Loading...
HomeMy WebLinkAbout2016-00589 - new house CITY OF ORONO * 2 0 1 6 — PJ 0 5 8 9 * , 2750 KELLEY PARKWAY DATE ISSUED: 06/10/2016 ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS : 1070 HUNTER DR PIN : 25-118-23-42-0008 LEGAL DESC : MOONEY LAKE PRESERVE : LOT 3 BLOCK 2 PERMIT TYPE : NEW STRUCTURE PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : SINGLE FAMILY ACTIVITY : 101-SINGLE FAMILY HOUSES, DETACHED VALUATION : $ 1,047,004.00 NOTE: SEPARATE PERMITS REQUIRED:PLUMBING,MECHANICAL,SEPTIC,FIREPLACE,WELL(STATE),ELECTRICAL(STATE) SEPTIC AREA,NO SAC. NOTE:PLEASE SEE AND INITIAL NEW BUILDER ACKNOWLEDGEMENT FORM APPLICANT PERMIT FEE SCHEDULE 6,456.52 DIVINE CUSTOM HOMES STATE SURCHARGE(VALUATION) 518.80 397 EAGLE BLUFF COURT TOTAL 6,975.32 HLJDSON,WI 54016- Payment(s) (715)760-2298 CREDIT CARD 0739 6,975.32 Minnesota State License#:cont-BC442980 OWNER GRONHOLZ, SCOTT&AMY 2008 SUGARWOOD DRIVE ORONO,MN 55356- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,appiicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for due cause. `�� /, �� S V � � �o % �U � � � � � (,F, i � � i � � Applicant Permitee Signature D te Issued By Signature Date � � � City of Orono Building Permit Application for New Structures or Additions Mailing Address: QA> PO Box 66 Permit number: O/ - � `v0 Crystal Bay, MN 55323-0066 Date received: StreetAddress:' Received by: j j � ;.._r� �-� y ,� 2750 Kelley Parkway Plan review fee: � , '� c,� Orono, MN 55356 �qKfsHo�� Main: 952-249-4600 p;bl��p--�5�� Total Fee: Fax: 952-249-4616 www.ci.orono.mn.us � This application form must be completed in full and all required information must be submitted. �,.r�sy �/9/b Incomplete applications will be returned. (Please print) GENERAL INFORMATION: �--�f �� , �'� �'��K � Job Site Address: I„(�� 1-�UN'it2 �z-+�t Will this be a Parade of Homes, Remodelers Showcase Home or other Display Home? (�Yes ❑ No If yes,a specia/event permit is required with Police Department and City Council approva/60 days prior to the event. Shuttle bus service wil/6e required unless applicant demonstrates sufficrent on-site parking is availab/e. Non-permitted events wil/not be allowed. CONTRACTOR/APPLICANT INFORMATION: : Name: �1ViNt CuSi��nrl 1-�MES . State License# C3C-��}29�b Expiration Date: 3-3 i- ZO►.(o , Phone: (cell) ' (office) �115 --1tv0 2Z`��i . Mailing Address: '39'] E/.�r�F RLUFF CL�U(2--1' Cit : t-lUp�3 ZIP: �p�io Contact Person: .� Je f'�' I�f�//� �ISL-y'�{�- f/77 r�;ARplicant is: ontractor / Homeowner �c�►aa ooe� Email and/or Fax: - - - �115 - �(�D - ZZq� -�� PROPERTY OWNER INFORMATION: Name: SCt.�TT C��Zc�'t-�C]�.�. I AM�( G�zot�1 NoLZ �(Qi rY�Q,� Phone (day): ej52 _ 33 E{- - ��j�'j Address: 200� 5�.;�v/.k,ii W Oat� ��L� CitY� d('.�2i� ZIP- '�-�� Email and/or Fax � ��n- [�fL�l�,�-}t;�L �i.vE�..I.�S F�4fL�t� � M ARCHITECT NGINEE NFORMATION: Name: �l E _ �}Ai`ISC�t�i bR�U,� Phone (day): (o�2-�(� -�� Address: S�tC�TI ►L►I,�YY1t�.. '�Y`►R N• ��� �- City: ��.��c"�-1 ZIP: �,js`��1 � Email and/or Fax: n(�UL @ E-�AN�t�1 EifLe� M�l. CCm PROJECT INFORMATION: Descri tion of pro�ect: 1.Type of Project 2.Proposed Use 3.Structure Type 4.Sewage Disposal 8� New Construction �Sin le Famil with Water Supply g y ❑Accessory Bldg./Garage dition attached garage ❑ Deck ❑ Public Sewer ❑Accessory Building ❑ Single Family with ❑ Office/Commercial ❑ Relocation detached garage �Residence (�Private Sewer ❑ Other: (specify) ❑ Multiple Family/Condo ❑ Retaining Wall(s) � � ❑ Public 4-feet or greater ❑ Public Water �*Any earth movement may require ❑Commercial ❑Storage MCWD review&permits. ❑ Industrial ❑Warehouse �Private Well Minnehaha Creek Watershed District(MCWD) ❑ Other: (specify) ❑Other(speCify) 15320 Minnetonka Blvd Minnetonka,MN 55345 Phone: 952-471-0590 Fax: 952-471-0682 www.minnehahacreek.or Estimated Construction Valuation (excluding land) $ � � �,� 7� UQl�, L.G� Packet Last Updated: January 2015 Page 20 � �6TRUCTURE INFORMATION: 1.Structure Dimensions 1.Structure Dimensions(continued) 2.Type of Construction a.Length(ft.)