HomeMy WebLinkAbout2011-00203 - mechanical CITY OF ORONO PERMIT NO.: 2oii-oo2o3
2750 KELLEY PARKWAY
ORONO,MN 55356- DATE IssUED: 04/08/2011
952 249-4600 FAX: 952 249-4616
ADDRESS : 2745 KELLY AVE
PIN : 21-117-23-23-0028
LEGAL DESC : REG.LAND SURVEY NO. 0891
: LOT 000 BLOCK 000
PERMIT TYPE : MECHANICAL(>$500)
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : MECHANICAL-MULTIPLE
VALUATION : $ 3,652.32
NOTE: (1)LENNOX HEATING SYSTEM
MODEL-SL280UH090V48B-NATURAL GAS-4"FLUE-88,000 INPUT BTU'S,70,400 OUTPUT BTU'S,2,400 CFM
APPLICANT
MECHANICAL 50.00
ADVANCED AIR&FIRE STATE SURCHARGE MECH(VALUATION) 5.00
6724 KINGSTON DR. TOTAL 55.00
EDEN PRAIRIE,MN 55346
(952)448-4769 PAID WITH CC# 8991
OWNER
WOOD,JAY&BARBARA
2745 KELLY AVE
EXCELSIOR,MN 55331
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for only the work described and does
not grant permission for additional or related work which requires separate
permits. All provisions of laws and ordinances governing this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has commenced.
The applicant is responsible for assuring all required inspections aze
requested in conformance with the State Building Code.This permit may be
revoke any time for d cause.
' � / / � � � / '
G
icant ermitee S' ure Date Issued B Signature Date
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
C`1T i.�� F:
O�Q�,a City of Orono �'�: �/��j
P.O.Box 66 '�te Rece� �"�tYii�# �� �'V`r�
2750 Kelley Parkway " ��E:. *"'''��
� . � Crystal Bay,MN 55323 <i��rclved$y Att�tuit�:_,r��
� Phone(952)249-4600 Fax(952)249-4616
CITY OF ORONO-MECHANICAL PERMIT
(All Commercial permits must be approved by the Building Official or Inspector and/or Fire Marshall)
�j�� ;
I�3F�.�,r��,�+���U����� ..,,,,,;��:,,a,,. i�.>.£;
1. You may apply for mechanical permits by mail or in person at the City offices. Applications will
be reviewed and a permit will be issued within two working days.
2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT
VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE
PERMIT CARD IS POSTED ON THE JOB SITE.
3. Mechanical Desisns—Complete calculations,details and specifications are required for each
heating,ventilation,humidification-dehumidification,and air conditioning installation including
heat loss/heat gain calculation,design temperatures,equipment ratings and identification as to
type,manufacturer and model. Data shall be presented on form provided.
4. When any new construction or remodeling is involved,a separate building permit must be
obtained.
5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code
requirements.
6. All work must be inspected(rough-in and final). Call(952)249-4600.
(24-48 hour notice required)
7. House Heating Test Record must be submitted before final.
,s�� - ��� ��` �,
� ��������:� � . .. r . i �..: ' ;,
�Residential ❑Commercial(Approval Required)
❑New ❑Additional ❑Repairs �Replace
;Job Site/C�mer Infortriatio�.
Site Address: dadadf .r� �� I �
Owner: �" ( r 0 Mailing Address: a 7 y � �/[ �����y6'
c�ri: �ran v z�p: �J�3 !
Home Phone: J�a� ' �`�3"�77� Alternate Phone: ���o� - /� � ' ��D�(p
�c��t�ctc�r Info�in�t�c�y '°�<.
Contractor: VA n ce¢l �},Y �t�r-���Eontact Person:
`l�$. f� �i�e-r Pkmbi� w�:f
Address: 4 �ii �� State Bond#: ����D 2 l�
City: ��Qi'i YfCt,�'t i� Zip:�3'fb Expiration Date: �'�" aQ� �
Phone: ��a"`7��' J�7�� Alternate Phone: ���� o��j�' (�T I
� Insurance-Current: {� �fp.� �J
1
�,� % ���r�c. C'
Note: All Geothermal Systems will now require a Site Plan&Review by our Building Official.
