HomeMy WebLinkAbout2000-P02693 - mechanical PERMIT
CITY OF ORONO
` 2750 Kelley Parkway- PO Box 66 Permit Number: Po2693
Crystal Bay, Minnesota 55323 Permit Type: Mechanical Permits
(612) 249-4600 Date Issued: �ii9i2oo
SITE ADDRESS: 3713 LIVINGSTON AVE
WAYZATA,MN 55391
P I D: 17-117-23-34-0067
DESCRIPTION:
Proposed Use: Residential
Permit Class: General
Permit T e: Mechanical Permits Permit Sub-type(s): Heating Systems
� Air Conditioning
Ventilation
DETAILS:
Approved per resolution#:
Separate permits required:
IVOTICES/REMARKS:
FEE SUIIAMARY: Permit Fee: $ 62.50 Valuation: $ 5,000.00
State Surcharge Fee: $ 2.50
TOTAL FEE: $ 65.00
APPLICANT: COMPLETE MECHANICAL INC OWNER: EAGLE CREST NORTHWEST
5871 QUEENS AVE NE PO 47333
ELK RIVER,MN 55330 PLYMOUTH,MN 55447
THE UNDERSIGNID HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED
AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCFS AND
STATE OF MINNESOTA BUII.,DING CODE REQUIREMENTS.
__;��� `�' ����/ir
I C�P �� I D BY SIGNATURE
Copies: City,Applicant,Assessor,Finance Page 1
.
- �� � � ��
CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT
Box 66 (2750 Kelley Parkway) ��`�`���_-''
Crystal Bay, MN 55323
������' � 1 �DOQ
GENERAL INFORMATION U�a Y v�- tJti0111�
1. You may apply for mechanical permits by mail or in person at the City offices. Applications ill be
reviewed and a permit will be issued within 2 working days.
2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL
YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON
THE JOB SITE.
3. Mechanical Desi�ns - Complete calculations, details and specifications are requ�:�d for each heating,
ventilation, humidification-dehumidification, and air conditioning installation including heat loss/heat gain
calculation, design temperatures, equipment ratings and identification as to rype, manufacturer and model.
Data shall be presented on form provided. Identification of and specifications for water heating equipment
shall also be provided.
4. When any new construction or remodeling is involved, a separate building permit must be obtained.
5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements.
6. All work must be inspected (rough-in and final). Call 249-4600. 24-hour notice required.
7. House Heating Test Record must be submitted before final.
Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification.
INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 249-4600.
Please check one: � New Addition Repair Replace
� Residential Commercial
JOB SITE: �j�13 �-1 V I l��t�f�'1 �ti�-� �/ LL7-A� Z1P����7,�3
Owner's Name: Telephone Number: --�
Mailing Address: -- City: ---� Zip: —
Contractor's Name: ( /� Telephone Number:����_s��
Mailing Address:,5`�"7l t��1"15 ��� City: E � ��: .�`Lip: -��'- ���
SYSTEM DESCRIPTION
HEATING SYSTEMS
Quantity: l
Make: L�/�J
Model: (-����)j�13/�
Fuel: �.�f���
Flue Size: � " ��r�/�
Input BTUs: �Q,��
Output BTUs: ,-rj�-{,�`�
CFM: ���
COOLING SYSTEMS
Quantity: �
Make: L.�/��1_�Y��
Model: t-(f���_��c�
Tons: �,
H. Power
FIREPLACES
Gas factory fireplace
Wood burning factory fireplace with flue
Wood Stove
Wood stove with flue
Brand Name Model No.
VENTILATION
No, Kitchen Exhaust ducted recir`lating cfm
No. � Bath Exhaust (must be ducted outside) � cfm
No. Other Fans: Locations cfm
FUEL STORAGE (MUST BE APPROVED BY FIRE MARSHAL)
Installation Removal
Fuel oil: gallons underground inside outside
LP Gas: gallons
Other Gas opening
PERMIT FEE CALCULATION
1. 1.25% of Contract Price* or Minimum Fee ($35.00) �
���,�,L� x .0125 $ �Z�i.-�7
(contract price)
2, State Surchar�e. ** Add the State Building Code Division `_
Surcharge to each permit. ���,��� x .0005 $ �t�..�
or $.50, whichever is greater (contract price)
3. Posta�e and Handlin� (Only mail-in applications) � •
4. TOTAL PERMIT FEE (Add lines 1-3 above) � ���
* CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted
work including materials, labor,profit, and other fixed costs. It is the amount to be charged to the customer
for the work done. If any material, equipment, labor, or installation are furnished by the owner, tenant or
any other party the reasonable market value of such items must be added to the estunated cost or contract
price for permit fee purposes. In the event that there is a dispute on the amount of the job cost, the City may
request the submission of a signed copy of the actual contract.
