HomeMy WebLinkAboutre: as-built survey � ' DATE TIME
CITY OF ORbNO CALLED IN
INSPECTION NOTICE SCHEDULED Q--����
PERMIT NO. 2-bl���1�I COMPLETED
ADDRESS Z' Nlb ��U �V�
OWNER TELEPHONE NO.
CONTRACTOR '
� DESCRIPTION � � 1 ��
ly ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
_ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL
J ❑ DEMO-SITE ❑ SEPTIC INSTALL
2 OWNERICONTRACTOR TO MEET YOU:_YES_NO
y COMMENTS:
�
W
a
j � .. � (l �..' 'J� �/ ' 1�' C,� �t l��S (/�/'�
o p .
� �ly ?� �. <1i -(;''i, ��t �, CC'c'/I u''
O J , ; -
�'
Q � �1 L� �� d"�1 t ��I Cl�f G'G� vc • (�" GU`�
/
� e..f'I �f G� ' Q'I ' � �G I � �
� , � �f �v` �.�'���5 cz ocz ��r' � � a �t � -�
� 4��1 D�' �
� -
W ❑WORKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE
� ❑CORRECT WORK 8 PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY
W
� ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
� BEFORE CaNERING
PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. ❑ PHOTOTAKEN
INSPECTOR WFLL REfURN
❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑INSPECTION REQUIRED.CAIL TO ARRANGE ACCESS.
Call for the next inspection 2a hours in advance. (952) 249-46�0
OwnerlContract n site:
Inspector. ��
White Copy/lnspector's File Canary CopylSite Notice
. �� ✓
r � DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED _��"_�- _
PERMIT NO. LC LS - f�1��� COMPLETED
ADDRESS �S�Db {L�,II� b4V�
OWNER TELEPHONE NO.
CONTRACTOR
� DESCRIPTION �"�� �� SU I V� S�i I�.- V IJ��' �A.III,➢�'C���N�-
W ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
_ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL
v ❑ DEMO-SITE ❑ SEPTIC INSTALL
2 OWNER/CONTNACTOR TO MEET YOU:_YES_NO
c�.� COMMENTS:
�
a ���h ��m�s r�o�c r�_/���e� a s'
oa���e,e ��,dd�it,
�
° �rv r � c t�NNpn� � l�d�
� Gr 5��l �� '�l�*2li
Q
�
2
W
�
W
�
J
d
W ❑UVORKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE
� ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
W
� ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTO TAKEN
INSPECTOR WFLL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
O INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Cail for the next inspection 2a hours in advance. (952� 249-4600
OwnerfContra on site:
.
Inspector.
White Copyllnspector's File Canary CopylSite Notiee
Christine Mattson
From: Christine Mattson
Sent: Tuesday, September 13, 2016 9:15 AM
To: 'chet@leaseorbuyspace.com'
Subject: 2560 Kelly Avenue/#201 5-0071 9
Chet,
An as-built survey was submitted on August 26, 2016. Our inspector visited the property last week and found the
following items need to be addressed before we can finalize the project, issue a Certificate of Occupancy and refund the
$2,500 held in escrow: �� � �
� u,l� f,� �� '� � ���� Y�.�r��.�t.�� G�b�V1_
�`�'� �' � � � . �ic� +�� �'►,� � �I��'I�.i.�— 1i�l� pF S�+�Gts�
• It appears during construction soil was disturbed on �e neighboring property to the NW. Please �� ��
restore/establish vegetation in this area. ;�1„��,� � �{�,
• Drain tile termination along driveway is creating an erosion problem. Establish rock spillway, correct eros�on ��
problem, and re-establish vegetation.
• Have the survey updated to show all drain tile termination locations.
• Boulder wall along driveway is not shown on survey, please have survey updated.
• Boulder wall near the light pole is not shown in correct location, please have survey updated to reflect correct
location.
Please don't hesitate to contact me if you have any questions.
Christine Mattson
Planning Assistant
City of Orono
2750 Kelley Parkway ; Orono j MN ; 55356 (physical addressJ
PO Box 66 ' Crystal Bay ; MN I 55323-0066 (mailing addressJ
`�' 952.249.4620 ; 8 952.249.4616
� cmattson@ci.orono.mn.us ? � www.ci.orono.mn.us
Office Hours: Monday- Friday 8 am to 4:30 pm
OUR OFFICE WILL BE CLOSED: Friday, November 11, 2016
Thursday& Friday, November 24& 25, 2016
1
Christine Mattson
From: Adam Edwards
Sent: Friday,August 26, 2016 11:42 AM
To: Christine Mattson
Subject: RE: 2560 Kelly Ave/#2015-00719
Chris,
I've reviewed the as built. The as-built appears to conform to the intent of the approved plan.
An inspector should conduct a site visit and confirm the following:
1. The survey accurately depicts conditions on the ground.
2. The site is stabilized to the point the any remaining erosion control can be removed.
3. The Drainage pattern on the northwest side of the home does not direct surface water onto the neighboring
property.
Adam
From:Christine Mattson
Sent: Friday,August 26, 201610:00 AM
To:Adam Edwards<aedwards@ci.orono.mn.us>
Subject:2560 Kelly Ave/#2015-00719
Adam,
We received an as-built survey for the new house at 2560 Kelly Avenue. Please review and provide comments.
Thanks! '
Christine Mattson
Planning Assistant
City of Orono
2750 Kelley Parkway S Orono � MN 0 55356(physical addressJ
PO Box 66 0 Crystal Bay � MN I 55323-0066(mailing address)
'� 952.249.4620 � 8 952.249.4616
�cmattson@ci.orono.mn.us � �] www.ci.orono.mn.us
Summer Office Hours: (Monday, May 23 through Friday,September 2,2016)
Monday-Thursday: 7:30 am to 5 pm
Friday: 7:30 am to 11:30 am
OUR OFF/CE WILL BE CLOSED: Monday,September 5,2016
i