HomeMy WebLinkAboutA non-structural steel special inspection final report-2015 A Non-Structural Steel Special
Inspection Final Report
Orono Police Department Expansion
2730 Kelly Parkway
Orono, Minnesota
Prepared for
Kraus-Anderson Construction Com any
Project 614-05902
March 18,2015
Braun Intertec Corporation
B R A 1�1 N Braun Intertec Corporation Phone:9 2.995.2000
11001 Hampshire Avenue S Fax: 95�2.995.2020
I NTE RTEC Minneapolis,MN 55438 Web: braunintertec.com
The Science You Build On.
March 18, 2015 Project B14-05902
Mr. Mark Kotten
Kraus-Anderson Construction Company
8625 Rendova Street NE
Circle Pines, MN 55014
Re: Non-Structural Steel Special Inspection Procedural and Final Report Submittal
Orono Police Department Expansion
2730 Kelly Parkway
Orono, Minnesota
Dear Mr. Kotten:
Please find attached to this procedural report the Non-Structural Steel Special Inspection Final Report for
the Orono Police Department Expansion located in Orono, Minnesota, and the supporting Special
Inspection Daily Reports for your review and records.
Special Inspection and Testing Procedures
The special inspection services were provided by International Code Council (ICC) certified special
inspectors in accordance with the requirements of Chapter 17 of the International Building Code (IBC),
the Special Inspection and Testing Schedule and/or the project plans and specifications.
The purpose of special inspections is to provide a review of the contractor's work designated by the
project structural engineer as needing special inspection under the guidelines of the IBC to determine
compliance with the approved construction documents.The special inspector doesn't have the
responsibility or authority to, nor is it the intent of special inspections to have them,judge, or modify the
construction documents. Only the structural engineer of record can do this.
As the special inspections were completed, a Special Inspection Daily Report was prepared to summarize
the results of our inspections and testing. A copy of this report was provided to the contractor's site
representative for their review and records.As part of this report, items needing correction or
discrepancies observed from the approved construction documents were noted.
Plans and Specifications
The provided plans and specifications or the plans available at the site were used for our inspections.
AA/EOE
Kraus-Anderson Constructionl Company
Project B14-05902
March 18, 2015
Page 2 I
Summary of Special Inspections and Material Observations and Tests
Soil Evaluation and Testing
A Geotechnical Evaluation was not performed for the project. Braun Intertec technicians performed
shallow hand augers borings that upon review indicate the soils were capable of supporting the
presumptive bearing pressures that the structural engineer used for project design.The evaluation we
perFormed does not constitute a Geotechnical Evaluation,and because of the limited extents of our
evaluation,greater risks remain,which are assumed by the owner.
Soils exposed at structure subgrade elevations and in excavations were visually evaluated,while those
below subgrade elevations and excavation bottoms were evaluated using hand auger borings.This task was
perFormed to determine if the observed and tested soils were would be able to support the structural
design loads structural engineer used in their calculations. Hand auger probes were conducted over the
course of multiple days to confirm the consistency of soils for the building pad.Soils at the bottom of all
excavations were visually evaluated and determined consist of gray sandy lean clay.
The hand auger borings were drilled with a 1 1/2-inch-diameter hand auger.The borings were advanced in
2-to 4-inch increments to depths of 2 to 4 feet below subgrade elevations or excavation bottoms.The
auger was then withdrawn from the borehole to obtain cuttings.The soils encountered in the borings were
classified in general accordance with ASTM D 2488, "Description and Identification of Soils (Visual/Manual
Procedures)." Preliminary estimates of soil consistency and density were also evaluated based on resistance
to penetration of the hand auger,and the turning resistance.
Soils at the bottom of the excavations appeared to be suitable for the bearing capacity of 2000 pounds per
square foot, used by the structural engineer. Fill was placed above the bottom of the excavations to bring
the bearing elevation back to footing grade. From time to time,compaction tests failed. Failed tests were
retested for compaction after the contractor compacted the soils again.All fill placed was compacted to
project specifications.
Concrete Reinforcement
We initially reviewed the reinforcement and dowel requirements on the project structural drawings and
shop drawings, if available. Information reviewed included bar size, bar length, bar spacing, bar location,
splice lengths and dowel placement.This information was then used to determine if the inplace
reinforcement was placed in accordance with the requirements of the project plans and specifications.
We also noted if the inplace reinforcement was free of rust, scale and soil.
Concrete Ptacement Observations
Concrete placement observations were performed to monitor the procedures being used by the
contractor and to determine if they were consistent with typical industry standards and the pnoject
specifications.
e�au�
INT,ERTEC
Kraus-Anderson Construction Company
Project B14-05902
March 18, 2015
Page 3
Fresh Concrete Testing
Routine tests to determine the plastic concrete's slump,temperature and air content were done during
each pour. In addition, concrete cylinders were cast at rates specified in the project specifications to
evaluate the concrete's compressive strength.
Concrete Compressive Strength Testing
The cast concrete cylinders were temporarily stored at the site and then returned to our laboratory for
moist curing and testing.The results of the concrete compressive strength testing were forwarded to the
interested parties under a separate cover as they became available.
Masonry Construction Observations
Prior to conducting the observations,the special inspector reviewed the construction documents and any
associated approved submittals.As construction began,the proportions ofthe mortar, construction of
mortarjoints and the location of reinforcement and connectors was observed for compliance with the
requirements of the project plans and specifications.
The inspection program included determining the size and location of structural elements in addition to
the type, size, and location of anchors, including other details of anchorage of masonry to structural
members,frames or other construction for compliance. We also determined if the specified size,grade
and type of reinforcement was used and if the protection of masonry was in compliance with the
guidelines of the IBC.
Prior to grouting,the cleanliness of the grout space, placement of reinforcement and connectors,
proportions of grout and construction of mortarjoints were observed.
Concrete Masonry Grout Testing
The grout prisms cast were tested in general accordance with ASTM C1019:Standard Test Method for
Sampling and Testing Grout.The samples were temporarily stored at the site and returned to our
laboratory for compressive strength testing.The results for the compressive strengths of the grout
prisms were forwarded to the interested parties under separate cover as they became available.
Drilled Epoxy Anchor Observations
Observations were preformed during the installation of the drilled in epoxy anchors and to determine if
they were installed according to the requirements of the manufacturer and the project documents.
Items observed included the placement,depth of embedment, cleanliness of the drilled hole and
application of the epoxy adhesive. The type of epoxy used was also documented for compliance with
the requirements of the specifications.
eRauN
INT RTEC
Kraus-Anderson Construction Company
Project B14-05902
March 18,2015
Page 4
General
In performing its services, Braun Intertec used that degree of care and skill ordinarily exercised under
similar circumstances by reputable members of its profession currently practicing in the same Iocality. No
warranty,express or implied, is made.
Thank you for the opportunity to provide the special inspection and testing services for thls project.After
review of the attached Special Inspection Final Report,if you have any questions or require additional
information, piease call Evan Zik at 952.995.2233,or Chris Kehl at 952.995.2386.
Sincerely,
BRAUN INTERTEC CORPORATION
, � �
�--r_
,..--- ,�.--" �
� r
Evan A.Zik, EIT I
Engin r-In-Training /�� I
��ZE�1/
Christopher R.Kehl, PE
Principai—Senior Engineer
Attachment:
Non-Structural Steel Special Inspection Final Report
c: Mr. Douglas Hughes, Larsen Engineering
Mr. Lyle Oman, City of Orono
Mr.Jack Bronczyk, Kraus-Anderson Construction
Mr. Mark Kotten, Kraus-Anderson Construction
Mr.Steve Kleinman,SKD Architects, Inc.
s Ra�u N
INTERTEC
B R A IJ N Braun Intertec Corporation Phone:952.995.2000
11001 Hampshire Avenue 5 Fax: 952.995.2020
INTE RTEC Minneapolis,MN 55438 Web: braunintertec.com
The Science You Huild On.
Non-Structural Steel Special Inspection Final Report Page 1 of 2
City of: Orono Date: March 18, 2015
Attention: Mr. Mark Kotten
Project: Orono Police Department Expansion
2730 Kelly Parkway
Orono, Minnesota
Braun Intertec Project: B14-05902
In accordance with Section 1704 of the International Building Code and the agreed upon scope of
services,the required special inspections and testing has been provided for the following items:
Soils
A Geotechnical Evaluation was not performed for this project. Based on the observations and testing we
performed; it appears that the soils are capable of the net allowable bearing pressure of up to 2000
pounds per square foot.The testing and observations we performed, does not constitute a Geotechnical
Evaluation. Soils were cut below bearing elevation and raised back up to grade using a standard cut/fill
approach. Fill was used to raise the bearing elevation back to grade and compacted to appropriate
densities based on the project plans and specifications.There are no outstanding or unresolved soil-
related issues.