** The STATE SURCHARGE is .0005 of the contract price under$1,000,000 or $.50 - whichever is greater.
For valuations over $1,000,000 call the Department of Inspectional Services for the price.
The undersigned hereby applies to the City for issuance of a Mechanical Permit, agrees to do all
work in strict accordance with the ordinances of the City and the regulations of the Minnesota
State Building Code, and certifies that all statements made on this application are complete, true
and correct.
``--'. � �i- -c.--� Date: �"�j��C.�
, _
_ _ � � _
y
Applicant's Signature: �"��� "
�'(� Date: 7 - ��i� ��
Approved By:
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION OTICE �,Qq'�SCHEDULED y4 R •���
PERMIT NO. �aa'�P�O �`b +-i COMPLETED �'Z ' ��
ADDRESS 3713 �l ����1��'�'1 ��"
OWNER CONTR. s' a.s� C�Y�PS"�'
TELEPHONE NO. ��'I I � g� ��
� DESCRIPTION v�s�`'Q ? �e��� � -�—
l� 01 FOOTING 1 ECHANICAL RI 18 EXCAV/GRADING/FILLING
� 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
�
03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
J 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
_ ,0__ UMBING R 23 SEPTIC FINAL 35 HARD COVER REMOVAL
J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
Q OWNERICONTRACTOR TO MEET YOU:_YES_NO
Z
� OMMENTS:
r
� �� �S / 4-SSP�
�
J �
O
a
�
° 2 � w � �s�
� � _ � /0. �
Q
�
Z C S c�
W
W
�
j
d ❑WORK SATISFACTORY:PROCEED � PROJECT COMPLETE
W
� /�CORRECT WORK 8 PROCEED c ISSUE CERTIFICATE OF OCCUPANCY
O Cl CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
� BEFORECOVERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. CPHOTOTAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR � CITATION ISSUED
L INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. 249-46��
OwnerlContr on site:
Inspector. ,w`�
White Copyllnspector's File Canary CopylSite Notice
�«�M-"'J DATE TIME
CITY OF ORONO P�26 43 CALLED IN �-�'�O
INSPECTION NOTICEpL SCHEDULED �' 3'�0 ��
PERMIT NO. �D267 D COMPLETED �� � � .
ADDRESS �7/ 3 �-%V���b�v�
OWNER CONTR. ��^^�I U.►"� ���c�'
TELEPHONE NO. 76 3�Zy���`'IUv
� DESCRIPTION D�'�}o.� �" �CG���rc� �
lL 01 FOOTING ��� �AC� 18 EXCAV/GRADING/FILLING
� 02 FRAMING 13 ME ICAL FINAL 19 LAKESHORE/WETLANDS
�
03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
� 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
� 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
W 09 PLUM 23 SEPTIC FINAL 35 HARD COVER REMOVAL
= 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
J
Q OWNERICONTRACTOR TO MEET YOU:_YES_NO
Z
� COMMENTS:
�
W
�
j '
O
�
�
O
�
W
�
Q
�
Z
W
�
W
�
j
d WORK SATISFACTORY:PROCEED f_1 PROJECT COMPLETE
W
� [ CORRECT WORK&PROCEED '; ISSUE CERTIFICATE OF OCCUPANCY
W
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
0 BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. C PHOTO TAKEN
INSPECTOR WILL RETURN
C' CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. 249-46��
OwnerlContr c,�or on site:
Inspector. v
White Copyllnspector's File Canary CopylSite Notice
D�AyTE �T E
CITY OF ORONO CALLED IN f��(�L '' "'�-�
INSPECTION NOTICE ��Q SCHEDULED _/��3^0l ��
PERMIT NO. COMPLETED
ADDRESS 3^7l3 1�1 VIY,AS�'x� A-�1e._
OWNER CONTR. ��''m�� 1'�P�'1 •
TELEPHONE NO.��`�8 �1�
� DESCRIPTION
� 01 FOOTING 11 ME AN��Qi ?i 18 EXCAV/GRADING/FILLING
,Q 02 FRAMING 3 MECHANICAL F 19 LAKESHORE/WEfLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP O6 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
� 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
i09 PLUMBI I 23 SEPTIC FINAL 35 HARD COVER REMOVAL
10 PLUMBING FIN 36 FOUNDATION/REMOVAL
Q OWNERICONTRACTOR TO MEET YOU:_YES_NO
Z
� COMMENTS:
�
W
a
�
�
O
�.
�
O
�
W
�
Q
�
2
W
�
W
�
�
d�K SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
W
� ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
W
O �CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
� BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTO TAKEN
INSPECTOR WILL REfURN
❑STOP ORDER POSTED.CALL INSPECTOR � CITATION ISSUED
❑ INSPECTIONREQUIRED.CALITOARRANGEACCESS.
Call for the next inspection 24 hours in advance. 249-46�0
OwnerlContractor o
Inspector.
White Copyllnspector's File Canary CopylSite Notice