HomeMy WebLinkAbout2015-00950 - new structure 4 �
CITYOFORONO * zp� 15 - 00950 *
2750 KELLEY PARKWAY DATE ISSUED: 09/23/2015
ORONO, MN 55356-
952 249-4600 FAX: 952 249-4616
ADDRESS : 140 KINTYRE LA
PIN : 32-118-23-43-0019
LEGAL DESC : KINTYRE TWO
: LOT 2 BLOCK 2
PERMIT TYPE : NEW STRUCTURE
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTIOPT TYPE : SINGLE FAMILY
ACTIVITY : 101-SINGLE FAMILY HOUSES, DETACHED
VALUATION : $ 740,456.00
NOTE: SEPARATE PERMITS REQUIRED:PLUMBING, MECHANICAL,SEPTIC,FIREPLACE,FIRE,WELL(STATE),ELECTRICAL
(STATE)
NOTE: PRIOR TO THE START OF FRAMING AN AS-BUILT FOLJND TION SURVEY MUST BE SUBMITTED AND APPROVED BY THE
CITY OR A STOP WORK ORDER WILL BE ISSUED: MITIAL: L�
NOTE: PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY AN AS-BUILT SURVEY IS REQUIRED TO BE SUBMITTED AND
APPROVED BY STAFF. INITIAL: �.•_(�_ _
NOTE: IN THE EVENT OF WINTER CONDITIONS OR OTHER UNFAVORABLE WEATHER CONDITIONS(WHICH PREVENT THE
COMPLETION OF THE EXTERIOR IMPROVEMENTS AND/OR AN AS-BUILT SURVEY A TEMPORARY CERTIFICATE OF OCCUPANCY
(TCO)MAY BE NECESSARY. A TCO REQUIRES A$10,000 ESCROW. INITIAL: t�- _
NOTE: IF DURING CONSTRUCTION IT APPEARS THE RETAINING WALL WILL BE OVER 4 FEET IN HEIGHT,AN ENGINEERED
DESIGN MUST BE SUBMITTED PRIOR TO ITS CONSTRUCTION. INITIAL: �L�
APPLICANT PERMIT FEE SCHEDULE 4,894.84
PLAN REVIEW g22•42
GONYEA HOMES STATE SURCHARGE(VALUATION) 370.23
6102 OLSON MEMORIAL HIGHWAY TOTAL 6,087.49
GOLDEN VALLEY,MN 55427-
(612)741-9069 Payment(s)
Minnesota State License#: BUIL-2459 CHECK 16575 6,087.49
OWNER
MACKINNON,JAMES
2430 MEETING ST.
WAYZATA, MN 55391-
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for only the work described and does
not grant permission for additional or related work which requires sepazate
permits. All provisions of laws and ordinances goveming this rype of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has commenced.
The applicant is responsible for assuring all required inspections are
requested in conformance with the State Building Code.This permit may be
revoked at any time for due cause.
r �
��, � _._ , ��_ �, � �,
,
�; � 3/!�
Appl' n ermitee Signature Date Issued B ignature Date
� � �
/
� �
City of Orono
Building Permit Application � �g� ,�9
�, for New Structures or Additions �
'i '' �,� .; Mailing Address: �.
� l ����' ����� PO Box 66 Permit number: �5— � �j ;
� �� ^� �✓ �,_� Crystal Bay, MN 55323-0066 Date received: �
���` ' � � Street Address:' � �1
" � 2750 Kelle Parkwa � �5 ..�
.� lq � �, . `
ti� G� , , i y y 2���-ooR�� Plan review fee: .
� ,
Orono, MN 55356
Kfsr►o� Main: 952-249-4600 Total Fee:
Fax: 952-249-4616 �✓��ww.ci_orono.mn.us `F� �
This application form must be completed in full and all required information must� e submitted.
Incomplete applications will be returned. (P/ease print)
GENERAL INFORMATION:
Job Site Address: ��'
1 U � i�+v rr-� Ln ���,
Will this be a Parade of Homes, Remodelers Showcase Home or other Display Home? ❑ Yes �No
If yes,a special event permit is required with Police Department and City Council approval 60 days prior to the event. Shuttle bus service w�ll be
required unless applicant demonstrates sufficient on-site parking is available. Non-permitted events will not be allowed.
CONTRACTOR/APPLICANT INFORMATtON:
Name: G- � ►� �-��� }{o v�� S
State License# � .5�� Expiration Date:
Phone: cell � - t�4- office
Mailing Address: (c � G � o�. M r�� i�,r Cit : �:, r� U IP: 5 S 'a �
Contact Person: Ft v� Applicant is: ractor / Home wner (Circle One)
Email and/or Fax: �2t-1���i.� c.�c�c�4 �Pa���^c S � C r���'K
PROPERTY OWNER INFORMATION: 1�
Name: �-o nV�'�i C���S
Phone (day):
Address: City: ZIP:
Email and/or Fax
ARCHITECT I ENGINEER INFORMATION:
Name:
Phone (day):
Address: City: ZIP:
Email and/or Fax:
PROJECT INFORMATION: Description of project: �'� �"�''l ����`�f
1. Type of Project 2. Proposed Use 3. Structure Type 4. Sewage Disposal 8�
Water Supply
ew Construction ingle Family with ❑Accessory Bldg./Garage
❑Addition attached garage ❑ Deck ❑ Public Sewer
❑Accessory Building ❑ Single Family with ❑ Of�ise/Commercial �
❑ Relocation detached garage [�esidence Private Sewer
❑ Other: (specify) ❑ Multiple Family/Condo ❑ Retaining Wall(s)
❑ Public 4-feet or greater �ic Water
**Any earth movement may require ❑ Commercial ❑ Storage
MCWD review 8�permits. ❑ Industrial ❑Warehouse Private Well
Minnehaha Creek Watershed District(MCWD) ❑ Other: (speCify) ❑ Other(specify)
15320 Minnetonka Blvd
Minnetonka, MN 55345
Phone: 952-471-0590
Fax: 952-471-0682
www.rninnehahacreek.or
Estimated Construction Valuat;on (excluding land) $ J`-(>�f ��% CJ'
Packet Last Updated: January 2015
Page 20
r � �
STRUCTURE INFORMATION: �
1. Structure Dimensions 1. Structure Dimensions(continued) 2.Type of Construction � �
a. Length (ft.)= �s Number of bedrooms= � Wood/Frame
b.Width (ft.)= 1�.� Number of garage stalls: ❑ Masonry
Areas in spuare feet Attached = � ❑ Metal
❑ Pole Bldg.
c. Basement= �.5� Detached = ❑ ICF
d. 15�Story = ����
� ❑ On-site Prefab
e. 2�d Story=
❑ Off-site Prefab
f. 'h Story = �a5 �1'��` ❑ Other(please specify):
g.Total Area= �Y 7�
REQUIRED SUBMITTALS:
All of the information must be submitted in order for your application to be processed:
Not
Enclosed Applicable
❑ ❑ Buildin Permit Escrow A reement and Fees
❑ ❑ Plan Review Fee
❑ Com leted A lication Form
� ❑ Pro osed Buildin Plans—2 full size sets,to scale and 1 reduced 11 x 17 or 8'h x 11 set
GY ❑ Minnesota State Ener Code Calculations and Mechanical Code Re uirements
❑ Surve —2 full size,to scale meetin ALL surve requirements
❑ Hardcover Calculations
❑ ❑ Se tic S stem Certification
❑ ❑ Minnehaha Creek Watershed District(MCWD)Permit or
Documentation from MCWD statin no ermit is re uired
❑ ❑ Landsca e Walls and/or Retainin Wall Plans
❑ ❑ Stormwater Pollution Prevention Plan SWPPP
❑ ❑ Access Permit
❑ Data Privac Adviso Form
APPLICANT/OWNER ACKNOWLEDGEMENT:
• Agrees to provide all information required or requested by the Building Department;
• Agrees to pay the City of Orono for engineering consultant review costs in excess of$500;
• Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they
are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative
but to reject it until it is complete;
. Acknowledges the Escrow Agreement is completed and signed;
• Understands some or all of the information that you are asked to provide on this application is classified by State law as either
private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject
of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our
purpose and intended use of this information is to annually update our records and records of other governmental agencies
required by law. If you refuse to supply the information,the application may not be issued.
. Agrees that in the event that weather or other conditions prevent the completion of an as-built survey at the time the
Certificate of Occupancy is requested, a temporary Certificate of Occupancy may be issued upon �eceipt of a $10,000
escrow to ensure completion of the as-built survey and all site improvements.
ApplicanYs Signature: � � �� Date: ��� ����
Owner's Signature: Date:
Packet Last Updated: January 2015
Page 21
, ,
. . ,
. • • � •
� • .
emo
To: Finance Department
From: Christine Mattson, Planning Assistant
CC: Street File
Date: August 2, 2016
G/L: 101-22205
Re: Escrow Refund
Building Permit #2015-00950 pertaining to 140 Kintyre Lane is complete. Please refund
$10,000 to the contractor, Gonyea Homes.
The following is attached:
• Original signed escrow agreement
• Copy of cash•register receipt showing escrow amount received
Mail to: Gonyea Homes
1000 Boone Ave,#400
Golden Valley, MN 55427
w:�,street filesUcintyre lane(&a madcinnon drive)\140�escrow refund 201�00950.doac
, �
TEMPORARY CERTIFICATE OF OCCUPANCY
ESCROW AGREEMENT
Orono Building Permit#2015-00950
AGREEMENT made this�day of , 20 1�by and between the CITY OF
ORONO, a Minnesota municipal corporation ("City") and Gonyea Homes ("Owners").
Recitals
1. Construction of the new residence located at 140 Kintyre Lane the ("Subject Property"),
legally described as Lot 2, Block 2, Kintyre Two in Orono, Hennepin County Minnesota, is
the subject of building permit application number 2015-00950 has been completed.
2. Winter conditions currently prohibit completion of exterior improvements,final grading, and
vegetation establishment. An as-built survey cannot be accurately conducted at this time.
3. Owners request the City issue a temporary certificate of occupancy("TCO")to the Owners
so that the Owners may occupy the new residence.
4. The City will issue a TCO only if the Owners establish an escrow to ensure completion of
exterior improvements, continuation of erosion control and submittal of an as-built survey
to the City.
NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS:
1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow
Agreement, the Owners shall deposit a10,000 with the City. All accrued interest, if any, shall be paid to the
City to reimburse the City for its cost in administering the escrow account.
2. PURPOSE OF ESCROW. The purpose of the escrow is to assure completion of any
exterior improvements, final grading, establishment of vegetation as well as guarantee reimbursement to
the City for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of$500,
or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with
expenses the Owners would be responsible for under a building permit application. The escrow will also
guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work
is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City
Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions
associated with the work and to repair any damage to public property or infrastructure that is caused by the
work(including planning, engineering, or legal consultant review) associated with building permit#2015-
00950 if compliance with the approved building permit is not accomplished.
3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will
in tum send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the
Owners' receipt of bill.
4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make
payment to the City within the timeframe outlined in#3 above, shall issue a Stop Work Order until the Owners
pay all expenses invoiced pursuant to#3. The City may draw from the escrow account without further approval
of the Owners to reimburse the City for eligible expenses the City has incurred.
5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to
the Owners when all requirements related to the project are complete. City Staff shall review the terms of
this escrow agreement two times per year to determine whether the requirements of the project have been
successfully completed and whether it is appropriate to return the funds. Owner may also request the
release of the funds, and such funds shall be released upon City Staff receiving the appropriate verification
that all requirements of the project have been successfully completed.
155441
6. CERTIFY UNPAID CHARGES. if the project is abandoned by Owners, or if the eligible
expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the
unpaid balance to the subject property pursuant to Minn. Stat. §§415.01 and 366.012.
7. ACCESS TO SUBJECT PROPERTY. The Owners hereby grant to the City, its agents,
employees, officers and contractors, the right to enter upon the subject property for the specific purpose of
inspecting and completing any exterior improvements, final grading, establishment of vegetation and the
restoration of the subject property should the Owners not complete the work by the specified dates.
CITY: CITY OF ORONO OWNERS:
By:
its:
��-. � �=s� ��� ��,; �a��. �
155441
���� ������ �����l���� �'�� ��� ���������� f ��'�����!��
I�dcEress: � � �`4.����� ��� Permit t�o.: �1�J� -�d�.�v _
Descripfiion of v�rork: ��11� -IU Date�l�ec'd: � `��`��'.,)' ,
Septic review bY� D�te�provec9: � �
Zoning review by: t '� ' r Date Approved: � z� �
Buiiding review+bY� � Qate Approved: � �.� l
Grading r�vieHr bY- Date Approved: �i i
' Zoning Distcict: '( _ Zoning File#: Reso#: Reso Date:
Zoning: Lot Area:_ 1� /AC Width: Lot Coverage: SF %
S�rvey Submitted: �es t� No Date of;Survey: � •2�• (� Revised date(�)�
Pro osed Setbacks:
Front��'� Rear(S�eet) (�t S E W ) ( 1� �S � E 4N ) Other Buildings 1�Vletiand
Side '6i'tle
f � � . �� � � � ����
?�,,' ,{ 't�
Defined Height: Peak Height: FFE '�' �• ;: �FE minus 6 feet= t fa:' :'�=�# (�xisting Conto�
,.�
,
Perimeter(Finear feet) _ _> !`' 50%= ��',�. L,F. below grade #�of S�ories {.
M1 :X`_ Z, � ; ;•• • 1 :;;� � t ;
FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BU(LDII�G Old A SLAB FOUNDATION:
The dlstance between tfre lowest pruposed The distanoe between e Wp of
_'; , �. START W ITH floor(of the basemeM or crawl space)and �TAR'f WITH siab and tfte:highest t of the
i.f �y: the highestpolM of the roof. ' f.
If you have a... � lf you have a....' , f
GABLE OR HIPPED ROOF(no • GABLE OR WIPP RODF
• wintlows): Subtract half tlie disfance (no windaws,,�,S, traet half
' between the hiphest pofnYof tMe roof the dist�oe be en the
. , ` hi�he�fPcifrtoff' ronito
. ^�' to the low p.oint of the corresponding �
'- ' SUBTRACTION 9abie or hipped roof : ;-itie fow point of th
� (BASED ON . �qBLE OR HIPPED ROOF{with' SUBTR,4CTION :. ����g aa te or
, ROOF TYPE), windows): Subtract half 41ie distance (BASED ON , ' . Ga�iE OR HIP� U RQOF
-r'� betweer�the top of the htghest ROOF T'YpL�) (wfth winticiWs)," q�racc
. , �. > �
' window and the'highest point of Bie j" half the di§lanoe `tin�en
roof the4op of th�ttigti st
• ALL OTHER ROQF fiYPES{flat, " vukic7onD and#he hi hest
pointofthe roof "
mansard,etc):No subUaction. { J :
• ALL OTti�R RQ�TYP�S
' SUBi'R,ACTION Subtract the distar�ce b�iween thie (fiat�inarisaril,$ No
{ {,. (BAS�D ON basement/crawl space floor and the � ,��', suMra�n.
. a ��;,a EXIS�'INC� highest existing grade adJasent to tha ' A6DRiON Add the stance�e n' "e top
, �
�'� � GRAQES) towndation OR 1D feet(whictiever is less). j, (BAS�D ON of sla�i and.U�e highest xis8ng '
, , � T. EQiJALS Defined building height F�(ISTING grade adjaceM to fhe fo ntlatlorr� '
' i.�� GRAQ�S �.
`�"'°� `^1 F„G1UAL3 . Deflned byfWing tieig
� o-.�
1 , . - : .,.
Shoreland District MEWD Perrnit ?p►v�ra$e Lakesllore Setback Bluff �
_ ; ; Met? _,
0 Yes �o Permit Number. �� -� � Yes Q No /A ' � Yes � o
O N/A-see�ttached � 5etbaek:
Stormwater Quality Proposed '
Overla District Existing Hardcover .
y (%and sf� kardcover Variance Required CUP Requirec�.
Tier circle one %o and s `
0 Yes No Li Yes �No
1 : 2 3 � 5 �����,,,o� Type�S�. Type�s��
i`�J�l
l
Updated: January 2015 ',
z:\fortnslplan review checklist 2015.docx
REMARKS (in-house):
Fees ta t�e Char ed YE� ; NCf `
Permit �
Plan RevievN : �
St�te Surcharge ,
investigation Fee � :
`SAC=-1��em#aer af 3AC Units t `
Othsr(speci#y)
S uare Foota e $ er S uare Foota e .
� asement f���• X �`i f�l.� _ � ,�� J� (��q
_ ° �`(�
,�__+�' _.�'�� 7� 'J�' X �� (� �� $ ��. �2�� �
Znd F�00� G..-� ( X � — $ �:J � �7'
Garage �� l X , � _ $ 'u�J'I'� G.�" �-'T
e c k, : ` � � � '
Est mat ons ru on a ue: -- - — '�
-- _-� t, ,�(-- —
J
`t(J ��-� _ _._�, _
Orono inspections Required Work Requiring Separate Permits ; Required State Permits
p Sa� Plumbing 0 Grading 1 Filling � Well
Si1t Fence/Erosior�Control Mechanical i�Fire �leetric�i
CI Hardcover Removal Septic L1 Water Connection
Footing ireplace p Sewer Connection '
Poured Wall - � Masonry Q Lawn Irriga#ion ' :
Foundation Survey Mfg. CI Landscaping
Foundation Waterproofng Other(speci#y)
ttadon Rock Bed
Framing
lnsulation
-Built Sur�rey '
�inaF � /,
Other(specify) �u7'F1�
REMARKS(in-house): '
�
4ther Re�1ew. Reviewed by: Date Approved: ,�
Access: Existing: 0 YES 13 NO : hlewa Q YES a NQ `
OFfiC1Ai.REMARKS-TO BE NOTED QN PERMlT AND INiT1ALl.EU
� ` i �- e� �, I Yl l i 1� i 1�
�
�
r= ,�, .�. '
Updated: January 2015 -
z:\forms�pian review checklist 2015.docx
) T
Christine Mattson
From: Brad Hale<bhale@sathre.com>
Sent: Wednesday, September 02, 2015 7:24 AM
To: Christine Mattson
Cc: 'ethan@gonyeacompanies.com'; Jon Connolly(jon@gonyeacompanies.com); Dave
Pemberton; Melanie Curtis; Sam Weisdort; Bryan Voit; EJ Wirtz; Dean Baron
Subject: RE: 140 Kintyre Lane/#2015-00950
Christine,
All of our surveys have 4 offset irons which are the point of reference for the foundation heights. I will make sure to
include them on our foundation asbuilts from this point on.
From: Christine Mattson [mailto:CMattson@ci.orono.mn.us]
Sent: Tuesday, September 01, 2015 8:18 AM
To: Brad Hale
Cc: 'ethan@gonyeacompanies.com'; ]on Connolly(jon@gonyeacompanies.com); Dave Pemberton; Melanie Curtis
Subject: 140 Kintyre Lane/ #2015-00950
Good morning,
Our engineer has approved the survey dated 8-20-2015, but please note, if during construction it appears the retaining
wall will be over 4 feet in height an engineered design must be submitted and approved prior to its construction.
Also,we have recently changed our survey requirements, copy attached. One of the new requirements is to show the
point or spot where the top of the foundation elevation reference elevation point is being measured from;we expect
this to be consistent with the measurement on the foundation as-built. Please show the measurement point on the
survey and drop off or mail two full-size copies of the survey so we can finalize our review and issue the building
permit. This same location should be referenced on the foundation as-built.
Thank you and as always, please don't hesitate to contact us with any questions.
Christine Mattson
Planning Assistant
City of Orono
2750 Kelley Parkway � Orono I MN � 55356 (physical address)
PO Box 66 � Crystal Bay � MN 0 55323-0066 (mailing addressJ
S' 952.249.4620 � 8 952.249.4616
� cmattson@ci.orono.mn.us � � www.ci.orono.mn.us
Summer Office Hours: (Monday, May 18 ihrough Friday,September 4,2015)
Monday-Thursday: 7:30 am to 5 pm
Friday: 7:30 am to 11:30 am
OUR OFFICE WILL BE CLOSED: Monday,September 7,2015
1
� Y
From: Brad Hale [mailto:bhale@sathre.com]
Sent:Thursday,August 27, 2015 4:00 PM
To:Christine Mattson<CMattson@ci.orono.mn.us>
Cc: 'ethan@gonyeacompanies.com'<ethan@�onveacompanies.com>;Jon Connolly(lon@�onveacompanies.com)
<ion@�onveacompanies.com>; Dave Pemberton<pemberton@sathre.com>
Subject: Lot 2, Block 2, Kintyre Two
Christine,
Attached is an updated Certificate of Survey for lot 2, Block 2, Kintyre Two. I have revised the retaining wall height on
the north side of the house from a 4.3' wall to a 3.8' wall. Please let me know if there is anything else you need.