= r� c������� Number of bedrooms=� �Wood/Frame b.Width(ft.)= �- 1� ��Q'� Number of garage stalls: ❑Masonry Areas in sauare feet Attached=� ❑Metal 1-�-�g ❑ Pole Bldg. c. Basement= Detached=� ❑ ICF d. 18t Story = 2�`�`� ❑On-site Prefab e.2nd Story= ��rJ C7 ❑Off-site Prefab f. %Story = `-' ❑Other(please specify): g.Total Area= SQU�� REQUIRED SUBMITTALS: All of the information must be submitted in order for your application to be processed: ' Not Enclosed A licable � ❑ Buildin Permit Escrow A reement and Fees ❑ Plan Review Fee � ❑ Com leted lication Form ,� 0 Pro osed Buildin Ptans-2 full size sets,to scale and 1 reduced 11 x 17 or 8%x 11 set ❑ Minnesota State Ener Code Calculations and Mechanical Code Re uirements ❑ ❑ Surve -2 full size,to scale meetin ALL sunre r uirements 0 ❑ Hardcover Calculations ❑ ❑ Se tic S tem Certification ❑ ❑ Minnehaha Creek Watershed District(MCWD)Permit or Documentation from MCWD statin no ermit is re uired ❑ ❑ Landsca e Walls and/or Retainin Wall Plans ❑ ❑ Stormwater Pollution Prevention Plan SWPPP � Access Permit ❑ � Data Privac Adviso Form APPLICANT/OWNER ACKNOWLEDGEMENT: • Agrees to provide all information required or requested by the Building Department; • Agrees to pay the City of Orono for engineering consultant review costs in excess of;500; • Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no altemative but to reject it until it is complete; • Acknowledges the Escrow Agreement is completed and signed; • Understands some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If you refuse to supply the information,the application may not be issued. • Agre�that in the ever�t that weather or other coriditioeis preveM the campl+atlon of an as-built`survey.a#the tirr�e the cercfncam of occ�,pancy is r+eqw�tea,a �ora�•c.ertinca�e of occu�ncy may t�e�a upon rec��lr ot a$'�u,aao �crow to e�uro completfon+�#ths as-buNt sunrey snd aN slte trttproventents, ApplicanYs Signature: Date: J Owner's Signature: Date: p-1; —1 5 Packet Last Updated.• January 2015 Page 21 . ���:� ������ ������c�� ��� ��� ���u�r���� � �����°����� z�-1 t�-zg �z �vB �b �(0 ��� �►c�c�ees�: �� G[ 2! � Permie�o.:-- � �' e+�w� � �y�3a>�. D��r�p�ion of�aoek: ,��1 �t��GG���,�4�'f�� �S t�a�e l��c'ci: __��1.� /� �P� Sept6c revte�+r by: Date Approvec�: �� �o�Bn� rebiewr Fay: Dafe�pproved: ��Z �� BuiEc�ing revi�w 6�y: �ate Approvec�• � GracBing Fevi��by: -'' Date Appr�ved- ° °tw /S��74 Su. . Zoning D6strict: �� � ZoRie�g F's!e#: l�•�'7 [� Reso#:�� Reso D�te: <O /a /,� Z�rrir� Lo��ce�: �.��( D�� q ' fF�"�30� � �----- 9� � �lie�fih:3� Lot Coverage: SF � S�e�ey�u9arnE�ted: �Yes . � No D��e of 3�nrsy: �/d��!�'o Revised datef?l•��q f l� Lanc�sca�e pda�subrni4fiecG? �es � fVo Lar�d�c�per: � K1.S 6Uf�.���.,� P�� �set� Set�acks: Front(�� Rear(�e�• �S E VV � ( I� S E �� ) 0�6�er��ile�ings 1�lefianc� �._.� Si�e � / � F .�. � � �.�„ ,�- � �� e C� � Qefinec! i�ei E�t:<�D.�� �w��t�'�' � Pe�k t�eigC��:�� �FE: D2�.� FFE minus 6 �'eet= DI (Ex€st�ng�onto B� � �r� ' � �er�rneter(�ineaP fieet)_ .��Q 50%_ ��� 3� L.�. beiovv�ra�e Basement?