��opypnspector'a Flle C�nary CopyfSib Notia �-_�--- , .-. " r HA G0 ALO 1/10/14 � Daily Soil Observation Notes Project No: ' � b l� Date: ✓ � c� � � / ���d� eport No: Project ly�me: �! 7� -'� �P� ��/ � Project Location: !rJ��l`fl d r Client: � � ��� ��� Temp/Weather: �..�`' � � / r �G�� Project Manager: -o` �/.'�N Time Arrived: Departed: . • . . Areas Observed: ❑ Building Pad ouse Pad ❑Roadway ❑Parking/Walks Footing ❑Proof Roll ❑Other(describe): Soil report available? ❑ Yes No Report reviewed7 ❑Yes No Report prepared by: �"� Finish floor evaluation: ! Bottom of footing elevation: � Bottom of excavation elevation: "- Approved plans available? Yes ❑No Specified compaction: -- Fill source: � t� �'�G� Oversizing appears adequate? ❑NA Yes ❑No Soils observed agree with Soils report?�(/! _ QYes ❑No Soils appear adequate for design loads? Yes ❑No Proposed project bearing capacity(ps�: �--`��dQ 1 Contractor notified of results? ' Yes ❑No Name of person notified: a co.y of this report left on site? Yes ❑No If so,whom was it submitted to? N- � c �� � �, � - c-/' v .I 1 �c `_ f Notes/Comments: ,�-�/ �, G.. �;Oo��.-C' pv�v - � � � ,` �/',�/' � � ( .�;,n�� n r�,',tt , ,�; ���f , r �.;n l �';:1� ar ;j� + U � � t i� l� ' + t� 'l � i� - . � � rl,� '��:�:� /G� ' ���ir�l�t �f `�.� �r ���,�..� �,�,/�:}� i;� 1f�� ��� n �-�;`,f� � �� � �� ;1, ��/�y"�' (,Z,°j�l/t N`�1 IL� '� ,l� '� � `s��': il,.�����..t � � �) r1 � i; ;11�r b-F' fG /� � F, l f r) % � � ;,-� Performed By:f.�b�i � ���-'`� Reviewed By: Date: �"'i'' This is a preliminary report and is . ded solely as evidence that fleld observations and/or testing was performed.Observations and/or conclusions and/or recommendation conveyed in the final report may vary from,and shall take precedence over,those indicated in a preliminary report. �, �- �-� �/'� DATE TIME CITY OF ORONO CALLED IN � � INSPECTION TICE��/ � SCHEDULED •• a �/7 � PERMIT NO. ��' PLETED ` ADDRESS Gy a, a,-7h -[ 09 OMINER TEY�C-�NO.���= CONTRAC'TOR � DESCRIP TiON /'1 Qf'7r "//C�� �� /�Q.n'Il/(S �y ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL � ❑ POURED WAIL ❑ PLUMBING RI ❑ EXCAVKiRADING/FILLIN� ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑TREE REMOVAL Z � pA�ON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION � pAMING ❑ MECHANICAL FINAL ❑ RATED WALLS li � �INSULATION ❑W�D BURNER/FIREPLACE ❑�MP���'�T Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATIONIfiEMOVAL _ ❑DEMO-SITE ❑ SEPTIC INSTALL r TO MEET 1POU:_Y�._NO � z o�' �vu �� ' � COIIAMENTSc 4 �� �` �` �t - ' � �/ rR'�'1 7��L�iS �tK�' /4�i O / � < � �4s � � � W � Q � W W OC Q O PFiOJECT COMPL�TE y� SATISFACTORY:PFIOCEED � O�T yyppK a PROCEED O ISSUE CERTIFlCATE OF OCCUPANCY C ❑OORRECT WOfiK CAL�FOR REINSPECTION THrIPOMRY � O B�ppE�NO PERMANBIT V ❑pH0T0 TAK�N ❑OORRECT IMISAFE CONDI'TION WfTHIN HOURS. INSPECTnR WILL RETUFiN O CITATION ISSUED ❑STOP ORDER P08TE�.CALL INSPECTOR ❑IN3PECTION RE0�11qED.CALL TO ARRAN(3E ACCESS• �N���t�,u�,�s�n ea�ranoe. (952� 249-4600 pwr�IContrector on site: '� - NIMt�OoP11A^��FlN C�n�ry CoPy181N NM� D CITY OF ORONO CALLED IN //- AT4--)7 TIME J 7 INSPECTIONOTICE / SCHEDULED //-a /7 l. 00 PERMIT NO. /7 - 3101 OMPLETED ADDRESS 7 T7 vid I'u' t OWNER