Thank You,
��acf.�f�aCe
Sathre-Bergquist, Inc.
150 South Broadway
Wayzata, Mn. 55391
Ph: 952-476-6000
Fx: 952-476-0104
The electronic data conveyed by SATHRE-BERGQUIST,INC.is sent for the recipienYs reference only. This material is copyright protected. The recipient agrees,
by his receipt of electronic infortnation,to not alter the electronic data. The recipient agrees by his receipt of this data that the information contained in the
transmission may be changed without notification of the recipient.
This electronic information is not the certified version of a plan.
Recipient agrees to hold SATHRE-BERGQUIST,INC.harmless from any and all claims. SATHRE-BERGQUIST,Inc.makes no representation or warranties,
expressed or implied,with resped to the reuse of the data provided herewith,regardless of its fortnat or the means of its transmission.There is no guarantee or
representation to the user as to the accuracy,currency,suitability,or reliability of this data for any purpose.The user accepts the data"as is"and assumes all risks
associated with its use.By acceptance of this data,the user agrees not to transmit this data or provide access to it or any part of it to another party unless the user
shall include with the data a copy of this disclaimer.SATHRE-BERGQUIST,Inc.assumes no responsibility for actual or consequential damage incurred as a resuR
of any user's reliance on this data.
2
3 f
Christine Mattson
From: Christine Mattson
Sent: Tuesday, September 01, 2015 8:18 AM
To: 'Brad Hale'
Cc: 'ethan@gonyeacompanies.com'; Jon Connolly Qon@gonyeacompanies.com); Dave
Pemberton; Melanie Curtis
Subject: 140 Kintyre Lane/#2015-00950
Attachments: Survey Requirements-August 2015.pdf
Good morning,
Our engineer has approved the survey dated 8-20-2015, but please note, if during construction it appears the retaining
wall will be over 4 feet in height an engineered design must be submitted and approved prior to its construction.
Also,we have recently changed our survey requirements, copy attached. One of the new requirements is to show the
point or spot where the top of the foundation elevation reference elevation point is being measured from;we expect
this to be consistent with the measurement on the foundation as-built. Please show the measurement point on the
survey and drop off or mail two full-size copies of the survey so we can finalize our review and issue the building
permit. This same location should be referenced on the foundation as-built.
Thank you and as always, please don't hesitate to contact us with any questions.
Christine Mattson
Planning Assistant
City of Orono
2750 Kelley Parkway p Orono j MN � 55356(physical addressJ
PO Box 66 ( Crystal Bay � MN I 55323-0066(mailing addressJ �
tii' 952.249.4620 � g 952.249.4616
� cmattson@ci.orono.mn.us � � www.ci.orono.mn.us
Summer Office Hours: (Monday, May 18 through Friday,September 4,2015)
Monday-Thursday: 7:30 am to 5 pm
Friday: 7:30 am to 11:30 am
OUR OFFICE WILL BE CLOSED: Monday,September 7, 2015
From: Brad Hale [mailto:bhale@sathre.com]
Sent:Thursday,August 27, 2015 4:00 PM
To:Christine Mattson<CMattson@ci.orono.mn.us>
Cc: 'ethan@gonyeacompanies.com' <ethan@gonyeacompanies.com>;Jon Connolly(jon@gonyeacompanies.com)
<jon@gonyeacompanies.com>; Dave Pemberton<pemberton@sathre.com>
Subject: Lot 2, Block 2, Kintyre Two
Christine,
�
S 7
Attached is an updated Certificate of Survey for Lot 2, Block 2, Kintyre Two. I have revised the retaining wall height on
the north side of the house from a 4.3'wall to a 3.8'wall. Please let me know if there is anything else you need.
Thank You,
Brad�faCe
Sathre-Bergquist, Inc.
150 South Broadway
Wayzata, Mn. 55391
Ph: 952-476-6000
Fx: 952-476-0104
The electronic data conveyed by SATHRE-BERGQUIST,INC.is sent for the recipienYs reference only. This material is copyright protected. The recipient agrees,
by his receipt of electronic information,to not alter the electronic data. The recipient agrees by his receipt of this data that the information contained in the
transmission may be changed without notification of the recipient.
This electronic information is not the certified version of a plan.
Recipient agrees to hold SATHRE-BERGQUIST,INC.hartnless from any and all claims. SATHRE-BERGQUIST,Inc.makes no representation or warranties,
expressed or implied,with respect to the reuse of the data provided herewith,regardless of its format or the means of its transmission.There is no guarantee or
representation to the user as to the accuracy,currency,suitability,or reliability of this data for any purpose.The user accepts the data"as is"and assumes alI risks
associated with its use.By acceptance of this data,the user agrees not to transmit this data or provide access to it or any part of it to another party unless the user
shall include with the data a copy of this disclaimer.SATHRE-BERGQUIST,Inc.assumes no responsibility for actual or consequential damage incurred as a result
of any user's reliance on this data.
2
1 R
Christine Mattson
From: Adam Edwards
Sent: Friday, August 28, 2015 10:22 AM
To: Christine Mattson
Cc: Melanie Curtis
Subject: RE: Lot 2, Block 2, Kinryre Two/ 140 Kintyre Lane
Based on the electronic version. Approved. If during construction the retaining wall turns back into a 4.3Ft wall an
engineered designed will be required.
From:Christine Mattson
Sent:Thursday,August 27, 2015 4:40 PM
To:Adam Edwards<aedwards@ci.orono.mn.us>
Subject: FW: Lot 2, Block 2, Kintyre Two/140 Kintyre Lane
They are not surveyors...they are magicians. HA!!
From: Brad Hale [mailto:bhale@sathre.com]
Sent:Thursday,August 27, 2015 4:00 PM
To: Christine Mattson<CMattson@ci.orono.mn.us>
Cc: 'ethan@gonyeacompanies.com'<ethan@�onveacompanies.com>;Jon Connolly(ion@�onveacompanies.com)
<ion@�onveacompanies.com>; Dave Pemberton<pemberton@sathre.com>
Subject: Lot 2, Block 2, Kintyre Two
Christine,
Attached is an updated Certificate of Survey for Lot 2, Block 2, Kintyre Two. I have revised the retaining wall height on
the north side of the house from a 4.3'wall to a 3.8'wall. Please let me know if there is anything else you need.
Thank You,
Brad��faCe
Sathre-Bergquist, Inc.
150 South Broadway
Wayzata, Mn. 55391
Ph: 952-476-6000
Fx: 952-476-0104
The electronic data conveyed by SATHRE-BERGQUIST,INC.is sent for the recipienYs reference only. This material is copyright protected. The recipient agrees,
by his receipt of electronic infortnation,to not alter the electronic data. The recipient agrees by his receipt of this data that the infortnation contained in the
transmission may be changed without notification of the recipient.
This electronic information is not the certified version of a plan.
Recipient agrees to hold SATHRE-BERGQUIST,INC.hartnless from any and all claims. SATHRE-BERGQUIST,Inc.makes no representation orwarranties,
expressed or implied,with respect to the reuse of the data provided herewith,regardless of its format or the means of its transmission.There is no guarantee or
representation to the user as to the accuracy,currency,suitability,or reliability of this data for any purpose.The user accepts the data"as is"and assumes aIl risks
associated with its use.By acceptance of this data,the user agrees not to transmit this data or provide access to it or any part of it to another party unless the user
shall inGude with the data a copy of this disclaimer.SATHRE-BERGQUIST,Inc.assumes no responsibility for actual or consequential damage incurred as a result
of any user's reliance on this data.
1
� s
Christine Mattson
From: Christine Mattson
Sent: Thursday, August 27, 2015 3:21 PM
To: 'Ethan Kindseth'; pemberton@sathre.com !
Subject: FW: Lot 2, Block 2, Kintyre Two/ 140 Kintyre Lane/#2015-00950
Ethan,
After we spoke I had our engineer review the survey dated 8-20-2015 and noted one of the retaining walls on the north
side of the house still measures 4.3 feet in height. I have left a message for David at Sathre-Bergquist to call me and
have copied him on this email also. Engineering is needed for retaining walls over 4 feet in height. Please don't
hesitate to contact me if you have any questions. After the survey is updated we will need two,full-size copies to
review.
Thanks.
Christine Mattson
Planning Assistant
City of Orono
2750 Kelley Parkway � Orono � MN � 55356(physical addressJ
PO Box 66 � Crystal Bay � MN � 55323-0066 (mailing addressJ
'� 952.249.4620 � 8 952.249.4616
� cmattson@ci.orono.mn.us � � www.ci.orono.mn.us
Summer Office Hours: (Monday, May 18 through Friday,August 28,2015)
Monday-Thursday: 7:30 am to 5 pm
Friday: 7:30 am to 11:30 am
OUR OFFICE W/LL BE CLOSED: Monday,September 7,2015
1
� ,
�O� V�
C ITY OF ORONO
.a �, Street Address: Mailing Address: Telephone(952)249-4600
y�. Gti 2750 Kelley Parkway P.O.Box 66 Fax (952)249-4616
�q F, Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us
kESHO�
August 20, 2015
Ethan Kindseth
Gonyea Homes
6102 Oison Memorial Highway
Golden Valley, MN 55422
Re: Building Permit Application#2015-00950
140 Kintyre Lane
On July 28, 2015 the City received a building permit application for a new single family home at 140 Kintyre Lane. As
you know on August 13, 2015 an unresolved development issue was finalized. Staff conducted a preliminary review
based on the information provided and recommends the following items be submitted or revised in order for your
application to be considered complete and for the plan review to continue:
1. Certificate of Survey. The City Engineer has reviewed the revised survey dated 8-20-2015. Please provide two
copies of an updated survey addressing the comment below.
a. The northwest retaining wall is shown at 4.3 feet in height. Walls over 4 feet require an engineered
designed plan signed off by a licensed engineer. Please provide.
2. Landscape Plan. Before we will issue the building permit we need a landscape plan for the property. The name
of the landscaper performing the work must be shown on the landscape plan. Copy of Ordinance 146, Third
Series is enclosed.
3. Separate City Permits Required for:
a. Septic
The above information is required in order for the plan review to continue. Please feel free to contact me at
952.249.4620 or by email at cmattson@ci.orono.mn.us if you have any questions on the above requirements.
Sincerely, \ t
CITY OF ORONO �j ��/`� `
` v �
�I�I1t�VU�I�- ��,� / 'i
�.�� V�,h�,� � ,
Christine Mattson � � ���/' I
�"D�
Planning Assistant - �t �
�, �� i
c Ethan Kindseth via email ,
Roger Peitso, Building Official ��
enclosures "
. . ..„. _ _.: _ : ._ . ..
�
I
I
i;
' * V
�
Christine Mattson
From: Christine Mattson
Sent: Thursday, August 20, 2015 2:05 PM
To: 'Ethan Kindseth'; 'Jon Connolly'
Cc: Melanie Curtis
Subject: 140 Kintyre Lane/#2015-00950
Attachments: ord 146.pdf; letter.pdf
Ethan,
Attached is a copy of the letter and enclosures being mailed today. Please don't hesitate to contact me if you have any
questions.
Christine Mattson
Planning Assistant
City of Orono
2750 Kelley Parkway � Orono � MN � 55356 (physical addressJ
PO Box 66 � Crystal Bay � MN � 55323-0066 (mailing addressJ
'� 952.249.4620 � 8 952.249.4616
� cmattson@ci.orono.mn.us � �www.ci.orono.mn.us
Summer Office Hours: (Monday, May 18 through Friday,August 28,2015)
Monday-Thursday: 7:30 am to 5 pm
Friday: 7:30 am to 11:30 am
OUR OFFICE WILL BE CLOSED: Monday,September 7, 2015
1
�.._..
� r
Christine Mattson
From: Soren Mattick <SMattick@ck-law.com>
Sent: Thursday, August 13, 2015 6:19 PM
To: Christine Mattson; Roger Peitso; Mike Gaffron; Jeremy Barnhart; Melanie Curtis
Subject: Final Kintyre Building Permit
To All:
The final building permit for the Kintyre subdivision may be reviewed and issued. I have received the easement for
Outlot D and sent it in to be recorded.
Soren M. Mattick
CAMPBELL KNUTSON P.A.
Grand Oak Office Center I
860 Blue Gentian Road,Suite 290
Eagan,MN 55121
'I�'(651)234-6217•Fax:(651)234-6237
�smattick@ck-law.com•www.ck-law.com
IMPORTANT:This electronic message contains information from Campbell Knutson or its attorneys that is presumptively confidential
and,if sent to clients or co-counsel, may be privileged or otherwise protected from disclosure.The unauthorized use,distribution,or
re-transmission of any part of this message by an unintended recipient is strictly prohibited and may be a violation of law.If you are
not the intended recipient of this e-mail,please contact the sender immediately and delete all copies.
1
� <
Permit Application: Self-Checklist for Completeness
Please note, the applicant must initial in the boxes below to acknowledge the minimum
required information is included with the submittal. If not, the application will NOT be
accepted. Call 952.249.4620 to schedule a meeting with staff if you have questions on
application submittal requirements.
Completed Application
Plan Review Fee Paid
Signed Escrow Agreement & Escrow Payment
Building Plans (to scale) x2
- Certificate of Survey (to scale) showing the proposed project &
meeting all requirements x2
Hardcover Calculations (if applicable)
I are that Orono will not issue a building permit without a
opy of MCWD permits (or documentation from the MCWD stating
the proposed project does not trigger their permitting
requirements). I will contact the MCWD at 952-471-0590
re ardi �tla�� project.
Signed by:
Address:
Permit #:
Packet Last Updated: January 2015
Page 2
� 1.
RECEIVED
� ` City of Orono
�oN Hardcover Calculation Worksheet JUL 2 8 2015
� CITY OF ORO��
Pro ert Address: � � �e
y� G�. P Y ` � � K c n�y Y-� a
��KFSHOQ'� Prepared by: `r � A � Date: � �.
v� "�h
Stormwater Quality Overlay District Tier: (Circle one) Tier 1 Tier 2 Tier 3 Tier 4 Tier 5
Step 2: PROPOSED HARDCOVER
In the following table, identify all items of proposed hardcover on the property, keyed by letter to Certificate of Survey
(survey must accompany this form). Include all existing hardcover items that are intended to remain, as well as all
proposed hardcover items that will be added. Use as many lines as necessary to accurately depict proposed hardcover
status of the property. For Tier 1 properties, identify any features by letter which are split at the 75' setback line and
calculate hardcover s uare foota e se aratel for each ortion.
Key to Hardcover Item (Describe) Length x Width Total
Surve (S uare Feet
}f��arri le Ga , 2�'x 3D> � � � y. �:F. ,
A v..s•� S.F.
B op S.F.
C ,` Q S.F.
D �1 S.F.
E �P'r vcwa S.F.
F S.F.
G S.F.
H S.F.
I S.F.
J S.F.
K S.F.
L S.F.
M S.F.
N S.F.
O S.F.
P S.F.
Q S.F.
R S.F.
S S.F.
T S.F.
U S.F.
V S.F.
W S.F.
X S.F.
Y S.F.
Z S.F.
1 Total Pro osed Hardcover D" S.F.
Exctudable HaMcover See Ci �ode S�ee"�8-�884::' . . ' . . ,
S.F.
S.F.
S.F.
S.F.
S.F.
2 Total Excludable Hardcover S.F.
3 Net Pro osed Hardcover Subtract line 2 from line 1 OS S.F.
4 Total Lot Area � ( S.F.
Proposed Hardcover Percentage [(3)=(4)] � ,�'" %
Packet Last Updated: January 2015 This is an information packet regarding Hardcover. Every effort has been made to
ensure the accuracy of the information contained herein;however,if any information is
not consistent with provisions of the City Code,the Code provisions will prevail.
Page 17
� I
�O ♦O
C ITY OF ORONO
� � Street Address: Mailing Address: Telephone(952)249-4600
�, Gti 2750 Keiley Parkway I P.O.Box 66 Fax (952)249-4616
lq �, Orono,MN 55356 Crystal Bay,MN 55323 I www.ci.orono.mn.us
kEsxo�
August 7,2015
Ethan Kindseth
Gonyea Homes
6102 Olson Memorial Highway
Golden Valley, MN 55422
Re: Building Permit Application#2015-00950
140 Kintyre Lane
On July 28, 2015 the City received a building permit application for a new single family home at 140 Kintyre Lane. We
will not begin review of this application until the easement over Outlot D has been filed with Hennepin County. Our
City Attorney is working with Mr. McKinnon to complete this action.
Please feel free to contact me at 952.249.4620 or by email at cmattson@ci.orono.mn.us if you have any questions on
the above requirements.
Sincerely,
CITY OF ORONO
Nc�I� ��
Christine Mattson
Planning Assistant
c Roger Peitso,Building Official
U���� l���`��-��_��
� �� �� ���� ����
. �e���.� �
New Construction Energy Code Compliance Certificate
Date Certificate Posted RECE�VED
Per R4013 Building Certificate.A building certificate shall be posted on or in the elechical disffibution panel.
7/2/15
Mailing Address of the Dwelling or Dwelling Unit ��� 2 8 Z��5
140 Kint re Lane
Name of ResidenHal Contractor MN License Number
Gon ea Homes 2459 C�N�F ORONO
Community Plan ID
Orono GH0549
HERMAL ENVELOPE RADON SYSTEM
� Type: Check All That Apply X Passive(No Fan)
0
� �
a
F p T Active(Wi1h fan and monometer or
� � � � � � � other system monitonng device)
z U — -o �
� C � � � U � � G Location(or future Location)of Fan:
� U
� O N �i O � k. O
Insulation Lowtion ° z � `� v � w �=
rx � o � m O �
a� -o -o
Y � C � � � @ C
E-° 5 Z � i:; u°, u°., � rx r� Other Please Describe Here
Below Entire Slab X
Foundation Wall R-10 X Exterior
Perimeter of Slab on Grade X
Rim Joist(Foundation) R-20 X mtenor
Rim Joist(19�Floor+) f2-2� X �nterior
Wall R-2Q X
Ceiling,flat R-49 X
Ceiling,vaulted R-30 X
Bay Windows or cantilevered areas R-30 X
Bonus room over garage R-38 X
Describe other insulated areas
Buildin Envelo e air Ti htness: Duct s stem air ti htness:
Windows 8 Doors HeaTin or Cooling Ducfs Outside Conditioned Spaces
Average U-Factor(excludes skylights and one doon)U: 0.31 Not applicable,all ducts]ocated in conditioned space
Solar Heat Gain Coefficient(SHGC): Q29 R-8 R-value
MECHANICAL SYSTEMS Make-up Air Select a Type
Ap liances Heating System Domestic Water Heater Cooling System X Not required per mech.code
Fue1 Type NAT GAS ELECTRIC R-410A Passive
Manufacturer B ant Westin house B ant Powered
#1:9�2SB480100S21 #1: 113ANA036 Interlocked with exhaust device.
Model #2:912S848o6oS17 WER080C2X045 #2: 113ANA030 Describe:
Inpuc in #1: 100,000 Capaciry in 5� Output in #]:3 ton #2: Other,describe:
Ratiag or Size BTUS: #2:60 000 Gallons: Tons: 2.5 ton
AFUE or 92�/o SEER or 13 Location of duct or system:
Efficiency HSPF% EER
HEAT�OSS HEAT GAIN COOLING LOAD
RESIDENTIAL LOAD CALC 110,986 46,567 55,354
Cfin's
roun uc
Mechanical VentilaTion System "metal duct
Describe any additional or combined heating or cooling systems if installed:(e.g.two fumaces or air Combustion Air Select a Type
source heat pump with gas back-up furnace Not required per mech.code
Select Type X Passive
Heat Recover Ventilator(HRV) Capacity in cfms: Low: High: Other,describe:
Energy Recover Ventilator(ERV)Capacity in cfrns: Low: 40%=124 High: 80%=248 Location of duct or system:
Balanced Ventilation Capciry in CFMS: fUff12C2 fOOfll
Locations of Fans,describe: Cfin's
Capacity continuous ventilation rate in cfrns: 113 6 "round duct OR
Total ventilation(intermittent+continuous)rate in cfms: 226 "metal duct
�c
. � c
140 Kintyre Lane Orono WATK/NS
HVAC Load Calcu/ations
for
Gonyea Homes
Golden Valiey, MN
,;
Prepared By:
�� • Michael Hoium
Sabre Plumbing 8�Heating
15535 Medina Road
Plymouth, MN 55447
763-473-2267
' Friday,June 12,2015
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are perFormed per ACCA Manual J 8th Edition,Version 2, and ACCA Manual D.
