HomeMy WebLinkAbout2001-P04529 - mechanical CITY OF ORONO PERMIT
2750 Ka�ley Parkway - PO Box 66 Permit Number: Poas29
Crystal Bay, Minnesota 55323 Permit Type: Mechanical Permits
(952) 249-4600 Date Issued: ioi23i2oo�
SITE ADDRESS: 2507 Kelly Ave
Excelsior,MN 55331
PID: 20-117-23-12-0063
DESCRIPTION:
Proposed Use: Other
Permit Class: General
Permit Type: Mechanical Permits Permit Sub-type(s): Mechanical Undefined
DETAILS:
Approved per resolution#:
Separate permits required:
NOTICES/REMARKS:
This is for infloor tubing&snowmelt of driveway&piping&coi
FEE SUMMARY: Permit Fee: $ 334.75 Valuation: $ 26,780.00
State Surcharge Fee: $ 13.39
TOTAL FEE: $ 348.14
APPLICANT: GR Mechanical Plumbing&Heating Inc. OWNER: Bradley Hoyt
12401 Ironwood Circle-Suite 500 253 Lake St E
Rogers, MN 55374 Wayzata, MN 55391
THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED
AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF
MINNESOTA BUILDING CODE REQUIREMENTS.
_4` ^
�'�,l/// j� \.%��1.
' APP T PERMITEE Si�F IS UEDBYSIGNATURE
�
/t
� Copies:1-File(Signitures Reauired), 1-Apnlicant, 1-Monthlv Reoorts, 1-Assessin�. 1-Finance Page 1
Page 1 of 3
CITY OF ORONO APPLICATION FOR MECHANICAL
PERMIT
BOX 66(2750 KELLEY PARKWAI�,CRYSTAL BAY,MN 55323
GENERAL INF__ORMATION
1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be
reviewed and a permit will be issued within 2 working days.
2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID
UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL TI-IE PERMIT CARD IS
POSTED ON THE JOB SITE.
3.Mecha_n_ical_Designs-Complete calculations,details and specifications are required for each heating,
ventilation,humidification-dehumidification,and air conditioning installation including heat loss/heat gain
calculation,design temperatures,eyuipment ratings and identification as to type,manufacturer and model.
Data shall be presented on form provided. Identification of and specifications for water heating equipment
shall also be provided.
4. When any new construction or remodeling is involved,a separate building permit must be obtained.
5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code
requirements.
6. All work must be inspected(rough-in and final). Call(952)249-4600. 24-hour notice required.
7. House Heating Test Record must be submitted before final.
Instructions Complete all items on this application. Compute the permit fee. Sign and date the
certification. INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions,call
(952)249-4600.
Please ck one: New Addition Repair Replace Residential 7�
Commercial 7 �
JOB S�TE: 5�� �� 1 �e� Z�p: _ 3 �
Owner's Name: ��-� Telephone Number:
Mailing Address: ��`-ti1t1Q, City: Zip:
Contractor's Name: ���`;(��'�,��I C���1�(�i'elephone Number: �(�� �c�� ' ���,t��
/, ,
Mailing Address: ��G�( � I�L►.��i\;��"t� l���t� 'Z� Zip:--�������
SYS_TEM_DESCRII'TION
HEATING SYSTEMS
Page 2 of 3
Quantity:
Make:
Model:
Fuel:
Flue Size:
Input BTUs:
Output BTUs:
CFM:
COOLING SYSTEMS
Quantity:
Make:
Model:
Tons:
H. Power
' ���n `��� ,��/� � ^ ,
� _5���;�. ��o� - , ,, .
�/� � `� - c9��-d��'
F'IIiEPLACES �
Gas factory fireplace
Wood burning factory fireplace with flue
Wood Stove
Wood stove with flue
Brand Name Model No.