Concrete �
The required testing in the field and in the laboratory has been completed.The results have been
forwarded under separate cover.The compressive strength testing indicates the concrete placed has
met the project requirements.The placement procedures used were judged to have met the project
requirements. There are no outstanding or unresolved concrete-related issues.
Reinforcing Steel
The reinforcement placement detailed in the attached Special Inspection Daily Reports was observed
according to the requirements of the project plans and specifications.There are no outstanding or
unresolved reinforcing steel-related issues.
Structural Masonry Construction
The required structural masonry observations and testing detailed in the attached Special Inspection
Daily Reports have been completed in general accordance with the requirements of the project plans
and specifications. Following the required corrections,the structural masonry construction was found
acceptable.There are no outstanding or unresolved structural masonry-related issues.
Drilled in Epoxy Anchor Bolts
The drilled in epoxy anchor connections detailed in the attached Special Inspection Daily Reports were
observed in general accordance with the requirements of the plans and specifications. The placement
was done in accordance with the drawings,the nuts were fully engaged,the adjoining plies were in
contact with one another and the nuts were snug tight.There are currently no outstanding or
unresolved drilled in epoxy anchor-related issues.
�/EOE
BR�auN
T
I M1IT�RTEC
Kraus-Anderson Construction Company
Project B14-05902
March 18,2015
Page 2
Conclusion
Based upon the inspections performed, the testing completed and the attached Special Inspection Daily
Reports, it is our professional judgment that,to the best of our knowledge,the inspected work was
performed and completed in accordance with the approved plans,specifications,and applicable
workmanship provisions of the International Building Code.
Inspecting Firm: Braun Intertec Corporation
I hereby certify that this plan, specification or repo�t
was prepared by me or under my direct supervision
and that I am a duly licensed Professional Engineer
under the laws of the State of Minnesota.
�� � ���
/' � f'^"� '�� (y,
f G �- „a a��,,, .,
/ � G ,o'� •��y`P
� �--- o �
Christopher R. Kehl ° a�
. �
t ICEF'�. PE .
Principal—Senior Engineer a�� .o�����
License Number: 43459 �, '�
March 18, 2015 °+•.r....•�y��"
ni�
Attachments:
Non-Structural Steel Special Inspection Daily Reports 1 through 34
s R�►u N
INTERTEC
Page 1 of 1
eRauN
INTERTEC
Special Inspection Daily Report
City of Orono Page: 1 ot t
Report No.: #1 Dafe: August 1 S,2014
Project Name: Orono Police Dept. Expansion ProJecf No.: 614-05902
Project Address: 2730 Kelly Pkwy. Broun Infertec PM: MARK FLYNN
CIIeM: City of Orono Client Project No.:
Weather: Partly Cloudy Temperafure: 55°F
Type of Inspection: Inspedion Coverage:
❑Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑5pecial Cases
� Periodic ❑Welding&Bolting ❑Concrete ❑ Fireproofing
❑ Piles&Piers ❑Tendon Placement �Soils
Did the architect or engineer authorize changes to approved plans� Yes❑ (Listed Below) No �
DescripHo�and IocaHon of work completed:
-Observed the soils in the bottom of test pits excavated in the area of the new addition.
List tests perfortned:
. Are there any discrepancies noted from this day's observations� Yes ❑ No �
• Are there any outstanding discrepancies on this project2 Yes ❑ No �
. If yes,see attached Summary Sheet.
• Report Discussed with and Given to Contractor: Yes � No ❑
Report Emailed to:
Jack
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
/
,-�%���,�% Loosbrock, Tom
I.D.No.: 1136593
_.____.__ i
I
-Prouiding engineering and enuironmental solurions since i957
Page 1 of 1
s Rau N
INTERTEC
Speciat Inspection Daily Report
City of Orono Page: 1 of 1
Report No.: #2 Date: September 2,2014
Projecf Name: Orono Police Dept.Expansion Project No.: B14-05902
Projecf Addreu: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN
Clienf: City of Orono Clie�Project No.:
Weather. Partly Cloudy Temperafure: 65°F
Type of Inspection: Inspection Coverage:
❑ Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑Special Cases
� Periodic ❑ Welding&Bolting ❑Concrete ❑ Fireproofing
❑ Piles& Piers ❑Tendon Placement �Soils
Did the architect or engineer authorize changes to approved plans� Yes❑ (Listed Below) No �
Descripfion and locaflon of wo�lc completed:
-Observed the soils in the bottom excavation on the east end of the addition. Performed hand auger probes in the
bottom of the excavation. The soiis consisted of gray sandy lean ciay.The soils appeared to be suitable for the designed
footing beqring pressure of 2000 psf.
-The elevation at the bottom of the excavation ranged from 1014'to 1016 1/2'.
-Performed 3 compaction tests on fill placed in the building pad. One of the three compaction tests failed to meet
project specifications of 989b compaction. Nofrfied the contractor of the failing test.
List tesis performed: I
. Are there any discrepancies noted from this days observations� Yes ❑ No �
. Are there any outstanding discrepancies on this project� Yes ❑ No �
. If yes,see attached Summary Sheet.
. Report Discussed with and Given to Contractor: Yes � No ❑
Report EmaAed to:
Ja�k
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
��:��,�-�= Loosbrock, Tom
I.D.No.: 1136593
Prrouiding engineering and environmental solutions since i957
Page 1 of 1
sRauN
I NTE RTEC
Special Inspection Daily Report
City of Orono Page: 1 of 1
Report No.: #3 Date: September 3,2014
ProJect Name: Orono Police Dept. Expansion Project No: 814-05902
Project Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN
Client: City of Orono CIIeM Project No.:
WeafhQr. Parfly Cloudy Temperature: 65°F i
Type of Inspection: Inspection Coverage;
❑ Continuous ❑Masonry ❑ Rebar Placement ❑ Foundations ❑Special Cases
� Periodic ❑Welding&Bolting ❑Concrete ❑ Fireproofing
❑ Piles&Piers ❑Tendon Placement �Soils
Did the architect or engineer authorize changes to approved plans� Yes❑ (Listed Below) No �
Descripfion and localion of work comple+ed:
-Observed the soils in the bottom excavation on the east end of the addition. Performed hand auger probes in the
bottom of the excavation. The soils consisted of gray sandy lean cloy.The soils appeared to be suitable for the designed
footing bearing pressure of 2000 psf.
-The elevation at the bottom of the excavation ranged from 1014'to 1016 1/2'.
-Performed 2 compaction tests and 1 retest on fill placed in the building pad. The tests met project specifications of 98�0
compaction.
list tests perfortned:
• Are there any discrepancies noted from this day's observations� Yes ❑ No �
• Are there any outstanding discrepancies on this project2 Yes ❑ No �
. If yes,see attached 5ummary Sheet.
• Report Discussed with and Given to Contractor: Yes ❑ No �
Report Emailed to:
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
l
:�����=� Loosbrock, Tom
I.D.No.: 1136593
Prouiding engineering attd enuironmental solutions since 1957
Page 1 of 1
s Rau w
I NTE RTEC
Special Inspection Daily Report
City of Orono Page: 1 oF �
Report No.: #4 Date: September 4,2014
ProJect Name: Orono Police Dept.Expansion Project No.: B14-05902
Projecf Address: 2730 Kelly Pkwy. Braun Infertec PM: MARK FLYNN
CIIeM: City of Orono Clie�Project No.:
Weath�r. Partly Cloudy Temperafura: 65°f
Type of Inspedion: lnspedion Coverage:
❑Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑Special Cases
� Periodic ❑Welding 8�Bolting ❑Concrete ❑ Fireproofing
❑ Piles&Piers ❑Tendon Placement �Soils
Did the architect or engineer authorrze changes to approved plans8 Yes❑ (Listed Below) No �
Description and IocaHon of wo�lc complsted:
-Observed the soils in the bottom excavation on the east end of the addition. Performed hand auger probes in the
bottom of the excavation. The soils consisted of gray sandy lean clay.The soils appeared to be suitable for the designed
footing bearing pressure of 2000 psf.
-The elevation at the bottom of the excavation ranged from 1014'to 1016 1/2'.
-Performed 4 compaction tests on fill placed in the building pad. The tests met project specifications of 98%
compaction.
List tests performed:
. Are there any discrepancies noted from this day's observations? Yes ❑ No �
• Are there any outstanding discrepancies on this project2 Yes ❑ No �
. If yes,see atiached Summary Sheet.