�Yes � No, �. Stories ��L. � FOR,R BUILDING M�ITH A BRSEMENY OR CRAWL SPACE: FOR A BUILDlNG Ot�ASLAB FOUNDATtOId: `fhe distance between the lowest proposed Slab at or above grede— �"]. � START WITH fl°°r t°f the basement or crawl space)and measure irom hiahest existfna � the highest point of the roof. TART WITH ��to the fif8hest point of the roof even if fill was brougM in to If you have a. . eievate home. SUBTRACTION � GABLE OR HIPPED ROOF(no Slab below grade—measure (BASED ON windows): Subtract half ttie distance from highest exlsting grade to the ROOF TYPE) between.the highest point oF tltie roof hf hest t�t of tde roof; tothe low pWnt of the corresponding ' If you have a... gable or hipped roof SUBTRACTlO ° �«OR HIPPED ROOF g�� � GABLE QR HIPPED ROOF(with (BASED ON (ne windows): Subtract half windows): Subtract fialf the distance ROOF TYPE) the distance between the between the top of the highest highest poirrt of the roof to windowand the highest poiM of the ttie Iowpolnt of tMe roof correspondfng gable or • ALL OTHER ROOF TYPES(flat, � P�roof mansard,etc):No subtraction. ° LE OR HIPPED RDOF ( ' "ndows). Subhad SUBTRACTION 3ubtract the distance between ihe half distance behveen (BASfD ON basemenf/crawi space floor and the the top the highest ` � �� EXiSTING hfghest existing grade adjacent to the wii�dow a the highest � GRADES) foundation OR 10 feet(whichever is less). poiM of the f • ALL OTHER OF'fYPES EQUAIS Deflned bullding height (flat,mansatd, :No subtraction. 2�j Q� Defined buiiding height ' i �" f � ELIUALS Updated: October 2015 z:\forms�plan review checklisi 10-2015.docx a l�;�i� Shorela�n� C�@:�tricY RF�f�[� �e�rr�§� � ;;`ti ��� '`£ �ber��e �akeshore Se4:�acf� Blu� ,;�s F��t? Yes No Permit Number: ���-��j� � Yes � No �/A � Yes�o � � j bpe ��o � N/A-see attached Setback� �tormwrat�r�u�Ei�+ �x6�ting Propo�ed Ov��Ba�@�i�tr6cti'E'i�� F�ae¢9co�ec E�ardcovee Varoarrce Req��rec� C�iR E�eQuir�cE circle one %and s %and s b L p ' � Yes o O Yes No 1 2 /� 1�� 4 5 �� iv � TYPe(S)' TYPe(S)� / �s G Fees to be Char �d YE� �1O A��4 � Plan R�v6�wr � S�Sa�+c6�r� r/` Investigafion F�e �C- o�S�C 1�t9� l/' Other(apecify) � S c�are�oot� e � r S uar� Foota e Basement X = � 1�Floor X = $ 2"a Floor � - $ Garage X - $ 7 O � Estam�sted Constre�ct�oe�Valea�; � Orono Inspections Required 1ldoek Requiring Separate Perme� Footing � Site Plumbing � Grading/Filling Poured Wall Silt Fence/Erosion Control Mechanical Cj Fire foundati�n Survey � Hardcover Removal Septic 6 Vllater Connection �foundation Waterproofing � Other(specify) Fireplace � Sewer Connection �Fcaming � Masonry � Lawn irrigation Insulafion �Mlfg. � Landscaping As-Be�i6t Sucdey � Other(specify) Fina1 �Lathe 6�eq�aired SY�ate Perr�fts � Other(specify) Well Electricai RENiI�EtKS (in-house): OFFICI�L RE1��F�K�-'�O �E NO'FED �!� PER�ET��d�4N�'FIALl.ED: L� S�e��ilcl� � �.cknewisdgerr�ent Focm � Prior to releas of escrow money an as-built survey and hardcover calculations must be submitted and approved. Updated: October 2015 �•\fnrmc\nlan rAviow rhockliet 1f�9f11�,rinrv , Builder Acknowledgement Form Permit #2016-00589 / 1070 Hunter Drive Builder Representative Name: ��//%/?e. Cc.c Sf�c.���� , � Permit Conditions: Initials **NOTE CHANGE** Before scheduling an exterior insulation and/or drain tile inspection,a foundation as-built survey must be submitted and approved by the City or a Stop Work order �`'� will be issued. Schedule a minimum of one hour for the framing inspection. f� L, Erosion control mechanisms must be installed and inspected by the City prior to any land disturbing activities. The contractor must provide a minimum of a 24 hour notice prior to /A /' inspection. ���� l� Erosion control shall be installed and maintained throughout the entire project and must remain until vegetation has been established. ,�,�v✓ A haul route shall be submitted to the City Engineer for approval and inspection prior to commencement of hauling from the site.The property owner shall be responsible for cleaning ��� and repair of roadways for any adverse impacts. No underground sewer within 20 feet of well. �� Prior to the issuance of a Certificate of Occupancy an as-built survey must be submitted and /� approved. .