Loading...
HomeMy WebLinkAbout2011-00203 - mechanical CITY OF ORONO PERMIT NO.: 2oii-oo2o3 2750 KELLEY PARKWAY ORONO,MN 55356- DATE IssUED: 04/08/2011 952 249-4600 FAX: 952 249-4616 ADDRESS : 2745 KELLY AVE PIN : 21-117-23-23-0028 LEGAL DESC : REG.LAND SURVEY NO. 0891 : LOT 000 BLOCK 000 PERMIT TYPE : MECHANICAL(>$500) PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : MECHANICAL-MULTIPLE VALUATION : $ 3,652.32 NOTE: (1)LENNOX HEATING SYSTEM MODEL-SL280UH090V48B-NATURAL GAS-4"FLUE-88,000 INPUT BTU'S,70,400 OUTPUT BTU'S,2,400 CFM APPLICANT MECHANICAL 50.00 ADVANCED AIR&FIRE STATE SURCHARGE MECH(VALUATION) 5.00 6724 KINGSTON DR. TOTAL 55.00 EDEN PRAIRIE,MN 55346 (952)448-4769 PAID WITH CC# 8991 OWNER WOOD,JAY&BARBARA 2745 KELLY AVE EXCELSIOR,MN 55331 AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections aze requested in conformance with the State Building Code.This permit may be revoke any time for d cause. ' � / / � � � / ' G icant ermitee S' ure Date Issued B Signature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. C`1T i.�� F: O�Q�,a City of Orono �'�: �/��j P.O.Box 66 '�te Rece� �"�tYii�# �� �'V`r� 2750 Kelley Parkway " ��E:. *"'''�� � . � Crystal Bay,MN 55323 <i��rclved$y Att�tuit�:_,r�� � Phone(952)249-4600 Fax(952)249-4616 CITY OF ORONO-MECHANICAL PERMIT (All Commercial permits must be approved by the Building Official or Inspector and/or Fire Marshall) �j�� ; I�3F�.�,r��,�+���U����� ..,,,,,;��:,,a,,. i�.>.£; 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be reviewed and a permit will be issued within two working days. 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON THE JOB SITE. 3. Mechanical Desisns—Complete calculations,details and specifications are required for each heating,ventilation,humidification-dehumidification,and air conditioning installation including heat loss/heat gain calculation,design temperatures,equipment ratings and identification as to type,manufacturer and model. Data shall be presented on form provided. 4. When any new construction or remodeling is involved,a separate building permit must be obtained. 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements. 6. All work must be inspected(rough-in and final). Call(952)249-4600. (24-48 hour notice required) 7. House Heating Test Record must be submitted before final. ,s�� - ��� ��` �, � ��������:� � . .. r . i �..: ' ;, �Residential ❑Commercial(Approval Required) ❑New ❑Additional ❑Repairs �Replace ;Job Site/C�mer Infortriatio�. Site Address: dadadf .r� �� I � Owner: �" ( r 0 Mailing Address: a 7 y � �/[ �����y6' c�ri: �ran v z�p: �J�3 ! Home Phone: J�a� ' �`�3"�77� Alternate Phone: ���o� - /� � ' ��D�(p �c��t�ctc�r Info�in�t�c�y '°�<. Contractor: VA n ce¢l �},Y �t�r-���Eontact Person: `l�$. f� �i�e-r Pkmbi� w�:f Address: 4 �ii �� State Bond#: ����D 2 l� City: ��Qi'i YfCt,�'t i� Zip:�3'fb Expiration Date: �'�" aQ� � Phone: ��a"`7��' J�7�� Alternate Phone: ���� o��j�' (�T I � Insurance-Current: {� �fp.