� ,
�.� �.�������� �
������� � �����
_ � —
, ;
, . ,
��� :,._ ,..� ... :, -� r.
� a . ��
..
Pro'ect Re ort
Project Title: 140 Kintyre Lane Orono WATKINS
Designed By: Michael Hoium
Project Date: Friday, June 12,2015
Client Name: Gonyea Homes
Client City: Golden Valley, MN
Company Name: Sabre Plumbing&Heating
Company Representative: Michael Hoium
Company Address: 15535 Medina Road
Company City: Plymouth, MN 55447
Company Phone: 763-473-2267
Company Fax: 763-473-8565
, .
. �k �� �.�
�'•-.� r.-"�. .;,., .�< � s � ,r. a ��'� �;��'"y.` :;s.r :
,. ._ �a:: P.,._ , ���•. . ,, �_:.�.., . _ .
Reference City: Minneapolis, Minnesota
Building Orientation: Front door faces East
Daily Temperature Range: Medium
Latitude: 44 Degrees
Elevation: 834 ft.
Altitude Factor: 0.970
Outdoor Outdoor Outdoor Indoor Indoor Grains
D�y Bulb Wet Bulb B�L1�U�] $�LHUp] Dry Bulb Difference
Winter: -15 -12.38 Na 30% 72 29.40
Summer: 88 73 50% 50% 72 42
G � S{t. ' 3.?. a�^. ;�t'� ,UY`L[ .w`�` '� '� ��i;t" ;4�''?; '=` s
, . _ .. �..,. , n , x. ,. .*- r . . .> ..,:, .. .. ,... �. n ..-,..� ..,,�, -,..
Total Building Supply CFM: 2,109 CFM Per Square ft.: 0.310
Square ft.of Room Area: 6,800 Square ft. Per Ton: 1,474
Volume(ft�)of Cond. Space: 68,644
�y % < <� #�,,�. s �._
x ,��;
Total Heating Required Including Ventilation Air: 110,986 Btuh 110.986 MBH
Total Sensible Gain: 46,567 Btuh 84 %
Total Latent Gain: 8,788 Btuh 16 %
Total Cooling Required Including Ventilation Air: 55,354 Btuh 4.61 Tons(Based On Sensible+ Latent)
f � : �, ��� . .� � � � ��� -
�„ .. . ,.
, � �„
� « � ,�:, �_, r „ ..
�� �� � ������
� ;�. � � ;-
,�._. �4�. . :� , ,�,
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition,Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
M:\Sales and Estimating\Heat Calcs\Gonyea\140 Kintyre Lane Orono WATKINS.rh9 Friday,June 12, 2015,2:01 PM
t �
�� t����O11rl�li���� �' ; � � �.
� ��.
Load Preview Re ort
�S Sys sy�
Net RZ Sen Lat Net Sen �9 �� � Dud
Scope Ton /Ton Area Gain Gain Gain Loss CFM CFM CFM S�
Building 4.61 1,474 6,800 46,567 8,788 55,354 110,986 1,373 2,109 2,109
System 1 4.61 1,474 6,800 46,567 8,788 55,354 110,986 1,373 2,109 2,109 20x20
Ventilation 1,544 6,210 7,754 8,394
Duct Latent 476 476
Humid�cation 9,319
Zone 1-Ck,�•:28°�a,Htcj•:22% 1,848 14,859 0 14,859 20,436 301 696 696 10x14
1-BasemeM 1,848 14,859 0 14,859 20,436 301 696 696 7-6
ZOfte 2-Clg.:7%,H�.:18% 725 3,715 0 3,715 16,413 242 174 174 6x6
2Sport Court 725 3,715 0 3,715 16,413 242 174 174 2-5
Zone 3-Clg.:47%,Htg.:30°� 1,848 25,342 2,101 27,443 27,932 411 1,187 1,187 12x17
3-Main Floor 1,848 25,342 2,101 27,443 27,932 411 1,187 1,187 11--6
Zone 4-Clg.:19%,Htg.:31°h 2,379 10,044 0 10,044 28,492 419 471 471 8x13
4-Second Floor 2,379 10,044 0 10,044 28,492 419 471 471 5-6
Sum of room airtlows may be greater than system airtlow because
s stem has multi le zones.
M:\Sales and Estimating\Heat Calcs\Gonyea\140 Kintyre Lane Orono WATKINS.rh9 Friday,June 12, 2015,2:01 PM
� ,
�:� ����#��� , ���er
�� ,,�� � '��h'�� ,�,
Total Buildin Summa Loads
Low EE:Giazing-LowEE Builder Grade .31 U-value, .29 884.5 23,853 0 21,275 21,275
SHGC, Window and Patio Door, u-value 0.31, SHGC
0.29
11J: Door-Metal-Fiberglass Core 69.3 3,620 0 1,124 1,124
15A-10sffc-8:Wall-Basement,concrete block wall, R-10 1306.5 5,186 0 148 148
foam board to floor, no framing, no interior finish,
filled core, 8'floor depth
15A-10sffc-4:Wall-Basement, concrete block wall, R-10 114 496 0 0 0
foam board to floor, no framing, no interior finish,
filled core,4'floor depth
R20 12F-Osw: Wall-Frame,Custom, R-20 Insulation in 5153.5 29,592 0 5,543 5,543
2x6 Cavity, no board insulation, siding finish,wood
studs
RJ 20 Spray Foam:Wall-Frame, Custom, Rim Joist R-20 717.4 3,122 0 985 985
Closed Cell Spray Foam
R49 166-49: Roof/Ceiling-Under Attic with Insulation on 3146.9 6,297 0 3,690 3,690
Attic Fl�r(also use for Knee Walls and Partition
Ceilings), Custom, R-49 Blown Insulation, No
Radiant BaRier,Vented Attic,Asphalt Shingles
21A-32: Floor-Basement, Concrete slab,any thickness,2 1848 3,216 0 0 0
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 32'wide
21A-28: Floor-Basement, Concrete slab,any thickness, 2 725 1,388 0 0 0
or more feet below grade, no insulation below floor, .
any floor cover, shortest side of floor slab is 28'wide
20P-30: Floor-Over open crawl space or garage, Passive, 27 82 0 10 10
R-30 blanket insulation,any cover
20P-38: Floor-Over open crawl space or garage,Passive, 534 1,393 0 176 176
R-38 blanket insulation,any cover
Subtotals for structure: 78,245 0 32,951 32,951
People: 6 1,200 1,380 2,580
Equipment: 901 4,116 5,017
Lighting: 0 0 0
Ductwork: 4,141 476 1,090 1,566
Infiltration:Winter CFM: 117,Summer CFM: 0 10,887 0 0 0
Ventilation:Winter CFM:226, Summer CFM:226 8,394 6,210 1,544 7,754
Humidification(Winter)25.41 gal/day : 9,319 0 0 0
AED Excursion: 0 0 5 486 5 486
Total Building Load Totals: 110,986 8,788 46,567 55,354
�� �"�� ;'3���� +. ``���- Ft�:;
,. ,. ., > ,e.� . ,. . .,..+ , ..� .. . �
Total Building Supply CFM: 2,109 CFM Per Square ft.: 0.310
Square ft.of Room Area: 6,800 Square ft. Per Ton: 1,474
Volume(ft')of Cond. Space: 68,644
Total Heating Required Including Ventilation Air: 110,986 Btuh 110.986 MBH
Total Sensible Gain: 46,567 Btuh 84 °�
Total Latent Gain: 8,788 Btuh 16 %
Total Cooling Required Including Ventilation Air: 55,354 Btuh 4.61 Tons(Based On Sensible+Latent)
�..
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition,Version 2,and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
M:1Sales and Estimating\Heat Calcs\Gonyea\140 Kintyre Lane Orono WATKINS.rh9 Friday, June 12, 2015,2:01 PM
• .� i
i
�Voigt & Associates, Inc.
oRoNo copY
� STRUCTURAL ENGIl�'EERING SERVICES
4635 NICOLS RD. SUITG 204
EAGAN,MN 55122 RECEIVED
� PH.(651)686-7727 FAX.(651)686-8444
JUL 2 8 2��5
Michael Karn Ju]y 18,��� �F pRpNO
Gonyea Homes
6102 Olson Memorial Highway
Golden Valley,MN 55422
763-432-4511
michaelL��.*on ca��anies.ce�m
RE:Watkins Residence at 140 Kintvre Lane,Orono,MN 55356
Dear Mr. Karn:
Per your request,I examined the main level garage wall (left elevation)of the address above for compliance with the 2015
Minnesota State Building Code(2012 IRC w/Minnesota amendments)bracing requircments. Your plan notes that you will
be sheathing the entire exterior of the building with OSB permitting the use of Table R60210.4 Continuous
Sheathing Methods,CS-WSP and CS-PF. Please note IRC Figure R602.10.8(1)Braced Wall Panel ...to Floor/Ceiling
Framing connection requirements for the continuous method.
The altached sheet,BP1,indicates the locations of braced wall segments for the garage elevation on the main level of this
house and the location of portal frames. See Detail S l.
You asked me to comment on the tall wall framing at the stairwell. Frame the tall wall at the stairwell with 2X6#2 SPF at
16"OC. Use a minimum of(2)2x6#2 SPF between each window at the upper IeveL You may support the headers above
those windows with inverted flange hangers installed to the sides of the double studs. Use Simpson Part#MUSC28 or
HUSC28(or equal) for double 2X10 header.
You also asked that I review the tall wall at the sport court.Frame these walls with(2)2X6s#2 SPF @ 12"centers.
A basic assumption of IRC bracing is that the rest of the structure is properly constructed and con�ected per the appropriate
section of the code.
The information and opinions contained herein are based upon the limited investigatio�described at the beginning of this
report. No warranties are expressed or implied regarding the existence of other unknown conditions not specifically
addressed. Our work is in accordance with generally accepted engineering standards and is not intended to be relied upon or
transferred to individuals other than the addressee. Should information or conditions become known which differ from the
discussion herein,they may alter the opinions or conclusions of the undersigned.
Please call if you have any questions.
Sincerely,
P�. � � .
�
I Hereby Certify That This Plan,Specification,Or Report Was Prepared
By Me Or Under My Direct Supervision And That I Am A Duly
Licensed Engineer Under The Laws Of The State Of Minnesota.
Paul W.Voigt Date 7/18/l5 License Number 20705
�
I Mnbr aatitr that this pan.�P�oineanan w . E.
npoA ras pnpond Ip m�or undr mr dlnaf
Outside Elevatlan S(de Qewtion sup�rvblon and lhaf I am a dulr Ito�ns�d ',
Extent of header one braced wall se m�t Pro/ndonal EnytnNr und�r M�laws ot th�
Sfab o( MinmaoM.
•
e-o_o a=a_� ��
°i i i
i i 9na un PAUL W.VOIGT
� �� 7/1a/2015 20705
i ii
i i i Dab R IskoHon NumMr
L_______I I �
a�o 0 0_o_� � I
o� o 0 0 o i9 II I I
°i ° ° � � i i � Sheathing filler if needed
ai p a o a MINIMUM 3� x 11-1/4" HEADER — SEE PLAN i i i i
i ii
oi o �� �� i
ii
o�-_�o�a_Q ii i
i - � iiii ii
o�oi ia i y i i i
�a' ' '� � ' � 18d sinker natls in 2 rowa
°i i i°yi 4 i i i
oia� ���R Header shall be fastened to the king stud '4 i � � �3' o.c.
oioi iii9 with 6-16D ainkar naile �ii �i i i
V � I I I ��I I I I
o °�°i �°�� Fasten sheathing to header with Sd comman i q � � �
r oio� �a�a nails in 3—in. grid pattem os shown and 3 in. '4 � i '
ii ii i �
L ° Qioi ia�a o.c. in all framing (studa and sills) typ. � � i i
a Y °i°� �°�° li � � ' Wood Structurol pand must be
t a,oi �a�o Minimum 1000 Ib heoder—to—jack—stud atrap , i � �
i � � � aholl be centered at bottom of heoder and � � � � conttnuaus hom top of wNl to
o $ oiai ioio i i i ' bottom of wall, or from top of
3 i i i i inetalled on backeide oe ehown on side i i ,
o r o�al i�i� elevation. Simpson Part LSTA21 OR EOUAL � � i � wall to permitted splice area
io i i '
M �� °i i �°�° i i i i
L p�oi_____ioio For a panel apitce ((f needed), pand adges i �
x ,; i° ° ahall occur avar ond be nailad to comman i i i u
o O °I°L°__°__°Jolo � � I I
� � i � i i blacking and xcur within the middle 24 in.
o��� �°�° of wall height. One row of 3 in. o.c. noiflng Is � �i � �
N o oioi ido roquirod at each pand edge. i i i i
ii ii , i � i
eioi iaio i � i i
�i�i iai� 9� + — fln(shed width � i �i i
oioi � i i i i
ii ii i ii
oia� ���a Minimum lenqth 24' ' � �i
i � Braced wall Iine with � � � �
iQi i i continuaue aheathing � i i i Full—length king studs
°i i i°i° i i i i
oia� �o�o i i i i
�oi i io Mln. number of atuds ehown ii i i i
' � �� No. of ck atuda ' ' � �
°i� �°�° Full—length king stud � � � � i
oioi i i per plan i i i
i i i i � i i 3/8" min. thickneee wood
oio iQia i i i i structural panel
��i--a-�s�a `�i---��-- sheathing
o' a ' �i i
L L L L
(2) t/2' dia. Mchor Bdts with Foundation
2' x 2" x 3/18" Plate Woshers per Code
� PORTAL FRAME AT 9� GARAGE DOOR - METHOD CS-PF
NO SCALE
DETAIL MAY BE REVERSED
�Voigt & Associates, Inc. WATKINS RESIDENCE /GONYEA HOMES ��
� STRUCTURAL ENGINEERING SERVICES
4635 NICOLS RD. SUITE 204 140 KINT'YRE LANE,ORONO,MN 55356
� EAGAN,MN 55122 PROJ.#: 2015.xxx REVISIONS:
PH.(651)686-7727 FAX.(651)686-8444 DRAWN BY: RNS DATE: 7118/i5
a ar j
WALL CONSTRUCTIOM
GUt�Ti�1tJ0US Rlt�t FUIL MEcGHT BLC�C!«N�'i —�
,�dR BAND JUIST CC7��lTI Nk10U�AlO1tiG i.E�JG�H
` �JF'E3ltAC£t3 V'iAi.l,P'AN��
P�RP't�h1171�:iJLAR FRAt�11t�iG
�� '-8d L ti"G�,C.i1L�3hiG
�-8c�G"C+.0 ALt7FdG �R�kGED'IJALL PANEt
�- �
B6tAGE0 tNAil.PANF1. �
� �.s (i17AC:�f?YJAE 4. PRhfE.€�
�3RAf;Gfl th'k!t Pf4NEL
�—.3.1�;i�1�"0 G AtiK�� 3-1h�� 76"�.�.0 ALOCdG
� �RAt�.E�l 4'�A�t F?AI+IEL � #�RAC:�6�k�tAl.1. P�,NE�
P[RPE��lr,iG�rla€�Fs�AraiF��
�
�. ���•����Ot3 tINUC}US€21Pd ���LL NEI�H?8LC3�K1M1G��'
C3R[3APli7.�QIST CONTINUpUS AILC}PtG tENGTF#
OF @RACED W4�L PAi+dEL
Yzrr SI: 1 incl�=2:i d mm.
fIGUR�#2fA2.70.8{7)
SRAC€O MVAL.L FANEL CONNECTION WHEW PERP��4DICUlAR TO FLdI}RlCEILING FRAAMNG
r—GfXdT�NUOIiS�IIA'JR ��AQ�J�TlON,4L FRAf?Iri3u r—FUt�L NEI�kT BLO�KtNG
j r EtJD J':7157� r t�1Eh',BER�RECTL2'A&t7�J� � �t!�`[�C AE_ONi�
w� � ��.A';.ED vti'A��v PIt�JEt � @Rq��D YVAlI PANEL
_� r � w-,..
.. .� � �.,
� i+C t"n'�� O.0 �1L�7'JG �—i Ut t�lAl�3•bd
j -�ea�s�c�e. ��c,r�� ar�cnc�fl y�au Part�� IVAllS Af F�ifH
' 6r'iAC�DLVtLL PAldFt BLOCK3PdL�
�y
. - ,-- t.?EFAE}EFi
� j -=-�� „
�+�8.x7ACEd V.'ALL PA'JEL _�_.�Ft{4G�R t�'.;'s1 t P!t'lEl -- BR/IGEE{LWALL f��4*aEL
�
�i ,—3-1 fid�1 G'Ci C At C)F:C� i 16d�,�i�"G�C AL+:7h�G ;�.1£u7 AT EAC.F's
,I 3FGACE�V1(P,ti PAh1-t �/� pFiAGEiJ'NALL F'At+tEl ! Q(Q(;KsC�IC�f.1E�+18E�
I
"t
�..>.. . .___.�_ -,-�-.
' �� � 2-16d NAILS
�. FACii S1�F
�� � �� �
� " � COtJTRVUC7U�F2lhk �k�plTl�^u4C FRAtdlNG �L r
k � C?R EPdC,JC�S7 �d£R1�ER DIR�GTCY pC�C1W �JL6 HEiGHT
8F{ACEO WALL f'APdEI E3it7€3SUJ(i(t�1�a"L7t;..
ALQNG Bft11t�QU'dAi�L.
1�'nr SI: 1 i�ai 3a—T.S.1 ni�rt.
FIGURE R602.10.8(2}
Bl2AGE0 WAtI.PAlVCL CONNECTION WNEN PAIZ/4CL[L TO FLOQ6tfCElUNG FRAMING
20121NI£l2NA71QNA�RESIOENTtht CODE` 185
y , '�.
MINNEHAHA CREEK WATfRSHED DISTRICT
QUALITY �F WATER QUALITY OF LIFE
Pursuant to Minneso#a Statutes Chapter 103D, and on the basis of statement�
The Minnehaha Creek and information contained in the permit applicatian, correspondence, plans,
maps, and ail other supporting data submitted by the applicant, and made a part
���'��'��'�"�'S hereof by reference, PERMISSION IS HEREBY GRANTE�to the applicant
cornmitted tc�a leade�ship named below for use and d�evelopment of land in the Minnehaha Creek
Watershed District. �O ' � �
rote in pr�tecting.
irnproving and rrtanaging
Issued to: Gonyea Homes Permit No: 15-404
t3�ee surface waters arKf
Location: 140 Kintvre Ln, Orono
affitiat�i groundwater
����„����� Purpose: Erosion Control, Sina(e Familv Home
Distric�,including tlieir Date of lssuance: 8/7/2015 Date of Ex iration: 8/7/2016
retationships to the By Order of the Board of Managers
ecasysterns of which �"�.,,_ "_ � .
`�- K:. .,:��
�����►��s��Pa� Tam Dietrich
We achieve aur m�ssion District Technician .
through regulation, This permit is not transferable without District approval, and is valid ta the date af
expiration. No activity is authorized beyond the expiration date. If the permitt�e
�►��P�J�- requires more time to complete the project, an application for renewal of the
����� ������ permit must be received by the District at least 30 days before expiration.
endeauars,and othe►- The applicant is responsible for compliance wi#h ail District Rules and for the
action of their representatives, contractors, and emplayees.
programs based on
�u��� Conditions: Project to be completed as described in plans submitted to the
MCWD office on July 31t'', 2015 according to the provisions of this
innQvaLive thinking,en permit.
• Properly install and maintain all required erosion control
�nfom�ed and ergaged measures until the disturbed areas are re-stabilized
constitueney,arul the • Notify MCWD in writing upon completing installation of
perimeter and sedimentation contrals
casteffeect,'ve use o� . When the site is re-stabilized and the MCWD staff has
pubtic ft,nds. p��Formed a final inspection, �II silt fences must be removed
(Statement concerning fees for inspeetians, violations, etc... on following page)
15320 Minnetonka Boulevard,Minnetonka,MN 55345•Office: (952)471-0590• Fax: (952)471-0682•www minnehahacreek.org
. .