�� In the event of winter or other extended unfavorable weather conditions(which prevent the completion of the exterior improvements and/or as-built survey)a Temporary Certificate of ��� Occupancy(TCO) may be necessary. A TCO requires a$10,000 escrow. � Advisory Comments Any changes to the exterior/landscaping improvements, i.e. patios,grading, sidewalks, retaining walls, etc. not currently shown on the approved survey and landscaping plan will require a _ /-�� separate Zoning Permit application to be submitted and approved prior to the work '� commencing. Any retaining walls that are over 4-feet in height or tiered walls not separated by twice of the height of the lower wall require engineered plans and a building permit to be submitted and �(^/ approved rp ior to construction. w:\street files\hunter drive\1070\builder acknowledgement form 2016-00589.docx . Permit Application: Self-Checklist for Com�leteness Please note, the applicant must initial in the boxes below to acknowledge the minimum required information is included with the submittal. If not, the application will NOT be acce.pted. Call 952.249.4620 to schedule a meeting with staff if you have questions on application submittal requirements. � Completed Application �l Plan Review Fee Paid ;-< � � j � �' ; , ���� � � � Si ned Escrow A reement & Escrow Pa ment .�� � � � i�_=�_>� _�=_ _n�ev�' i�, 9 9 y �=� ��ev�- C,ha,c,�c- �1or►a Qlv�ru ►�b S�,K.o�o�d per cDnucda han, w� S�ff Warru� � Building Plans (to scale) x2 ��.; , -}� ��-ti�-� C{__ X Certificate of Survey (to scale) showing the proposed project & meeting aII requirements x2 f �I�-, I ��_ ��,�.�... `>�.��, c,<<, �-� �t, `�c� �:.��.c__. -;' Hardcover Calculations (if applicable) I am aware that Orono will not issue a building permit without a copy of MCWD permits (or documentation from the MCWD stating � -- = the proposed project does not trigger their permitting requirements). I will contact the MCWD at 952-471-0590 regarding this,.project. _ � -�I ..-�-- Signed by: ; � c:J_�---�--_. ,. � Address: l4 7O � I/�-�- Permit #: o?Dlh-D�✓`�g'9 - Minnesota State Energy Code Calculations and Mechanical Code Requirements Form Additional copies can be found by going to: http://www.dli.mn.qov/CCLD/PDF/sbc 1322 cert.pdf ��� � �op� �iiai.s ctra��etr s�a«?��:co�,�. Date: �-/t� —/S Site Address; �1�1�11�_ 1��V� Contrac#or Na�ie: � � G Licerss�e N�umber. tocai�n Type af Instal/�r/ Type Locatsan Si�z�e Inessttlatr�wi R-Ya/xr� Mak J1ir Raof Ceit' Comb�ustion tir Wa�Ls � Ilitat+a�Hea " Slab-an-Grade `L � C� �ort�l Floar iluc.#s t.l�tside t�#Coi�arMed Rim]oist A�n -Z- L,t�iv.Ext�rior or Irroe4�'� 1 ara�i►T R-Y,�f/tx Foundation Wal� o �l �� A t/-Facta�r SHGC rl�.�at m ca�f�ci�t Passri+oe Actis�e Fenestration . 3CS Rado�Contr+o�l T I t Ra ' AFI/E Pllanvsfact�rner Pf�vd�f Ca,�c�rt{at�d Heat Lo�s tM�#i 5 T Ra " SE'ER /'�an�rfacterr�er Moe�ei/ t"a�/' Laiad tl�at Garn Co�o�" S 7' Lacatia�r £t�nti+ytnxlcs Yentilati�rn Taia/V�entila#ir�rr Med�a�Ve�la#ion �� Packet Last Updated: January 2015 Page 19 � � ��. ,�, � r�:. Wise Hea ting -' HVAC Load Calculations for Gronholz Residence ���'�� RSSID�N`RAL. HVAC L.OAD� Prepared By: �, ,« � _ Wednesday,September 09,2015 Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. � , �Rhvac-Residentiai&Light Commercial HVAC toads . Elite Software D�v�etopm�Itua.' ;Auer Steel(New Hope) ■ ��� LPt rnouth.MN 55441 _ Pa�B 2 i _ . _ ---- _ ! Pro,jec� Report _ . ,Gener�l�Proj�Infonna�on .:- , ____ .. __---__. _��_________._____.