. Report Discussed with and Given to Contractor: Yes ❑ No ❑
Report Emalled to:
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
I
r.���,�.-= Loosbrock, Tom
I.D.No.: 1136593
I
Providing engineering and environmental solutions since i957
Page 1 of 1
sRauw
I NTE RTEC
Special Inspection Daily Report
City of Orono Page: 1 of 1
Reporf No.: #5 Date: September 5,2014
Project Name: Orono Police Dept.Expansion Projecf No.: B14-05902 i
Project Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN
Clisr�t: City of Orono Client Project No.:
Woafher: Parfiy Cloudy Temperature: 65°F
Type of Inspection: Inspection Coverage:
❑Continuous ❑Masonry ❑ Rebar Placement ❑ Foundations ❑Special Cases
� Periodic ❑Wel�ng&Bolting ❑Concrete ❑ Fireproofing
❑ Piles& Piers ❑Tendon Placement �Soils
Did the architect or engineer authorize changes to approved plans? Yes❑ (Listed Below) No �
DescripHon and localion of work compleled:
-Observed the soils in the bottom excavation for new addition. Performed hand auger probes in the bottom of the
excavation. The soils consisted of gray sandy lean clay.The soils appeared to be suitable for the designed footing
bearing pressure of 2000 psf.
-The elevation at the bottom of the excavation ranged from 1014'to 1016'.
-Performed 14 compaction tests on fill placed in the building pad. The tests met project specifications of 989
compaction.
List tQsts performed:
I
. Are there any discrepancies noted from this day's observationsZ Yes ❑ No �
• Are there any outstanding discrepancies on this projectZ Yes ❑ No �
• If yes,see attached 5ummary Sheet.
. Report Discussed with and Given to Contractor: Yes ❑ No ❑
Report Emalled to:
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
���%
.�,,_-- Loosbrock, Tom
I.D.No.: 1136593
-Prouiding engineering and enuironmental solutions since 19�
Page 1 of 1
sRauN
INTERTEC
Special Inspection Daily Report
City of Orono Page: 1 of 1
Reporf No.: #6 Date: September 8,2014
Project Name: Orono Police Dept.Expansion ProJect No.: B14-05902
Project Address: 2730 Kelly Pkwy. Broun Intertec PM: MARK FLYNN I
Clienf: City of Orono Clie�Project No.:
Weaifier. ParflyCloudy Temperafure: 65°F
Type of Inspection: Inspection Coverage:
❑Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑Special Cases
� Periodic ❑Welding&Bolting ❑Concrete ❑ Fireproofing
❑ Piles& Piers ❑Tendon Placement �Soils
Did the architect or engineer authorize changes to approved plans� Yes❑ (Listed Below) No �
Descripfion and location of work completed:
-Observed the soils in the bottom excavation for new addition. Performed hand auger probes in the bottom of the
excavation. The soils consisted of gray sandy lean clay.The soils appeared to be suitable for the designed footing
bearing pressure of 2000 psf.
-Performed 5 compaction tests on fill placed in the building pad. The tests met project specifications of 98�
compaction.
Ust tesh perfo�rned: li
I
• Are there any discrepancies noted from this day's observationsZ Yes ❑ No �
• Are there any outstanding discrepancies on this project2 Yes ❑ No �
. If yes,see attached Summary Sheet.
. Report Discussed with and Given to Contractor: Yes ❑ No ❑
Report Emailed to:
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
���f
,i,,,.--- Loosbrock, Tom
I.D.No.: 1136593
Providing engineering and enuironmeiital solutions since 1957
Page 1 of 1
sRauN
INTERTEC
Special Inspection Daily Report
City of Orono Page: 1 of �
Reporf No.: #7 Date: September 9,2014
Project Name: Orono Police Dept.Expansion Project No.: 814-05902
Project Address: 2730 Kelly Pkwy. Braun Interfec PM: MARK FLYNN
Cllent City of Orono Clie�Project No.:
Weather: Parfly Cloudy Tetnperafure: 65°F
Type of Inspection: Inspection Coveraye:
❑Continuous ❑Masonry ❑ Rebar Placement ❑ Foundations ❑Special Cases
� Periodic ❑Welding 8 Bolting ❑Concrete ❑ Fireproofing
❑ Piles 8�Piers ❑Tendon Placement �Soils
Did the architect or engineer author�ze changes to approved plans� Yes❑ (Listed Below) No �
Desc�ipiion and locafion of work compl�led:
-Observed the soils in the bottom of the footing excavation for new addition at Grid A-2 to D-2 to D-6. Performed hand
auger probes in the boltom of the excavation. The soils consisted of gray sandy lean clay.The soils appeared to be
suitable for the designed footing bearing pressure of 2000 psf.
I
List tasts parfortnad:
I
• Are there any discrepancies noted from this day's observations2 Yes ❑ No �
• Are there any outstanding discrepancies on this project� Yes ❑ No �
• If yes,see attached Summary Sheet.
• Report Discussed with and Given to Contractor: Yes ❑ No ❑
Report Emailed to:
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
/ � �i Loosbrock, Tom �D.No.: 1136593
-ProUiding ettgineering and environmenta(solutions since igy�
Pag e 1 of 1
s Rau N
I NTE RTEC
� Special Inspection Daily Report
I� CII�/ Of OTol10 Page: 1 of 1
Report No.: #8 Date: September 1 l,2014
ProJect Name: Orono Police Dept.Expansion Project No.: B14-05902
Project Address: 2730 Kelly Pkwy. Braun Interfec PM: MARK FLYNN
Clier�t: City of Orono Client ProJect No.:
Weafher. Partly Cloudy Temperature: 55°F
Type of Inspection: Inspection Coverage:
❑Continuous ❑Masonry � Rebar Placement ❑ Foundations ❑ Special Cases
❑ Periodic ❑Welding&Bolting �Concrete ❑ Fireproofing
❑ Piles&Piers ❑Tendon Placement ❑Soils
Did the architect or engineer authorize changes to approved plans? Yes❑ (Listed Below) No �
DescdpHon and loeallon of work complefed:
-Observed the placment of rebar for Footings&Cofumn Pads C�?Grid C-1 to C-2 to D-2 to D-5.
-Observed the placement of concrete for footings and column pads at the grids listed above. Sampled and teste the
concrete for slump,air content and temperature. Cast 1 set of 5-4x6 cylinders(Set#1).
list tests parfoRned:
Set#1 =Slump-4 1/4",Air Content-3.296,Concrete Temperature-68F,Workorder#45402
. Are there any discrepancies noted from this day's observations� Yes ❑ No I81
• Are there any outstanding discrepancies on this project� Yes ❑ No �
• If yes,see attached Summary Sheet.
• Report Discussed with and Given to Contractor. Yes ❑ No ❑
Report Emailed to:
To the best of our knowlecige,work inspected was done in accordance with the approved plans,spec�cations and
applicable workmanship provisions of the current IBC,except as noted above.
��� Loosbrock, Tom
I.D.No.: 1136593
Prouiding engineering and enuironmental solutions since i957
Page 1 of 1
srtauN
I NTE RTEC
Special Inspection Daily Report
City of Orono Page: 1 of 1
Reporf No.: #9 Dale: September 12,2014
Project Name: Orono Police Dept.Expansion ProJecf No: 614-05902
Project Address: 2730 Kelly Pkwy. Braun IntQrtec PM: MARK fLYNN
Client City of Orono Client P�oject No.:
Woathar. Partly Cloudy TemperaturQ: 58°F
Type of Inspection: Inspectlon Coverage:
❑ Continuous ❑Masonry �Rebar Placement ❑ Foundations ❑Special Cases
� Periodic ❑Welding&Bolting �Concrete ❑ Fireproofing
❑ Piles 8�Piers ❑Tendon Placement ❑Soils
Did the architect or engineer authorize changes to approved plans� Yes❑ (Listed Below) No �
Doscriptlon and locafiion of work compl�fed:
-Observed the placment of rebar for footings Q Grid D to D.2 from 5 to 6.
-Observed the placement of concrete for footings and column pads at the grids listed above. Sampled and tested the
concrete for slump,air content and temperature. Cast 1 set of 5-4x8 cylinders(Set#2j.
List tests perfortnad:
Set#2=Slump:4.75",Air Content:3.496,Concrete Temperature:66F,Sample#45609
• Are there any discrepancies noted from this day's observations� Yes ❑ No �
• Are there any outstanding discrepancies on this project8 Yes ❑ No �
• If yes,see attached Summary Sheet.