TELE; . NO. W2`- 70-1S/v? CONTRACTOR laeilA i' i S ------ __...e.l.0, i DESCRIPTION /-fain IA )q-ea) W ❑ FOOTING 0 DEMO-FINAL 0 SEPTIC FINAL 11. ❑ POURED WALL 0 PLUMBING RI 0 EXCAV/GRADING/FILLING Q 0 FOUNDATION DRAIN TILE 0 PLUMBING FINAL 0 TREE REMOVAL ❑ LATHE 0 MECHANICAL RI 0 SITE INSPECTION Q XFRAMING 0 MECHANICAL FINAL 0 RATED WALLS is. ❑ INSULATION 0 WOOD BURNER/FIREPLACE 0 COMPLAINT Q 0 FINAL 0 WATER HOOK-UP 0 FOLLOW-UP Z ❑ AS BUILT-SURVEY 0 SEWER HOOK-UP 0 FOUNDATION/REMOVAL v ❑ DEMO-SITE 0 SEPTIC INSTALL Z OWNER/CONTRACTOR TO MEET YOU:_YES_NO y COMMENTS: E/ec. Ge2 - ii-a 7- t 7 cc (Zoo-f trless bit. — 0K. IQ . o ( r 'y h q OM , iii . a Aierot ids N l I ,.) tlru ri.- cr ►tJifit - ° 6rov r,ym 5 6rLc�6 ccc S 'a- 5. 44 16, idke< Z .5p/r ce 5 Opt 56a•r 6 ,y /e (It cry Wt t/ ` L.G., / W f rvu r,j e s�ruc b4✓t C— 56,'r ,fro ryc fo/°/o%te 14, A'.Jc✓ 4aiNs rk.6 E - -v c c Cao -S it, c GQrreob...i, C 494-- iNctL ��r✓Je. sO "4l�to r 2- r/3Perr�pw -1rW - O ' •R SATISFACTORY:PROCEED ❑PRO ECT COMPLETE Cc[/e'#/4s W ftRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY C.1 BEFORE COVERING PERMANENT O CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN O 0 STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector.'9)/A /T White Copyllnspector's File Canary CopylSite Notice f- ..ek- IL--- R DATE cy TIME CITY OF ORONO CALLED IN or 7 /3 INSPECTION TICSSCHEDULED ...-41.A. /D, PERMIT NO. 0(ol7-GYM�ce// OM�PL ED 797 l //�� � ADDRESS i Gothr "lc__ re OWNER TELEP �., O. / ,.- A /Li (3 '? CONTRACTOR ' '. 1�f'� / [5 `- DESCRIPTION I(t2 / gi W ❑ FOOTING 0 DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI 0 EXCAV/GRADING/FILLING y ❑ FOUNDATION DRAIN TILE ❑ PLUMBING FINAL 0 TREE REMOVAL Z ❑ LATHE ❑ MECHANICAL RI 0 SITE INSPECTION ? ❑ FRAMING 0 MECHANICAL FINAL ❑ RATED WALLS h ❑ INSULATION ❑ WOOD BURNER/FIREPLACE 0 COMPLAINT Q tti* 1NAL 0 WATER HOOK-UP 0 FOLLOW-UP IQ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP 0 FOUNDATION/REMOVAL v ❑ DEMO-SITE ElSEPTIC INSTALL Z• OWNER/CONTRACTOR TO MEET YOU:_YES NO 0 COMMENTS: E!ec._ P.-04z-i - /k.) 1A•S A Ma- cc LU o 4544' 5 'D K '" -00. -,F e-el - d K • c, c ifo,r0 v sd Q. G`tCt/'sc 1,-"iiGee- o PiD'floe cdat:PQ rt CI yK� ,. -dere W CC cra m-` sAi.� Q 3 /Orra 0f 7c b 'A✓e r ••00ar- E 45 Z 4116 SG AWc CSS a W 0 WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE CCW El CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY CI ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY ✓ BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ID PHOTO TAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR p4CCIIILSEECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. 4 ' White Copy/Inspector's File Canary Copy/Site Notice I' i V DATE TIME CITY OF ORONO CALLED IN INSPECTION I OT.ICESCHEDULED -- -S-----1 /0:07 PERMIT NO. ,"4/7' u0,1, coo PLETED ADDRESS 797 6ri df- P-r -Q x- t OWNER : TELEPHONE NO6 /� /�� CONTRACTOR �-e DESCRIPTION /; k.Q:i/1 5p f W ❑ FOOTING 0 DEMO-FINAL 0 SEPTIC FINAL Ir. • ❑ POURED WALL 0 PLUMBING RI 0 EXCAV/GRADING/FILLING y 0 FOUNDATION DRAIN TILE 0 PLUMBING FINAL ❑ TREE REMOVAL Z ❑ LATHE 0 MECHANICAL RI 0 SITE INSPECTION Q 0 FRAMING 0 MECHANICAL FINAL 0 RATED WALLS • ❑ INSULATION 0 WOOD BURNER/FIREPLACE ❑ COMPLAINT v *FINAL 0 WATER HOOK-UP ❑ FOLLOW-UP W ❑ AS BUILT-SURVEY 0 SEWER HOOK-UP 0 FOUNDATION/REMOVAL J ❑ DEMO-SITE ElSEPTIC INSTALL Q OWNER/CONTRACTOR TO MEET YOU:_YES_NO u) COMMENTS: E./c < n ; - 3- / - /51 • a Q Provr;,a retasieuts. 