�_�_.� __��.___.___ _ __ _._ __. �_------ -_4... _._._ , Project Title: Wise Heating Project Date: Wednesday, September 09, 2015 Client Name: Gronholz Residence ��,_ _f18ts _ . _ .__ _ _.. __ _ _ _ _ _ � ._."__ ___ _— -- . _..' �. ._ _.._._.�.�_.r ., ;.�:. ..�. _ ____ _: _.�..�_�_ _ _r_ __._._, _ '__, Reference City: Minneapolis, Minnesota Building Orientation: Front door faces East Daily Temperature Range: Medium Latitude: 44 Degrees Elevation: 834 ft. Attitude Factor: 0.970 Eievation Sensible Adj. Factor: 1.000 Elevation Total Adj. Factor: 1.000 Elevation Heating Adj. Factor: 1.000 Elevation Heating Adj. Factor: 1.000 Outdoor Outdoor Outdoor Indoor Indoor Grains Drv Bulb Wet Bulb Rel.Hum Rel.Hum QN Bulb Difference Winter: -f4 -12.38 100% n/a 70 n/a Summer: 92 73 4i% 50% 75 29 - - -- - - - -- �Ei�18C�E -IJf�S . ,- _. ..: _ _ _ _ ___.__ _-- - -� _ _._. _ _ .S : ._�_ __ _ _ __.., ____._ _._..�._�„.�:._.. _ :�_.� _. _ , ___ _�.`...___. ._ .____ .�_...--.--__._ . .— - _ ,__ .. _... .-� . __� �� _� Total Building Supply CFM: 3,389 CFM Per Square ft.: 0.332 " Square ft. of Room Area: 10,198 Square ft. Per Ton: t,394 " Volume (ft3) of Cond. Space: (htg.) 102,382 * Based on area of rooms being heated or cooled(whichever govems system) rather than entire floor area. "` Based on area of rooms being cooled. _ .. t __. _ _ ._._ ' Buildir�E.oacts _-- __ __ ___�._ .. _ l �_�� _ ._._.____ . .__._._.__. _.._......� ..�..,_��___. _ ._ _ __ .�.__ ._�_�_.____ . -. --.. ---..__ ,_ µ__ __ :�`�..� .'�:. W. _. . � Total Heating Required Including Ventilation Air: 182,581 Btuh 182.581 MBH Tatal Sensible Gain: 55,561 Btuh 86 % Totat Latent Gain: 9,079 Btuh 14 % : Total Cooling Required Including Ventilation Air: 64,640 Btuh 5.39 Tons(Based On Sensible+Latent) . -�.... __ _ . ., , _ ,4 . �.._ _ , . .. _. _.... , i N� ..:,..:_.�___._.4., _.. . _ t ._.� _ _ .__'��� � � : _ .. . �.__ _ _.. .. _�_. _.. .:.. '. . _ �: .I Rhvac is an ACCA approved Manual J and Manual D computerLLprogram. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets bath sensibte and latent loads according to the manufacturer's performance data at your design conditions. C:\....�Wise Heating Gronholz Res.rhv Wednesday, September 09,20i5, i0:32 AM � ' �Rhv�c-Residential&LigM Commercial HVAC Loads Elite Software Qe�hfC.` ,Auer Steel(New Hope} � yy��g�( � ,Plymouth,MN 55441 . ___ _ _ _p�3� Miseeltaneous Report _ _ _ _ _ �Systern 1 House Outdoor �utdoor �utdoor Incfoor lndoor Q�� .lnput Data_ _ __ Dry_Bulb__ LL.___V1tet Bulb._,__, Re1.Ham __:� ReF.Hum C3r�Butb �_ �i��� VNinter: __ __ ---- - -14 -12.38 1b0% � n/a � 70 n/a Summer: 92 73 41% 50% 75 28.67 _.._ _�... _._,_. . _. . _ _. _ __�_ _ ._.� .. . ., _ _ __ Sy�t 2 Gac� Qutdoor Q�ppr � O�tdoor I�door ._ ��_Indao�.� .�� Gr�ir�s i tn��'�a#a ,_ . _ ..� Dcy_BuW- - W et�Buib _ �Re(.Hum _ ReF.Hum_ [�r Bu1b; _� ,E3ifFe��n�e� Winter: -14 -12.38 100% Na � 60 n/a Summer: 92 73 41% 50% 75 28.67 �y���t Ct,�trt Qutdoor Qutdoor : Outdoor fndoor I�door : �C,�r��ts' ���_....w______ _ _ �__ Q�Bull� �; VI�e��Bulb � �Rel.Ffum .___ �Ret:Fiu��� Dry�utti "Differ'��`��`e ��� Winter: -14 -12.38 100°/a n/a 70 n/a Summer: 92 73 41% 50% 75 28.67 Duct�{nP��_ _ ,.__�.___, . . ..- .. ., _ �� ...�_ �. -__. . _ .. .. , � _ . _3 Main Trunk Runouts y ���-� � � i ���_ .