� �J 1 �,� % ���r�c. C' Note: All Geothermal Systems will now require a Site Plan&Review by our Building Official. IS THIS GEOTHERMAL? ❑Yes �No HEATING SYSTEMS Quantity: I Make: �i��vx Model: ��OD G�� ��V �/..� Fuel: Flue Size: Input BTCJs: �� � Output BTUs: �� � CFM: � � COOLING SYSTEMS Quantity: Make: Model: Tons: H.Power FIREPLACES ❑ Gas Factory Fireplace Brand Name: ❑ Wood Burning Fireplace ❑ Wood Stove Model No.: ❑ Wood Stove with F(ue/Masonry VENTILATION ❑ No. Kitchen Exhaust duct recirculating cfin ❑ No. Bath Exhaust(must have duct outside) cfm ❑ No. Other Fans: Locations cfin FUEL STORAGE (Must be approved by�re MarshaU if proposing to abandon tank in plac�) ❑ Instal(ation ❑ Removal Fuel Oil: gallons ❑ Underground ❑Inside ❑Outside LP Gas: gallons Other: GAS LINE ONLY ❑ Outdoor Grill ❑ Other/List What&Where: 2 ❑ Yes,this section applies The replacement of a Residential fixture or apnliance that meets all three of the following requirements: 1. Does not require modification to electrical or gas service. 2. Has a total cost of$500.00 or less;excludine the cos�of the fi�cture or appliance:and 3. Is improved,installed or replaced by the homeowner or licensed contractor. Skip next section,if this applies; Cost of Permit $ 15.00 State Swcharge $ 5.00 Mail-In Fee(If Applicable) $ 2.00 Totai Permit Fee $ If above does not apply;follow guidelines below: 1. CONTRACT PRICE *is 1.25%of contract price with a(Minimum Fee of$50.00) ��,�5a. �a X.o�25$ ��. a� (contract price) (minimum$50.00) 2. STATE SURCHARGE **Add the State Bldg Code Div.Surcharge(Minimum Fee of$5.00) �,1�5a. 3 a- X.000s $ 5 60 (contract price) (minimam S 5.00) 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 2.00 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ . („)V ■ * CONTRACT PRICE or JOB COST means the actual or estimated dollar amount chazged for the permitted work including materiais,labor,profit,and other fixed costs. It is the amount to be charged to the customer for the work done. If any material,equipment, labor or installations are furnished by the owner,tenant or any other party,the reasonable market value of such items must be added to the estimated cost or contract price for permit fee purposes. In the event that there is a dispute on the amount of the job cost, the City may request the submission of a signed copy of the actual contract. ■ **The STATE SURCHARGE is.0005 times the Contract Price or a minimum of$5.00. The undersigned hereby applies to the City for issuance of a Mechanical Permit, agrees to do all work in strict accordance with the ordinances of the City and the regulations of the State of Minnesota, and certifies that all statements made on this application are complete, true and correct. ApplicanYs Signature: �'1 Date: ��7�� ��� � ,,�^ 3 , Masonary Walls,Biock or SQUARE ,� BTUH Brick,Fin.Or Unfin. FEET -Above G�ade HEAT TRANSFER MULTIPLIER Heat Loss 8"or 12"Block,No Insul.,Unfin. Zp �5.3 17.8 20.4 22.9 25.5 28.0 30.6 33.1 35.7 38.2 40.8 43.3 45.9 48.4 968 48.4 8"or 12"Block+R-5 104 4.3 5.0 5.8 6.5 7.2 7.9 8.6 9.4 10.1 10.8 11.5 12.2 13.0 13.7 1,425 13.7 8"or 12"Block+R-11 0 2•3 2.7 3.1 3.5 3.8 4.2 4.6 5.0 5.4 5.8 6.2 6.5 6.9 7.3 � 7.3 8"or 12"Block+R-13 0 �•4 1.7 1.9 2.2 2.4 2.6 2.9 3.1 3.4 3.6 3.8 4.1 4.3 4.6 � 4.6 Masonary Wails,Block or BTUH Brick,Fin.Or Unfin.