IS THIS GEOTHERMAL? ❑Yes �No
HEATING SYSTEMS
Quantity: I
Make: �i��vx
Model: ��OD G�� ��V �/..�
Fuel:
Flue Size:
Input BTCJs: �� �
Output BTUs: �� �
CFM: � �
COOLING SYSTEMS
Quantity:
Make:
Model:
Tons:
H.Power
FIREPLACES
❑ Gas Factory Fireplace Brand Name:
❑ Wood Burning Fireplace
❑ Wood Stove Model No.:
❑ Wood Stove with F(ue/Masonry
VENTILATION
❑ No. Kitchen Exhaust duct recirculating cfin
❑ No. Bath Exhaust(must have duct outside) cfm
❑ No. Other Fans: Locations cfin
FUEL STORAGE (Must be approved by�re MarshaU if proposing to abandon tank in plac�)
❑ Instal(ation ❑ Removal
Fuel Oil: gallons ❑ Underground ❑Inside ❑Outside
LP Gas: gallons
Other:
GAS LINE ONLY
❑ Outdoor Grill ❑ Other/List What&Where:
2
❑ Yes,this section applies
The replacement of a Residential fixture or apnliance that meets all three of the following requirements:
1. Does not require modification to electrical or gas service.
2. Has a total cost of$500.00 or less;excludine the cos�of the fi�cture or appliance:and
3. Is improved,installed or replaced by the homeowner or licensed contractor.
Skip next section,if this applies; Cost of Permit $ 15.00
State Swcharge $ 5.00
Mail-In Fee(If Applicable) $ 2.00
Totai Permit Fee $
If above does not apply;follow guidelines below:
1. CONTRACT PRICE *is 1.25%of contract price with a(Minimum Fee of$50.00)
��,�5a. �a X.o�25$ ��. a�
(contract price) (minimum$50.00)
2. STATE SURCHARGE **Add the State Bldg Code Div.Surcharge(Minimum Fee of$5.00)
�,1�5a. 3 a- X.000s $ 5 60
(contract price) (minimam S 5.00)
3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 2.00
4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ . („)V
■ * CONTRACT PRICE or JOB COST means the actual or estimated dollar amount chazged for the
permitted work including materiais,labor,profit,and other fixed costs. It is the amount to be charged
to the customer for the work done. If any material,equipment, labor or installations are furnished by
the owner,tenant or any other party,the reasonable market value of such items must be added to the
estimated cost or contract price for permit fee purposes. In the event that there is a dispute on the
amount of the job cost, the City may request the submission of a signed copy of the actual contract.
■ **The STATE SURCHARGE is.0005 times the Contract Price or a minimum of$5.00.
The undersigned hereby applies to the City for issuance of a Mechanical Permit, agrees to do all
work in strict accordance with the ordinances of the City and the regulations of the State of
Minnesota, and certifies that all statements made on this application are complete, true and
correct.
ApplicanYs Signature: �'1 Date: ��7��
���
� ,,�^ 3
,
Masonary Walls,Biock or SQUARE
,� BTUH
Brick,Fin.Or Unfin. FEET
-Above G�ade HEAT TRANSFER MULTIPLIER Heat Loss
8"or 12"Block,No Insul.,Unfin. Zp �5.3 17.8 20.4 22.9 25.5 28.0 30.6 33.1 35.7 38.2 40.8 43.3 45.9 48.4 968
48.4
