HomeMy WebLinkAbout05-21-1980 Public Hearing Sewers . �--
Ci 1'Y Or ORi)'Vt"l
Public Hearing for proposed sewer on North Shore 7 : 00 P .M.
Drive and Scotch Pine Lane , May 21 , 1980
Acting :�iayor Butler called the Public Hearing to PUBLIC HEARING
order at 7 : 20 P.M. with the following members North Shore Drive &
present: Acting Mayor Butler , City Engineer Cook , Scotch Pine Lane
� On-Site Systems Mar.ager Gaffron, Public Works � S�w�rs
Coordinator Gerhardson, and City Clerk Strom.
Mayor Van Nest arrived at 7 : 30 P .M. Absent :
Councilmer�ers Hurr and Paurus and City Admir_istrator
Benson .
R�sidents of the afi�cted properties present :
Mr . & Mrs . Lawrence t,;halen - 2435 Scotch Pine Lane
Duane Luke - 2465 Ivorth Shore Drive
Edward Callahan, ,7r . - 2545 North Shore Drive
Mr . & Mrs . Steven 4Vilson - 2485 North Shore Drive
Mr. & Mrs . Joseph Jester - 2515 North Shore Drive
Andy Miner - representing Charles Pihl
Michael Gaffron, On-Site Systems Manager, presented ,
the Notice of Public Hearing and the Affidavit of •
Publication .
Discussion included the route of the sewer line, lift
stations , and assessments.
Mayor Van Nest explained the procedures the City
Council would take before the project is constructed.
He also stated that an assessment hearing would be conducted
prior to awarding the bid for construction to determine
if the project would take place.
Mrs . S . Wilso�, 2485 North Shore Drive, expressed concern
aboutthe placement of the sewer line due to her trees
and other plantings. She was assured that the engineer
would work with her to preserve as many as possible of
the trees and plantings .
Mrs . Jester, 2515 North Shore Drive, questioned the method of
assessing the project. Her main concern was for unforeseen
extra costs .
Mayor Van Nest explained that they were built into the
contractor ' s bid because of undetermined extras at the
time of construction.
Mr . Callahan, 2545 North Shore Drive, did not feel that
sewer was necessary as his system is adequate and problem
free .
: ';�sI�IC iiE�R�^.G Nr,ETING, :��Y 21 , 1980 Page 2
Letter from Albert Andrews , Jr . , 2625 North -
Shorc Drive , dated May 19 , 1980 -
Fag�s 3 & 4
Letter from ,;ohn Eastman, 2656 North Shore Drive ,
dated May 16 , 1980 -
Page 5
�
At 8 : 20 P .M. , Nayor Van Nest continued the public
hearing until the �7une 2 , 1980 Council meeting at
7 : 00 P .M.
,
r �
William B. Van Nes , Mayor
.
Attest:
Walter . Benson, City Administrator
Page 3
PLFERT ANG � E'�' S, `; R.
�CC�. � �. _�T �F['L __.�� 1��
SC� fJiCO��E' N��L
p•.7NNL:.-_•L'S�M:'vnESC-h �_ 'v2
' '4
:�.ay 19 , �9�0
T�iavor William B. Var����est
and City Council 2�lembers
Ci�y of Orono �
P. O. Box 66
Crystal Bay , r2innesota 55323
Dear Nayor VanNest anc Council N�erlbers : �
' Unfortunately, Z have to be out of towr. May 21st , the
d�te o� the public hearing ror the proposed sew2r pro-
ject on North Sho?-e Drive. I believe my views are well
known to most of you--I would like the project completed
as soon as possible.
Throughout this process we , the residents, have been told
that our views would be taken intc account and tha� it
was up to us to decide whether or not we wanted the pro-
�ect. I believe the vote (8 to 3 with one abstentior.,
or 8 to 4 in favor) is a rinqing endorsement that should ,_
not nor cannot be ignored by you, our elected repre-
sentatives. I believe the project is essential for the
reasons specified in my previous letters to you so I
will not belabor those points here. I would only like
to emphasize that the project has been overwhelmingly
approved by tnose of us affected and that the bidding
climate is e�;tremely favorable at the present time--one
onlv has to look at the low bids coming in on the
stadium to see the savings we might realize if we mo��e
witnout delay. I might add that witn the extremeiy drj�
weather we have been h�ving, tne water levels have dropped
and construction miqht be cor.siderably less costly. It
is no�T time to act--tc folloti� tnrouah with your original
�romise thzt the resinGnts should decide the issue--we
have decided--we want the �-oject by at least 2 to l .
Page 4
'�,avor A'�11. iam B. �".�^t."est
�nd City Ccuncil '��embers
i✓,3y 19 , 1°80 � t � •
Paae two
F'llYT�"1E?r O21Z.\'S � 1r �i�' OD_rilOTl � WOU�C be ii-i"�SL%�r'iSlble
and woula only ad� to e�-eryone ' s cos�s .
Tr,anic you for your consideration .
Very truly yours ,
- .�
�, , . -. . �- _ `>� J' f_ _ �
1
AP.. ss ; :
Page 5
: ; -
- � .= . - # i��
U
-- ��
. . _ -J
�.�. �a �-..1L'.
- • .� ' f 4':_�-a Y-�,
May lE, 1980
City of Orono ' '
Attn. Dick Eenson and Council
P.O. Bo>: 66
Crystal Bay, Mf� 55323
RE: SANITARY SEWER CTY. RD. 51
We have attended several m�eiings and replied to various
questionaires on the abo��e subject. Our feelings in this
maiter are that we do not want the sewer, as we do not .
have a problem. This has been determined by tests on our ''
present system as late as 13st Fall , 1979. l�le regularly
take care of our system on a planned pump out schedule
to meet the city of Orono r2quirements.
We cannot attend the hearing May 21st, but would be
against the project.
Very truly your
�
John H. Eastman
2656 North Shore Dr.
P.O. Box 53
Crystal Bay, MN 55323 '