VENTILATION
No. Kitchen Exhaust ducted recirculating cfin
No. Bath Exhaust(must be ducted outside) cfrn
No. Other Fans: Locations cfm
FUEL STORAGE(MUST BE APPROVED BY FIRE MARSHAL)
Installation Removal
Fuel oil: gallons underground inside outside
LP Gas: gallons
(lther C'.ac nnenina
Page 3 of 3
PER_MIT FEE CALCULATION
1. 1.25%of Contract Price* or M__inimum Fee�$35.00
�� �
(Contract Price) c����� x A125 $ �� • ��i
2. State_Surchar�e. ** Add the State Building Code Division
Surcharge to each permit. (Contract Price) ��� IJIJ x.0005 $ I �'`J�"1 or$.SD
3. P_o_stage and Handling(Only mail-in applications) $�0
4. TOTAL PERMIT FEE(Add lines 1-3 above) $ � -
* CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the
permitted work including materials, labor,profit, and other fixed costs. It is the amount to be charged to
the customer for the work done. If any material, equipment, labor, or installation are furnished by the
owner,tenant or any other party the reasonable market value of such items must be added to the estimated
cost or contract price for permit fee purposes. In the event that there is a dispute on the amount of the job
cost,the City may request the submission of a signed copy of the actual contract.
**The STATE SURCHARGE is.0005 of the contract price under$1,000,000 or$.50-whichever is
greater. For valuations over$1,000,000 call the Department of inspectional Services for the price.
The undersigned hereby applies to the City for issuance of a Mechanical Permit,agrees to do all work in
strict accordance with the ordinances of the City and the regulations of the Minnesota State Building Code,
and certifies that all statem s m' e on this appiication are complete,true and correct.
Applicant's Signature: - �—�---C' Date: �� ���/�
Approved By: Date:
V DATE TIME
CITY OF ORONO CALLED IN I a-f�-�
INSPECTION NQ��G 1�EDULED f � ��� �
PERMIT N0. vy"� COMPLETED / G ~ � �
ADDRESS a�� FI�� 'KX
OWNER CONTR.��c��ra�
TELEPHONENO. ��3 � �f 2p -�' Z�oC.3
� DESCRIPTION �r �S'� (7c',c� L.,�,
� 01 FOOTING 11 MECHANICAL RI 18 EXCA�I/GRADING/FILLING
Q 02 FRAMING 13 ECHANICAL FINAL 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q OS FINAL 14 SEWER HOOK-UP O6 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
� 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
= 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
J 10 PLUMBING FINAL 36 FOUNDATIOWREMOVAL
� OWNERICONTRACTOR TO MEET YOU:�YES_NO
� COMMENTS:
W
a �
� �
� . . _ ,.r:>�� �,���/
�
o ._._
�
W
�
Q
�
Z
W
�
W
�
�
�
� ��l WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
W
� ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
W
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERINCa PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. p pH0T0 TAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Call forthe next inspection 24 hours in advance. (952) 249-4600
OwnerlContra�tAr on site:
Inspector ��% /'�i7 � /.�i`7-'' ,
v
White Copyllnspector's File Canary CopylSite Notice
/
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION OTICE SCHEDULED
PERMIT NO����Z� COMPLETED �o Z
ADDRESS � L � "
OWNER C NTR.
TELEPHONE NO.
� DESCRIPTION
ly 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/F'ILLINC�
�Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP O6 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
� 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
i09 PLUMBING RI 23 SEPTIC FINAL 35 HAFD COVER REMOVAL
J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
� OWNERICONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
a ��
J �Q
O
� ��d�L f �v 'i �
° f��'�L' C�
W -
� � C'�� \ ' � �.
Q
� �p ��.-- 2 ,� / �t � �
z
W
�
W
� L. �
�
d ��,,/
W� O WORKSATIS RY:PROCEED �"`� �� ❑ PROJECTCOMPLEfE
W ❑CO WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
� CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
BEFORE COVERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. p pHOTOTAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
O INSPECTION RE�UIRED.CALLTO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (g52) 249-4600
Ownerl tr n site:
�
Inspector.
Whit pyllnspector's File Canary CopylSite Notice
� � � DATE TIME
CITY OF ORONO � CALYE�iN T—
INSPECTION �IC SCHEDULED � �> f J � - �Q
PERMIT NO. L' COMPLETED `� / ! � -�p
ADDRESS � SZ�� I�~�-�Q-�`'
OWNER CONTR.