• Report Discussed with and Given to Contractor. Yes ❑ No ❑
Report Emailed to:
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
,-���� Loosbrock, Tom
I.D.No.: 1136593
I'roufdin,q engineering and enuironmentalsolutions since 1957
Page 1 of 1
sRauN
INTERTEC
Special Inspection Daily Report
City of Orono Page: 1 of 1
Report No.: #10 Date: September 15,2014
Project Name: Orono Police Dept. Expansion Project No.: 614-05902
ProjectAddress: 2730 Kelly Pkwy. Braun Infertec PM: MARK FLYNN
Cliet�t: City of Orono Clienf Project No.:
Weafher: Partly Cloudy Temperature: 57°F
Type of Inspection: lnspeciion Coverage:
❑Continuous ❑Masonry � Rebar Placement ❑ Foundations ❑Speclal Cases
❑ Periodic ❑Welding&Bolting �Concrete ❑ Fireproofing
❑ Piles 8�Piers ❑Tendon Placement ❑Soils
Did the architect or engineer author¢e changes to approved plans� Yes❑ (Listed Below) No �
Descriptlon and IocaHon of work completed:
-Observed the placement of rebar for Foundation Walls @ Grid D-2.1 to D-5.1 and Footings @ Grid A-2 to A-4
Observed the placement of concrete for footings,foundation walls,and column pads at the grfds listed above. Sampled
and tested the concrete for slump,air content and temperature. Cast 2 sets of 5-4x8 cylinders �Set#3&3et#4).
lisl tesh perfoRnad:
Set#3-Slump:5",Air Content:6.8%,Concrete Temperature:70F,Sample#45839
Set#4-Slump:4",Air Content:3.4�,Concrete Temperature;67F,Sample#45871
• Are there any discrepancies noted from this days observations? Yes ❑ No �
• Are there any outstanding discrepancies on this project� Yes ❑ No �
. If yes,see attached Summary Sheet.
. Report Discussed with and Given to Contractor: Yes � No ❑
Report Emalled to:
Jack Broncryk-jack.bronczykCa�krausanderson.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,speclfications pnd
applicable workmanship provisions of the current IBC,except as noted above.
/
� f����.--- Loosbrock, Tom
I.D.No.: 1136593
Providing engineering and environmental solutions since 1957
I
Page 1 of 1
eRauN
INTERTEC
Special Inspection Daily Report
City of Orono Page: 1 of 1
Reporf No.: #11 Date: September 16,2014
Projecf Name: Orono Police Dept.Expansion ProJect No.: 614-05902
ProJecf Address: 2730 Kelly Pkwy. Broun Infertec PM: MARK FLYNN
Cllenl: City of Orono Client Project No.:
Wecrther. Partly Cbudy Temperat�re: 65°F
Type of Inspection: Inspection Coverage:
❑Continuous ❑Masonry � Rebar Placement ❑ Foundations ❑Special Cases
❑ Periodic ❑ Welding&Bolting �Concrete ❑ Fireproofing
❑ Piles&Piers ❑Tendon Placement �Soils
Did the architect or engineer authorize changes to approved plans� Yes❑ (Listed Below) No �
DascripHon and locaflon of work completed:
-Observed the placement of rebar for Foundation Walls C�?Grid D.l to D.3 from 4.2 to 6.
-Observed the placement of concrete for foundation walls at the grids listed above. Sampled and tested the concrete
for slump,air content and temperature. Cast 1 set of 5-4x8 cylinder(Set#5�.
-Observed the soils in the bottom of the footing excavation Q Grid A-4 to A-6 to 6.2-6 to C.2-6.9. Performed hand auger
probes in the bottom of the excavation and the soils appear to be suitable for the designed footing bearing pressure of
2000 psf.
Llat tests perfortned:
Set#5-Slump:5 1/4",Air Content:5.9�0,Concrete Temperature: 72F,Sample#46045
. Are there any discrepancies noted from this days observations� Yes ❑ No �
• Are there any outstanding discrepancies on this project8 Yes ❑ No � �
• If yes,see attached Summary Sheet.
• Report Discussed with and Given to Contractor: Yes � No ❑
Report Emalled to:
Jack Broncryk jackbrnncryk�akrausandflrson.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications pnd
applicable workmanship provisions of the current IBC,except as noted above.
,�%.�,z,,f--� Loosbrock, Tom
I.D.No.: 1136593
Prouiding engineering and enuironmenta!solutions since 195'/
Page 1 of 1
s Rau N
INTERTEC
Special Inspection Daily Report
City of Orono Page: 1 of �
Report No.: #12 Date: September 17,2014
Project Name: Orono Police Dept.Expansion ProJact No.: 614-05902
Project Address: 2730 Kelly Pkwy. Braun Interfec PM: MARK FLYNN
Clier�t City of Orono Clie�ProJect No.:
Weuther. Partly Cloudy Temperature: 70°F
Type of Inspection: Inspection Coverage:
❑Continuous ❑Masonry � Rebar Placement ❑ Foundations ❑Special Cases
❑ Periodic ❑Welding&Bolting �Concrete ❑ Fireproofing
❑ Piles&Piers ❑Tendon Placement ❑Soils
Did the architect or engineer authorize changes to approved plans� Yes❑ (Listed Below) No �
Descdpfion and locafion of work completed:
-Observed the placement of rebar for Footings @ Grid A-3.5 to A-6 to B.2-6 to 6.2-6.2 to 6.9-6.2.
-Observed the placement of concrete for footings at the grids listed above. Sampled and tested the concrete for slump,
air content and temperature. Cast 2 sets of 5-4x8 cylinder(Set#6 8�#7).
-Cast 2 sets of cylinders yesterday because the contractor ordered concrete for the foundation walls but decided not to
pour the walls and use the concrete in the footings.
lisf tests pertormed:
5at�6=Slurnp:4",Air Content:3.5%,Concrete Temperature:70F,Sample#46254
Set#7=Slump:5",Air Content:6.896,Concrete Temperature:70F,Sample#46256
• Are there any discrepancies noted from this day's observations� Yes ❑ No �
• Are there any outstanding discrepancies on this project? Yes ❑ No �
• If yes,see atlached Summary Sheet.
. Reporf Discussed with and Given to Contractor. Yes � No ❑
Report Emalled to:
Jack Broncryk-jack.bronczyk@k►ausanderson.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,specificatfons and
applicable workmanship provisions of the current IBC,except as noted above.
9
� ���`�..= Loosbrock, Tom
I.D.No.: 1136593
Prouiding ettgineering and environmenta(solurions since i957
Page 1 of 1
s Rau N
INTERTEC
Special Inspection Daily Report
City of Orono Page: 1 of 1
Reporf No.: #13 Date: September 18,2014
Projecf Name: Orono Police Dept.Expansion Project No.: 614-05902
Project Address: 2730 Kelly Pkwy. Braun IMertec PM: MARK fLYNN
CUenh City of Orono Client Project No.:
Weathmr: Par11y Cloudy T�mperalure: 70°F
Type of Inspection; Inspection Coverage:
❑ Continuous ❑ Masonry � Rebar Placement ❑ Foundations ❑Special Cases
❑ Periodic ❑Welding&Bolting ❑Concrete ❑ Fireproofing
❑ Piles�Piers ❑Tendon Plqcement ❑Soils
Did the architect or engineer authorize changes to approved plansZ Yes❑ (Listed Below) No �
Doscriptlon and loccrtion of work complefod:
-Observed the placement of rebar for Footings @ Grid 8.2-6.2 to 6.9-6.2 to 8.9-6.9 to C.2-6.9 and Wall C�Grid D-2.2 to D-2
to C-2 to C-1 to&1 to B-2 to A-2 to A-4.
List tasts periortned:
I
• Are there any discrepancies noted from this day's observations� Yes ❑ No �
• Are there any outstanding discrepancies on this project2 Yes ❑ No �
• If yes,see attached Summary Sheet.
. Reporf Discussed with and Given to Contractor: Yes � No ❑
Report Emailed fo:
Jack Broncryk jack.broncryk�skrausanderson.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
,-�.��/,�z�_--� Loosbrock, Tom
I.D.No.: 1136593
-Providing engineering and enuironmentalsolutions since 1957
Page 1 of 1
s Rau w
INTERTEC
Special Inspection Daily Report
City of Oroflo Page: 1 of 1
Reporf No.: #14 Dofe: September 19,2014
ProJect Name: Orono Police Dept.Expansion ProJecf No.: 614-05902
Ptoject Addresx 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN
Client City of Orono Client Project No.:
Weather. Partly Cloudy Temperalure: 70°f
Type of Inspection: Inspection Coverage:
❑Continuous ❑Masonry � Rebar Placement ❑ Foundations ❑ Special Cases
❑ Periodic ❑Welding&Bolting �Concrete ❑ Fireproofing
❑ Piles& Piers ❑Tendon Placement ❑Soils
Did the architect or engineer author¢e changes to approved plans� Yes❑ (Listed Below) No �
Description and IocaHon of work compl�fod:
-Observed the placement of rebar for Footings @ Grid 6.2-6.2 to 6.9-6.2 to 8.9-6.9 to C.2-6.9;Wall @ Grid C-1.3 to C-2 to
D-2;Wall C�?Grid A-2 to A-4.5 and Wall Q Grid A.6-6 to C.2-6.
