HomeMy WebLinkAboutScan reg 2 mbPROIECT NARRATIVE
FRESHWATER APARTMENTS
The Freshwater Apartments will be a valued residential option for the City and Navarre. Alex
Ugorets, the owner of the property, is proposing a 45-55 unit apartment building to coincide
with the building improvements he is undertaking at the existing Freshwater Building. Both
projects will enhance the work/live environment that is desired in this area.
Prior to our application we have met with city staff, Hennepin County, and the Minnehaha
Creek Watershed District. The city letter we received on November 10th noted the following
items to address:
Land Use. The site is zoned e-4, but the Comprehensive Plon anticipates devefopment of the site
to include a mix of uses, induding condominiums and opartments. We are in conformance to
this vision.
Densitv. The proposal moy exceed the 4-15 unit per ocre assigned to this site. We are expecting
to adjust the lot lines to accommodate setbacks for the office building and apartment. With the
lot line adjustment the density calculation could be met.
Treffic Studv. The city may require a troffic study. If required, we will provide a study. See also
our meeting details with Hennepin County on access.
Access. The new entrance should be aligned with the new development across the street. We
had a joint meeting with City staff and the County to review the access points. At that meeting,
the proposed access location was supported by the County as they identified benefits of the
project as it relates to future road improvements. We removed a proposed second access as
part of this discussion.
Parkin¢. Covered parking for one car should be provided. We are providing underground
parking to accommodate this request and will have sufficient on-site parking to meet code. The
site plan identifies 51 stalls below ground and 49 surface parking stalls. We also have the ability
to create a joint parking arrangement with the office building if necessary.
Buildins Heisht. Historically, the City Council was cautious of buildings over 2-stories when
adjocent residents and the loke. We are proposing a 3-story building fronting County Rd 19 with
penthouse units on top along the northeast corner of the building. The building height will be
31 feet facing CR 19 and then steps up to 42 feet with the penthouse units at the back of the
building. Because of the topography and underground parking, the building will have a
maximum height of 54 feet facing the wetland (east). The architectural renderings we are
showing are conceptual to demonstrate the architectural style we wish to provide but may be
altered as we move forward with the project.
RECEIVED
# 3 9 03 JAN " a%'C17
CITY OF ORONO
The building location also supports the building height. We positioned the building to take
advantage of the topography of the site and to minimize any visual impact along County Rd 19.
The site slopes away from the road and toward the wetland to the south and east. By using this
topography we are abie to angle the building away from the street with only having a corner of
the building at the front setback. The rest of the building will fall away from the street thus
keeping an open view along the road corridor. The topography also allows us to step the
building down to 3 stories in front and a partial fourth floor to the back. The penthouse
apartments will be set back away from the front building line and placed in the northeast side
of the building. In this location the penthouses are away from public view and transitions in
height from the existing Freshwater Office building to the north and the residential homes to
the south.
The site is separated from the residents to the south by 590 and 380 feet respectively with a
band of existing mature trees. Lake views of the building will be minimal since the building is on
a non-usable part of the lake with few homes. The proposed 54-foot building height matches
the height of the Freshwater building when viewing from the east. The 42-foot height also
matches the height of the Freshwater building southwest corner along County Road 19.
Wetland. The wetland is o"Preserve" wetland ond will require o 75 foot buffer from the MCWD
with on additional 10 foot city required setback from the buffer. The wetland has been
delineated and we have identified the 75-foot buffer line on our plan. In speaking with the
Watershed they noted that the buffer size can be averaged to accommodate the building and
that replacement buffers may be allowed on the office site to the north in order to provide
buffering along the wetland edge where none exist today. We are improving the quality of the
lake by incorporating buffers and ponds for stormwater treatment plus improving existing
conditions to the Freshwater Office site. We will continue to work with the Watershed and the
city to provide an acceptable buffer. (See attached meeting summary)
From the above meetings and the comments that we received we prepared a site plan and
building elevations that we believe supports the direction given to us and continues to be a
viable project. The plan respects the views of the neighboring homes and the views along
County Rd 19. It is designed to transition from the 52,000 sq. ft. Freshwater Office building to
the north and the homes to the south.