-Walls SQUARE Heat Lass Extend Z'-5'Below Grade FEET HEAT TRANSFER MULTIPLIER 8"or 12"Block+No Insul. 70 3.7 4.4 5.0 5.6 6.2 6.9 7.5 8.1 8.7 9.4 10.0 10.6 11.2 11.9 g33 11.9 8"or 12"Block+R-5 728 2•2 2•6 3.0 3.3 3.7 4.1 4.4 4.8 5.2 5.5 5.9 6.3 6.7 7•0 5,096 7.0 8"or 12"Block+R-11 0 1.5 1.8 2,0 2.3 2.6 2.8 3.1 3.3 3.6 3.8 4.1 4.3 4.6 4.8 0 4.8 8"or 12"Block+R-19 0 �'0 1.2 1.4 1.5 1.7 1.9 2.0 2.2 2.4 2.6 2.7 2.9 3.1 3.2 � 3.2 Ceilings Under a Ventilated ;;��?�f,;GF.� _ 55 6C BTUH Attic Space or Unheated SqUARE Heat Loss Room FEET HEAT TRANSFER MULTIPLIER Noinsulation 0 �$•0 21.0 24.0 27.0 29.9 32.9 35.9 38.9 41.9 44.9 47.9 50.9 53.9 56.9 � 56.9 R-11,3"Insulation 0 y,6 3.1 3.5 4.0 4.4 4.8 5.3 5.7 6.2 6.6 7.0 7.5 7.9 8.4 � 8.4 R-19,6"'Insulation 1508 0.0 1.9 2.1 2.4 2.6 2.9 3.2 3.4 3.7 4.0 4.2 4.5 4.8 5.0� ��0 R-30,10"Insulation 0 1.0 1.2 1.3 1.5 1.6 7.8 2.0 2.1 2.3 2.5 2.6 2.8 3.0 3.1 0 3.1 R-38,12"Insulation 0 0.8 0.9 1.0 1.2 1.3 1.4 1.6 1.7 1.8 2.0 2.1 2.2 2.3 �.5 Q Floors over an Open Crawl SQUARE BTUH Space or Garage Heat Loss FEET HEAT TRANSFER MULTIPLIER Hardwood Floor+No Insulation 0 9.4 10.9 12.5 14.0 15.6 17.2 18.7 20.3 21.8 23.4 25.0 26.5 28.1 29.6 0 29.6 Hardwood Floor+R-11 416 Z_4 2.8 3.2 3.6 4.0 4.4 4.8 5.2 5.6 6.0 6.4 6.8 7.2 7•6 3,162 7.6 Hardwood Floor+R-19 0 �•6 1.8 2.1 2.3 2.6 2.9 3.1 3.4 3.6 3.9 4.2 4.4 4.7 4.9 � 4.9 Hardwood Floor+R-30 D �•1 1.3 1.5 1.7 1.8 2.0 2.2 2.4 2.6 2.8 3.0 3.1 3.3 3.5 � Basement Floor SQUARE BTUH FEET HEAT TRANSFER MULTIPLIER Heat 10S5 2 or More Feet Below Grade 936 0.7 0.8 1.0 1.1 1.2 1.3 1.4 1.5 1.7 1.8 1.9 2.0 2.1 2•3 2,�53 2.3 � �'"'A�r�f �-:� '"'�a.V�7�3�€��`�,��:�3�5� �"�'�� � 93�1,� �P�1 9 � ����".�:.� ManuualJ7thedition e._i.., JOB NAME: Wood DATE: 3/15/2011 ADDRESS: 2745 Kelly Ave Excelsior OUTDOOR TEMPATURE: -25 INDOOR TEMPERATURE: 70 TEMP DIFFERENCE: 95 MOVABLE CLEAR GLASS SQUARE BTUH WINDOWS(Metai Frame) FEET Heat Loss HEAT TRANSFER MULTIPLIER 34.7 40.4 46.2 51.0 57.8 63.5 69.3 75.1 80.9 86.6 92.4 98.2 104.0 109.7 � SINGLE PANE 0 109.7 19.5 22.8 26.0 29.3 32.5 35.8 39.0 42.3 45.5 48.8 52.0 55.3 58.5 61.8 p SINGLE PANE W/STORM 0 61.8 21.8 25.4 29.0 32.6 36.3 39.9 43.5 47.1 50.8 54.4 58.0 61.6 65.3 68.9 13,160 DOUBLE PANE 191 68.9 14.7 17.2 19.6 22.1 24.5 27.0 29.4 31.9 34.3 36.8 39.2 41.7 44.1 46.6 � DOUBLE PANE W/STORM 0 46 6 SUDING CLEAR GLASS SQUARE BTUH DOORS(Metal Frame) FEET Heat Loss HEAT TRANSFER MULTIPLIER 34.7 40.4 46.2 52.0 57.8 63.5 69.3 75.1 80.9 86.6 92.4 98.2 104.0 109.7 � SINGLE PANE 0 109.7 19.5 22.8 26.0 29.3 32.5 35.8 39.0 42.3 45.5 48.8 52.0 55.3 58.5 61.8 � SINGLE PANE W/STORM 0 61.8 36.0 25.4 29.0 32.6 36.3 39.9 43.5 47.1 50.8 