-Observed the placement of concrete for footings and wall at the grids listed above. Sampled and tested the concrete
for slump,air content and temperature. Cast 2 sets of 5-4x8 cylinder (Set#8&�,.
�9
Lisf tasts perfortned:
Footing-Set#8=Slump:2",Air Content:2.4�,Concrete Temperature:70F,Sample#46632
Wall-Set#9=Slump:8",Air Content:SA�o,Concrete Temperature:72F,Sample#46654 �
• Are there any discrepancies noted from this days observationsZ Yes ❑ No �
• Are there qny outstanding discrepancies on this project� Yes ❑ No �
• If yes,see attached Summary Sheet.
• Report Discussed with and Given to Contractor: Yes � No ❑
Report Emailed to:
Jack Broncryk-jack.bronczyk�krausanderson.com
To the best of our knowledge,work inspecied was done in accordance with the approved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
?
����,,;-- Loosbrock, Tom
I.D.No.: 1 i 36593
_ �
Prouiding engineering and enuironmental solutions since i957
Page t of 1
BRauN
INTERTEC
Special Inspection Daily Report
Clty Of OP0110 Page: 1 of 1
Repafi No.: #15 Date: September 22,2014
Project Name: Orono Police Dept.Expansion ProJect No.: 814-05902
Project Address: 2730 Kelly Pkwy. Braun Interfec PM: MARK FLYNN
Cflent City of Orono CUeM Project No.:
Weath�r. Partly Cloudy T�mporaturo: 70°F
Type of Inspection: Inspedion Coverage:
❑ Continuous ❑ Masonry � Rebar Placement ❑ Foundations ❑Special Cases
❑ Periodic ❑Welding&Bolting � Concrete ❑ Fireproofing
❑ Piles 8�Piers ❑Tendon Placement ❑Soils
Did the architect or engineer author'¢e changes to approved plans8 Yes❑ �listed Below) No �
Dos�rlpNon and location of work compl�fod:
-Observed the placement of rebar for Wall C�Grid 6.2-6.2 to 8.2-6.3 to B.9-6.3 to 6.9-6.4.
-Observed the placement of concrete forwall at the grids listed above. Sampled and tested the concrete for slump,air
content and temperature. Cast 1 set of 5-4x8 cylinder(Set#10).
List tasts performad:
Set#10=Slump:3",Air Content:5.19'0,Concrete Temperature:78F,Sample#46955
• Are there any discrepancies noted from ihis day's observations? Yes ❑ No �
. Are there any outstanding discrepancies on this project2 Yes � No �
. If yes,see attached Summary Sheet.
. Report Discussed with and Given to Contractor: Yes � No ❑
Repo�t Emailed to:
Jack Bronczyk-jack.broncryk@krausqnderson.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
�%��'�-� Loosbrock, Tom
I.D.No.: 1136593
Prouiding engineering and enuironmental solutions since 19�
Page 1 of 1
s Rau N
INTERTEC
Special Inspection Daily Report
CItY Of OI'On0 Page: 1 of 1
Report No.: #16 Date: September 23,2014
Project Name: Orono Police Dept.Expansion Project No.: B14-05902
Project Address: 2730 Kelly Pkwy. Braun Infertec PM: MARK FLYNN
Clier�t: City of Orono Client ProJact No.:
Weafher. Partly Cloudy Temperature: 70°F
Type of Inspection: Inspectfon Coverage:
❑Continuous ❑ Masonry � Rebar Placement ❑ Foundations ❑ Special Cases
❑ Periodic ❑Welding&Bolting �Concrete ❑ Fireproofing
❑ Piles&Piers ❑Tendon Placement ❑Soils
Did the architect ot engineer authorize changes to approved plans� Yes❑ (Listed Below) No �
Dascription and location of work completed:
-Observed the placement of rebar for Wall�Grid A-2 to D-2 to D-2.2 and Footings Q Grid C to D from 1 to 2.
-Observed the placement of concrete for the footings and wall at the grids listed above. Sampled and tested the
concrete for slump,air content and temperature. Cast i set of S-4x8 cylinder(Set#i 1).
List tests arformed:
P
Set#11 =Slump:4",Air Content:5.3�0,Concrete Temperature:73F,Sample#47135
• Are there any discrepancies noted from this days observations� Yes ❑ No �
• Are there any outstanding discreppncies on this project2 Yes � No �
. If yes,see attached Summary Sheet.
• Report Discussed with and Given to Contractor: Yes � No ❑
Report Emalled to:
Jack Bronczyk jack.broncryk�krnusanderson.com
To the best of our knowledge,work inspected was done in accordance with the app�oved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
�.���
,z,��--r� Loosbrock, Tom
I.D.No.: 1136593
I
Prouiding engineering and environmental solutions since 1957
Page 1 of 1
s Rau N
INTERTEC
Special Inspection Daily Report
CI['�/ Of OfOnO Page: 1 of 1
Report No.: #17 Date: September 24,2014
Project Name: Orono Police Dept. Expansion ProJect No.: 814-05902
Projecf Address: 2730 Kelly Pkwy. Braun I�tertec PM: MARK FLYNN
Client City of Orono Cllent Project No.:
Weather. Partly Cloudy Temperaturo: 70°F
Type of Inspection: Inspection Coverage:
❑ Continuous ❑ Masonry � Rebar Placement ❑ Foundptions ❑Special Cases
❑ Periodic ❑Welding&Bolting �Concrete ❑ Fireproofing
❑ Piles 8�Piers ❑Tendon Placement �Soils
Did the architect or engineer authorize changes to approved plans� Yes❑ (Listed Below) No �
Dsscription and IocaFion of work complefed:
-Observed tfie placement of rebar for foundation wall @ Grid 8.9-6.2 to B.9-6.9 to C.2-6.9 and piers�Grid C to D from 1
to 1.9.
-Observed the placement of concrete for foundation wall and piers at the grids listed above. Sampled and tested the
concrete for slump,air content and temperature. Cast 1 set of 5-4x8 cylinder (Set#12).
-Performed 3 compaction tests and 1 retest on interior wall backfill. The tests met project specifications of 95�
compaction.
List tests p�rfortned
Set#12=Slump:4 1/2",Air Content:5.096,Concrete Temperature: 70F,Sample#47349
. Are there any discrepancies noted from this day's observations� Yes ❑ No � '
. Are there any outstanding discrepancies on this project� Yes ❑ No �
. if yes,see attached Summary Sheet. ,
• Report Discussed with and Given to Contractor. Yes � No ❑ �
Report Emalled fo: '
Jack Broncryk-jack.broncryk@krausanderson.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,spec'rfications pnd
applicable workmanship provisions of the current IBC,except as noted above.
�%�= Loosbrock, Tom
I.D.No.: 1136593
-Providi�ig engineering and environmental solutions since 19�
Page 1 of 1
s Rau N
I NTE RTEC
Special Inspection Daily Report
City of Orono Page: 1 oF �
Report No.: #18 Date: September 25,2014
Project Name: Orono Police Dept.Expansion Project No.: 814-05902
Proj�ct Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN
Client: City of Orono Client Project No.:
Weather: Partly Cloudy Temperature: 70°F
Type of Inspection: Inspedion Coverage:
❑Corrtinuous ❑Masonry � Rebar Placement ❑ Foundations ❑Special Cases
❑Periodic ❑Welding&Bolting ❑Concrete Placement ❑ Fireproofing
❑Piles&Piers ❑Tendon Placement ❑ Soils
Did the architect or engineer authorize changes to approved plans? Yes❑ (Listed Below) No �
Description and Ixation of work completed:
-Observed the placement of rebar for foundation wall cLD Grid A�.S to A�to B-6.
List tests pertormed:
• Are there any discrepancies noted from this day's observations? Yes❑ No �
• Are there any outstanding discrepancies on this project? Yes ❑ No �
• If yes, see attached Summary Sheet.
