� r � � Minnehaha Creek Watershed District
Improvin�Quality of'Water, Quality af Life .
� February 14, 2002
Gray Freahwe�er Center
Fine Line Design Group
Hwys.15&19,Nava�e C/O Steve 6ehnke
PO Box 1611
�a��; Bumsville, MN 55337
250o s�d Road Re: MCWD Permit Appl#01-276: 3551 Livingston Ave., Orono.
�xce�ior,Mnr�s��-ss�e Dear Mr. Behnke:
�no��(asz)a��-osso .
Fan:(952)471-0682 During rautine inspections by the Minnehaha Creek Watershed District(MCWDj
Staff, we found a number of violations of the provisions of the MCWD Rule B fo�
erosion controi. The following violations and observations were recflrded on
Ema�l: Februery 13, 2002:
adm�n�minnehahecreek.org � Construction without a MCWD permit.
• Silt fence down an the westem border.
W�$11e� • Silt fence not installed along the front of the prope�ty.
wwwminrrehehacneekorg • Single f�mily home is near completion.
You are reminded that construction without a permit is a violation of MCWD
Rules and is a misdemeanor punishable under State Law. These violations
require prompt and immediat�att�ntian. All violations should be attended to and
fixed immediately. You are th�reby required to:
B°ab m�anayers . Get a permit from MCWD.
Pemele G.Blixl � Maintain and install sitt fencing to MCWD specifications. Install silt
����� fences in the front of each site, on all�downhill slopes and around
stockpiles. Silt fence must be trenched in B inches and installed
�,ce Flsher according to instructions.
��,;�G� • Stop all work on the site until a permit i5 issued.
ScoitThomas Please not�that these issues have been brought to your attention several times
Ma�oo�m Re�d �in the past. Our records show thart a) a permit application was receive on July
RobertSchroeder 10, 2Q01�, b) MCWD staff have contacted you on several occasions requ�sting an
erosion control plan for th� project, and we still have not received the r�quested
information. Under MCWD Rules,we are autho�ized to'charge the developer
fees in accordance to the District's fee schedule. The fees indude inspections
� and administrative time taken in bringing a developer into complianc�with
MCWD Rules. Therefore, the following balance is due to the District:
• 2/13/02 Insp�ction � $33/hour
• 2/14/02 Administration �$33/hou�
� 7otal Balance Due: $66.00
. Due no later than: Ma�ch 14, 2002.
Checks can be made out to: Minnehaha Crisek Watershed District
In order to avoid further penalties from the Minnehaha Creek Wate�shed District
� which may include additional fees and the delivery of a Stop Work Order, please
have the necessary work completed by February 20, 2002, and the balanc� paid
no later than March 14, 2002. �
����°��� .
FEB-14-2002 13�53 MINNEHAHA CREEK WATERSHED 6124719682 P.03/03
A MCWD repr�sentative will retum to the site aiter the Feb 20�' deadline to
fnspect the repairs and check the progress of the appliqtion process. Your
prompt cooperatlon and immedlate attention to this matt�r is appreciated. If you
have any questions, I c�n be resched at 952-471-0590.
. � �
R hy Khi
. District Represer�tative
CC: Lyle Oman, City of Ornno.