8"or 12"Block+R-5 104 4.3 5.0 5.8 6.5 7.2 7.9 8.6 9.4 10.1 10.8 11.5 12.2 13.0 13.7 1,425
13.7
8"or 12"Block+R-11 0 2•3 2.7 3.1 3.5 3.8 4.2 4.6 5.0 5.4 5.8 6.2 6.5 6.9 7.3 �
7.3
8"or 12"Block+R-13 0 �•4 1.7 1.9 2.2 2.4 2.6 2.9 3.1 3.4 3.6 3.8 4.1 4.3 4.6 �
4.6
Masonary Wails,Block or BTUH
Brick,Fin.Or Unfin.-Walls SQUARE Heat Lass
Extend Z'-5'Below Grade FEET HEAT TRANSFER MULTIPLIER
8"or 12"Block+No Insul. 70 3.7 4.4 5.0 5.6 6.2 6.9 7.5 8.1 8.7 9.4 10.0 10.6 11.2 11.9 g33
11.9
8"or 12"Block+R-5 728 2•2 2•6 3.0 3.3 3.7 4.1 4.4 4.8 5.2 5.5 5.9 6.3 6.7 7•0 5,096
7.0
8"or 12"Block+R-11 0 1.5 1.8 2,0 2.3 2.6 2.8 3.1 3.3 3.6 3.8 4.1 4.3 4.6 4.8 0
4.8
8"or 12"Block+R-19 0 �'0 1.2 1.4 1.5 1.7 1.9 2.0 2.2 2.4 2.6 2.7 2.9 3.1 3.2 �
3.2
Ceilings Under a Ventilated ;;��?�f,;GF.�
_ 55 6C BTUH
Attic Space or Unheated SqUARE Heat Loss
Room FEET HEAT TRANSFER MULTIPLIER
Noinsulation 0 �$•0 21.0 24.0 27.0 29.9 32.9 35.9 38.9 41.9 44.9 47.9 50.9 53.9 56.9 �
56.9
R-11,3"Insulation 0 y,6 3.1 3.5 4.0 4.4 4.8 5.3 5.7 6.2 6.6 7.0 7.5 7.9 8.4 �
8.4
R-19,6"'Insulation 1508 0.0 1.9 2.1 2.4 2.6 2.9 3.2 3.4 3.7 4.0 4.2 4.5 4.8 5.0� ��0
R-30,10"Insulation 0 1.0 1.2 1.3 1.5 1.6 7.8 2.0 2.1 2.3 2.5 2.6 2.8 3.0 3.1 0
3.1
R-38,12"Insulation 0 0.8 0.9 1.0 1.2 1.3 1.4 1.6 1.7 1.8 2.0 2.1 2.2 2.3 �.5 Q
Floors over an Open Crawl SQUARE BTUH
Space or Garage Heat Loss
FEET HEAT TRANSFER MULTIPLIER
Hardwood Floor+No Insulation 0 9.4 10.9 12.5 14.0 15.6 17.2 18.7 20.3 21.8 23.4 25.0 26.5 28.1 29.6 0
29.6
Hardwood Floor+R-11 416 Z_4 2.8 3.2 3.6 4.0 4.4 4.8 5.2 5.6 6.0 6.4 6.8 7.2 7•6 3,162
7.6
Hardwood Floor+R-19 0 �•6 1.8 2.1 2.3 2.6 2.9 3.1 3.4 3.6 3.9 4.2 4.4 4.7 4.9 �
4.9
Hardwood Floor+R-30 D �•1 1.3 1.5 1.7 1.8 2.0 2.2 2.4 2.6 2.8 3.0 3.1 3.3 3.5 �
Basement Floor SQUARE BTUH
FEET HEAT TRANSFER MULTIPLIER Heat 10S5
2 or More Feet Below Grade 936 0.7 0.8 1.0 1.1 1.2 1.3 1.4 1.5 1.7 1.8 1.9 2.0 2.1 2•3 2,�53
2.3
� �'"'A�r�f �-:� '"'�a.V�7�3�€��`�,��:�3�5� �"�'�� � 93�1,� �P�1 9 � ����".�:.� ManuualJ7thedition
e._i..,
JOB NAME: Wood DATE: 3/15/2011
ADDRESS: 2745 Kelly Ave Excelsior
OUTDOOR TEMPATURE: -25 INDOOR TEMPERATURE: 70 TEMP DIFFERENCE: 95
MOVABLE CLEAR GLASS SQUARE BTUH
WINDOWS(Metai Frame) FEET Heat Loss
HEAT TRANSFER MULTIPLIER
34.7 40.4 46.2 51.0 57.8 63.5 69.3 75.1 80.9 86.6 92.4 98.2 104.0 109.7 �
SINGLE PANE 0 109.7
19.5 22.8 26.0 29.3 32.5 35.8 39.0 42.3 45.5 48.8 52.0 55.3 58.5 61.8 p
SINGLE PANE W/STORM 0 61.8
21.8 25.4 29.0 32.6 36.3 39.9 43.5 47.1 50.8 54.4 58.0 61.6 65.3 68.9 13,160
DOUBLE PANE 191 68.9
14.7 17.2 19.6 22.1 24.5 27.0 29.4 31.9 34.3 36.8 39.2 41.7 44.1 46.6 �
DOUBLE PANE W/STORM 0 46 6
SUDING CLEAR GLASS SQUARE BTUH
DOORS(Metal Frame) FEET Heat Loss
HEAT TRANSFER MULTIPLIER
34.7 40.4 46.2 52.0 57.8 63.5 69.3 75.1 80.9 86.6 92.4 98.2 104.0 109.7 �
SINGLE PANE 0 109.7
19.5 22.8 26.0 29.3 32.5 35.8 39.0 42.3 45.5 48.8 52.0 55.3 58.5 61.8 �
SINGLE PANE W/STORM 0 61.8
36.0 25.4 29.0 32.6 36.3 39.9 43.5 47.1 50.8 54.4 58.0 61.6 65.3 68.9 4,961