,,
MINIVEHAHA CREEK WATERSHED DISTRICT
QUALI7Y OF WATER QUAIITY OF LIFE
Inspection/Analvsis/Monit+orina Fees
The Minnehaha C.reek
Watershecf District is
A site inspection and monitoring by District staffi will be performed where the
carnmitted to a leadership activity invalves;
���"'p�"�' • a commercial/industrial/multi-family residential development
improving and managing • a single family residen#ial development greater than 5 acres or of any size if
within the Minnehaha Creek subwatershed
the sur�ace waten and . any alteration of a floodplain or wetland
affiliated graundwater ' dredging within the beds, banks or shores of any protected water or wetland
+ a violation
resourtes within the . any project which in the judgment of the District staff should be inspected
District,including their
due to project location, scope, or construction techniques
rel�tionships to the
In these cases, the applicant shall pay to the District a #ee equal to the actual
������'►���► costs of field inspection of the work, including investigation of the area affected
they are an ir9tegral part. by the work, analysis of the work, and any subsequent monitoring of the work,
which in the case of a violation shall be at least$35.
We achieve our mission
thraugh r�gutation,
�p�����.a�� Standard F+ee Schedule
edur�tian,cooperative Distriet professional staff $ 65.51*
District interns $ 40.35*
endeavorsr ami o�er District clerical staff $ 46.69*
progr�ms based an Consulting Senior Engineer $ contracted rate
Consulting Engineer/Technician $contracted rate
sound science, District Counsel $ contract�d rate
Application fee $ 10.00
innavative thinking,an Copy costs $ .25 + actual staff time
infr�m�ed and engaged Color copy costs $ 1.00 + actual staff time
constituency,and the
�°���"�"�°� * Hourly
pubtic�.tnds.
�Minnetonka Boulevard,Minnetonka, MN 55345•Office: (952)471-0590• Fax: (952)471-Q682•www minneMahacreek.org
\
��
DATE TIME
CITY OF ORONO cnLLED IN
INSPECTION NOTIC �q .rJp SCHEDULED
PERMIT NO.��-n� COMPLETED ,
ADDRESS ,����L- f �-{�/ v'e C-i�'
OWNER TELEP ONE NO. �1 Z ����l
CONTRACTOR
� DESCRIPTION ��d �'�'�
W ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
vj ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTiON
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL
_
J ❑ DEMO-SITE ❑ PTIC INSTALL
2 OWNERICONTRACTOR TO MEET YiOU: YES_NO
y COMMENTS:
a�_
�
j
O
�
O
�
W
�
Q
�
2
�
W
�
�
�
d
W WORK SATISFACTORY:PROCEED ❑PRW ECT COMPLETE
W ❑ RRECT WORK 3 PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECdVERING PERMANENT
❑CORRECTUNSAFECONDITIONWRHIN HOURS. ❑pHOTOTAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Ca��for the next inspect 24 twurs i 2) 249-4600
OwnerlContractor on site:
Inspector.
Whits CopyAnapector's File Canary CopylSite Norice
. �-� c���i � �
�" �' � TIME �
CITY OF ORONO CAL�ED IN
iNSPECTION NOTIC� �� SCHEDULED -�
PERMIT NO. "_ '` !`=�� coM �Er�
ADDRESS � !{�I �' �.� �G�%
OWNER T EPHONE NO. ��-� y
CONTRACTOR ;'���'�� �_ -�`, "1 C.L-�1-
. ,
� DESCRIPTION `f � / �""� l S -�-�
4~j�FA9TING ❑ DEMO-FiNAL ;' ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI � ❑ EXCAV/GRADING/FILLING
Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
2 ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
i ❑ AS BUILT-SURVEY ❑ S WER HOOK-UP ❑ FOUNDATION/REMOVAL
v ❑ DEMO-SITE ❑ PTIC INSTALL
2 O'WNERICOHTRACTOR TO MEET YiOU: ' YES_NO
� COMMENTS:
� ' ✓ 4.. �¢ i� E k�
O � �o'' '`-S ' ��
� ' 2�la•�� - p(C
O ' C�-DcG ' Gl4
W
aC
Q
Z d K -�s /,�ay •
� /(�v{ �i 'J�'W 6/�C OK .Sp4�t 5�_
W
�
J
� �QRKSATISFACTORY:PROCEED ❑PROJECT COMPLEfE
�`❑CORRECT W'ORK 3 PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOWERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑pHOTO TAKEN
INSPECTOR WFLL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
OwnerlContractor on site:
Inspector: �'�-�
Wh yAnapsctw's Fils Canary CopyfSfte Notice
� /� DATE TIME
V
CfTY OF ORONO LED IN ' , ` /� ___'��
INSPECTION NOTIC SCHEDULED
PERMIT NO. � COMPLETED
ADDRESS � �% �l /��l ,rL� �
O'WNER TELEPH E NO. CD�a-7��-7�
CONTRACTOR a-
� DESCRIPTION ��y��'
ty ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
� ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAWGRADING/FILLING
Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
W ❑ AS BUILT-SURVEY ❑ ER HOOK-UP ❑ FOUNDATION/REMOVAL
_
� ❑ DEMO-SITE ❑ PTIC INSTALL
i OMlNERlCOI�IiRACfOR TO M 11�_NO
� COMMENT'� .
4 o ro5�o�. �'asr�ial �.. .o�4Gs "'
, —T
o `
'�°''L'�-'' ��0 5�.r r- Co rt.E..L 0..� 56scL�f-
ti s -
W
�
Q
�
W
W
�
j
� �K SATISFACTORY:PROCEED ❑PROJECT COMPLETE
W �C�ORREC?VMOFqC 6 PROCEED O ISSUE CERTIFlCATE OF OCCUPANCY
0 ❑CORRECT VNORK,CALL FOR REINSPECTION � TEMPORARY
V BEFORE(��VERIN� PERMANENT
❑(�RRECT UNSAFE CONOITION WITHIN HOURS. p p�pTO TAKEN
INSPECTOR 1MLl RETURN ❑dTATION ISSUED
O STOP ORDER P03TE0.G1LL INSPECTOR
�INSPECTION HE(]UIRED.CALL TO ARRANCiE ACCESS.
caa ror the next tr�spect�on 2a taurs�n advance. (952) 249-4600
O�n�erlComractor on site:
Inspector:
Whib CaPYMspsctor's FlI� C�nary CopylSib NoNos
`/G� DATE TIME
�
CITY OF ORONO CALLED IN
INSPECTION NOTIC � SCHEDULED ���� � �—
PERMIT NO. �� � COMPLETED
ADDRESS ��� �G ��'�/r� 1-�l
OWNER TELEPHO E NO. ��a""7����/
CONTRACTOR � ��'�'`�-� T,�NS
� DESCRIPTION � ��� `- ����
4~j ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
�Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
W ❑ AS BUILT-SURVEY ❑ SE ER HOOK-UP ❑ FOUNDATION/REMOVAL
_
� ❑ DEMO-SITE ❑ TIC INSTALL
2 ONfNERfCO1�ITRACT TOQA MEET YOy: YES_NO
�_��
� COMMENTS:
�
j
0
�
0
W
�
Q
�
W
�
W
�
j
O
W RK SATISFACTORY:PROCEED ❑PRW ECT COMPLETE
� RECT W'ORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY
W
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOYERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. ❑pHOTOTAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next insp�ction 24 hours in advance. �9 � 249-4600
OwnerlContractor on site:
Inspector.
White Copyllnspector's File Cana CopylSite Notice
��
DATE TIME�
CITY OF ORONO CALLED IN ��s �
INSPECTION NOTICE SCHEDULED
PERMIT NO. 2lX�v-OC�5C COMPLETED �
ADDRESS j �
OWNER TELEPHON O. � �Z ���-��
CONTRACTOR �
� DESCRIPTION �
4~j ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL
❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
2 ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
_ ❑ AS BUILT-SURVEY ❑ SE ER HOOK-UP ❑ FOUNDATION/REMOVAL
v ❑ DEMO-SITE PTIC INSTALL
2 OWNERICONTRACTOR TO MEET YOU: YES_NO
y COMMENTS: �^
W � l
�
j
O
�
O
W
aC
Qy
F►
W
�
W
�
�
,
C
W WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
� ❑ RRECT WORK 8 PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY
W
� ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑pH0T0 TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. �9 9-46��
OwnerlContractor on site:
inspector:
White CopyMnapecto�'s Fik Cenary CopylSfte Notiee
�� �v�
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTIC SCHEDULED
PERMIT NO. '' COMPLEfED � l Z%��
ADDRESS /��b �i /7'! fY��'
OWNER `� TELEPHONE NO�t��� r,�tlC�--��.�-cJ
CONTRACTOR - ��N��
� DESCRIPTION � ��� � � ��
�
� ❑ FOOTING ❑ PLUMBING FINAL � ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL
❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
= O DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNERICONTRACTOR TO MEET YOU:_YES_NO
��., COMMENTS:
o�
W
a
� ar/ -� ��t a
0
�.
�
W „�Uwl S '�' � f�-�
�
Q
� .Q�'1 cv �/'ff� (D G2 y � GI
W � �
�
� � C���
�
a
W� RKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE
❑CO ECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
� ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECWERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pH0T0 TAKEN
INSPECTOR WILL REfURN ❑CITATION ISSUED
O STOP ORDER POSTED.CALL INSPECTOR
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Cail for the next inspection 24 hours in advance. (g52) 249-4600
OwnerlContra on site:
.
Inspector.
White Copyflnspector's File Canary CopylSite Notiee
�� ��
DATE
TIME �
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED �- � (v �
PERMIT NO.����,�'S"�%;z"`�'S�' COMPLETED
ADDRESS / �G /� /�'7�7/�-�-- �
OWNER TELEPHONE NO. ���Z� 7������g
,
CONTRACTOR
� DESCRIPTION �,fi��j��IC �/�? �
ly ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL C 'C '
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADI ILLING
O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMO L
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPE ION
Q ❑ F MING ❑ MECHANICAL FINAL ❑ RATED WA LS
_ ❑ SULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAI
� FINAL
❑ WATER HOOK-UP ❑ FOLLOW P
W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUND ION/REMOVAL
J ❑ DEMO-SITE ❑ SEPTI INSTALL
2 OWNERlCONTRACTOFi TO MEET YOU:_ _NO
y COMMENTS:
W �
a
�
J
O
�
O .
W
aC
Q
�
� /
W
�
J
d
W� ❑WORKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE
W ❑ RECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
� RRECT WORK,CALL FOR REINSPECTION TEMPORARY
� EFORE COVERING
PEfiMAN ENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. p pHOTOTAKEN
INSPECTOR WFLL REfURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection hours in advan 2) 249-460�
�--
OwnerlContractor on site:
Inspector.
White CopyAnspector's File Canary CopylSite Notice
�� �� DATE TIME �
CITY OF ORONO C� CALLE�m�
INSPECTION NOTICE SCHEDULED <� �� Gj � .c C
PERMIT NO. "������ ' G�'��L connP�ErE�
ADDRESS `'�' o � � r �--C�--r�-s%�
OWNER C�- � TELEPHONE NO.
CONTRACTOR ��c��—— ��� � �7�-� � �G�'��
� DESCRIPTION � � � ` �'
�
ly ❑ FOOTING ❑ DEMO-FINAL SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z/��DON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
� I ULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL
_
J ❑ DEMO-SITE ❑ S TIC INSTALL
2 OWNERICONTHACTOR TO MEET YOU: YES_NO
� COMMENTS: � ; �,l,i c�C�-"f'T GY1 r�(.,�(�U ' ��'�
a �/�. (�-�. - �a -a�r� is �' ►� I � S
�
�
o _
� - O'✓'i1?• �a/r'�G��r�� /.�iGri���f��
� /s�3�6i�.1, — b��`s-- �"ac�e v
�
Q
�
z
W
�
W
2
J
GW RKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE
❑ CORRECT WORK 8 PROCEED ❑iSSUE CERTIFICATE OF OCCUPANCY
O O CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECWERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN
INSPECTOR WFLL REfURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Ca11 for the next inspection 24 hours in advance. (g52) 249-4600
OwnerlContractor on site:
'�spector.��
White Copyllnspector's File Canary CopylSite Notice
�o� �'
�� � �
DATE TIME��
CITY OF ORONO LLED IN
INSPECTION NOTICE ��y scHEou�E� /�����
PERMIT NO. 2(J/����J(r"/SOCOMPLETED � 4�- l�
ADDRESS ��(i �� l ���(.J��P_ L�-�
OWNER T EPHONE N� � �--13�j
CONTRACTOR e'
� DESCRIPTION ��u r �� / V� �
ll� ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
? ❑�RAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
� INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
_ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL
J ❑ DEMO-SITE ❑ PTIC INSTALL
� OWNERICONTRACTOR TO MEET YO :�YES_NO
� COMMENTS: �
W � .i 7R"' .� la !� ��, �� ��t
a �� 7�
�
�
� -L����"'� ��'/ �- d
�
° 1�ut s � C;��,
W
�
Q �
,
Z - rJ' 1�'l �',''C( j G.-� .�r�^ �
� '� v+`� ��p v,^� c> �r�'� C'��v�'�"i�'�`I�:
�
�
a
W ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPIEfE
� CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
❑ RECT WORK,CALL FOR REtNSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑ CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pH0T0 TAKEN
INSPECTOR WILI REfURN
❑ STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952� 249-4600
OwnerlContra on site:
`
Inspector.
White Copyllnspector's File Canary CopyfSite Notice
� c �
� � �. DATE TIME
CITY OF ORONO CALLED IN
INSPECTION jIC scHeou�E� ��� -��
PERMIT NO. l �COMPLETED
ADDRESS l ��= �l-��f�� �
OWNER TELEPHONE NO. '1-�a �`���13rS`��
CONTRACTOR �" '
� DESCRIPTION �
ly ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
_ ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
L /�=W�ISULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
_ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL
J ❑ DEMO-SITE PTIC INSTALL
2 OWNERICONTRACTORTOMEETYO • YES_NO
y COMMENTS: "`--�
� l / �P� rl e'�v Go � 'to ?�
� i ,tb � -`1' /�. r��
�' 3� .�l Qro�c� /� K��t /i� / 4,
OSG��t/ '/ �`' �pt � �fa�o f� ts�-L•G. -S• �c r!
W �-� '��/'�'-•' �`
� �!✓G� • v� N�l c��l� PT L- C. .
Q
�
Z
� S� a�'�=/�5�.�. 91-- l�Pa✓
� yJa r✓�� �e� u�o�J�f D� —
a corr�� y--�'/ L� ��
W ❑WORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLEfE
� WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
� ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECWERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑pHOTO TAKEN
INSPECTOR WILL REfURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Cail for the next inspection 24 hours in advance. (952) 249-46��
OwnerlContractor on site:
�
Inspector. �^-
White Copyllnspector's File Canary CopylSite Notice
_3 ��-
� -
�'�-� �
CITY OF ORONO CALLED IN
INSPECTION NOTIC �SCHEDULE !TI��
PERMiT NO. o���� MPL ED
ADDRESS
OWNER TEL ONE NO.��/�� —��
CONTRACTOR
� DESCRIPTION
ll� ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL
_
J ❑ DEMO-SITE ❑ SEPTIC INSTALL
2 OWNER/CONTRACTOR TO MEET YOU:_YES_NO
c�., COMMENTS:
�
W
a
j r�
O
�. ,
�
O %
�
W
�
Q
�
2
W
�
W
�
W RKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE
�` ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING pERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN
INSPECTOR WILL REfURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call forthe next inspect,ipn 24 hours in adv��.�{952) 249-46��
OwnerlContractor on site: '
�
Inspector. -
: �f�
� .
White Copyllnspector's File J Canary CopylSite Notice
�/� _
3 DqT� TIME
CITY OF ORONO CALLED IN /
INSPECTION N�I �EDULED — �
PERMIT NO. � OMPLETED
ADDRESS � �� �"e- ��--
OWNER HONE NO.Y���7�1�vh y
CONTRACTOR
�; DESCRIPTION /��C� �.�%�(w` C . D.
ly ❑ FOOTING ❑ D M -FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON S B ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FR G ❑ MECHANICAL FINAL ❑ RATED WALLS
� ❑ SULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
J FINAL
Q ❑ WATER HOOK-UP ❑ FOLLOW-UP
S BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL
J ❑ DEMO-SITE ❑ SEPTIC INSTALL
2 OWNERICONTFiACTOAJBMEET YOU:_YES_NO
� COM�yIEN.TS:
! ,
a �
�
�
0
�.
�
0
�
W
2
Q
�
2
W
�
W �
� ri
�
J
� ❑ ATISFACTORY:PROCEED / OJECT COMPLETE
� ❑CORRECT VYORK&PROCEED I UE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CAIL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pHOTO TAKEN
INSPECTOR WlLL REfURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
O INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 ours in advance. � 249-46�0
OwnerlContractor on site: "
Inspector.
White Copyllnspector's File Canary CopyfSite Notice
. �
„a,�. .
_- -- -- �
iD'-t tYd' � W!a t- ._.___..10'^S 91d' .___� W CJ s i l3 ti � W N W�
4�� �. . .. . . ... .
� , g-n' )'�' � , e'-0' ;'�+'„ � , 8�� +��-0:- m /-� cn ('� ___ a-a )'�", •
_._. ____.� __ -- -- -
p � C] � .__..�.._.�--�1 �. O � - : O U� � ,'' � "' .� _ _ __- -_ _... t
D � D � � �� �. A � ,�� `a � s, �.� � . . �
r � I r- _�' r ---- r _ -...,� 3
m -� i m m , m m � �
rn �-- � Z 1 ' � � � - -
, . ,
__ � _ ; � — �
a � I , A � I . '` II J , �1 JI J � 'I � y � '
t -7 -1
� ..__ . � T �, i � ' -' � i
.
_ r _ . � .
D J i'
'''7'�''yy ' I
p N .. �.� O Q I �� o O �...� 1 P Q I .. ... .. .}, o O f� _ t'�.I i
G
�
n I _� � Q I i� � Q � ' Q �I I a -_- "
� _ � � � 1 �' j � �� � � , �� '
�p '-- m , � Y I 1 � 5. ,__. � i� � � bT !� � �I��J y �
(� o � j . T � � 25 , �
�
i
� . N
( � � F � .
. . ; � -rl
i . ;
� S�U . 4 I 1 51t�-n..�-.� �, N ,t. • ._.�,� � � ����� _� I !. D'I i
1� , o ; z � D � D e � � v� ,, I�� , � �� fi ;
_ �
;iI __._..._� t- ' �J i
i . _
`' ` ;�I', � , t � � i — ❑ ,
____ �i _� w u, � � _ ,§ { 2 + ; � � �
m ' � - � � �
,
,
w� � z ,�_„�- , U) � � ; � n I � t
tn � iG.t t,'9' � D tr1�' , . �a
_ , D , __-----s;, ; � _
9 :
� D , _ ��- � �
. �� . m (- , �,r
r .._.._. __ . i r `
m r , � r _._ � � ,.,.
.. ,. �, _..�_ _, _.—_ _ - ----y
_�, - �_ , �
,
, r `'. � N `ti - _ __ _+� ,
_ �_ ,. �
p (n �I � + S.a). b � � b'{r' 7�'0�
u �j ` '
-. s•.u- " j b • i- _,—�' . ,r.�i,�
b , . D � _ _,
. .__._ �_ _ --�—
b � � r
� _�._ � �_J �t7
n � 2
2 65{i'
� .._... . . . . . .._.._'___ .__ ._ .. . .. __._. .._.�/ - ___'.'-_.__ -___._. �
't-0' 35�6 2E '.�..
> > . ....._._.. ..._...__.__.._.. .._ .— _..__ _. _... ._... ....... . .. ._ .. .. .. ,
' S'.�1._ ��'�"T ..`ti�,_.... . . � 5'17' i
_ "__'a__'_..__._ ......... .._..
, �_ ___--- _-----_
zozo r a�zu T
�.�
- V(D.LEOGE FRAME'fOCElUNC3���... S+tp.LEDGE
h
a
� _.
. . ...------
.� -'�,�.�:: _,_,..-� ._.. ,�,,....�.u.. ..�.e. ._,,..�.._..e.....,�,,.�.,.�„_...w_.,,�..,.�.,«�_,..e_..,,��..,�...,..,...,.,._�.....__ -- �.._ .n.
w.�r .