� Calculate: Yes Yes Use Schedule: Yes Yes Roughness Factor: 0.00300 0.01000 Pressure Drop: 0.1000 in.wg./100 ft. 0.1000 in.wg./100 ft. Minimum Velocity_ 650 ft./min 450 ft./min Maximum Vefocity: 900 ft./min 750 ft./min Minimum Height: 0 in. 0 in. Maximum Height: 0 in. 0 in. Outside Air Data _. � __._,_.,.___-__ �._ _:+_,_ � . __.. .�..� ._v___ _ _ �._ __:.�.__ _�_�_�._._.��___._____ _.�;_.� Winter Summer Infiltration Specified: 0.611 AC/hr 0.290 AC/hr 779 CFM 253 CFM tnfiltration Actual: 0.611 AC/hr 0.290 AC/hr Above Grade Volume: X 76,394 Cu.ft. X 52.280 Cu.ft. 46,714 Cu.ft.lhr 15,161 Cu.ft./hr X 0.0167 X O.Q167 Total Building Infiltration: 779 CFM 253 CFM Total Building Ventitation: 185 CFM 185 CFM ---System 1--- Infiltration &Ventilation Sensible Gain Multiplier: 18.14 = (1.10 X 0.970 X 17.00 Summer Temp. Difference) Infiltration &Ventilation Latent Gain Multiplier: 18.92 = (0.68 X 0.970 X 28.67 Grains Difference) Infiltration &Ventitation Sensible Loss Multiplier: 89.65 = (1.10 X 0.970 X 84.00 Winter Temp. Difference) Winter(ntiftration Specified: 0.560 AC/hr(488 CFM), Construction: Semi-Loose Summer Infiltration Specified: 0.290 AC/hr(253 CFM), Construction: Semi-Loose ---System 2--- Infiltration &Ventilation Sensible Gain Multiplier: 18.14 = (1.10 X 0.970 X 17.00 Summer Temp. Difference) Infiltration &Ventilation Latent Gain Multiplier: f 8.92 = (0.68 X 0.970 X 28.67 Grains Difference) tnfiltration &Ventilation Sensible Loss Multiplier: 78.98 = (1.10 X 0.970 X 74.00 Winter Temp. Difference) Winter Infiltration Specified: 0.940 AC/hr(211 CFM), Construction: �oase Summer Infiltration Specified: 0.000 AC/hr(0 CFM), Construction: Loose ---System 3--- Infiltration &Ventilation Sensible Gain Multiplier: t8.14 = (1_10 X 0.970 X 17.00 Summer Temp. Difference) Infiltration &Ventilation Latent Gain Multiplier: 18.92 = (0.68 X 0.970 X 28.67 Grains Difference) Infiltration &Ventilation Sensible Loss Multiplier: 89.65 = (1.10 X 0.970 X 84.00 Winter Temp. Difference) Winter Infiltration Specified: 0.450 AC/hr(80 CFM), Construction: Average Summer Infiltration Specified: 0.000 AC/hr(0 CFM), Construction: Average C:\...\W�se Heating GronhoSz Res.rhv Wednesday, September 09,243i5, ti4:32 A'�9� Rhvac-F'�esidential&Light Commerclal HYAC Loads E��gp��qay��,�,; Auer Steel(New Hope) � y��}{eS��# P�,MN 55441 p�e 4; _ _ _ _ , Load Preview Report : __ � Z ` _ � �. Sysf . SYS'. _Sys Net; ft. i ; S�; Lat; Net Sen; Ht � CI f Act� �ct Scope � Ton� /Ton` Area; Gain; Gain! Gain loss� 9 9� � Size __. _ .__ . ___..._ � � ; f ' i V CFM� CFM• GF4A _ _.__ _ ._. � � _____ . __.. ..__..__.,__ ._ _ ._ __ ._. ,. ____�.._____....__..�.__�._�._._._ .._ _.._---_ -------. _ ____._ B���n9 5.39 1,394 10,199 55,561 9,079 64,640 182,581 2,355 2,540 3,388 System 1 5.39 1,394 7,510 55,561 9,079 64,640 119,167 1,506 2,540 2,540 22x22 Ventilation 1,343 3,500 4,842 6,634 Zone 1 7,510 54,219 5,579 59,798 112,533 1,506 2,540 2,540 22x22 1-Basement 2,320 11,571 724 12,295 25,797 345 542 542 5--6 2-Main Floor 2,350 24,756 2,598 27,354 39,116 524 1,160 1,160 11--6 3-UpperLevel 2,000 12,562 1,360 13,922 27,886 373 58.9 589 5--6 4Bonus Room/Playroom 840 5,330 897 6,227 19,734 264 250 250 2--7 System 2 0.00 6 1,344 0 0 0 34,654 464 0 464 8x12 Zone 1 t,344 0 0 0 34,654 464 0 464 Bxt2 rGarage 1,344 0 0 0 34,654 464 0 464 4-6 System 3 O.QO 0 1,344 0 0 0 28,760 385 0 385 8x10 Z�e � t,344 0 0 0 28,760 385 0 385 8x10 &Sport Court f,344 0 0 0 28,760 385 0 385 3--7 C:\�...\Wise Heating Gsonholz Res.rhv Wednesday, September OS,20�5, �4:32 A4J1 f#hv�eC-Re�Mlst 8 LigM Contmarcial HVAC Loads Elite SMtware Development,tnc. ; �3te�t{New Hope) . Wise Heatir�g; Ptymouth.MN 55441 Page 6' System 1 - House - Adequate Exposure Diversity Test Test For Adequate Exposure Diversity 80,000 _-�.. so,o�o j 52.7% Diff.fram Avg. (6,721 Btuh Excursion) � m � 40,000 .