Laserfiche WebLink
� � <br /> �1 O / <br /> 7 � <br /> O O CI'TY OF ORONO <br /> Municipal Offices <br /> � �� 3treet Address Mailing Address: <br /> �� 2750 Kelley Parkway P.O.Box 66 <br /> �iG Orono,MN 55356 Crystal Bay,MN 55323-0066 <br /> �9kE8H�4 <br /> To: The Current Owner of Address 3050 JAMESTOWN RD <br /> City Ordinance requires that onsite sewage treatment systems in Orono be inspected on a <br /> periodic basis. The onsite sewage treatment system at the above address has been insp�cted and <br /> the following is known about the system. A sketch of the known components of the system is <br /> available for most properties at the Orono City Hall. <br /> Imminent Public Health hreat <br /> Yes <br /> No <br /> If yes, please contact the Onsite Systems Manager at 954-249-4626 within 10 days of receipt of <br /> this notice. The septic system must be brought into compliance within 90 days. Failure to do so <br /> will result in referral to the City Attorney for legal action. <br /> System Identified as Non-C mpliant <br /> Yes <br /> No <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes <br /> No <br /> The city recommends the septic tank(s) and/or lift tank be serviced and pumped aut every three <br /> (3) years. City records indicate the tank(s)were last pumped out on t o?-�-O� <br /> The tank(s) should be cleaned through the manhole and not through the inspection pipes, this <br /> allows for proper cleaning. <br /> Comments: <br /> �� � <br /> �C�_ _. <br /> Inspector: Date of Inspection: �� � � <br /> Telephone (952) 249-4600 • Fax�952) 249-4616 <br /> www.ci.orono.mn.us <br />