0.1 bra z a--c CC coit1Ore- 65400109 >.) 0 Prot/foe hognia, re&✓ $ Pi J fif 5 CC ,2doCAe✓ aPc i 4e„r6 res t€ 6- rl ec W cc Q 2 "i4 r -6tr✓e t—i-4. G4- �✓ j re"r_I SpGee rbr- a r W ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE CCW 0 CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY O 0 CORRECT WORK,CALL FOR REINSPECTION TEMPORARY OU BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. El PHOTO TAKEN INSPECTOR WILL RETURN ID CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR CSAICECSION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. /fin White Copyllnspector's File Canary CopylSite Notice BUILDING LEAKAGE TEST Riccar Heating &Air Conditioning 2387 Station Parkway NW Andover, MN 55304 Phone: 763-754-4000 Fax: 763-754-0132 Date of Test: 3/1/18 Technician: Jeff Test File: Wooddale 797 Bridgewater Customer: Wooddale Builders Building Address: 797 Bridgewater Orono, MN Minnetonka, Phone Test Results 1. Airflow at 50 Pascals: 960 CFM (+/-0.5 %) (50 Pa= 0.2 w.c.) 1.81 ACH 0.27 CFM per ft2 floor area 2. Leakage Areas: 86.1 in2 (+/- 1.6 %) Canadian EqLA @ 10 Pa 42.2 in2 (+/-2.7 %) LBL ELA @ 4 Pa 3. Minneapolis Leakage Ratio: 0.18 CFM50 per ft2 surface area 4. Building Leakage Curve: Flow Coefficient(C)= 53.6 ( +/-4.4 %) Exponent(n) = 0.738 ( +/-0.012 ) Correlation Coefficient=0.99919 5. Test Settings: Test Standard: =CGSB Test Mode: = Depressurization Equipment= Model 3 Minneapolis Blower Door, S/N 1 Infiltration Estimates 1. Estimated Average Annual Infiltration Rate: 52.0 CFM 0.10 ACH 17.3 CFM per person (using bedrooms + 1) 2. Estimated Design Infiltration Rate: Winter: 76.3 CFM 0.14 ACH Summer: 39.2 CFM 0.07 ACH 3. Recommended Whole Building Mechanical 58.1 CFM Ventilation Rate: (based on ASHRAE 62.2) Cost Estimates 1. Estimated Cost of Air Leakage for Heating: $ 65 per year heating 2. Estimated Cost of Air Leakage for Cooling: $ 5 per year cooling BUILDING LEAKAGE TEST Page 2 Date of Test: 3/1/18 Test File: Wooddale 797 Bridgewater Building Conditions Inside Temperature: 65 deg F Heating Fuel: Gas Outside Temperature: 35 deg F Heating Fuel Cost: $0.68/ccf #of Stories 2.0 Heating Efficiency: 92.00 Heating Degree Days: 7981 Wind Shield: M Cooling Fuel Cost: $0.115/kwh #of Occupants 2.0 Cooling SEER: 13.0 Cooling Degree Days: 330 #of Bedrooms: 2.0 Volume: 31730 ft3 Ventilation Weather Factor: 0.97 Surface Area: 5291 ft2 Energy Climate Factor: 17.0 Floor Area: 3562 ft2 Design Winter Wind Speed: 9.0 mph Design Winter Temp Diff: 82 deg F Design Summer Wind Speed: 7.0 mph Design Summer Temp Diff: 14 deg F Comments 4 BUILDING LEAKAGE TEST Page 3 Date of Test: 3/1/18 Test File: Wooddale 797 Bridgewater Data Points: Nominal Temperature Building Fan Pressure Nominal Adjusted Fan Baseline Pressure (Pa) (Pa) Flow Flow % Error Configuration Std Dev(Pa) -1.9 n/a +/-0.16 -51.8 275.1 981 953 -0.9 Ring B -45.9 230.3 898 872 -0.5 Ring B -41.5 204.7 847 823 1.5 Ring B -37.4 171.8 777 754 