� C7 � c� a� _ 20,t}00 0 8 am 9 am 10 am 11 am 12 pm 1 pm 2 pm 3 pm 4 pm 5 pm 6 pm 7 pm Average Glass 1.3 x Average / Hourly Glass Gain / Houriy Total Net Sensible Gain Glass Gain Gain Over 12 Hours __ _ _ _ . _ . _ __ AED Calcuiation Sumnia�Y�_:___ --- SYSTEM DOES NOT HAVE ADEG�UATE EXPOSURE DIVERSITY. --- System is on N, E, S, W rosette. Peak load exceeds 12-hour average load by 52.7%. AED Excursion (amount by which peak exceeds 1.3 x average): 6,721 Btuh Definition: A system has adequate exposure diversity if the peak-hour glass load for the entire conditioned space does not exceed the average glass load for the entire conditioned space by more than 30 percent. (System Concept Warning for excursion equal to or exceeding 1.5 x baseline)This application has glass areas that produced large heat gains for part of the day. Variable air volume devices are required to overcome large spikes in solar gain for one o�more rooms. Install a zoned system or provide zone control (individual, motorized,thermostatically controlled dampers)for problem rooms. Single speed equipment may not be suitable for the application. C:\...\Wise Heating Gronholz Res.rhv Wednesday,September 09,2015, i0:32 A41l91 ----- ;Rhvac-fiesidentiai&Light Commerclat HVAC Loada ��e g�� Auer Steef(New Hope) � ' ������ Ptymouth.MN 55441 � _ _. _ _ ___ __ _ Page 7 __ System 2 - Garage - Adequate Fxposure Diversity Test Test For Adequate Exposure Diversity , 1 r 1 � � m c .� C'3 � d a� _ 0 0.09�o Diff.from Av . 0 8 am 9 am 10 am 11 am 12 pm 1 pm 2 pm 3 pm 4 pm 5 pm 6 pm 7 pm Average Glass 1.3 x Average / Houriy Glass Gain / Houriy Total Net Sensible Gain Glass Gain Gain Over 12 Hours __.. _ — -- --�. ._ _ .. . . _ _ ._ . 'A�Eri+�ah�ta�on;��mmary_.�. _ __ ::: ..._: _ : --- SYSTEM HAS ADEQUATE EXPOSURE DIVERSITY. --- System is on NE, SE, SW, NW rosette. Peak�oad exceeds 12-hour average load by 0.0%. AED Excursion (amount by which peak exceeds 1.3 x average): 0 Btuh Definition: A system has adequate exposure diversity if the peak-hour glass load for the entire conditioned space does not exceed the average glass load for the entire conditioned space by more than 30 percent. C:�C...\W ise Heating Gsonhotz Ftes.rhv W ednesday, September 09,2415, 14:32 AM Rhv�us-R��4lgtK Co�mnrotcied HVAC Loads . Elite Soitvrare Development,inc.j 'At�S�(New Flope) � Wise Heating� Pymouth,MN r-a5441 _ - ---- - P�e B, ; System 3 - Sport Court - Adequate Exposure Diversify Tesf Test For Adequate Exposure Diversity 1 1 - � � � m c 'c� C7 � 0 a� _ 0 0.0% Diff.from Av . 0 8 am 9 am 10 am 11 am 12 pm 1 pm 2 pm 3 pm 4 pm 5 pm 6 pm 7 pm Average Glass 1.3 x Average / Hourly Glass Gain / Hourty Total Net Sensible Gain Glass Gain Gain Over 12 Hou�s ,.-�-- -- .� _ � .. . _ _. ___ _ _ 14��E�E�rEIC�atiE!'ti 9um1!�ta�t_� ._._._,_ _. . _ , --- SYSTEM HAS ADEQUATE EXPOSURE DIVERSITY. -- System is on NE, SE, SW, NW rosette. Peak load exceeds 12-hour average load by 0.0%. AED Excursion (amount by which peak exceeds 1.3 x average):0 Btuh Definition: A system has adequate exposure diversity if the peak-hour glass load for the entire conditioned space does not exceed the average glass foad for the entire conditioned space by more than 30 percent. C:\...\W ise Heating Gronhotz Res.shv W ednesday, Septembes OS,20�5, i 0:32 A4�A �w���� • Mv• . Y s"tiac�3'DI�^" .,.w:'��1t.•Ky;�s;- 6 at' , • �'". 'e 11 p� :"',;,�`�- � _�.. �.. �y�' r',�' '����Y,n��.'