. Report Discussed with and Given to Contractor: Yes � No ❑
Report Emailed to:
Jack Bronczyk-jack.bronczyk@krausanderso�com
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current IBC,except as noted above
,�i��,,,,�� Loosbrock, Tom
I.D.No.: 1136593
I
Proriding engineering and environmental solutions since 1957
Page 1 of 1
sRauN
INTERTEC
Special Inspection Daily Report
City of Orono Page: 1 of 1
Raport No.: #19 Date: September 26,2014
ProJecf Name: Orono Police Dept.fxpcxnsion Project No.: B14-05902
ProJect Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN
Clienf: City of Orono CNeM ProJect No.:
Weaiher: Partly Cloudy Temperature: 70°F
Type of Inspedion: Inspection Coverage:
❑Continuous ❑Masonry � Rebar Placement ❑ Foundations ❑Special Cases
❑ Periodic ❑Welding&Bolting �Concrete ❑ Fireproofing
❑ Piles&Piers ❑Tendon Placement �Soils
Did the architect or engineer authorize changes to approved plans� Yes❑ (Listed Below) No �
DescripHon and location of work compl�fed:
-Observed the placement of rebar for foundation wall Ca�Grid A-4.5 to A-6 to B-6.
-Observed the placement of concrete for foundation wall C�?Grid A-4.5 to A-6 to B-6.Sampled and tested the concrete
for slump,air content and temperature.Cast 1 set of 5-4x8 cylinders (Set#13).
-Notified the contractor and Cemstone of the low air content(3.49a). Sampled and tested the next load of concrete and
the air content was 5.4�.
-Performed 3 compaction tests on interior wall bac�ll.The tests met project specifications of 95�compaction.
Lis1 tests pertormed:
Set#13=Slump-5",Air Content-3.4�,Temperature-76,Sample#47737
• Are there any discrepancies noted from this day's observations� Yes ❑ No �
• Are there any outsianding discrepancies on this project2 Yes ❑ No �
• If yes,see attached Summary Sheet.
• Reporf Discussed with and Given to Contractor: Yes � No ❑
Report Emalled to:
Jack Hronr.ryk-jnck.broncryk@krausanderson.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable wakmanship provisions of the current IBC,except as noted above.
��� Loosbrock, Tom
I.D.No.: 1136593
I
Providing engineering and environmental solutions since 1957
Page 1 of 1
sRauN
I NTE RTEC
Special Inspection Daily Report
City of Orono Page_ 1 oF t
Report No.: #20 Dafe: September 27,2014
ProJect Name: Orono Police Dept.Expansion ProJect No.: B14-05902
Project Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN
Clie�: City of Orono CUent Project No.:
Weath�r. Partly Cloudy Temperature: 70°F
Type of Inspection: Inspection Coverage:
❑Continuous ❑Mpsonry ❑ Rebar Placement ❑ foundations ❑Special Cases
❑ Periodic ❑Welding&Bolting �Concrete ❑ Fireproofing
❑ Piles&Piers ❑Tendon Placement ❑Soils
Did the architect or engineer authorize changes to approved plans� Yes❑ (Listed Below) No �
Description and locaflon of worlc compiefed:
-Picked up 1 set of 5-4�cylinders cast on 9-26-14.
Usi tasts performod:
. Are there any discrepancies noted from this days observations� Yes ❑ No �
• Are there any outstanding discrepancies on this project6 Yes ❑ No �
. If yes,see attached Summary Sheet.
• Report Discussed with and Given to Contractor: Yes � No ❑
Reporf Emailed to:
Jack Bronczyk-jack.broncryk@krausanderson.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications pnd
applicable workmanship provisions of the current IBC,except as noted above.
�l�%
Loosbrock, Tom
I.D.No.: 1136593
-Prouiding engineering and enuironmentaf solutions since 1957
Page 1 of 1
s Rau N
I NTE RTEC
Special Inspection Daily Report
City of Orono Page: 1 of t
Report No.: #21 Dafe: October l,2014
Project Name: Orono Police Dept.Expansion Project No.: B14-05902
Project Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN
CIIeM: City of Orono Clier�t Project No.:
Weafh�r. Partly Cloudy Temperature: 50°F
Type of Inspectlon: Inspection Coverage:
❑ Continuous �Masonry � Rebar Placement ❑ Foundations ❑Special Cases
❑ Periodic ❑Welding&Bolting ❑Concrete ❑ Fireproofing
❑ Piles�Piers ❑Tendon Placement �Soils
Did the architect or engineer authorize changes to approved ptans? Yes❑ �Listed Below) No �
DoscrlpNon and location of work compl�f�d:
-Observed the contractor grouting the existing foundation wall down to the e�usfing footing at each location of the new
columns on the south side of the existing building.
-Performed 4 compaction tests on interior wall backfill. The tests met project specifications of 95�o compaction.
I
llst tests perfoRned:
I
. Are there any discrepancies noted from this days observationsZ Yes ❑ No �
• Are there any outstanding discrepancies on this project� Yes ❑ No �
• If yes,see attached Summary Sheet.
. Report Discussed with and Given to Contractor: Yes � No ❑
Report Emalled to:
Jcac:k Rroncryk jack.broncryk@krausanderson.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
�`r� �f Loosbrock, Tom
I.D.No.: 1136593
I
Prouiding engineering and enuironmenta(soluiions since 1957
Page 1 of 1
sRauN
I NTE RTEC
Special Inspection Daily Report
City of Orono Page: 1 of 1
Reporf No.: #22 Date: October 2,2014
Project Name: Orono Police Dept. Expansion ProJect No: 614-05902
ProJect Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK fLYNN
Clier�t: City of Orono CII�M ProJ�ct No.:
Weather. Cloudy Temperature: 50°F
Type of Inspection: Inspection Coverage:
❑Continuous ❑Masonry ❑ Rebar Placement ❑ Foundations �Special Cases
❑ Periodic ❑Welding&Bolting ❑ Concrete ❑ Fireproofing Anchor Bolts
❑ Piles 8�Piers ❑Tendon Placement ❑Soils
Did the architect or engineer authorize changes to approved plans8 Yes❑ (Listed Below) No �
Description and locafion of work complot�d:
-Observed the contractor drill&epoxy anchor bolts into the top of the foundation wall�Grid B.l-6 to B.1-6.3 to B.9-6.9 to
C.1-6.9.
I
List tests porfotmed:
• Are there any discrepancies noted from this days observations2 Yes ❑ No �
• Are there any outstanding discrepancies on this project2 Yes ❑ No �
• If yes,see attached Summary Sheet.
• Report Discussed with and Given to Contractor: Yes � No ❑
Reporf Emailed to:
Jac:k Rron�:ryk-jack.broncryk�krausanderson.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,specificat(ons and
applicable workmanship provisions of the current IBC,except as noted above.
�-%����� Loosbrock, Tom
I.D.No.: 1136593
I
Prouiding engineer�ttg and enuironrnental solunons stnce 19�
Page 1 of 1
s Rau N
INTERTEC
Speciat Inspection Daily Report
City of Orono Page: 1 of 1
Report No.: #23 Date: October 8,2014
Project Name: Orono Police Dept. Expansion ProJect No.: B14-05902
Project Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN
Clier�t: City of Orono Client P�ojecf No.:
Weath�r: Partly Cloudy T�mperafure: 50°F
Type of Inspection: Inspection Coverage:
❑ Continuous ❑Masonry ❑ Rebar Placement ❑Foundations ❑ Special Cases
❑ Periodic ❑ Welding&Bolting ❑Concrete ❑ Fireproofing
❑ Piles&Piers ❑Tendon Plpcement �Soils
Did the architect or engineer author'¢e changes to approved plans� Yes❑ (Listed Below) No �
Descripfion and location of work completed:
-Performed 2 compaction tests on plumbing trench backfill and 2 compaction tests on fill placed below the exterior slab
on grade for the Nash enclosure. The tests met project speci�cations of 9596 compaction.
I
Llsf t•sts porformod:
�
• Are there any discrepancies noted from this day's observations� Yes ❑ No �
. Are there any ouhtanding discrepancies on this project2 Yes ❑ No �
. If yes,see attached Summary Sheet.
. Report Discussed with and Given to Contractor: Yes � No ❑
Report Emalled to:
Jack Broncryk-jac:k.Uionczykiakrausanderson.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
� ����-'� Loosbrock, Tom
I.D.No.: 1136593
I
Prouiding ettgineering and environrnental solutions since 1957
Page t of 1
s Rau N
I NTE RTEC
Special Inspection Daily Report
City of Orono Page: 1 of 1
Report No.: #24 Date: October 9,2014
Project Namo: Orono Police Dept.Expansion Project No.: B14-05902
ProJed Address: 2730 Kelly Pkwy. Braun Inter#ec PM: MARK FLYNN
Clienf: City of Orono Client Project No.:
Weathsr: Partly Cioudy Temperature: 50�F
Type of Inspection: Inspection Coverage:
❑ Continuous �Masonry � Rebar Placement ❑ Foundations ❑Special Cases
❑ Periodic ❑Welding&Bolting ❑ Concrete ❑ Fireproofing
❑ Piles&Piers ❑Tendon Placement ❑Soils
Did the architect or engineer authorize changes to approved plansZ Yes❑ (Listed Below) No �
Doscrfptlon and IocaFbn of work complefed:
-Observed the placement of rebar and gro�t for a masonry wall�Grid B.2-6 to C.2-6 at elevation 109'.