TELEPHONE N0. � r' �oZ =
� DESCRIPTION �� � �� �Z� L��Q-
� 01 FOOTING 11 MECHANICAL RI 18 EXCA�//GRADING/FILLING�
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
= 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVA
J 10 PLUMBING FINAL 36 FOUNDATION/REMOV L
Q OWNERICONTRACTORTOMEETYOU: YES_NO
Z
� COMMENTS: � V� �L� U 1 �.Q 2 � ,
a ��
j � � -
o ,
�
0
�
W
�
Q
�
Z
W
�
W
�
�
� �VORKSATISFACTORY:PROCEED � PROJECTCOMPLEfE
W �❑CORRECT WORK 8 PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY
� ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
�CORRECT UNSAFE CONDITION WITHIN HOURS. p pH0T0 TAKEN
INSPECTOR WILL RETURN
�STOP ORDER POSTED.CAII INSPECTOR �CITATION ISSUED
❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-46��
OwnedContract r on site:
Inspector. ��T�Gf L�'n,�
White Copy/lnspector's File Canary Copy/Site Notice
✓ �j�
y�c (� DATE TIME
CITY OF ORONO�"��'7�/a'9 CALLED IN
INSPECTION SCHEDULED �
PERMIT N0. COMPLETED
ADDRESS � �
OWNER CONTR.
TELEPHONE N0. ��D � f �� --�l� l0�
� DESCRIPTION �Y��/— �V /C G��
� 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRAD�NG/FILLING
Q 02 FRAMING �.i2�IGIECHANICAL FINAL 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATEF HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
? 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL 36 FOUNDATIOWREMOVAL
� OWNERICONTRACTOR TO MEET YOU:�YES_NO
� COMMENTS:
�
W
C
j ��
O
a
�
O
�
W
�
Q
�
W
�
W
�
�
d
WORKSATISFACTORY:PROCEED ❑PROJECTCOMPLEfE
W ❑CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR RE�NSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. p pHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑INSPECTIONREQUIRED.CALLTOARRANGEACCESS.
or the next inspection 24 hours in advance. (952) 249-4600
Ownerl tract on site:
�spector.
pyllnspector's File Ca Copy/Site Notice
�( t� �N�� ' �% �.�,�'/'��`.� ���` <�''
���" � ��3� � ' 1( ' DATE T�ME
CITY OF ORON ALLED IN �
INSPECTI TICE. , SCHEDULED '�`� �
PERMI O. COMPLETED
ADDR o� � 1C.
OWNER CONTR. ,�,�
TELEPHONE NO. �
(.�CS v; �f-�--
� DESCRIPTION � � ) � T�-
� 01 FOOTING 11 MECHANICA � 18 EXCAV/GRADING/FILLING
Q 02 FRAMING 1 L 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP O6 PROGRESS
� 07 OEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
� 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
= 09 PLUMBING RI 23 P71C FINAL 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
� OWNERICONTRACTOR TO MEET YOU; YES_NO
� COMMENTS:
�
� _�
j 5 . j" r" `
O �
o� �`."'.
° � 1� ��'�ti � � Gc. <�n
W �,
�
Q
�
z
W
�
W
�
�
� ��1/VORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
�.,
W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
� O CORRECT WORK,CALI FOR REINSPECTION TEMPORARY
� BEFORECOVERING
PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. p pHOTO TAKEN
INSPECTOR W{LL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR
�CITATION ISSUED
❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. �95Z� Z49-4600
OwnerlContracto on site:
Inspector. ����s�l/t- ��'� S
White Copyllnspector's File Canary CopylSite NoUce
f / DATE TIME
1�
CITY OF ORONO CALLED IN �,, �
INSPECTION NOTICE SCHEDULED ��� I;, �`'�
PERMIT NO. �,�� � COMPLETED '"'� �- �
ADDRESS f�' ^f
•..r-
OWNER CONTR. � -(�-�-�-��-
TELEPHONE NO. CC%S I � � 3 =�� �' �
� DESCRIPTION _�, �'e- �"�-''
W 01 FOOTING � 1 MECHANICAL RI 18 EXCAV/GRADING/FILLING
� 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
h
03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
� 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Z
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
J 07 DtMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
W 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
= 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
J
Q OWNERICONTRACTOR TO MEET YOU:_YES_NO
Z
� COMMENTS:
�
W r
�
o � �����
�
�
a
�
W
�
Q
ti
Z
W
�
W
�
1
�
d ORK SATISFACTORY:PROCEED �:� PROJECT COMPLETE
W
� ❑ CORRECT WORK 8�PROCEED C, ISSUE CERTIFICATE OF OCCUPANCY
W
p ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
� BEFORECOVERING PERMANENT
❑ CORRECTUNSAFECONDITIONWITHIN HOURS. r; pHOTOTAKEN
INSPECTOR WILL RETURN r; CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
C; INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. 249-46��
OwnerlContractor on site:
Inspector.� ��� y ��
White Copyllnspector's File Canary CopylSite Notice