0.8 Ring B -34.0 146.9 719 698 0.4 Ring B -27.5 103.7 605 587 -0.3 Ring B -23.5 80.5 534 518 -0.6 Ring B -18.2 52.6 432 420 -1.1 Ring B -1.5 n/a +/-0.27 DATE TIME V CITY EC ION NO CALLEDIN L INSPECTION NOTICE SCHEDULED PERMIT NO.c-201"7-UO3(c I COMPLJETED ADDRESS �lq OWNER T LEPHONE NO. CONTRACTOR DESCRIPTION ' W ❑ FOOTING ❑ DEMO-FINAL SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING Q ❑ FOUNDATION DRAIN TILE ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ LATHE ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT "� .L2FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP �`/❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL v ❑ DEMO-SITE ❑ SEPTIC INSTALL OWNEWCONTRACTOR TO MEET YOU:_YES_NO COMMENTS: Cc0 W 2 Q W ` Z W W ❑WORK SATISFACTORY:PROCEED /�RAJECT COMPLETE cc W El CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. p PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR LI CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspecto _ Whi Copylinspectoes File Canary CopylSite Notice DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED s 777 7 f PERMIT NO.,720 F A' C. ='... > COMPLETED ADDRESS a � a j , % �` : L.-� cc OWNER TE=LEPHONE NO.'y CONTRACTOR (; DESCRIPTION W ❑ FOOTING ❑ DEMO-FINAL tj SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING Q ❑ FOUNDATION DRAIN TILE ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ LATHE ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q fO_FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP ?` ❑ ASBUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL v ❑ DEMO-SITE ❑ SEPTIC INSTALL Z OWNEPXONTRACTOR TO MEET YOU: YES_NO COMMENTS: cc cc F �( Qc W QC Q LU tu _r s„ J d 41J [IWORK SATISFACTORY:PROCEED ,lb-PROJECT COMPLETE W ❑CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS- ❑ PHOTO TAKEN INSPECTOR WILL RETURN El CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector Canary COOVISIte Notice Date Time Inspector Inspection Type Stat H Permit# Address Permit Type Property Type Construction Type 797 Bridgewater Dr Water Meter-Residential Ra idential 'Vkiater Meter-Residential .11!29!2017 12:00 AM JAMV RA Airtest-At Same Time P Y 2017-01456 797 Bridgewater Dr Fire Systems Residential Sprinkler System-In Building ■2!26!2018 12:00 AM JAMV Water-Flow Test P Y 2017-01456 797 Bridgewater Dr Fire Systems Residential Sprinkler System-In Building ■2f26f2018 12:00 AM JAMV Final P 2017-01456 797 Bridgewater Dr Fire Systems Residential Sprinkler System-In Building .1111!2017 12:00 AM METJ Mechanical-Rough In F Y 2017-01406 797 Bridgewater Dr Mechanical Residential Fireplace-Gas ■1118I2017 12:00 AM METJ Mechanical-Air Test P Y 2017-01406 797 Bridgewater Dr Mechanical Residential Fireplace-Gas 2/28/2018 12:00 AM METJ Mechanical-Final P Y 2017-01406 797 Bridgewater Dr Mechanical Residential Fireplace-Gas ■11 f8f2017 12:00 AM METJ Mechanical- Rough In REINSPECTION P Y 2017-01406 797 Bridgewater Dr Mechanical Residential Fireplace-Gas 11116f2017 12:00 AM JASR Mechanical-Rough In P Y 2017-00889 797 Bridgewater Dr Mechanical Residential Mechanical-Multiple .211912018 12:00 AM METJ Mechanical-Air Test P Y 2017-00889 797 Bridgewater Dr Mechanical Residential