-Sampled and tested the grout for slump and cast 1 set of 3 grout prisms(Set#1). j
list fests pe�formed:
Grout Set#1 =8 3/4"
. Are there any discrepancies noted from this day's observationsZ Yes ❑ No �
• Are there any outstanding discrepancies on this projectZ Yes ❑ No �
• If yes,see attached Summary Sheet.
. Report Discussed with and Given to Coniractor: Yes � No ❑
Report Emalled to:
Jaek Rronc,ryk jack.broncrykC`krousanderson.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable workmanship provis'rons of the current IBC,except as noted above.
���I
�-= Loosbrock, Tom
I.D.No.: 1136593
Prouiding engineering and environmental solutions since 19�
I Page 1 of 1
s Rau N
INTERTEC
Special Inspection Daily Report
City of Orono Page: 1 of 1
Report No.: #25 Date: October 10,2014
Project Name: Orono Police Dept.Expansion Project No: 614-05902
Projecf Address: 2730 Kelly Pkwy. 8raun Intertec PM: MARK FLYNN
Clie►�t: Ci1y of Orono Cllent ProJect No.:
Weather. Partly Cloudy Temperafure: 50°F
Type of Inspection: Inspection Coverage:
❑Continuous ❑Masonry � Rebar Placement ❑ Foundations ❑Special Cases
� Periodic ❑Welding&Bolting ❑Concrete ❑ Fireproofing
❑ Piles&Piers ❑Tendon Placement ❑Soils
Did the architect or engineer authorize changes to approved plans2 Yes❑ (Listed Below) No �
Descripfion and location of work complet�d:
-Observed the plqcement of rebar for interior slab on grade @ Grid A to E from 1 to 6.
-Picked up grout samples cast on 10-9-14.
I
Llst tests performad:
I
• Are there any discrepancies noted from this day's observations� Yes ❑ No �
• Are there any outstanding discrepancfes on this project� Yes ❑ No �
• If yes,see attached Summary Sheet.
• Report Discussed with and Given to Contractor: Yes � No ❑
Report Emailed to:
Jack Bronc.ryk jar:k.broncrykCg-krausanderson.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,speclfications and
applicable workmanship provisions of the current IBC,except as noted above.
-�;%� Loosbrock, Tom
L?h /�/,/�
I.D.No.: 1 136593
Prouiding engineering and ettuironmental solutions since 1957
Page 1 of 1
s Rau N
I NTE RTEC
Special Inspection Daily Report
City of Orono Page: 1 of 1
Report No.: #26 Date: October 11,2014
Project Name: Orono Police Dept. Expansion P�oject No.: 814-05902
ProJect Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN
Client City of Orono Client Project No.:
Weafher: Partly Cloudy Temperafure: 50°F
Type of Inspection: Inspection Coverage:
❑Continuous ❑ Masonry � Rebar Placement ❑ Foundations ❑Special Cases
� Periodic ❑Welding&Bolting ❑ Concrete ❑ Fireproofing
❑ Piles&Piers ❑Tendon Placement ❑Soils
Did the architect or engineer authorize changes to approved plans� Yes❑ (Listed Below) No �
Descriptlon and bcaFion of work comp{eted:
-Observed the placement of rebar for interior slab on grade @ Grid A to f from 1 to 6.
list tests perfortned:
. Are there any discrepancies noted from this day's observationsZ Yes ❑ No �
• Are there any outstanding discrepancies on this project2 Yes ❑ No �
• If yes,see attached Summary Sheet.
. Reporf Discussed with and Given to Contractor: Yes � No ❑
Report Emafled to:
Jack Bron�;ryk jack.bronczykc"s7krausarxiers��n.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
;��p-� Loosbrock, Tom
I.D.No.: 1 136593
Prouiding engineering and enuironmentai solutions since i957
Page 1 of 1
sRauN
INTERTEC
Special Inspection Daily Report
City of Orono Page: 1 of 1
Report No.: #27 Date: October 13,2014
Project Name: Orono Police Dept.Expansion ProJect No.: 614-05902
Project Address: 2730 Kelly Pkwy. Braun In4erFec PM: MARK fLYNN
Clienf: City of Orono Client Project No.:
Weather: Partly Cloudy Temperature: 50°F
Type of Inspedion: Inspedion Coverage:
❑ Continuous ❑ Masonry � Rebar Placement ❑ Foundations ❑Special Cases
� Periodic ❑Weldng&Bolting �Concrete ❑ Fireproofing
❑ Piles 8�Piers ❑Tendon Placement ❑Soils
Did the architect or engineer authorize changes to approved plans? Yes❑ (Listed Below) No �
Descripfion and location of work compl�fed:
-Observed the placement of rebar for interior slab on grade @ Grid A to E from 1 to 6.
-Observed the placement of concrete for interior slab on g�ade @ Grid A to E from 1 to 6.Sampled and tested the
concrete for slump,air conient and temperature.Cast 1 set of 5-4x8 cylinders(Set#18).
list tests performed:
Set#1 B=Siump-5 1/2",Air Content-2.44b,Temperature-67,Sample#50205
Set#19=Slump-6 1/4",Air Content-3.3�0,Temperature-64,Sample#50228
• Are there any discrepancies noted from this days observations� Yes ❑ No �
• Are there pny outstanding discrepancies on this project2 Yes ❑ No �
. If yes,see attached Summary Sheet.
• Reporf Discussed with and Given to Contractor: Yes � No ❑
Report Emafled to:
Jack Bronczyk -jar_k.broncrykf�krauzarxierson.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
��� Loosbrock, Tom , 3659 ',
I.D.No.: 1 3
Providing engineering and environmental solutions since 1957
Pag e 1 of 1
s Rau N
INTERTEC
Special Inspection Daily Report
City of Orono Page: 1 of 1
Report No.: #28 Date: October 14,2014
Project Name: Orono Police Dept. Expqnsion Projecf No.: B14-05902
Project Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN
CNer�t: City of Orono Client Project No.:
W�afh�r. Parf1y Cloudy Temperature: 50°F
Type of Inspection: Inspection Coverage:
❑Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑ Special Cases
� Periodic ❑Welding&Bolting �Concrete ❑ Fireproofing
❑ Piles&Piers ❑Tendon Placement ❑Soils
Did the architect or engineer authorize changes to approved plans� Yes❑ (Listed Below) No �
Dosc�iption and IocaHon of work complated:
-Picked up 2 sets of 5-4x8 cylinders cast on 1 a13-14.
List tests perfoRned:
I
. Are there any discrepancies noted from this days observations� Yes ❑ No �
. Are there any outstanding discrepancies on this project� Yes ❑ No �
• If yes,see attached Summary Sheet.
• Reporf Discussed with and Given to Contractor: Yes � No ❑
Report Emailed to:
Jack t�ronc�yk jc�ck.broncryk@krausanderson.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
��;��
x,t,- Loosbrock, Tom
I.D.No.: 1136593
Prouiding engineering and enuironmental solutions siitce 19�
Page 1 of 1
s Rau N
INTERTEC
Special Inspection Daily Report
City of Orono Page: 1 of 1
Reporf No.: #29 Dafe: October 15,2014
Project Name: Orono Police Dept.Expansion ProJect No: Bl 4-05902
ProJect Address: 2730 Kelly Pkwy. Braun Interfec PM: MARK FLYNN
Clienl: City of Orono CIIeM ProJect No.:
Weafher: Partly Cloudy TemperaFure: 50°f
Type of Inspedion: Inspection Coverage:
❑ Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑Special Cases
� Periodic ❑Welding&Bolting ❑Concrete ❑ Fireproofing
❑ Piles&Piers ❑Tendon Placement �Soils
Did the architect or engineer authorize changes to approved plans2 Yes❑ (Listed Below) No �
Descripfio�and IoccFfon of work completed:
-Observed the soils in the bottom of the excavation for footings for new sign base located at the norfh and south
entrances into the west parking lot. Performed random hand auger probes in the bottom of the footing excavation and
the soils appear to be suitable for the designed footing bearing pressure.
-Recommended the contractor place cleor crushed rock in the bottom of the excavation for the new sign bases
because of water in the bottom of the excavation.