I .. �..�. ti ;
---
..� _... ._.. _ . :..
� � -- -- -_ -- . .
; �. � 1 1 � 1 �.
I I i �"3.,
'� ` 1 I i i '�y
I I I ( b
I �� �. I 1 I � 1
I I I I �
� � � M � � �
� � � a -�
� � � � , � o
__ _� _ _ _ __e �- — --- � � �? o "
. . ._ ___ _ -1 _ . � . '. . � •. __� _ __. _._ y n -� ` � h;
. .. r----�-� � 1 . _ .. _. ._.
� , � , �_, y o .
i i i i L �
L_�.____________________"����J L____ . J t �j "'.�i
�i 1G'-9'W..H'�lt'H.STL OH GM.AGE OR ff-0'YJ.sS'�'H.STL�GARAGE OR �� -/J (�;y�
" .4 - v
. , �<2 6 14 � n ���� �
� -�m � .1^_ _
- ♦' u C+> 1� '
IV S y�n n
. b .+ �C�� Yk`` 'J \
_� _ a
..� Ui D O ; (,� I
Cn� .. U-+.II'� v i
. +S . ;JQ�y � `r ,
L;c 9u c) ±
� �� �':�� '. �..
` � ' - - --- -- _ . .
,._.__�- . .. . . �� .. :
- -- - - - _ r....._.__,_.�..�_ . __ _.
,m 12•'r .. Sd' . a•�• i U)
:.i . ... _.__ _.. ��_��n _.�... �_,.. .,,...._..�... �
, ,.-�..... '�-,_...r_._.�.. �w_...,_._,._ ,.r:.�:...e.L._-�- .��� .
. �._ � J _ � p m N
i � ` �
� m ,
S,`. .. �sZ otn �.
, . . �._ -'- � .. � -.T ... .
kz �� � � ; >��b r .�� o�
_ �
� . o x ��
_________ _ ... _._�.. -- —
t _ ,•-JW....-_�..�-..,..-_; ...,. + ...�..._ `.�' ��� m V m� Y ��_ . �, . .. . . . _
�
r t
_
IJ'-0' _ ;, , DRCPUESN ........ � . . I �
, ._ a ' �' k . N _'c_� cz, �., N c _r
. J .... .N 1 VI Y.� y
�, ���� Z� � N � 7" �ti ���) ��.s M� `� �I-�t�� 3��• . . S•-�• . .... .t•'d' �� t's''�• �' a�- .
��, r -.. C 1. t� . N c�l K G, .._... ._. .. . . �.._...._.....�._ I
�_.._.. .. �� ..= v��. . ' .. . i ... -_-'_. ' .
. �'� � �.in 0 R� �__.. . .�
i7 � m .
K N � .:T ��'� �i O{' f��\ �4"a'NEFK `A80VE V�'PEKS� �c,.��� UPPEftS::••, ,.. _('j . .
N _
�. .._.. � ( .y _ _
'� .�__ � .. , .. . � 3 ... � !.
� ��. � . _ ' ry ._ � +- .... OAfiC � ,'. c m �........_ '
� �
� +r� .: � � � � � �
" � " > k �Aui i w a� oy�� � -.a __...
, o_ h
� � y� ��;i ;i h ��'`, __ -�'--__ �
���'•, 3'�• z � ,y � •i i � .t
C) � . , N ��. Yn'� � 1 I �' ._ ��
� D . . . _ .. ..... �� , ..,, � ! �� . ., ___ ..'_r._.�'_�.� . ..... _ ,..
rTm � w (t6&�. .. .. . � .._
Z , .§ . �;y�; . . ... ��,,,, � i`� pp � yv�pt,��4� q :
� �
A r- �» . S . i : Y � _. .L. ..� ��, �..q.pq..�
. -
P
u ('� �� � �g � p � ;{� �..���� � ° �. � � ° `m`.. � � ��i�i
�- i r
ti
b < � �- � � � Q a� _ � �
,
rn �� � � i� � a ,; , , p _
�- _ .. � x ; �£,
�
_ s -
: . F 4---- ' P �°�i.' �' � �g�'^' z m�
�W m x
-� ,-�--�. �-s._�___�._ .__ m w
�,
�'
�- e::• � y a.a d••,p-� p.:.i '��:; =��Z�� �. � m� p�.. . .. L��X�w b � ._
� ��G `� ---a_. __... Da�t,t71d � ' ��dp � -, � a' . � n � � ��..
m� �� t � � (
� �d q� 'v� � �.: . a� . , � ,
� � m n � .._ . . . � I �.s . . � .
y ,
� .... � �, ��
Z f`� y � n
�'. f ��, �'� �� � � 6
�, � � �
' n�� � I � � r.2' �� s'�7' �8'Ft(k�RTRUSSES ' O
♦
� r. �
�- `O � 4 {{� . i n ' ' � � R 1�.7 O.C.
,
Di' " i' � �'� VP!��Xt,_, I � ��' � � �>� m
Z - .,.,y. i z �s_ .
:. , i �
, I . r ._� . _._. . .._ .. ---- - . .
...a�_ � _.... . ., _-_-'
...---_".�i _"6,{ �-' __�..,. __...__' _'_.-..�_:: 5...,..,..- :.tf,fiPICT
�` ` _,,.�... ;. ...� ;
--...-_.�.
..,� .�� _. ... .. �.. -�� � �--�- - - . . . _ ..--� . f . ... a�t nti.N - � -
ti�"'+,,, -'� .�x-.__ _.� . . . . ; i � � 7a��7' '�` _.., r _.---._. . __. ;��'? ..---._ ._.._. _ ,
� \I u � 1 � __" �_._
�r - � S t , . r ,rb- _ � ;� sre.aRcte �
� �, • . ; �� sr n�c�. m � � . . .
� �. n , `Ci ' �� zv;e O � 8�,b i ii , � . _.... ... aU � i O
1 L', � -: im ! 1' � oli �..i �i .... .. _ "�__.
` z ��. �x � � ��om s � '� ,. _.. . . . n�-- ` . r - �?- = = u?
m ..i�.j� �� � �m :U � � �� .. }-�`., .,,; i ;.' . � �...� OO> Z� <n� �2a
`�`�,�,� d I �I
� �
\. '.���� �,__ i c��t... _________ r- � � ' t,7 � .,,.,,�, A ;� ;..n ��o- n � .z nzx �n� ?� co��
i
. ❑ �m . � _________ '. • . y �I- ... . r 6� ^a _ o-� �� On �t9i wx
.� �_� t . o' ' �- �T`•� ' i -� s� � �� �m � oa "��z
� ______ ___...- s
----- --r
�'' g P � z � � �, y F ,o "'m-
❑ . �. .�.1y- �t.�. . C ? t' 1 r. _ . . -. � ^ x q �R •�r m'-". -
� _.. �,. � �. � su AR(a+ � � ;i /}� ;'q' _ -:c`.i��� 1 .�. 5� 1� � `r� � N i.� � n � y
_^ Ob y Yy .; `C�'� 3w 4T i n nZ �..
9 �i V c y � � ..-.},, � -� zr -' .�O � O S O
� . ....... . .. .__.,..�� �. p � . . . � g n� c o
7� ��mE II . �~ � a.� '�a��� 00 � apr�i rr.. N n
f n , . 'a+ d 2h .v.`E't �� _._ .._ . . . . __ . .. o�m � ' � Csvsm � �� P m
L�l� 'b; 4" y$Gl' z ' I . , . . � .SF �oo
�_
.,o . N
t �. =1 � p� . 9 �{ . �K�-0� ....� y . � .
1 = , � � �
.. .... ___.._ ___.
��� ' � f I ...... . R.A9 . .. .M . � .
'� 1 I'Y 4' 4.'a 5'.V' 4 3' P'�9'}
� ! t ..� .. . _-..�-
{b t
� �"��i�� � NI1ESplFFIPCPF E�,. . _ '
� '_ ___ _ _ "_�.
. ___y..,�.1 .
E�C C +
y" �. ..__.__-,... ... .. .. . ____. _ ._.... � i� .. __'_--•-.__ ..._.. . ...: .... . . . __ ......_._.-___.'._�
y�� � GASFP • " � .
l."•,�� 8U4L7ti: � i� D(, TJY I� �•v
� '
. ._a t_. L.0�Knl' f%
. . .. . . . .. . ..... ... i . ..... � .
...........,....� � .._' '�......_.^_�_�......, - s--�-
� z..T,. 2fi^<OFIr,EO �0"s' 25:4FL{i:U�_n_ �.
� .. .
;�..-i' � tS'A' . '�fi' Fi`� 6�d' � _...._... 7Y•t'' . �
.`:::;'f' .
. ........... ..... ..._'"__-_
,�C; 2015 GQNYEA HOMES
' m �, � � � o a U m = WATKINS RE�IDENCE '�i��,� W,N,j m � ��z�. ,'�:',
� � z � `c 'B i � � I U7 �—�:
r' ��
I -i O O � p I p z � �tv � sl�'v,n.{v,i� C �rr � �O i? � ' Ii�
�W �, z i � I � i' � � ° LOT 2 BL_OCK 2 KINTYRE TWO �,r� o � N��,�� m � �°�o �� ;�+ `I��i��
o ' � �g � � -. -." � � 140 KINTYRE LANE � � �����i�;"=Q N � �� �m � `� ;
� ( , � �� w��� �� , � ; ;z = _�� N i�;.� . �
�, ; � � N�V AN. ;�- pROfUO, MN 55356 ; .� D �_.._-------
;n� Icn co loo;o I m o V ti<
+ ,
RECEIVED
JUL 28 2015
,o:,z
CITY OF ORONO �-- — •
,<,z �z ,.,z
��� �o� ia:iz .
_.isaz �y� s.�:iz /�.
/ tz
� � 7X30VEP1%BLP / ,� .. 14:12 ' �6.315 '
� �4��Z S LP FRIEZE BD. $OfF1T 8 fA$CIA "
� �p 1<:12 - - 11:12 i 6'LP FRIEZE BD.
. `.
, _ �
I -19 ' �� � . I _. • •
Iia�.t1 ' .;"- :' - '� D.12 _ _ _
.
_1
_- .i - - l= �.
. i - ._- . - - -�
II � f HOM S
�'�I �a,i2 . ro � ..; . ' - - . ._ —, _u:iz - — _ ��
1X30VER 1XB LP ; ',, �, I - 1
� � ._
12 I.-I" SOFFITdFASCIA � � _._���� - ,,.� ._ --__ � . I � ... -:.-. __. 10�� . .. \ - _ - 12
�
� I
<r-- ' � � - � -�- � � 4�12 I = �< 61020LSONMEMORIALNNN.
." I i �- ._. . - �-- I / ���,`.\ � I _ __ - \� 55422
� � � �� I - � � G�FlilCE 3�232-4500
' . � . �- __ .--'. I -_ ` . /f� _ - . 4507
. _ .____. � __ �- - ' ,. . �:: _ _ _ -
I'_ . " ____.__ __' -I l I '.: —��-7 u __� ;I�I ti.
_. .-.- .!'�'��-i� . - -- -- � � ..- � _. '� � � �.:i. I :�., � �:: :�JI�1�= �'� i�,T i .. � ._ - .'`�°-_-��i - I BUIL�ER LICENSE#2459
__
�I�h,;� nn�-�� -I mo- �- � I -- - i : ,; '- `; t — - - :
� _ _ -, ` : , ,i, ,, ____ s iu� --; l'� � ,.�. -,i,�.I wsiowc �-.. -I'- � :3 ;':�
. "- LP SIDING "--- _.�i�,1 i� i.�.�il ' '� I I �I I �
___
II
I
� -1
I
� 1 _I
_-'- I i� r . ... . �
.: +, J ... -.... ........ _�. .: ..�
�,5 — __ -ixzoveaixio _ REVISION RECORD
y _ _ _- I ���� i
� __ ___-- �44 1J I^, n i i �i i,, u i � i _;u; � - - � - --
I r ... ..'4 � 1"' . . .,� I '�:: . ..._-_ -... , . �'r �tW �- ___�-LPTRIM- � p -
i�i ._'_ _-.. .... � ��'��i 111 �'.I li - - -'_..... - --_ _- G f'�-��. � ::: "'___ -_ f..
j �W -- -- _ - ' �4' i �i � r u c C < __ - '--- �� r: -� -� �� -" _.._ . - - =- -i��'-�� - - _ - - - �C'I NI 1 4-29-15
_ _ _ _ �- , ���y� = __ __ — -
- i o r ,r,i -- �. i i i� u � ��iu - --- --- - � � ' J f , u.
��1 - _ -_ — - c ._ - i _ � `� I
_ - _ _ �J�� ��_ - - -
i _ — - 2 5 15 15
I I� _- i ' � r I� �I��!' I�I : - -- i i i i � _ _ I � ��I= � _ I _ 3 5-22-15
' _- --- --- -------
iI� _ --- I I�; �' � � � i i i ' i I � _ � � 4 5-29-15
� _ � �
�-----
�� 7%20VER1%tD I �/ .. I I ... .
i I. E [
�� __'___ ""- _.. �._..' I�
� � - --� _ U _ -'��I— _ _ t°P'�` ' ' ' ��� _!�� � ti��I''� 5 6-10-15
' , � �Q�__ -- � _ � _�._ _ � -._ � ' 6 6-17-15
_ _
LPTRIM j r-I \ .1. Ii ______1-___1 J___ ________�
'i . I I I I I � .. �
1 ____ _ ____ ____---__-; LEFT SIDE ELEVATION � � ____ -____ __`_ -____ -_____ _____ _---=t ----�, RIGHT SIDE ELEVATION t-== _____ �' __-- =====y 7 6-26-15
- - scA�e: ,�a•=,•-o�� REAR ELEVATION scA�E: 1;8'=1'-0"
SCALE: 1!8"=7'_p"
3'-0"
� }10'� y8�� i�
I-� �
. . . p _ F- -�_
a
��., � � e .�}. SPRINKLER SO.F7.RG�UIREMENTS CHART
, �� � � ���� .... . . __-__. _..........._.._ _ .... ..._. _ �--
10:12
� ,� TOTALLOWERLEVEL50.FT. ifl9B
I a.,
TOTAL MAM LEVElS�.FT. 1BOB
� � TOTA�UPPER LEVEL SO.Ft. 2379'
TOTAL SPORT COURT SO.FT. IZS
' ^ CEDAR BRACKET 'j,d rorn�sa Fr. seco ! W
SCALE: 1/2"=1'-0" 1z3OVER1x8LP SPRIN!QERREOUIREI:�EATSQFT. a500 O
I
O\�ER +2300 ; ' `
SOFFITEFr15CIA � � �
o� - G'PE:` '��.L:'Q.FT.'NCIU�ES'OPENT06ELJW a��
e'LPFRIEZEBD. AREA£ANGAIiEASOVERGARAGEIFAPPLICAB(E � �
'-4�4� .1.10• ..._ Y 12 �LP MINI lA? �� � �
�.%�I J �'1...�.
CEDAR BRACKET ` �14 , ' W �
� i �ti��.� `�\ ' �
SCALE: 1l2"=1'-0" �
17,'�� 1_1� �^ � �
, , .
'-�Trl I �,n,; ��— '�l� _ t.I� Z W
, a _
,o,�
_ _ L.I.J
� �,�. ❑� i� -�,,.. � r[�`:]1 t�� ...; � i, - - ,, ���-��' � � � � ������•�, � '�:- - : ,o�,z ��_ �/ � � �
� � -- 4, �rr � � � _ - ;�� L.L- N J
�,-,� ' , ,
� � � �i�iri. i � T �r_ <.� �r ri� , ��� - - � s
�, �-. � I �1 iiii� �
� �� I 1 i.z ovea i.io '�� � �
��`L 11] I� _i i I i � i � i �_. � _. '� �I I � �rrRiM � � � � �
J f� 11 I-1 I I Ll�- � � I I � I i�ti �� �� 1��� � I]l, T. [`Tl � I�i I I �1� 1 I� <—� - �l I �_��jl��. �
r � t
tf�7 �ir�ii - _ -
��'i���l��iI]����II_C�---m�-� Z I L1,�1�I��Ii� 1 iJlil i rT��-�j�t� �r i i.. iarz L1_�T� ��i �I !LL!� � io:iz � �����i,�'��� _._ �,_ � � � � �
l �
� i � �1 1 1
, _ — - n �r rit
�.�l�.I . " ,onz �� � i i � �� i �i i t r�. _ � m Z
NOTES. �- -' ' ` � � �
,I . ' I -'_"- -
1.1 ELEVAiIONI�AftTIST , - " � ..� i ���. • � i �� '. . . - • � � ._._ II N
RENDERINGONLY ACTt1AL � - �� �-- � ��,-� j I��., '- -� _ � _ <'LPOS.CORNERS
_._.. .-. ��. .. i � I�
�I O �
,— � - L�' CI ❑ � --- �_' � �— � � � --- — �� _ � Y0
' ._. -.. � �Ir ;-i�' � ....,1����� � i. � II7_� I 7 � r i' `!� I�' I'- � � f �����- 9lu � � O
EIEVATION MAY VARY - � �- 1
2.)ALL OVEFI IANG^:DLPTH -� � I .
SMAIL BE 1'-6'TYPICAL . � .. J� I'� - ' O d" �
UNLESSNOTEDOMERWISE I� I r ,I� . - - � '-I - 1I ��. ��I -'-- LPSIDING g ''I
3)ALL RAKES�.OEPTH --�SIOING . CEDAF SHAKES�l . T 11 l 1 l l . �� r. _�- �T r� �� . .. � , f o a W � � r O '.
- I __
I 1 1
�- �' � � I \- _��
SHALL BE i-0'TYf'IGPL r -- � ��
— 1 �i �, ' �'u ��i � �ir �
� �T iiiii �rr �.. i � �
u N�s s H o r e o o r r+e a w i s e �, - 7' -- - _�f 1 I I I I I I I i �II-lIl I t I [I.��l���I i 1 I.1 1 I �, -�_ - _�— ' �,-- �1_I I --
a.)s�ocFiiu�si�s � ' .�,7 �J7��- i..._'-- __ _ ,�I I I II,�I�C�I� 1�17I_�1I�t1�] 1 I�L.il�'�l�l�`� [i l-- _ �--- y- _,,--- ' ' I -�_. �!�I�IIiIiI����� Z PROJECT �
IIII1„ II _ 1
,-� 1 1.�lil�li = .� �z�1 I L'11 f l I f[;l l C �i � I ,� C —� � _ I ,-�—----- '�_:i;�G� 1 I 1 L� 1 LI1 � FouNonnoN 1848
5.)LPSIDINGIGEDMSHANES/STONE, ---'-"�� ._I.� I I I.I�I I I .�__ � �-.j , _-- .�'. ^� _�__ _ � � i I '�1 1 1 f�.-1� - I --�- - �- - _ R CESSEDRISLR = 5" � I �; I..� �_f�� - �'
FaoNior+�v � -�� � - �- � �-_ � -��""-- � - � � � FINISHEDSQ.Ff.
_-___ ' __ _.
LP SIDWG ALL OiHERS ��- �
- ��- --- 1520
� �� � � � BASEMENT
6.)FINAL GRADE TO BE
DETERh1MED ON SITE BY OTHERS I I I I I I �'� I <a6 CEDAR BRACNET I � � FIRST 1848
l.)ALL IXTERIOft GLAZING ADDRESS STONE
TOBELOW-E I �---._- ----- ---T----=I I \_M OCSTONE'I4•-1'_O" ATION �' I I O SECOND 2379
� � � I FRONT ELEV
�
8,)WINOOWMANUFAGTURER: I � -_L____--- 1_ � I ���., i 10x10LPCOWMNS I � N SPORTCOURT 7ZS
ANDEHSEN 100 SINGLE HUNG I � . �I I I I ...
TOTAL __. 6472
� � I I I I I I � PROJ.NO.
I � I I � I I I GH0549
� � ------ ---�------ ' � � J-
C _ _ _ __ i ._ --- _ _-i -� - � - --'-�
- -- --
SHEET
1 oF 5
,
;
� ,
1
i'
I�---JI • •
I '
I ,- ;��
_ - 1 P_ , ----i-�;-=2.�X;o =�=z=zX,o=� L�
, � d-, . .
,
r ` - 8,��' -�--- ��-_- _ _—!r_------ --<
' zs� }I --; __ �I� HOMES
33'-0'
I _--_-- ... _--_ __- - . i-1_.. � �_��� ._ _ �� _, - ._ _- .._-_.. -"_""'.