We have not conducted soil borings specifically to this site but Mr. Ugorets has conducted soil
borings for his parking lot improvements on the Freshwater Office building. The borings closest
to the proposed apartment building did not encounter ground water in the 14-foot deep
boring. The wetland delineation reports also did not encounter ground water. Based on this
information we are not expecting to encounter groundwater during construction or have it
impact the project. We will conduct further borings as we move forward with the project.
RECEIVED
� � � �� JAN ? 8'?t71i
CITY OF ORONO
We are very excited to bring an attractive residential option to the residents of Orono and
Navarre. We believe this project will match well with a life style that is desired in this area and
around the lake. This project, along with the improvements to the Freshwater Office building,
will provide new business and living opportunities to this area that meets local demands and
regional goals.
We look forward to be part of this community and welcome your comments of our conceptual
plan.
RECEIVED
JAN 1 � 201?
# 3 9 0 3 crrv oF oRorvo
MINNEHAHA CREEK
QUALITY OF WATER
�lectronic Copy
WATERSHED DISTRICT
QUALITY OF LIFE
January 9`h, 2017
Pre Application Summarv: 2500/2520 Shadvwood Road. Orono
Attendees: Tom Goodrum, Westwood; Heidi Quinn, MCWD; Katherine Sylvia, MCWD; Renae Clark,
MCWD
Meeting Date: December 29`", 2016
Current site sketch proposal:
• New 45-50 unit apartment building with underground parking and parking lot at 2520 along with
parking lot expansion at 2500
Permit Pre-App review:
• Rules Triggered: Erosion Control, Wetland Protection, and Stormwater Management
Stormwater Manaeement:
Table 4:
Site
Size
<1
acre
>1
acre
• Size of site in aggregate: 7.71 acres
• Existing impervious surface: 1.88 ac —1.89 ac (based on 2015/2016 applications)
• Proposed impervious: unknown
• Assuming less than 40% of the site is disiurbed (less than 3 acres), the proposed increase in
impervious surface will determine if the new impervious surface or entire site need to be
treated.
• Required volume standards are calculated by abstraction of the first 1" of rainfall from the
impervious surface. Phosphorus standards are assumed to be fulfilled by abstracting the first 1"
(volume requirement�. The rate control standards are met by showing there is no net increase in
peak runoff for the 1, 10, & 100 year storm event.
• Below is a table that summarizes the stormwater rule for an increase in impervious:
<40% site
disturbance
>_ 40�o site
disiurbance
< SO% increase in impervious
surface
>_ 50% increase in impervious
surface
in an
BMPs
Phosphorus Control, Rate
Control, and Volume
Control
Phosphorus Control, Rate
Control, and Volume
Control
.' � 1 ,
in impervious surface
Treatment
Additional impervious
surface
Entire site's impervious
Entire site's impervious
JAiti! ' , .,E , `
CITY OF ORONO
MINNEHAHA CREEK I
QUALITY OF WATER
� WATERSHED DISTRICT
QUALITY OF LIFE
• Currently, 2 filtration ponds are proposed within the wetland buffer
o If BMPs are proposed within the wetland buffer, than the buffer area must be increased
to make up for the area lost from the BMP. This may cause unwanted site constraints.
o Filtration is given a 50% credit for abstrection, ie treat for the first 2" of rainfall. The
abstraction credit schedule can be found on pages 12-13 of the stormwater rule.
• High Water Elevation
o All applications shall provide at least two vertical feet of seoaretion between low
openings of structures and the 100-year high water elevations of stormwater BMPs and
waterbodies.
o NOD does not reference, but it appears the preserve wetland is a DNR public waters
wetland that connects to Lake Minnetonka. The 100 year floodplain elevation for Lake
Minnetonka is 931.5'
• The below table summarizes the allowable impact to downstream waterbodies based on
management class. The large wetland complex has been identified as a preserve and the small
wetland to the SE does not have a management class on file.