DOUBLE PANE 72 68.9
BTUH
WOOD&METAL DOORS SQUARE Heat l.oss
FEET HEAT TRANSFER MULTIPLIER
13.8 16.1 18.4 20.7 23.0 25.3 27.6 29.9 32.2 34.5 36.8 39.1 41.4 43.7
SOLID CORE WOOD 36 43� 1.573
SOLID CORE WOOD&METAL � 9.6 11.2 12.8 14.4 16.0 17.6 19.2 20.8 22.4 24.0 25.6 27.2 28.8 30.4 0
STORM 30.4
36 5.7 6.7 7.6 8.6 9.5 10.5 11.4 12.4 13.3 14.3 15.2 16.2 17.1 18•7 652
METAL URETHANE CORE 18.1
METAL URETHANE CORE& � 5.1 6.0 6.8 7.7 8.5 9.4 10.2 11.1 11.9 12.8 13.6 14.5 15.3 16.2 �
STORM 16.2
Runnin Feet 197
Ceiling Height X 8
Wa��S Gross Wall = 1576
Windows&Door Areas - 3
Net Wall Area 1241 1365
WOOD FRAME EXTERIOR SQUARE BTUH
WALLS WITH EXTERIOR FEET Heat Loss
FINISH HEAT TRANSFER MULTIPLIER
No Insulation 1/2"Gypsum Brd � 8.1 9.5 10.8 12.2 13.6 14.9 16.3 17.6 19.0 20.3 21.7 23.0 24.4 25.7 0
(R-0.5) 25.7
R-11,1!2"Gypsum(R-0.5) 1241 2'� 3.1 3.6 4.0 4.4 4.8 5.2 5.6 6.0 6.4 6.8 7.2 7•2 �•6 9,432
R-13,1/2"'Gypsum Brd(0.5) 0 2•4 2.8 3.2 3.6 4.0 4.4 4.8 5.2 5.6 6.0 6.4 6.8 7.2 �•6 0
R-13,1"E�Ar Poly Brd(R-5.0) 0 1'8 2'� Z•4 2.7 3.0 3.3 3.6 3.9 4.2 4.5 4.8 5.1 5.4 5.� 0
R-19,1/2"Asphalt(R-1.3)or 1.6 1.9 2.2 2.5 2.8 3.0 3.3 3.6 3.8 4.1 4.4 4.7 4.9 5.2
Bead Brd(R-1.8) � 52 �
��E
Concrete Slab on Grade LINEAR y�, BTUH
FOOT HEAT TRANSFER MULTIPLIER Hedt LosS
No Edge Insulation 24.3 28.3 32.4 36.4 40.5 44.5 48.6 52.7 56.7 60.8 64.8 68.8 72.9 76.9 385
5 76.9
1"Edge Insulation,R=5.0 12.3 14.3 16.4 18.4 20.5 22.5 24.6 26.6 28.7 30.8 32.8 34.8 36.9 38.9 0
0 38.9
2"Edge Insulation,R=11.0 6.3 7.4 8.4 9.4 10.5 11.5 12.6 13.6 14.7 15.8 16.8 17.8 18.9 20.0 p
0 20.0
Concrete Slab with Perimeter BTUH
System Warm Air Duct System LINEAR Heat Loss
FOOT HEAT TRANSFER MULTIPLIER
No Edge Insulation 57.0 66.5 76.0 85.5 95.0 104.5 114.0 123.5 133.0 142.5 152.0 161.5 171.0 180.5 0
0 180.5
1"Edge Insulation,R=5.0 �•2 39.9 45.6 51.3 57.0 62.7 68.4 74.1 79.8 85.fi 91.2 96.9 102.6 108.3 �
0 108.3
2"Edge Insulation,R=11.0 Z�•9 32.5 37.2 41.8 46.5 51.1 55.8 60.4 65.1 69.7 74.4 79.0 83.7 88.3 �
0 88.3
An additional infiltration load is calculated only if the home is loosely constructed or when windows infiltration is greater than.5 CFM per linear foot
or crack.
0 Floor sq.ft.X 0 Ceiling height= OCubic ft.
Infiltration and Ventilation
1.00 X �cubic ft. divided by �equals #ftlt# CFM
Mechanical Ventilation CFM=Fresh Air Intake
CFM 'e �5 � so BTUH
HEAT TRANSFER MULTIPLIER HE3t LO55
Infltration 33 39 44 50 55 61 66 72 77 83 88 94 99 105 �
0 105
Mechanical Ventilation 33 39 4d 50 55 61 66 72 77 83 88 94 99 105
0 105 �
HEAT LOSS SUBTOTAL 51,338
DUCT GAIN Enclosed in BTUH
Uncontioned Space Heat Loss
Vented or Unvented Crawl Space or Basement-No Insul,15°/a(.15) 0.00 0
Vented or Unvented Crawl Space or Basement-R-2,10%(.10) 0.00 0
Vented or Unvented Crawl Space or Basement-R-4,5°/,(.05) 0.00 0
Vented or Unvented Crawl Space or Basement-R-6 0%(.00) 0.00 0
TOTAL HEAT LOSS 51,338
Note:All heat transfer multipiiers from ACCA ManuaJ"J"Seventq edition