Loading...
HomeMy WebLinkAboutSeptic info ..�_._____ . '/, .;; ��,.�:.�� �� �,',.` '/� o`��� ` �/ �� ,,; � , _ ��. _ �� CI�'Y of O1t01\T� ��: ,.;�:: ''.�:;���;- . �+;; '.,''��9,� '�`'�M• ,. ,�ti;';' Municipai O.ffices / 4 � '; 'g.�G. Street Address: Mailing Address: ��' `4$EggO : 2150 Kelley Parkway PA. Box 66 '--_-�- Orono, MN 55356 Crystal Bay, MN 55323•0066 To: The Current Owner of Address �CpO �O j��� l�. ��/��i1�� City Ordinance requires that onsite sewage treatment systems in Orono be inspected on a periodic basis: The onsite sewage treatment system at the above address has been inspected and the following is known about the system. A sketch of the known components of the system is available for most properties at the Orono City Hall. Imminent Public Health Threat Yes No �C If yes,please contact the Onsite Systems Manager at 952-249-4626 within 10 days of receipt of this notice. The septic system must be brought into compliance within 90 days. Failure to do so will result in referral to the City Attorney for legal action. System Identified as Non-Compliant Yes �No If yes, system must be brouDht into compliance by: December 31, 2007 , December 31, 2010 Other Septic Tank(s)Pump aut Needed Yes No r�� - _ - The City recommends the septic tank(s) and/or lift tanlc be serviced and pumped t�ut every three years. City records indicate the tank(s) were last pumped out on �-�L�'O� . The tank(s) should be cleaned through the manhole and not throu�h the inspection pipes, this allows for proper cleaning. Comments: � ..... ._ _ _. _ InspeC�.,�X.LJG ��C�� Date of Inspection � - O 6 � Telephone(9�2)249-4600 � F'as{9�2)249-4616 w��;•w�.ci.orono.mn.us