_ � : . . . .. �. . ' '__' _ �"__'_" '� "____" , " " 1
20'-0' , 2'-0'
T I r . .._ __ ________._ _ _______ 2-2x10 .� 7 . � 2ax7o 2-sxio - i z-zXm -.1 � 61020LSONMEMORIALMWY.
� � I GOLDEN VALLEY,MN 55422
� � ;� ,s•� o��� o�icE:�wz�soo
4 �� � �? � � � r��Y
FAX:763-032�507
. . I - _.__- -'"__`_ I Ex6 TRTU.POST ON
� 18'Dt450NOTU0E I I `��� I
, BUILDER LICENSE A2459
� .. 'p . �� . �-_ I FR03T FOOTING ��
I 4 O I • EXTER105 WALK OUT WALLS H� SP�S �
2x6 STUDS @ 16 O C.ON I E%1 ERIOR WAIK OUT WALI 5 o V I I ��j I I �v� 1 Tr mmer
I °'� � � I z�sTuos@�s•o.c.oN pd d s�a �.y � T��mR,�r� REVISIONRECORD
� O �� 1TRTD.PLATEON � iTRTDPLATEON �\•. •`•'Ui;,I1.�tlG.:,cr.�sa • �q
4'-�'H.x 8'W.POUREO� .1 �� q'-0'H.z 8"W.POURED m , � �� � Q-29-�rj
Y �CONG.FOUND.WALL9 CONC.FDUNO.WALS n� oI I� �� /
olI R-10�RAINAGE BOAR0 ON _
x
II YO'xe"CONT.GONC.�FTGS. 1 I I R 10 ORAIN/�GE BOARD ON �'i
I I� REBARPERCODE.________"_"__________'� I � I REBARPERCODEC.FTGS. ��L� ....�' Z 5-15-15
�- -� ___ ___ . I II x
��_.._ �2�-z� ��k �-� � i � ��..� 17'-]• __ . � _ .. i I_ 19'-B' 1I _ .. -____ -_
3 5-22-15
I . I I - . fi'-10' fi:i 2'-9' I ]-0 ___..7''0' � 9'-0 I s.a• , .�-�• <�-e• a�-e• 4 ...5 29-15
, EXERCISE ROOM SR. ARCH ; � 5 6-10-15
1 30561PICT � 30%PICT I
2 $CA�E: l�4"=1�-�� '� � � �- ___SH305F2__ I .._3016!AWN I Bx8 PATIODR. ____ 3018'�AWN � 6 6-17-15
i SCONCTENAMELT � I III 1� ',L �I� S�.-.. .__. _.__.__ -..___ �-_
4 i I �-' ——��`IT ' —— 4�'-� -� 7 6-26-15
4._ __... ... _ I I � �� I I l:� - �_HDR M RIM ( � , I �
__ �I i � , , ,, L,, �
I ' I �j F' C��. ...:.�MAT� \'����'L4C�.� ` �("` r. I�� ' Q
� �! � I �i i i i Nr. �11Gx.� �i' I�m� aossaicr ,�; aose�'�P�cT ,y'_ aose�cr _ � �'�
. I '. I I I I I I 4016�NRJ � GOI6AWN I�4018�wN -- �� ,...
� t _..._- '__ ._ . I I I 1 � 13'-0'x 13'-2' 19-0'x 15'-0' _ � `9
� EXERCISE RM. GAME ROOM �- -� H ' -`- --� o- �- I�'
I I L; i j i i \:� �i I
I I ����`�'`
Q:, � � ��,.I EXERGSE.U,AT. 0 CARPET *-I I ^'
I �.. I , I '. �{J I I �IV 4 �� z � I 9YH.s8'W.PWRED I
I CONG.FOUNDATION WALL J 2'-0"I I
�!,� � � �� n I I I wl 1TRTD.PLATE�� �
�� Sp .j.. . ._ 10'-10 i�� I I � L___ \�J_ __� I I I I¢ I � �I R-10ORAINAGEBOARDON , I' i
I , ' I I�I¢ � � � '�il pI� 20'x0'CftEBAR ERCODE I I I
z REC. ROOM SEATING, SR. ARCH " —
i i�^ — 5 I
I I ' ':' �� i� � 'i o g�' loo i
2 SCALE: 1/4'-1'-0' � o � � �, � o
a__� , I'-'i I ---� �- _ -- -_ -- �� �--- - ^� �E � � __.. .. -- ' i li ' REcnrsrOOM ���il � II I ' �.J:", Ni W O
�- � �� i i
__ _ ___ c �
� b
GONC. i O U
� _ �_ ,�� � __�_ _ . _._ � � �@I a � .
� � � � U
� n�! ---'' � � m ' ' s�-o•x,a-o• � M1 ii � �I�vEi suNo J..I `" I` _I_ ��,:,"lil <, i+ ,I � �
I I �
_ � I I Iii I STO�GE I B� TIL�_ i i b 2z68EARINGN'ALL ' ���'. f .... � W^,
I I �ILE 1 r
�I �
� I - i � I � � � � J SD SPAC NG fON I II I N �i
u
�
� ��..
� � I I I , �'�. � �'. I_ � `', � p�ARCH i 61' O i' -- - --- RE9AR�ERCODC-FTGS. .�-..I � � -
.. �i��1Y��-ti_� - r � I � }
' _-__ 36 REF . �I
R
� ' UPPERS_ ..i -� Z __! _.� " ._I ..J
'' .
�1- 7A 1���_ m � I �- .. r . _
i I � -�"� 4 2CCE5��� I �-~ �� I ''I
._...._ - r `7 �
i i
I --- c� � -� _ .-`o,�_'-_. _ __ ' ----____-� � � � � W '^
s GAME ROOM SR. ARCH � i � ; �— N �P, , � �_ �
� I W �1 J
� � aQ � � Y Q �
2 SCALE: ll4"=1,��� I � I I NOTE>'HEADEftST08EZ2x10 I x ry06� _ � I I '� �^. I I� `�� �? �
� I /�/
- � ,2•-0• ,z� pI ,— : �' � /���° g v ;I �, �� . N J �
1 ALLINTERIORBEXTEftIOft I 5'-1'_ _ 7'3' n 5-4 10"I. Ip � i� W , r
� � -��. �_ �, �' i2 .j J � 1..`
�- rv I � N g2'EXTERIOR�LEDGE TO E�EfCERMIONEDeYE / � >� �(1 .____I. C` - � IINEN ��kv ¢O J.3 I'� n //�� �
� L/NLESSOTHERWIEENOTED , i
I p,)STAIRTREADCUT _ I . / w � EXP ENDCAP6 F �I �/ , W
��. - �-��-� SNOWN�1d'-7314'MAXRISE CANC.FWNO WALLS . _ Q __ '-10"x12'B" �ry J ', 4 V' �
, � I ' LqYOUT OF MECH ROOM GUEST BEDROOM g� i , �
. � I II 3JALLANGIEDWhLLSAT45 1TRTDPLATE IMF.CHSUBCONTRACTOR - C�PET u� N � � O � `
'� UWlES50THERWISENOTED ^ R-10ORAINAGEBOAROON I j I � b
�� `Q I I I 20'z8'GONT CONC.FfGS. I 1} °.P LL �- I �-- li W.I.G pb0 � W � � L
I� n I 4.�A�L E%TERIOR UNEXCAVA7ED REBAR PE4 COOE I F.D.�r� � T �, I _ II C/.ftPET �' RETAI Ao EEDEO C ` / � r "
�II ��,_ � DIMENSIONS TO �., ---�"- II BAT �, • I v
I i i� '��`.., I � 5'�NILESSOTHERWISE'NOTED : I �- _HM. -I�\�.H.� -- /4TRE H � .--� .��. ...__I II_'_-5 9____ ��� 13d I I m O � � � O
I 3
I 'f� �
i, � � �9'-10'HGT.(TRANSOM$HBOVE) �=- � '� -- . - ., Y
` � ��'I I � �� 48 IUNfI:�lISHEDUNDERSTAIRSII '--- - - - --- - - - -� . ' c, O �
3-0 .�.._: I� . /
0 6.)GFRAGE WALL 2x6 r __ .. �.... . . .. .... ..�_� -� . I.. � `
I �
"�� � . I 9'!1'H. A'W.PMIRFD . � �' �. I � � O � O
� l.)1RU55 d FLOOR JO�ST MANUFACTURLR I CONC FOUNO.WALLS m Ty�p�LS TO]H'�,
Q HALL SR. ARCH '��, TOVERIFYSIZESSPACINGOFJSTS. I I iTRTD.PLATE I � � ! �'pqpp��PIPESEALEDI ! � � � W J �
Z SCALE: 1/4"=��-O" i �j I SlRIJ55ES R10DRAINAGEBOARDON � -- I�SUMP���INTOSUM1PBASKET . I �
� 20'K8'CONT.CONC.FfGS. '� � _J � �
8.)a 12'AETURNS ON ALL DOORS I RE6Aft PER GODE i
��� UNLESSOTHERWISENOTED I I - �! � � I I
o_� _ �' _ -- _ �'� �
�� I 9.�ROOMDIMtNSIONSFORFIN15HE� I I � .; . i I �, PROJECT
�__ '� ROOMSAREAPPROXIMATE8USE0 q '� � I .
I FOft GENERAL PIANNING.EXACT I Im I I 8'H.x B'W.POURED . �. O FOUNDATION �S4H
ROOM�IMENSION WILL VARV. CONC.FROST WALL ON rn
� §� I FINISHEO SQ FT.
� __-
I �i -- � "' � REBAR PER cooec.�cs.I V i
I � �i s . � BASEMENT 1520
� � - � acoNc FouiJo wn° I I � _ ,�� -- ^ - v�' o ' ' ---
r , s. �� ,n :�a � FIRSL.. �$48
� � .�.� II 2'INT.LEDGE _____J ' II' II '"` I ---L.R •"•UnlessN 1 tl......:.:.....• SECOND 2379
� ��- �I I�� �''�, `fq��I � � . , -_ �L 0'x8'GRERBAR ER CODE -_..I � r---- I O
�- �� L I
` � N SPORTCOURT 725
~ 20_,,� ta�• z-o�j -� - I , ' roT4� 6472
.- ' � .
5 REC. ROOM TV, SR. ARCH �_"�-- � �_ — ;__ _. -- _.___— ', � �� PROJ.NO.
� p.fi' l t1'-0' 10'-P
2 SCALE: 1!4°-,�-o° 6.�• � T-0• ,z-0• i 6'-6' 12'-0' 6'-0' .�p$' �g� r°' GH0549
.... _ 2.E '" _ _. .... 49�"6 .. _... .. -,i `
_ __ - .-_ - _ -.. ._-_ __-_. ......__..
- - _ '`-0:. _ --- - --- --± SHEET �
--- -- -- ---
LOWER LEVEL FLOOR PLAN
oF 5
SCALE: 114"=1'-0"
r
I
I
W� 10'-1 118" W A 10'-1 1/8' W w I 11'-0 118' W N W� tt'-6 ll�'
_ _ _ _ . _ _ _ - _ _ _. _ _ . _
� r_ _ . 9-0„ ,�_� � � . _ .B-0 �..� (ll � _ . b�,0.. �-0 � � (� UJ gA• -�._
� �
' > T ' I 8 ' D I _ - � D �J �_ I Dr � � �� _-__.__-_._.
i � I -. � -
m � ..- � mz .. � mm I mm mm
li Am — , � — � D �� � D p � T�IE-�r
� p � p A �
''. D �- J,: � l,- � , � „ � J, � � � �
�] � o �-`- S � m �
o � '�I o O o O '� i �I
� ' �.
� � = Q � 0 I 0 � � ������ ���� �I��
_ � � x �.b: I � � � 5,-0, � � I __
� o i � I � � � ' � bII�I�� l �
,
� --5'�--f o " 6�'�" • I , ` ' I�'. ' I �'� 9'
� i �, � z �i � � g �_ I���,�ii11�I�fl�J�
� � � --
� �
b ' �'b � 2 D � -- �
_ '' �
W cn g � '
w� ,�-,,,a- , m
� — -
m = � io-�ira- y = e'-0' " � � � _��
� � , _ _ �..u• �,. i m � �, i I �'� 5_3 ��
mr ! , r --- { - - -
; � p s ,
p cn �,- � 5, a I
ii, -{� 5,�. y, � � -.._ ....'� �11'.A 1/8' _�
/V
� D �
�7 �i Is (-�
� _ � 65'{�^ -'n1.1 ;'v�1-',.:' I
��. 2'�' JS'A" ZB'-0" =._ .__.
.,�. "� — —_- >_'."_.`
-S'-11' �y �. 16'-2'� -� 5 11' �
j - ' — I --�----;�.__�---f---�
..I__ �^ 1020 T �' ' 2020 T '-_
. i._.`_ _ .. .._._ .. . .. .. _ . . ` �
. . .. . . . ... _ r
WD LEOGf FRAMETOCEILING WO LLDGC
vl t I'Iz��ti � ..�� _.�
� _�
�
I 6'-P � 16'-0" 2 G• I__ 9�,0" —"_-"�-4'� t.�
_-.
-__
� I �31 W Lv� I (31���e U�. _ _... . ... __ --- '..___. ......---- „'�_ 'I
-.�_- :-_— -._.__...._ �
� I! i i i i
i i i i
i i i i K, i
�y �i = A
4 �� �i � i ; , �
i i i i � � : �
� � � � �
i --�-------------- -'--�--- - �3)ii%'.'�-- - "p n � I � � q
.- ----�--------------a--�--- -------- Qn �'� S� �
I ___ m 'N
> yA � /
I I i i i i = IJ � �
I � o ; ♦ � .
II Ib� I.II L-----16'-0'W n8-0'M.STLOHGPMGEDR-----J 9'-0 W 8'-0' .SF�.OHGARAGEDR .. � -I I £ „ II
, �o �� I!
'L�fn_-�':.,, u t� � I � 'Cf� I I -�c` �II
� ��� � � �� -- °a��° � � � � _ � ��` �
fa �° " � _ ` �
o�yo � � c
�' �
i � a p� � �
Dp> �
I y .�
II §$ I II ZO m � �\ '
i ' ------ ---------- p � m � �,
2 I
i I ----------------- i � ���\ _ I �
I. ,� ,x•-s• � ss� a�a� _ �' � {
d � I -�' 6 maA ,.
� v I ��; o �, Dxm Sc .
� I_�—. 1- -'-'�/-- - ' � ;S�c p �� ��°g�'
, _ __ ' - - � _ ,,, - - - - -
. _ , ,,_
I m (.2)2 I r.ROPDESK� .". . _" .. A�. _� iom� r HI' pPl=l — �
O I � I
13'-0' L- �� �� I I V tn . L] I Gl � ��
i� m �Do -
i � � � _ ` 3'� . o'!. � I m� � !4 Q�. y , I Ibt 9Js C d' I
mi � .
� ~ m CA / �^(� ��i o<b 6 �'"� '
���n m m O . i�� � MICRO rn�C 4-0 � 1]'b' �.m
3'8'
z. � � '
m & , m ��p� � _ I ( I - J i i
� m ru . _____ ..1 _- ___
H
b� b; � T� ci 1. �b �I UP ERS UPPER �� � ��
� m . x y ,y�� 4B RCFR. ABOVE --� -- (� o� - 1r.� I
! I _ - —_
Q \ m.. .-..... __--.- 6ASE _.,..._,�\ : I -�m'- ,�j b j N
IS ;� 'I � � GA0 O� � d' ^ { - .� - b1
I �
°' . �li �i' o n�� �i N �'b p ,a°yyo� �- � � c� w
� m �._6. �� . ��. p� �^� � � n 'I I r� I' � N ' I
, n m l� I� � I I , b' li)9�IZ Lsl � —0 6
� IDrT1 � w ��^�� ."T�� Iti R35H. � �3_. —1 ...� __..-.'�Q"_ F "-
.. . � ., � po ��I I_ s�" I
Z Li � 1� � -�ir-_-- � �W � i i ' ry ��$ I
I .. � ��O ..��• I II
a r x ".'��" � � -7 ' y q
� �� �'o�� � � �� � � � a i �, .� I
, u mi § y � �O o . In I i � � I 4 n I
' �, a � _�oi � �
� i S ' 00 �6 � Izb � c�� ,_��m� _ O"- �7 y; i
mj I I �olm \ � i iil• I I _ x� .iri �'. mEZ� � f�'' �, � . � I
r- _ A . (y'1X'� � `F=�b � I<i 'i4 O fn. I
I ��� � -� � i nSmg �i�; i� ��ImI' � "I, � mn' I I
�. � i� e-r �� '�" �-0 n i �- z� , �� � � . N °° �x� �e I
�, � � � I � oNi�� ' bi � �' i� f ro� ' � ol � � � � �
OI �t O 9I�` \ I �I I _-J . I �I I y � I
'O .' \ I1.�'�i I I�'� � I p �p
. T 2 �- � vC„ZI�,�`-� __ __ '�I' .1 . ..I _T I 1I�Ir �l O
ITV _�
V a � �� O I� ( I � I
� ��^ z �n� '� � ' I 3'�8" 9'-0" � 18'FLOOF TftUSSES 'y rp I �
� _ .. 91 {1 QiB2'OC ''BI I
D � (il x`� �i �I U 19R I � m I �' �
u
lo �
I , I A � '� I
� (2)2X
� 1 ________ _____ I.n ; rl
u
❑ V � _-� -1-- --� ----- --------------- , --�"--�-- - - ---
�._
� z a� �� "- � - ---- -
--- 3056PICT �-
Z' I " �_ � ___ _�__- � ..___I . '_�"'-- -_ '__- �16IAWN
( ' I.' / --- _- I ' � I rl � 14'-0' T1 ,�� �� 3._3. I 2'-B" iB'-2' �
t'
�� a� /I �. � o i�e• �I �_;I " i sn.nrscH �- I � �
i � � �� �� sa nracH � n �i� � I I � I I �� I `�p ' i' I
9 � � �6 N _�L - --J�_ � , m�.
i iy � -�� �,I FSo� i ii�-�r- -- ----i�-� sa m . � _ � � � H V °.
�A I�o� �r. A � I i �. _- �T�� �> � ; ; o� �� H� �_� N�
�, . � m�m ^� � zm i i II � ' I� � io�o mp oA i�P g� z y m�r
� � Id � `"� I ---L�� - - ----� i �i � ! �'- I°sc>�� � ym� �S No= oz'� ��Z °Fn oz '
' r � � -' � ' � I I = G� I I � � o o m 9" m . zp
� � m� ---- - -- --- �° I I I ����nall i Q j �;m� �a "No � ��� °g� �� 90 �oa
I � p ,o 111 �
� ���' � � _ -I _. . . -0'� 11'.1'i" I I �SagOA�l I � � D3i J4 �,a�� �O PA ��� m 2� �mP I
o� IC3)���c, SR.HRCH I �..��e �Q'! y I �y ZQy 2 O �� O J� ^'� I5.
c � i �� � I I oa;l I i I F g �'� �� oo " c'� �
� N � i 'r_ I I "z�' � I I �" � ,m <c3,�s '�Q�j €NQ,`L_ � �" � '��p i
I �'. :i^ - . `,' 0 fn I � � ~ \ 'Uy I � Dmx�� fni/ L]� Oqm"' oN A � �
� CQ9 � Ei i.i � Z� �mll III_I I I / I � � I� S I �u pDC2 ON OD � m O �i
I, &�n`o z Ib �'�, mpL�,� n `I 1� -_ _J i_ __ - - -- �i I_.- D9� ymo y� m �',,
� - . � ��r S � I �i �-���-_ ---�. .--� iS i � I ,
g$ 'a � 5 �tS I I ! 16'-0' � � �I w� I
I �Ny� � � � I II I SR.ARCH Iw I
I �9"�9' <' ' 6'-0_� 1 3 9'9'.
1 { I�
�3 3 w �6 __11-�q�-�� r �� �.
I �o a , "' LLTNABOVEFI �LjCE __ _-1� I _
I I
� �- I r� _
§ BUILT-IN -'�GAS F.P.i BUILT If1' II �
I I (zliwo . e-o�Hci I b �.
i -i- I--- � �� `
I I Z..�i Y620 FLYED 10'-7' Z620 FIxED 2_�r�.