54.4 58.0 61.6 65.3 68.9 4,961 DOUBLE PANE 72 68.9 BTUH WOOD&METAL DOORS SQUARE Heat l.oss FEET HEAT TRANSFER MULTIPLIER 13.8 16.1 18.4 20.7 23.0 25.3 27.6 29.9 32.2 34.5 36.8 39.1 41.4 43.7 SOLID CORE WOOD 36 43� 1.573 SOLID CORE WOOD&METAL � 9.6 11.2 12.8 14.4 16.0 17.6 19.2 20.8 22.4 24.0 25.6 27.2 28.8 30.4 0 STORM 30.4 36 5.7 6.7 7.6 8.6 9.5 10.5 11.4 12.4 13.3 14.3 15.2 16.2 17.1 18•7 652 METAL URETHANE CORE 18.1 METAL URETHANE CORE& � 5.1 6.0 6.8 7.7 8.5 9.4 10.2 11.1 11.9 12.8 13.6 14.5 15.3 16.2 � STORM 16.2 Runnin Feet 197 Ceiling Height X 8 Wa��S Gross Wall = 1576 Windows&Door Areas - 3 Net Wall Area 1241 1365 WOOD FRAME EXTERIOR SQUARE BTUH WALLS WITH EXTERIOR FEET Heat Loss FINISH HEAT TRANSFER MULTIPLIER No Insulation 1/2"Gypsum Brd � 8.1 9.5 10.8 12.2 13.6 14.9 16.3 17.6 19.0 20.3 21.7 23.0 24.4 25.7 0 (R-0.5) 25.7 R-11,1!2"Gypsum(R-0.5) 1241 2'� 3.1 3.6 4.0 4.4 4.8 5.2 5.6 6.0 6.4 6.8 7.2 7•2 �•6 9,432 R-13,1/2"'Gypsum Brd(0.5) 0 2•4 2.8 3.2 3.6 4.0 4.4 4.8 5.2 5.6 6.0 6.4 6.8 7.2 �•6 0 R-13,1"E�Ar Poly Brd(R-5.0) 0 1'8 2'� Z•4 2.7 3.0 3.3 3.6 3.9 4.2 4.5 4.8 5.1 5.4 5.� 0 R-19,1/2"Asphalt(R-1.3)or 1.6 1.9 2.2 2.5 2.8 3.0 3.3 3.6 3.8 4.1 4.4 4.7 4.9 5.2 Bead Brd(R-1.8) � 52 � ��E Concrete Slab on Grade LINEAR y�, BTUH FOOT HEAT TRANSFER MULTIPLIER Hedt LosS No Edge Insulation 24.3 28.3 32.4 36.4 40.5 44.5 48.6 52.7 56.7 60.8 64.8 68.8 72.9 76.9 385 5 76.9 1"Edge Insulation,R=5.0 12.3 14.3 16.4 18.4 20.5 22.5 24.6 26.6 28.7 30.8 32.8 34.8 36.9 38.9 0 0 38.9 2"Edge Insulation,R=11.0 6.3 7.4 8.4 9.4 10.5 11.5 12.6 13.6 14.7 15.8 16.8 17.8 18.9 20.0 p 0 20.0 Concrete Slab with Perimeter BTUH System Warm Air Duct System LINEAR Heat Loss FOOT HEAT TRANSFER MULTIPLIER No Edge Insulation 57.0 66.5 76.0 85.5 95.0 104.5 114.0 123.5 133.0 142.5 152.0 161.5 171.0 180.5 0 0 180.5 1"Edge Insulation,R=5.0 �•2 39.9 45.6 51.3 57.0 62.7 68.4 74.1 79.8 85.fi 91.2 96.9 102.6 108.3 � 0 108.3 2"Edge Insulation,R=11.0 Z�•9 32.5 37.2 41.8 46.5 51.1 55.8 60.4 65.1 69.7 74.4 79.0 83.7 88.3 � 0 88.3 An additional infiltration load is calculated only if the home is loosely constructed or when windows infiltration is greater than.5 CFM per linear foot or crack. 0 Floor sq.ft.X 0 Ceiling height= OCubic ft. Infiltration and Ventilation 1.00 X �cubic ft. divided by �equals #ftlt# CFM Mechanical Ventilation CFM=Fresh Air Intake CFM 'e �5 � so BTUH HEAT TRANSFER MULTIPLIER HE3t LO55 Infltration 33 39 44 50 55 61 66 72 77 83 88 94 99 105 � 0 105 Mechanical Ventilation 33 39 4d 50 55 61 66 72 77 83 88 94 99 105 0 105 � HEAT LOSS SUBTOTAL 51,338 DUCT GAIN Enclosed in BTUH Uncontioned Space Heat Loss Vented or Unvented Crawl Space or Basement-No Insul,15°/a(.15) 0.00 0 Vented or Unvented Crawl Space or Basement-R-2,10%(.10) 0.00 0 Vented or Unvented Crawl Space or Basement-R-4,5°/,(.05) 0.00 0 Vented or Unvented Crawl Space or Basement-R-6 0%(.00) 0.00 0 TOTAL HEAT LOSS 51,338 Note:All heat transfer multipiiers from ACCA ManuaJ"J"Seventq edition