Mechanical-Multiple 211912018 12:00 AM METJ Manometer Test with Final P Y 2017-00889 797 Bridgewater Dr Mechanical Residential Mechanical-Multiple ■211912018 12:00 AM METJ Mechanical-Final F Y 2017-00889 797 Bridgewater Dr Mechanical Residential Mechanical-Multiple 2128/2018 12:00 AM METJ Mechanical-Final REINSPECTION P Y 2017-00889 797 Bridgewater Dr Mechanical Residential Mechanical-Multiple 6/1412017 12:00 AM SOBR Sewer Connection f Air Test f Final P Y 2017-00579 797 Bridgewater Dr Sewer&Water Residential Connection 6f30f2017 12:00 AM MARK Plumbing-Rough In P Y 2017-00540 797 Bridgewater Dr Plumbing Residential Fixtures-Multiple .211412018 12:00 AM METJ Plumbing-Final P Y 2017-00540 797 Bridgewater Dr Plumbing Residential Fixtures-Multiple 10211 f2017 12:00 AM METJ Plumbing-Rough In P Y 2017-00540 797 Bridgewater Dr Plumbing Residential Fixtures-Multiple ■ Mechanical-Rough In 2017-00539 797 Bridgewater Dr Mechanical Residential Gas Line Only 2/2812018 12:00 AM METJ Mechanical-Air Test P Y 2017-00539 797 Bridgewater Dr Mechanical Residential Gas Line Only 2f28f2018 12:00 AM METJ Mechanical-Final P Y 2017-00539 797 Bridgewater Dr Mechanical Residential Gas Line Only ■ Escrow Refund Requested 2017-00364 797 Bridgewater Dr Escrow Fee-Tied to Building Permit Residential Escrow Fee-Tied to Building Permit Escrow Refunded 2017-00364 797 Bridgewater Dr Escrow Fee-Tied to Building Permit Residential Escrow Fee-Tied to Building Permit .512612017 12:00 AM MARK Footing(or Rebar) P Y 2017-00361 797 Bridgewater Dr New Structure Residential Townhome .7/1312017 12:00 AM MARK Radon Rock Bed(Poly) P Y 2017-00361 797 Bridgewater Dr New Structure Residential Townhome 6/812017 12:00 AM MARK Poured Wall(Foundation) P Y 2017-00361 797 Bridgewater Dr New Structure Residential Townhome ■611412017 12:00 AM METJ Foundation Survey B14 Water Proof P Y 2017-00361 797 Bridgewater Dr New Structure Residential Townhome ■6115/2017 12:00 AM MARK Foundation Water Proof(Drain Tile) P Y 2017-00361 797 Bridgewater Dr New Structure Residential Townhome .8C2f2017 12:00 AM METJ Framing P Y 2017-00361 797 Bridgewater Dr New Structure Residential Townhome ■12A!2017 12:00 AM JASR Insulation P Y 2017-00361 797 Bridgewater Dr New Structure Residential Townhome ■9/112017 12:00 AM RANM Lath P Y 2017-00361 797 Bridgewater Dr New Structure Residential Townhome 2/28/2018 12:00 AM METJ Final F Y 2017-00361 797 Bridgewater Dr New Structure Residential Townhome ■ As-Built Survey 2017-00361 797 Bridgewater Dr New Structure Residential Townhome 5tl M017 12:00 AM MARK Sit Fence(Installed&Inspected) P Y 2017-00361 797 Bridgewater Dr New Structure Residential Townhome ■611912017 12:00 AM CMAT Foundation Survey B14 Framing P 2017-00361 797 Bridgewater Dr New Structure Residential Townhome 7/6/2017 12:00 AM MARK 1 Hour Walls P Y 2017-00361 797 Bridgewater Dr New Structure Residential Townhome ■11128/2017 12:00 AM METJ Framing P Y 2017-00361 797 Bridgewater Dr New Structure Residential Townhome ■315f201 12:00 AM METJ Final REINSPECTION F Y 2017-00361 797 Bridgewater Dr New Structure Residential Townhome ■3f7t2018 12:00 AM METJ Final REINSPECTION P Y 2017-00361 797 Bridgewater Dr New Structure Residential Townhome