�
_q�'p_'_ __ �9 � 15'�6' 1'-6" 6'-d' 73'E' "
i�
:�:
___-. _ -'- .__. 55'fi' -__.___---"_.-...-..._'_"__ -_"__"_"_'-"'-_-y
� � 2015 GONYEA HOMES
m � o � � z � � �=a � WATKINS RESIDENCE � � � A � N ! < 6 ���� _ ( �--- ,
-mi = L O I m la ➢ .T7 � p m<� QO I, �
� z � � �' 'p Z ° LOT 2 BLOCK 2 KINTYRE TWO N �' �' N �I' ;IN ° m d��� �� ''� I
� (j7 O � ; T m rn j o co n`i j �o xl z o .` i,'�.I,
° � � ��W,� � � 140 KINTYRE LANE �^ � �^ �^ �^ �'� o p ���> Nm ',',',, � . I
� �N �I���o � ORONO, MN 55356 0 �N� D ' - �
�
� _
�
�
�
�
� a
R�g� �N ��N A ��n �_� �� �p ��� U
A O � �O1.D r
�mNp Np m m �o m�x N� i� ypy
mAm7 a� `^�T ➢ �yo �yp �O �> �NO
i v�i�ntn =Z m$ m. v O 2� p',O 20A
���ZSN w Ayf9i1 Spp A� n �Nln
cz ��p n �� �S
_i°N �n �m m mmz = my ^ m�'� � ---------------__ .__ ._..---�
. �m�A �c �� O�� 4"+ Oa � O�p II II
z oc � owm o _ o �
<�c y oa � m � � �
��
� I
� a Np v II III
� �->i - ------- -_ _ _ _ _ - - - - - - - --;i '
�r--- - - --- -- - - _-- '� �
I � �� i �
I� I � �� ' �
_L sn'.m I �a��r _._._. I
s-0• io- za�a __-��-- 5`�• I
i �-� __
j �r- �a - --- i
� i i � � � � �� i
� �
I � � �� v I
'i � I I �� m 1 xy A� �
. II I �O I ' p._ wDOo 0� ~m°� II
Q I I �;R nafn,;
I, § � S� �x I I n�:d c�',�.Z7^' b � �
I I � N I I f �~O dl CPT .�
I � � . � 3 VINYL I
I �''� '`m " � � l
� � �
i i ' �= a I
I � � I
I '`L �� ausn�no.c.o. ��
--- ----J�
— _ �
ss�� � � -- ,� -----
--- ---- �
I � �---- I �
n�� . i 7� 7 ir�e^ I,
i b �i a AI' �� I I
� I �———— — �_ .__..13'7 0' __ ���- _ —�=I I y�— s�I �p O" � .l��I I r I
� �
� I I I I� � �
f
� �---- "�- i P
i . -- - $� __ " m �
`�' ' _ ..__._. . _..._...___ .w.._...��,.-_—_. .�y��"t-��. �; I �S �N b
_ _
I � D m O,y ^i �'" ; �� �I�
� � �f �~3�' i i y � LJ
� � � � N N �— � � ' i � �� I
� n
N �H �i ° m m a '
; r., f ; o N � I a^ i 6..3• I
§ �I z m� v �,�o ua � .__ .—_ 6-fi"__ �
n�A� �
N i o �'��� } an � ..�..
I � � p � � � �.. �y ..
� I� � N � ; �o� ", _, -i,
'� ;� � IIA� ._ _ I �k-�j m 6' " -1 '�r' I
��wn m �� � � . &( I
. ,� � Z a ol a--e'.��e z`� � in �° ��- �§ � � I
q I i I sa - --a•_�o^ I',i �F oA y �I , z m m �° � i d
� i n �' c� < ' ��f�:��� � s A� �.�_ ' -LJ- _��
��. I 7' I-�i . . u t= 'a - �.- - _ .
;�_ {� , . i nm -- i
n �-n I I 1 I��l�Dm -DI � M1. �li B�� ��. Ilp,: ..� .. � 296BGKT.OR. �
2 0� (� II= I
� m � I�Ib' I 1 I �I p �ik II D�2 v� -_-_ ._ __JI_ . I
� m , ����,N 4 VANITI� wJ �-I d� UPPERS I
A
A ���.n - I� , i I`�... 41�1 n . I
II � ' _— _ - _— — —#� ( J, \:�;1 L _'____ IINEN I I .' I
r � �I------ m m �, "' I
o m -- i i � ��� �;A N � _ �a w ��
y' O �Q
� I '�DN�19R � . .
Z" I .�
C � p 0 �I�i'� b
� � n �� (� I
i > o � "�� � �,�,�o� I�, �+ �
rf" . s
� � . � $b I ' ��S
r � �' � , i,a I j � ' � �I�, �
, i
�4 0 �I ti o u� �A � i � ' il a�
a; Q i m� !� ,,
O ' ���m �`,.� � � I I ' � ��'A �ii�. a n �>,<ti , i i
., , �I yl ' ,.,
'�, O u = �' � � � � '' N
� . �o,.,
z " I I
� r�� w ti� y y. i I ---- c �____---___� y
� � � � _'_ . ._. � � � �� ..
, .�
J I __ ____ .. S ly
D - i �- -- --- � - --- o ��N. I
�
z I � ,� m N "'`�m �' ��-;-1=---- i �
� � I
'�,i -nm� . �
� ,i �9 D� y I I ��
j I �� i �I � �� I I� I I �, I
� I87 I � $ I I� 4
11'>'�O§ __ 5'-5' I I �., I ..
I � ' - ._ m_._- �i{i�
iill m � 'I�� I `°om N � § �
�o� � � �
� i _;;n�o i �t�
, I❑ _ . _--- --_ _~� I �yAD W x I !� � N
§ �,_J----i- - m �: � ��n�m'> b
ii p
3 � ��~�pb� I n
� I N� I �m D I ��~ Cj I ol
I �' 3 � �r m y m _ � � � �b �'„
m_ I—
o m "' I�� i
� . � �I :g ��� ��� -------------� � �
�., �m- � �, m I�, '� ,
�%/ I �~� � � I I ij ' I
��i �I. = Z�' x,
i � ��I� " � i �
ti m , �i _
... _ �.," ��,§" ��i� �y1�� � L ___ .
d; =
� i� TILE BENCH �Z\�-��� �� b
j I._�1
J �',�Z �c"7a�., ' ..I
_ i
.—•-- —�— i� __'_ ______ ____ .__ 1
� ... �--_ __————�.FU(ED r.r
P020 FI%E��� 2020 I%EO 20Z01 ,
I�__ _ WALL_0EL_OW_ _ __ ��
L- _ _ J
i1'�" 3 8_ 2'7� 10'd' 2'-6•
7•-0• 4'-B" S_2, 15'.S �
�: d•a, � 3z•-0• I 6•-0•
i . _"—_i—_.__ ._- .._.
�— ... . .. .Qz�-0�. ..
I
�CJ 2015 GONYEA HOMES
m � ° ° � NN =° WATKINS R�SIDEN�E ` �'��� WNlm m ��oo . .
c� o � Z � o � ` °�NIo
-, _ . � � � D �' � �� O
'�a 1 �n � A rnrnrncncn A O A m`>Z
o Z '� � ° ° LOT 2 BLOCK 2 KINTYRE TWO N ; , N N �'�N Z m AwFm ��
.p U1 � ���. � � ti1 rn � o � N c� �o A N w p<o
0 rn� N�� cn in cn cn �n cn I cn c� b z-n '
„ � � � W � � � 140 KINTYRE LANE `" � N"�p m
o A �N� (AD . .i
� N � ��� � ORONO, MN 55356 ; o � � �r ---
i i �
_-- ------ i ----- __.._. 33'-fi-4—- —- -� --- — — --f��bf�Y ETJ_'�2--Q_.0�
LEFT END OF TRUSS GECIt LEDGER ' '
MAIN FLOOR PLAN NOTES: � r _ _ _ _ _ _
�z- � , � n a
1. 20"4X2 FLOOR TRUSSES � ( �' •� �^ v ' v JUL 2 8 2015
Ii' I: � _
2. 1/2"SHEATHING DEDUCT ill � i; ' j i �i �' � i I; I� CIN OF ORONO
I 3. TRUSS IDENTIFICATION IABEL LOCATED ON END I � ' ! I ;i
`��I � ; i � � � I
OFTRUSS. g�,il''; � , I' � i I i
4. LEFT END OF TRUSS IS PAINTED. THE X TICK MARK ON =a,,I, , , I I � �'I � "------19 _
� � a 'I i LEFT END OF TRUSS .2"O.C.SPACING
w
�; I
�._AYOUT INDICATES LEFT END OF TRUSS AS SHOWN ON �o,. I; I� �i I � "
I LEFT SIDE OF TRUSS DRAWING. c�o � a�;�� j �� I I' I �� ��i �� I�
, � � " ;-:I i I �il !i i: � I i � � � �
,.LL DIMENSIONS ARE IN FEET-INCHES-16THS ",,� i j � i �� � � ;
i j I (� I I �� I I � I
I 6. HOLD RIBBON FLUSH WITH TOP OF TRUSS. NOTCH IS i I! j � I i i j �i ( i I
M A D E L A R G E R F O R V A R Y I N G L U M B F R (H I C f<N E S S. � i', 'j � I i I I �� i j ! j i i � I (
' � I i I' ; � I ;; I; � ' �; I i
I 7. ALTER TRUSS SPACING UP TO 3 1/2" FOR PLUMBING II; �' ' � ' � I � i ' '' � � � i� ' � ��''
AND MECHAN1CAL LOCATIONS. TOILET SYMBOL DOES NOT ;�; (t ! I i I f j i i i; i i I - j i I i � �i � I �
� REPRESENT EiCACT LOCr',TION. I � � ' � � � � � � '
i,ll- I: I i I I i !
I
�� i � I� � I � � � � �I � �
�� d. DO NO�i MODIFY,�u�i,OR REPAIIZ<1NY PORTION OF THE � �I � I � � j � �I �,
TRUSSES WITHOUT WRITTEN APFROVAL FROh1 APC Tf;USS. � i � i � '�� � i i �'�
WARRANTY WILL BF V/OIDED WITHOUT OFFICIAL j ' � � ! � i I j i '� 'rj
DOCUMENTATION. j I �� " ; ! � ;j I
I ' � ' ' I
�� i I il � �� � � � ; � �
o � ' I I ; i � � �
THE IM'Fhl i�OF TNlS E�OC'UMENT IS TO Sl�IOW TI�USS � � � � � � � I � I (
F tACFf?�; 'I i�ONLY. 1 FIE l, '. '�-.CTC�r'��feiLL f3E �
I � �
� RESPOiU�IBLE FOR VERIFING ALL DIMENSIONS AND VVALL I I I I I I � I � I I !
I HEIGHTS WITH THE BLUEPRINT PRIOR TO SETTING TRUSSES. � ' i i � ! �� � I
_-- _. ___.------ - _ _
I
i ' �. I, : i ! � � �I �
_ � ( � j � I I�
i ; ; ! I � ;
STR❑NGBACK BRACING DETAIL ',; �� i I � ' i � � � ��
i; i: ; I� ; ;: ' i �� -�
'� ��
i: I ;� ;, i I; I ; !I i�
', � � � �
- j' ' r' � , 'i
- ' � j� 'i i� ; ; I � �I ��''
�
! ;I, II i � i � ;�
.
�
'A K F N R R,• V RY OF ..
2X6 STR�NGB C BR C] G EQUI EO E E 1 ❑.C. I
�!
STRONGBACKS T❑ BE SECURED TO VERTICAL V]TH (3> 16D NAILS 'I I
SiRONGBACK LUMBER MUST BE 14' IN LENGiH AND LAPPE� 2' HT EN�S j: ;I , I � �� � i i�
INSTALL S7RONGBaCKS PRIpR ip $HEATHING j ; � � I ' ' �' � � � � � � � �
SEE JOH PPCKE7 FOR ADDITiONAL OETAI�S � � I I � � � �� I� � � . a i_._� � � f� � �
� � F�r�'— —'.�—''�_- .. .. .--� r
I', I I = ; i �'V FLUSH BEAM �� j � o
� �I i � i � (supplied by others) � �� o
I
I I. �I i � � I �
I'. I ��,, '�� I ! :
( I � , � ,
� ,
i' I � i; ' i I; i ; �
�: � �� i; �� , I!
�, I , � '� 'i, j i
�
� �' li '
i' i ( i ,� '�
� ,
�
„ '; ' ' i
,
' ;
i i� i
; , � ,
i, �� -
� o ;i
i � �; ',
M =
�� ��� '
� � s,-o�__ � s,_o_o„ v- - - � ------�.Q�--
� ��� �
�n..na� .:._._. t- �— �—_ . ------ v v
12,0 0„ ��,_6_�„ 2,_�_�.
GERTfilEO ,� -------- - -- - 55._6_0„ ---- ----- ---- ------- _ ---- -----------��
Automated [3uildins� Compon�nts, �IIC wATK = NS SALES REP = LLC WO# � T54221F
� f1r �t'1 ��IL't"t DUE DATE : 07/21/15 SCALE : 1"=5 ' -4-0"
ChetQk. Wl �4��8' LYMAN CHAN DSGNR/CHKR : JLB / Date : 7/21/2015 6 : 47
1 4 O K I NT YRE LANE TC Live 4 0 _ oo psf DurFac-Lbr _ 1 _ 00
f'lrrrrae �I)D-S��^J��rJ TC Dead 10 . 00 psf DurFac-P1t = 1 _ 00
�f'hr►Ift� 'Ii-5t?�-I--lfY6' O R O N O MN
BC Live 0 . 00 psf O_ C _ Spacing : 1- 7- 3
1'u.. 7!a��M=l-�«.58?
BC Dead 5 . 00 psf Design Spec = SRC-2012
#Tr/#Cfg : O / O
"5E7rTlt�lG THE STANDAl3`b5 FOR QUA�lTY sa,NO SERVE CE" T o t a i s s . o o p S f
,. �
--� — --�'=D=°�'
20�-0-0
UPPER FLOOR PLAN NOTES
1. 20"4X2 FLOOR TRUSSES
2. 1/2"SHEATHING DEDUCT
3. TRUSS IDENTIFICATION LABEL LOCATED ON END
OF TRUSS.
4. LEFT END OF TRUSS IS PAINTED. TNE(X)TICK MARK ON
LAYOUT INDICATES LEFT END OF TRUSS AS SHOWN ON LEFT END OF TRUSS «______�9.2"O.C.SPAC�NG
� LFFT SIDE OF TRUSS DRP.iNING. � I I '
� I ' 1 ii '� � i
m
�I 7_ ALL CIi�1ENSIONS;�,RE IN FEET-INCHES-16THS �' � �� ( �� �� � �
, i I � �� ,�
I�, rs HOLD RIBBON FLUSH WITH TON OF TRUSS. NOTCH IS I i �
' ,\4ADE LARGER FOR VARYING LUMBER THICKNESS. � � I i I' �� i ,� +� ��� I
" i � f� i �( i lii
I 7. ALTER TRUSS SPACING UP TO 3 1l2° FOR PLUMBWG � �I j; I I ii
I nND MECHANICAL LOCATIONS. TOILET SYMBOL DOES NOT �! ' I I i; j I I.
�I
i' ii
I REPRESENT EXACT LOCATION I ! � �� (( �� 'I � I �ii g m
I � „ Q�
8. DO NOT MODIFY,CUT,OR F'f�•i:Z�„�J��f PORTiON OF THr I � I �I �� I � � '�m a
TRUSSES VVITHOUT WRITTEN APPkOVAL FROM ABC TP.tlSS. � ( � � � � � � I'i x�
WARRANTY JVIL�E�F VOIDED WITHOUT OFFICIAL , �� � � � � I'.�a _
DOCUMENTAI IQN. i �':, I�� I i � i ; I' �!i LL a
I� � I �
9. THE INTEM-OF THIS DOCUMEN�IS TO SHOW TRUSS � '
PLACEMENT ONLY. THE CONTRACTOR WILL BE I� � i I li' ���
RESPONSIBLE FOR VERIFING ALL DIMENSIONS AND WALL �I I �� I'' I
HEIGHTS WITH TME R!��EF�?}�IT PRIOR TO SETTING TRUSSES � � I I
�
___ _ � , ; � � j'.
,��
I i '� !!'
� ��
�� �
,
' ' � k I I � `
_ ; ,
_ , � , i�„ ' � �f
i �
-t�oo ; �� s _o" i
I, ; � � i
�� �'�' j '� � i; i ��
I � '
, ; iI 'I � ' i �o
;i, , ; ►; I �
�; � I� � ;� �
��; � i �i i i!
�, �: �i
,! i; ' i
i� ��
, I I � iI
i� I � � � � ���,
;I � ' i i ' �
i! � , �� �i �� � �
�� ,� ��
,i ; , ,, ;,
--— __----- -----�--------
�
��
� __ __ -- ---- _— —�2 0_0;�'
Ny Tli.w _ �
��f,�9, _ --
cE�r���En
Autamated Ruilding Camponen� wo# : T s 4 z 2�F
7111 $tlt Str�.'t'L S scz�L,E : i �'=s � -lo-o••
Chet�k, W! 547i8 nate : � i2iizois 6 : 48
PIr arac� �OrI-�_4-l'7�C! � p S f D,1 r F a�-L b r _ l . o 0
�'jt011[� ?j�-S�"?�--/XfS� � psf DurFac-P1t _ 1 _ 00
i�G�.t 71J 9.�,�/-;.;.5'? � psf O _ C _ Spacing : 1- 7- 3
) psf Design Spec : SRC-2012
"SE7T(NG THE ST�4,MD�4RDS FOR QUA�ITY ANt? SF� E,S f #�r r�#c f g : o i o
R L '
}' _ 33�_�_��� �— �?�_p_p�,
20'-0-0"
�; l ,` ' i
UPPER FLOOR PLAN NOTES ,i � � ,I I� ��� ��j
LEFT END OF TRUSS
i, i
1. 20"4X2 FLOOR TRUSSES ��� ( � ':
� i
2. 1/2"SHEATHING OEDUCT � ��� � j i I �i, I I I I I � I � � `
�'I ' ' i I j li; I � � I I i ' � � j �
3. TRUSS IDENTIFICATION LABEL LOCATED ON END i!j ;I �; i , � � j -
OF TRUSS. �I i i i I I i j i � j � I I I I
;';,� �' I I�I; ! � � � i I,', i
4. LEFT END OF TRUSS IS PAINTED. THE(X)TICK MARK ON i, �: •: � i i j ; j � : � , � LEFT END OF TRUSS «------19.2"O.C.SPACING
