My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SAC determination
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2745 Kelley Parkway - 33-118-23-12-0008
>
Correspondence
>
SAC determination
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:59 PM
Creation date
3/28/2017 12:39:52 PM
Metadata
Fields
Template:
x Address Old
House Number
2745
Street Name
Kelley
Street Type
Parkway
Address
2745 Kelley Parkway
Document Type
Correspondence
PIN
3311823120008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��� Metropolitan Council <br /> ii <br /> Environmental Services <br /> October 20, 2008 <br /> �? �i'�,. ��'� <br /> L <br /> Lyle Oman `�p `�.j t�� <br /> Building Administrator � <br /> � ���� <br /> City of Orono '�Q <br /> PO Box 66 '1.�'� <br /> Crystal Bay, MN 55323-0066 <br /> Dear Mr. Oman: <br /> The Metropolitan Council Environmental Services (MCES) Division has determined SAC for <br /> the shell building (Berkshire Partners)to be located at 2745 Kelley Pkwy within the City of <br /> Orono. <br /> This project should be charged 11 SAC Units, as determined below. The Council understands <br /> this building is speculative office. <br /> SAC Units <br /> Charges: <br /> Office (speculative) <br /> 27,481 sq. ft. @ 2400 sq. ft./SAC Unit 11.45 or 11 <br /> At the time the finishing permits are issued, if the use changes from the speculative use to a <br /> different use, then the SAC assignment needs to be reviewed based on that change. The business <br /> information was provided to MCES by the applicant at this time. It is also the City's <br /> responsibility to substantiate the business use and size at the time of the final inspection. If there <br /> is a change in use or size, a redetermination will need to be made. If you have any questions, <br /> call me at 651-602-1118. <br /> Sincerely, <br /> , <br /> �`;,,�� %j� )'/�'��;:�'c t.t;,,� <br /> Karon Cappaert <br /> SAC Technician <br /> Environmental Services Division <br /> KC:kb: 081020B4 <br /> cc: J. Nye, MCES <br /> Kevin Lindquist, RJ Ryan Construction (email) <br /> www.metrocouncil.org <br /> 390 Robert Street NorTh • St. Pau1, MN 55101-1805 • (651) 602-1005 • F�(651) 602-1477 • TTY (651) 291-0904 <br /> An Equal Opportunity Emp(oyer <br />
The URL can be used to link to this page
Your browser does not support the video tag.