List tests pertortned:
• Are there any discrepancies noted from this day's observations� Yes ❑ No �
• Are ihere any outstanding discrepancies on this project� Yes ❑ No �
. If yes,see attached Summary Sheet.
• Report Discussed with and Given to Contractor: Yes � No ❑
Report Emailed to: ,
Jack Broncryk-jack.broncrykQkrausanderson.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable workmanship provisions of the cuRent IBC,except ps noted above.
,��� � Loosbrock, Tom
I.D.No.: 1136593
Prouiding engineering and environmental so(utions since 1957
Page 1 of 1
s Rau N
INTERTEC
Special Inspection Daily Report
City Of OfOt10 Page: 1 of 1
Report No.: #30 Date: October 16,2014
Project Name: Orono Police Dept. Fxpansion Project No.: 614-05902
Project Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN
Cilenh City of Orono Client ProJect No.:
Woa4he�: PartlyCloudy Temparafur•: 50°F
�
Type of Inspection: Inspection Coverage:
❑Continuous �Masonry � Rebar Placement ❑ Foundations ❑ Special Cases
� Periodic ❑Welding&Bolting � Concrete ❑ Fireproofing
❑ Piles&Piers ❑Tendon Placement ❑Soils
Did the architect or engineer authorize changes to approved plansB Yes❑ (Listed Below) No �
Deser�pMon and location of work eompleted:
-Observed the placement of rebar and grout for masonry wall�Grid D-5.2 to D-6 at elevation 104'.
-Observed the placement of concrete for interior slab on grade�Grid B.2 to C.l from 6 to 6.9. Sampled and tested the
concrete for slump,air content and temperature. Cast 1 set of 5-4x8 cylinders (Set#20).
List tests perfortned:
Sei #20=Slump-4 1/4",Air Content-3.3�0,Temperature-64F,Sample#50839
. Are there any discrepancies noted from this day's observations� Yes ❑ No �
• Are there any outstanding discrepancies on this project2 Yes ❑ No �
• If yes,see attached Summary Sheet.
. Reporf Discussed with and Given to Contractor: Yes � No ❑
Report Emalled to:
Jack Broncryk jar_k.bronc:ryk:��krc�usanderson.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
���-� Loosbrock, Tom
I.D.No.: 1136593
Prouidiieg engineerittg and enuironmentaI solutions since 1957
Page 1 of 1
sRauN
I NTE RTEC
Special Inspection Daily Report
City of Orono Page: 1 of 1
Rsporf No.: #31 Date: October 17,2014
ProJect Name: Orono Police Dept.Expansion Project No.: 614-05902
Project Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN
Client City of Orono CIIsM Project No.:
Waath�r: Partly Cloudy Temperature: 50°F
Type of Inspection: Inspedion Coverage:
❑Continuous �Masonry � Rebar Placement ❑ Foundations ❑Speciai Cases
� Periodic ❑Welding&Bolting ❑Concrete ❑ Fireproofing
❑ Piles 8,Piers ❑Tendon Placement ❑Soils
Did the architect or engineer authorize changes to approved plansZ Yes❑ (Listed Below) No �
DescripHon and Iocallon of work compleled:
-Observed the placement of rebar and grout for masonry wall @ Grid D-5.2 to D-6 at elevation 108'.
-Picked up 1 set of 5 cylfnders cast on 10-16-14.
,I
list tasts porformed:
• Are there any discrepancies noted from this days observations� Yes ❑ No ($!
• Are there any outstanding discrepqncies on this project� Yes ❑ No �
. If yes,see attached Summary Sheet.
• Report Discussed with and Given to Contractor: Yes � No ❑
Report Emailed to:
Jnr.k Rronczyk jack.bronczyk�krausanderson.com
To the best of our knowledge,work inspected was done in accordance with ihe approved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
���,�.,,�/� Loosbrock, Tom 1136593
,.��v"' I.D.No.:
I
Prouiding engineering and environmental solutions since 195'7
Page 1 of 1
sRauN
INTERTEC
Special Inspection Daily Report
Clty Of OfOno Page: 1 of 1
Report No.: #32 Dafe: December 4,2014
Projed Name: Orono Police Dept.Expansion Pro)ect No.: 614-05902
Project Address: 2730 Keliy Pkwy. Braun Intertec PM: MARK FLYNN
Client City of Orono Client Project No.:
Weather: Parfly Cloudy Temperature: 20°F
Type of Inspection: Inspection Coverage:
❑ Continuous �Masonry � Rebar Placement ❑ Foundations ❑Special Cases
� Periodic ❑Welding&Bolting ❑Concrete ❑ Fireproofing
❑ Piles 8�Piers ❑Tendon Placement ❑Soils
Did the architect or engineer authorize changes to approved plans� Yes❑ (Listed Below) No �
Descdption and locafion of work compiefed:
-Observed the placement of rebar and grout for masonry wall @ Grid C.6 to D from 5.4 to 6 at elevation 104'and
masonry wall�Grid A-5.7 to 8-5.7 at elevation 104'.
lisf tests perfortned:
I
• Are there any discrepancies noted from this day's observations� Yes ❑ No �
. Are there any outstanding discrepancies on this project8 Yes ❑ No �
. If yes,see attached Summary Sheet.
• Reporf Discussed with and Given to Contractor: Yes � No ❑
Report Emalled to:
Jack Broncryk-jqck.brnnczyk@krausanderson.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,spec'rfications and
applicable workmanship provisions of the current IBC,except as noted above.
a� Loosbrock, Tom
I.D.No.: 1136593
-Prouiding engineering and enuironmenta(solu�ions since 1957
Page 1 of 1
s Rau N
INTERTEC
Special Inspection Daily Report
Ciiy of Orono Page: 1 of 1
Report No.: #33 Date: December 5,2014
Projecf Name: Orono Police Dept.Expansion Project No: 614-05902
P�ojecf Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN
Clieni: City of Orono Client ProJect No.:
Weather. Partly Cloudy Temperature: 20°F
Type of Inspection: Inspedion Coverage:
❑ Continuous � Masonry � Rebar Placement ❑ Foundations ❑Special Cases
� Periodic ❑ Welding&Bolting ❑Concrete ❑ Freproofing
❑ Piles 8�Piers ❑Tendon Placement ❑Soils
Did the architect or engineer authorize changes to approved plans8 Yes❑ (Listed Below) No �
Description and location of work complefed
-Observed the placement of rebar and grout for masonry wall Q Grid C.6-5.8 to D-5.8 at elevation 108'.
-Observed the masonry contractor drill and epoxy#5 dowels every 48"on center intor the slab on grade for a masonry
wall @ Grid 6.9-5.2 to B.9-b.
List t�sts performad: I
• Are there any discrepancies noted from this day's observations� Yes 0 No �
• Are there any outstanding discrepancies on this project2 Yes ❑ No �
. If yes,see attached 3ummary Sheet.
. Reporf Discussed with and Given to Contractor: Yes � No ❑
Report Emalled to:
Jack lirc:,nc_ryk-jack.bronc. .ryk�krausanderson.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
,-'%��,�.----� Loosbrock, Tom
I.D.No.: 1136593
-Providing engineering and enuironmental solutions siiice i957
Page 1 of 1
s Rau N
I NTE RTEC
Special Inspection Daily Report
City of Orono Page: 1 of 1
Report No.: #34 Dafe: December 10,2014
ProJect Name: Orono Police Dept.Expansion Project No.: 614-05902
Project Address: 2730 Kelly Pkwy. eraun IMerfec PM: MARK FLYNN
Clier�t: City of Orono Cliant Project No.:
W�athar: Cloudy Temperafurr. 20°F
Type of Inspection: Inspection Coverage:
❑ Continuous �Masonry � Rebar Placement ❑ Foundations ❑Special Cases
� Periodic ❑Welding&Bolting ❑ Concrete ❑ Fireproofing
❑ Piles&Piers ❑Tendon Placement ❑Soils
Did the architect or engineer authorize changes to approved plans� Yes❑ (Listed Below� No �
DesctipHon and location of work complet�d:
-Observed the placement of rebar and grout for masonry wall @ Grid A-5.2 to B-5.2 at elevation 110'.
List tasts performed:
I
. Are there any discrepancies noted from this day's observationsZ Yes ❑ No �
. Are there any outstanding discrepancies on this project2 Yes ❑ No �
. If yes,see attached Summary Sheet.
• Report Discussed with and Given to Contractor: Yes � No ❑
Report Emalled to:
Jack Broncryk ja�;k.bronczyk�e�krausanderson.com
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and
applicable workmanship provisions of the current IBC,except as noted above.
�' Loosbrock, Tom
;-
,�.�_ . ,�,�,,_-
I.D.No.: 1136593