LAYOUT INDICATES LEFT END OF TRUSS AS SHOWN ON - - ' � � I i i� � I � � I � r
LEFT SIDE OF TRUSS DRAWfNG. ��� � � � �' � � �' i I � i � � r� '�� `°
� � �
� ' � '� I �I ' I I ' , �
i5. ALL DIMENSIONS:'�RE IN FEET-INCHES-16THS II I �,� ' � � � i� � I : � ; ; i � ii
' S, HOLD RIaBON FLUSH WITH TOP OF TRUSS. NOTCH IS � �t �� � � j �- � I I� � �i � �� � � � j� � I� � � �'.'�
i' _ t'r � n
� MADE LARGER FOR VARYING LUMBER THICKNESS. �', '; �i � I j I I ' ! � I �I I I I i I I I i�i
7. ALTER TRUSS SPACWG UP TO 3 1!2" FOR PLUMBING ;i i '� ;; � � � � ' � j I I �I � � �� �!!
AND MECHANICAI LOCATIONS. TOfLET SYMBOL DOES NOT '' I' � I I I ' �� ( I j j j � � �' �� ^
I ' �!I I' I i� �I ij �� � � I i I� i II I I ii (..Q o
I REPRESENT EXACT LOCATION. � i lii a�
, '� ' I: '( i ' � i i I, � I!,
� 8. DO NOT MODIFY,CUT,OR REPAI�;;;JY PORTION OF 1 hit_ —____- ,: ,�., ,: , ' ' i ;i � i I I (ii m� _
i l i� f I
TftUSSES V�lITHOUT WRITTFN APPROVAL FROM ABC TRUSS. i: � �; � j I� ' j I ;� j ;I � (ii�a
I WARRANTY VVI�L BE VOIDED WITHOUT OFFICIAL '�i� i� '� ;I �� I; �� i 'i I I i � � i i I I � °� a
� DOCUMENTATION. �iI i I I � 'I � �; ;i I i I: I � ' � I i I � i I �' �
� � I � I i i i I I I ! j � I i � ; �� I � ii I � i I �ii
! 9. THE WTEM'OF THIS DOCUMEN�IS TO SHOW TRUSS i i i ; � i i � i� j I I ( �
PLACEMENT ONLY. THE CONTRACTOR WILI BE Q L � � �� i I I � � � i I ; I � i � I': I 'i
RESPONSIBLE FOR VERIFING ALL DIMENSIONS AND WALL w � i� � ; ; i� ! � ' � � � , I I � I � � �" � i
�HEIGHTS WITH f HE r� �" ` �'dI Pi?IOfZ TO SETTIN6 TRU`��f.S � `'a �,,� � � � � _ �� �I ! � � I � � � � �� � � I �' i
0
_ _ � � j� j , � i � � � � � � �,) ��=
J ij �� , � � i' � � � � � i ��;
ii i � -' 'I � i j � I � i I ! I ��
''i I 'I; � i, 'i i ' i i � ' i i i{ I j i ���
; '' ' j � i
'; I , 'i � i, ; � '• � � ��
I
� _ I
, �I I I �
A � M A ■ � � A A ■ � � r: _ � -- i�
�
I ! �' ,
- � : _ : ;
___ __ __ _ _ �
_ ATTIC ROOF TRUSS GIRDER __ i `' y +i i ' . . _ ' � 1 i I � i f ' I I
f '
" � I 3'-6�D" �; I 14'r�1-0" j, ; � I �� Z
'� ( �� � �� i � �i �� �0-0"� �' �� �� 9" -0° �
'i ' � I � I ;
� I I �, ' � " i I II I �1` f -��_ II I �� �� � � � � I
I i I! � j �
i I � , ��s==.—k-� - �-� �I � �
I � i I FLUS BFAM I
_ j i I i ; , I I j i (supplie�. by others) � ! o
. �.i I; I ij p
=i � �i I: � ;� �� � � �
ii I - �
,I I I ��; I I,� - ��
� I � i
� � 'i �i j ;I
i i i i � �� � I ` � ' �, � ; j
i i I � I �� (; I I; i ( �
, �� li
� i �� � �; �
'i i � i ' i; i
; I ii � I
I I�
i I ��
0
co = FLUSH�BEAM
- su lied b others I =
ro ' ( PP Y )
� — �'-0-°° — �9,_0_0„
� � s,-o-o„ � � �
� � i r-o-o°- �o�-s-o�� �— — 2 0 0��
�'�, �� 55,_6_0�, - — ------ �'
��an�n,� �� �
CEfCTfFiEO
Autamated C3uitding Companents, Inc wAT K = N s sALEs REP : LLc wo# = Ts 42��F
? �11 SU� SLIUC'C DUE DATE : 07/21/15 SCALE _ 1"=5 ' -10-0"
L�TE�t�k, �j ���L�B, LYMAN CHpiN DSGNR/CHKR : JLB / Date : 7/21/2015 6 : 48
Z 4 � K I NT YRE LANE TC Live 40 _ 00 psf DurFac-Lbr . 1 _ 00
Plrurrr &flt)-s_.�-''1�9�1
��f1�'}fI[' ��f-��'�1--/r�`(f� �RUN� MN TC Dead 10 . 00 psf DurFac-P1t = 1 _ 00
BC Live O _ 00 psf O_ C _ Spacing = 1- 7- 3
�'[t.L- f j J��J'�tiF-���l?
BC Dead 5 . 00 psf Design Spec _ SRC-2012
"SETTlNG THE STAI�fOARDS �FDR QUALJTY,4N0� S,ERVECE" p #T=�#c f g : o � o
Tota1 55 . 00 sf
_ ---_ �
i 1�
i
i ` �' �`:
KINT�'RE LANE o ! o i4 0000�, , �� � ��
� S00°32'S3"E 102.76 ;,o�,�3 61. 14 S�3°27' „ z�\
/� 48 w "�
m
� i026.4 142�.9 � � �
«.S ���4.� �Q24.5 . I ���3�.'� � 3 �
FDP I b ---- --�
_ 1024.63 1028J I �'3/�
- -' - - . `^"�- - - � --- �,_ �`
FDP
'C23."t -i m�� 1. O - _ -_. _. � '-, I �.I030,g� ��3i.9 .
•,- .
r `. _�= - � - �= - -.- �'` - - .� - . .
,� � ��� '--�-... -.� ... \\ - � _ _I- re ��� � � II O �3
, �, _ � o __ _
_ ,•
�- --
5 I ,,ya \ ..... ,02� ,o2s �,. , o �� , .v �o2e �` � � \ \ Ser Rcs 4pa4a �°�'� _ _ _ _ _ - _
. .,. - -
�� '.�026.? � 1�27.� � a � ,, _ - \ . . __
,,
, v ..... -.... �.___--� � � I
i � �0$
���"
J2�.0 , p�3��0 x1025.5.. � � �� 0 '-
, I 1�p ,\ � � � x i02s.o � � ' r , o
-.. I �� � �. O I \ ;o�V9. In�iO'8.5 �.. ,...` "�iP
� � ,' � � x1Q29,8 � ..
�,
� (102,5.'8)X � -,
� � I o 'j --- N a � I:.` �, 1033.
yak �
� N FRON�� _ � _ , � ;� �
�- o � .� - - - �`J.�u � ' % � ��1 --- 1028.6 � -• 4
o�q� ----_ �
, ..� 024.8 n�i�, �U �V i 7 _��� �� / � S.
roi9,u ,oie. � � � `� �'� � � 7.0 12. � ��-- �oze �� � � �� � `- -,- _ �
I I � A \ n _ `� ' r." .
. Q� i� � St�OPI lc
�C.� r i `� .II�LJ.8 � � I ,� ` . I I �`
J .. I ip ,, ' 16'3. , I �4 3 �Q.`J I . , _ '`� ' ' �.
O I
� '�r 19.0 {' c„6�,� _ IK�ozz 2 '�.�
i
on.; �� - � � � �, o � I L 5 � u, � . ti.' � • io�a.s I Yoza.o ' X
- u �a.9 �. �, q. � �,. Xio�e_a �
_ ,
. � �. � � w
I 3.5� � 1 _ --
_ r � ' ' o `�
_ ,_ � � � _ �, , i , -
�, . �. �, o � _
I �C:� . � L. .+ (.. .,.:- .� '
... � _ ���� - � x
� � _ � �_�� � � � "
I ' � � o � I � w� � ��
� � �, � � 2.0� 20.0 � o o .35 '�'�� -����ti°` �1 a' %�� �
_ � � � ,
i .s �oi�. o� co � -- - iu s � �iq2s� \
� � �� 33.0 " rv xioza��
���� '\ a � (1017.3) ��T"'�"��j7� c° � _�� ��°� �.
" � , mu' � �o-n W �..� . � �� �J . � �
�` � � � � . •. � � � 1 - 0
, w
ak (D
x IOL'.6 ... I x IOI6.0 ` --� -� _.__� � s m� . Ui� _ --�-. __ ..}\ x - -� ,4f
�
\ o- - _ � � 26 5 r .._ __ \p2�!� ��'�, ��
�
15.0 '
`� ��,... �`_ � ��' -c1Gl . .t I0�5.3 ---�._ � Q o a � �'� ��' .�� � �`,.�� �� �
..... _,. . .
"�� �� x1016.9 --- �- --... -- --.-._ . '_.- _. . �x ��., 'J 'O
_._
,� � � _� ��� . � �' I � r � `=
. _ ' .,.. � . �,. ` � \O '>
� ��y '1G(1, - xion3 ioz3a x �.._ �_ io� � I p Z o . \, m
,, �, - ___ __- -_. ���.�� \ I � .
- I� 0; --__ _ _ __ _ __ � ''` I , '., c�-i ar-?<.
� � - � _ _� ��ioz3 s . x ��00 x io2s.s--�_ _ -�-��_�v_>�.
� ��� "�-- _` � �,� 4?>'��� CO ' "o -'� `'`��
-- _ . �., o � ,
i ioia iois _ ` . � � `' ' a o o z ,-, ��
Z C�C� � '�-.' --T._�--•-��_'-- a �
1004.E � ,��.I � � __.� _ �=------� - 2 ���'N G) .
� W
`\ � ./, O/2 .. ,.� \� �... . O�c0 N � �� \
1005�� /p � � � ` � � -.
� I
I �
�"`; .
p8 � I �1J O
� I � �T �., _ -
------- �\
W I °0s � .,, �oio � ��o�F.o ioi2 �,� � W�
W �5.9 • \ `�_...,� I I I C � � .. ..X ._. .. p4 _
._ ��..� '.\ ' <
_ � ` �L
C i. .` �\` `� a; I ..'�. 6, ..._ .
� _
. G I I � ., x � � . . .__ _ ... -.
O
�";, / � , \� x 1017.1 ' �'"_",-- -._._O ...'<.� .�. __.w._�__. ,
p_
/ _ � --
��.. � �� >:iooaz --� �� 1 ���- N ���� `'W ��
� , �_ , I �, -- --- -- �� _ ; _ __ .�,_►- - - _ ,X
I � ., �\ U� �� I O oc, _ � 1ti'L�
w �, �o�, ;,, ���,,,�� _o <o�E� II _ -,o Z --- _ �,oZo:s _�s_._ ___ __ -- ��ti° _
_ �_ 1,
, oo \ -_ �rv _ _
. \ .
- -- - _ _
,�`, . � � �� � ,, , � --- _ � . � . ___ __
, ___
__
�, _ ,
� x� ei���-� ' � �. �_ -
�
�J I :, '._ r \ __._ �`:.:I _ _ Io15_2-. .__.__ ._. __ __ , -_- __x __ �`'o
` \'- �� ` ......... ` ---x._._.... p� � s
� � 000_� ��' \��_Z -.�._� - -4-100`.3.._-- --- �,� � � - ._.. ,�.,,, " EPTIC iAN�rd' �-- _ �, o -
_, ; �
xoy?/ � � C� D . �` � '-�- .__._ �, �.. _._ i0ia.57 r_ ..... ...s
\ ...,. � .' ...�
' I I� .� ��'.,. \ - �:,�. I '`...h...��'. VENT _ _ ...
, m � , _,._I � sEP��n+vK __..__° C�-_ x ---- -o-__ --�
� � � � �ui4.�6' ��-� m �
., __
- __� � �,EPTic vEr,r .� X-, ,-�
_.__ ___ "
-- -
� � �� ���Ol.i� � �. �1603.a ,�1002.6 --_. �. . � '. � ��� -� �
x1004.5-.__ ___._. 'O
� x��08.9
� � IOOS.y���. . _ . � --� x
, �-. o
, I ' -- -- �,o
� -- --__
� - _ � �� �,, � _ x x '� '
`l'�_, p� pO . -. ._..X ... ..... .
f ,� � �
� � -� � ,, .__
0 0 0 o WC� -i � � (nCn2 � = -• r I __ _ _. ��o�
_ � _
�. N N N N y < p�"�j <� n � � C � � O Q � � ' �'C, _ __ ' $_
_-- -- -`. -
_._
N � _ ...
�4.5 � -v � � 3 � = fy � �° � Dp, � a _ __ � �5 _. - _ __ _ - , �
m m co m � n� � °� D D � C! � � pp �p - ___ ___ ._
_. _. _. _. -_ __
sss.2 < � N e�D m � � � D °� D n�i � II � m fy/1 � - __ � `��0-� �eoc. x�ooi s__ x' --_. _ ,
-- ---_ �__
, ___ - -
�b-- �.
'--
..« ... .. .-« rt � II Cfl � r .. � __ -_ �---_. _---- x.._�`_ �.
, f� C�D N C� � O p�i � p�j � II �I .� � N Q 6 , � a ,.s�_ ----- - oa `�.
__ ... .
�,,\ " tQ1 C) Gt o tC/� II W 11 � W � � T� � <y95.a__ � _ _ _ .�, \.
- - ---
-- ___ _... ,-- x
Q'�- o o \ !�!`� � w �' w � � Z tl� � -- ----- \,o
----
� � � C N(,� � � (A � � � C� 905�.._�:r,>-`.. •,o
.��� N A � (A � (n 'il � � �• � _ � \
1 -- -- ---
� '� � Cn '�'1 "11 O � r'► -- ._._, '.\
,, N _ fll �. _ _ `
� � � . . . \
( :: k
� N � � 11 TI � -i � _ x 95 5 - - yo
- � �,�, `
. � _ � _- - -- -- �.� '..
.. �
T V N N W � Q � � �-, � 33i6 � .
p . p CIl „
N � -> _ __{ x �.
, _ _ __
Q p 'A Ul � p� ___ -,� \
�• � r- T � (D Ul n , 1 � �
. :'
��� o T o o ?� °� � -� _ "`_--` 99C.- � �
---- -- ---- � �
---
� o _____ � ,
a
� � _ .
•\ 'Qi �. ? 6 c� � x 987.6 1 �\ v
� �
O .-. -� __ _ __.
� � � p _ __._ ._._ __�...�957.2--_:... ..l - �-- � \ '�., �. .
` � -� .-. - � � . .
� � II � � ` 1 __ - _ �`� \ \ \
l�_. ` \ � II � 1 \
�:-. �� �
o W � � ____ _ . I .\ �
N O O -_ -�" � �� �5.: � a8.,.� � �
�� 1. �a�s o �, x
�°� � � ( a _ /<984.1� �,_ _ _ � \
., � r � Q �
_. , � ,r �- _ ��
�� c� m � � _�_ �a � � � � � � �
�,
�
` \
. � _ \ 1�
-�► m -_
r. � � 1
� �� � o
� �� _. .\ 1` � x
� -I D_ _ \ \ _ ...- 1 i ` �
O _ J d
� - � � -- �� �
\ ` _ __ ,, n � �o , -1 ,
� �
,
-� � � � �� , ��
! \ \ ` � •
�� � ,.---y�_--- , ,
�`, r�� \ � � � ��'` � �� ', �i
� � � ,� � / � � �
\ �\ � " � � �� � � � �� ' ' �
% 1 �
, ,.
�� -- � �
� - � � - - __ , ;
98L6 / .x. �.� %�978.5 - Cn .
�9%9.5
��U_I I �
``; ' -- - �� � ;= -� �1 1, ,, � ' � ',
` � ��� �� � � i ! � I �
• �� � i \ � , � ? ` �
�` � \� �� 1 ; ', ` �\
� �. � . � � , - _ � 1 � �
r
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED " 1 —I l0
PERMIT NO. 2L IS -00(1.5C' COMPLETED
ADDRESS I' ICiYl ICC V(r
OWNER TELEPHONE NO.
CONTRACTOR
DESCRIPTION P) PCU I . SU iv CI 5, lc, ki,A .-
4, ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS
v) 0 FRAMING ❑ MECHANICAL FINAL 0 TREE REMOVAL
❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP 0 PROGRESS
• ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
❑ DEMO-SITE ❑ SEPTIC MAINT. 0 FOLLOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL 0 HARD COVER REMOVAL
0 PLUMBING RI 0 SEPTIC FINAL ❑ FOUNDATION/REMOVAL
2 OWNER/CONTRACTOR TO MEET YOU:_YES_NO
vvi COMMENTS:
cc
LLJ
49, ,s-(,(1/'e / , -Pr c,-1 ycatcc
��
J c-i (x,ei`7Ll 0 v z(,L 7`x`2 17 7'l/42 '{i
0
z
0
W
CC
CC
W ❑WORK SATISFACTORY:PROCEED ❑PROJECT COMPLETE
CC ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. CI PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
Owner/Contra • •n site: ' ,
Inspector . JAW
White Copy/Inspector's File Canary Copy/Site Notice
Christine Mattson
From: Adam Edwards
Sent: Thursday, July 28, 2016 3:00 PM
To: Christine Mattson
Subject: RE: 140 Kintyre Lane/#2015-00950
Chris,
The as-built appears to conform to the intent of the approved grading plan.
An inspector should conduct a site visit and confirm the following:
1. The survey accurately depicts conditions on the ground.
2. The site is stabilized to the point the any remaining erosion control can be removed.
Adam
From: Christine Mattson
Sent:Wednesday,July 27, 2016 1:26 PM
To:Adam Edwards<aedwards@ci.orono.mn.us>
Subject: 140 Kintyre Lane/#2015-00950
Adam,
Attached is an electronic copy of the as-built survey for 140 Kintyre Lane. The landscape was completed without an
issued permit. I've enclosed a partial copy of the landscape plan and placed it in your inbox with the file. Please review
and provide comments.
Thank you!
Chris—
From: Ethan Kindseth [mailto:ekindseth@gonveahomes.com]
Sent:Wednesday,July 27, 2016 9:35 AM
To:Christine Mattson<CMattson@ci.orono.mn.us>; Melanie Curtis<MCurtis@ci.orono.mn.us>
Subject: Fwd: 140 Kintyre Lane
Does this look ok?
Sent from my iPhone
Begin forwarded message:
From: "Bryan Voit" <Bvoit@sathre.com>
To: "Ethan Kindseth" <ekindseth@gonyeahomes.com>
1
-
Cc: "Jon Connolly" <jonnolly@gonyeahomes.com>
Subject: RE: 140 Kintyre Lane
Ethan,
Attached is the PDF of grading asbuilt.
Original Message
From: Ethan Kindseth [mailto:ekindseth@gonyeahomes.com]
Sent: Tuesday, July 19, 2016 1:02 PM
To: Bryan Voit
Subject: 140 Kintyre Lane
When can you do final as built?
Sent from my iPhone
2
Christine Mattson
From: Christine Mattson
Sent: Wednesday, July 27, 2016 1:10 PM
To: 'Ethan Kindseth'
Cc: 'Mike@landscapesunlimitedmn.com'; Melanie Curtis
Subject: RE: 140 Kintyre Lane
Ethan,
The Zoning Permit Application for landscaping/minor land alteration permit has not been issued. The proposed
landscaping appears to be complete per the as-built survey submitted. Mike should stop by the office so we can issue
the permit. Please note, because the work was completed without an issued permit, an after-the-fact, double fee will
be applied to this permit.
Please confirm all disturbed areas have been established with vegetation before I send an inspector to the site.
Thank you,
Chris—
Christine Mattson
Planning Assistant
City of Orono
2750 Kelley Parkway i Orono MN 55356 (physical address)
PO Box 66 Crystal Bay ! MN 1 55323-0066 (mailing address)
`t 952.249.4620 8 952.249.4616
® cmattson@ci.orono.mn.us " www.ci.orono.mn.us
Summer Office Hours: (Monday, May 23 through Friday,September 2,2016)
Monday-Thursday: 7:30 am to 5 pm
Friday: 7:30 am to 11:30 am
OUR OFFICE WILL BE CLOSED: Monday,September 5, 2016
From: Ethan Kindseth [mailto:ekindseth@gonyeahomes.com]
Sent:Wednesday,July 27, 2016 9:35 AM
To:Christine Mattson <CMattson@ci.orono.mn.us>; Melanie Curtis<MCurtis@ci.orono.mn.us>
Subject: Fwd: 140 Kintyre Lane
Does this look ok?
Sent from my iPhone
Begin forwarded message:
i
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED
PERMIT NO. 2.015 -C0 COMPLETED L0 7 i5
ADDRESS (40 N br'w Lkf
OWNER TELEPHONE NO.
CONTRACTOR
DESCRIPTION - 1 hü CU' kit-1 l )- 5 i al
w ❑ FOOTING 0 DEMO-FINAL 0 SEPTIC FINAL
Q ❑ POURED WALL 0 PLUMBING RI 0 EXCAV/GRADING/FILLING
Q ❑ FOUNDATION WATERPROOF 0 PLUMBING FINAL 0 TREE REMOVAL
❑ RADON SLAB ❑ MECHANICAL RI 0 SITE INSPECTION
.4t 0 FRAMING 0 MECHANICAL FINAL 0 PROGRESS
• ❑ INSULATION 0 WOOD BURNER/FIREPLACE 0 COMPLAINT
Q 0 FINAL 0 WATER HOOK-UP 0 FOLLOW-UP
IQ_ 0 AS BUILT-SURVEY 0 SEWER HOOK-UP 0 HARD COVER REMOVAL
v ❑ DEMO-SITE ❑ SEPTIC INSTALL 0 FOUNDATION/REMOVAL
Z OWNER/CONTRACTOR TO MEET YOU:_YES_NO
rn COMMENTS:
cc
cc
OW I/it+;XCUOI GO IV) /ij •
cc
cc
W
cc
Lu ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
CC• 0 CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
O (]CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
u BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
Owner/Con qron sit