Wetland Permitted Inundation Inundation Runout Control
Management Bounce for 1-, Period for 1-Year Period for 10-
Class/ 10-, and 300- Event and 300-Year Elevation
YearEvent Event
Waterbody
Preserve Existing Existing Existing No change
Manage 1 Existing plus 0.5 Existing plus 1 Existing plus 2 No change
feet day days
Manage 2 Existing plus 1.0 Existing plus 2 Existing plus 14 0 to 1.0 ft above
feet days days existingrunout
Manage 3 No limit Existing plus 7 Existing plus 21 0 to 4.0 ft above
days days existing runout
Lakes Existing N/A N/A No change
Wetland Protection:
• W15-17 Boundary & Type NOD valid
• No proposed wetland impacts
# 3 9 03
E�EC���/��
JAN 1 8 2(J'I r
CITY OF ORONO
MINNEHAHA CREEK
QUALITY OF WATER
• Proposed buffer disturbance
WATERSHED DISTRICT
QUALITY OF LIFE
o Requires restoration plan, 5 year monitoring & maintenance plan and financial
assurance minimum of $5,000
• Preserve wetland requires a 75' buffer
o Averaging min 37.5', max 150'
• Type 2 wetland in SE corner does not have FAW management class
o Typically a wetland delineator or specialist will run a MnRAM to identify the
management class.
• Buffers are required around wetlands that are downgredient of the site disturbance.
• Buffer averaging can occur on both parcels (2500 & 2520)
o Existing struc[ures are grandfathered in
MCWD encourages native wetland buffers even when not required by regulation and
can provide technical assistance on seed mixes and maintenance.
Other:
• eoardwalk/Dock in wetland-
In summary WCA does not does not consider boardwalks as fill in wetlands as long as the
hydrology, vegetation, and soils are not effected in a manner that would cause them to
loose wetland characteristics.
MCWD Waterbody Crossings & Structures rule may be triggered if the boardwalk comes into
contact with the bed or bank of the wetland. Additionally, Lake Minnetonka Conservation
District (LMCD) regulates docks on Lake Minnetonka and should be consulted. There is no
dock permit required from the DNR if the dock is built within the guidance criteria (DNR
guidance attached separately).
• Upon consulting with the District's engineer, there are some preliminary concerns regarding a
high ground water table, site space for BMPs and space for required wetland buffers.
Alternative and/or additional BMPs should be explored based on the soil conditions and location
of the ground water table. Some other options may be underground storage, permeable pavers,
additional filtration "gardens", and/or a treatment train(s).
RECEIVED
JAN ? =� %[� i ?
# 3 9 0 3 �ITY OF ORONO
Electronic Copy
DATq PRIVACY ADVISORY
In accordance with Minnasota State Statute 13.04 Righ[s of Subjeds of Data, Subd 2, 'Tennessen waming", we
would Ilke to Inform you that your request for a permit or license From tho City of Orono or any of its departments
may requlre you to furnisb cerN�iin prlvate or confidentiai information.
You are notified thaC
1.
2.
3.
4.
5.
The information you furnish will be used to determine your qualification for the permit or license
requested.
You may refuse to supply data, but refusal may require thaf the City deny the permit or license.
The information may be shared with other local, slate or federal agencies to the extent necessary
ro process the permit or license.
If your requested permit or license requires Council action to approve, some information may
become public.
You have certain riyhts under Minnesota Sta�e Statute 13.04 (see follawing page) to review private
data on yourself.
6. Your full name is required to process this application or permit.
Alexander Ugorets
First Middle Last
410 llth Ave South
Address
Hopkins
City
MN 55343
State Zio
I undc i� d my rights �is s�atad above.
� _�� �
' �nature
Land Use Appllcalion — May 2015
Page !1
(612)363-3321
Phone
FtECEIVED
sa� i a 20�7
# 3 9 03 ��N OF ORONO