^,: � �� _ � r� � � _ '����� I ry I� • %�' � � p� 1 r > � . � , ets. / � � / / Contractor/Homeowner Divine Custom Homes HCC Job# 15231 Job Address 9831 WhisUing Valley Road Change Order No. One Lake Eimo,MN _ Basis of Change Order j__J Error/Omission ;_J Differing Condition � Builder Request ❑ Fieid Resolution U Structura� Ll Other Change Order Amourrt $5,296.00 Description of work required Convert front and side wall of garage from 9'high x 10"thick to 10'high 10"thick$1046.00 Engineering for new door placement and added window$960.� ,� Labor to reform door opening includes cutting existing rebar and adding new rebar(incorrect location on plan)$1360.00 Labor to reform for window opening includes cutting existing rebar(omittied on plan)$1120.00�( Add window opening includes green treated lumber for window opening$250.00 � Added structural I-beam for new window opening$560 00 ,t This�tia��t�d�fa��d'.�i�pl�a�a�Sfa�p��a�l.di�Gt�iri�tet�� l�t!�n9-ii�a��d.�14r�i1'; s�ttensionsfioit�et�e:#brtbritt�£�1�6on;inr��desc�be�d t��yig�sm�he�loope;�ftla�Vtl+�rk: I hereby.auiHortze H�tsreracar���c�ete fo�mpte�e N�"jOb as'sp�ed�r-the oF�l�a1�o►iVaL��d�to,ri3�tce ofiarages�risted�ove.; Con or Axep nce Owner Accepta�ce � � S� Signatu �a Signature Date HCC Representative Acceptanc� Signature Date . ' • � 1 � ol�,��..-�- � N F���-_ �Q2� �S" � � `1�L-- ��t w�� - . 3 7�-� �' 3$ fi �t- 2 d,2 �' �� -,f 2� �- �O � 219 + �S't' ?,� � l'1,? �t-.Z + I��'7 � 3 �- �,�� iz �- � g + 2n = 3�� �c�r�n� w � � w�-�r �� � �.�-��r � '� ' (� ��.���z-� � � �,`? -�-t?.'`j + 2 + 13 �''�? �. 3 -N"Z ,'i -+� t Z +- 1Q,�,}-2D �- 3``7 +� � -�' �� +��`�"rv = �� � � � � � � � v 3�t �� � � .� � �� 5 � i � `���P-Pc� W�� ��v�— �v ��2(��q — C� /'�/�� � . °' � o� /L1 �s �-c�s 7-� / C�' � � (9 ' -L��os� c�c�-- �- ��� � �s� .� � S ✓ f�w�� �NL i� ' � � A \ l ,i � - /� . � - �� �� ���. � � � / � �� � � / � , �� � '' ` _ \ \ � , � � � / / ,-= � % - - - _ _ > ��\ , , ` — _ J � � / \, 1 ��� ` / � 1 �� � �' ��� / � `� � � � 1 %' �' � '/ �� / � � /�- / /�� // �/�� / � �— -- \\ \ ,�= - - - - % �� , � � � �%�� ��FF i ,� � � �� � ,d� / � 'S 89°37'�5" W 52��07 �' �� �`� � � � ,��— � -- ���-- - ---�-- --- -� - -- - � �---- --- �------ � ,L- ---- - -- ---�---- — /// l — j -- � ---- � �— �- ---�— � � '�� � ,,�� � � �� // % � \ � io°/ ,%� � � . ; � , �d�`� . �,�'� � � —�- --�-- - -- 1 -- - - �- � � , , - � � f / � �. (� � � � � � s��� \ � ; � �� � / �� ` :/ �� t� `� � , , �/; � „ �, �� o-, � ,� , � � i � � � i � � ' 2°° o � �� / �/ �� � N TW=1017.0 / / / // � -� � BW=1015.0 / e � � // / �� ' \ o� � BW=1012.2 // � � � � � o m a. /� � , � - —G w � � -1 � � � N �� / � � O � � � � G o � n i � � � � � � �m N � � i � � ,A� � �ao � I I � � 1g 41 + � � �W:1015 2 TW=1016.0 �,� �� ���bo� �'' �. ��W;�p12 � , y�. BW=1012.1 / a � J � `, h / V�. �� �p. � I o � ��� � � � � O�� � ����.�--' � \ \\\ \�\ � a800 �Q��J P�� � �. � . �/— -- -- ,� � � �ROPO� \ � � � �_ 280 --a 480�GrUBI � � �� /��� — �� �\ � "" "\ � (1� � � � — - __ ,� _ — \ • \ � � � f�-8�6 � T �� � � � iC � -� � � � �x � � � 'Q��\ / \ \ ` ` S / /' \ \ / \ \ � � � � � � \ .� � _ /-- -� ��� // � \ X \ \ � � �� \ '� \ �96' // / �� � \ � � � �i� �� �� V �� � � / �',� i Christine Mattson From: Jeremy Barnhart Sent: Friday,June 03, 201610:14 AM To: Christine Mattson Subject: FW: 1070 Hunter Drive Jeremy Barnhart,AICP Community Development Director Direct 952.249.4626 Planning &Zoning Office 952.249.4620 2750 Kelley Parkway, Orono, MN 55356 Website: www.ci.orono.mn.us From:Jeremy Barnhart Sent: Friday,June 03, 2016 9:38 AM To:'Scott.Gronholz@wellsfargo.com'<Scott.Gronholz@wellsfargo.com> Cc: Denny Walsh<dwalsh2@ci.orono.mn.us>; 'jeff@divinecustomhome.com'<jeff@divinecustomhome.com>; Roger Peitso<rpeitso@ci.orono.mn.us> Subject: 1070 Hunter Drive Mr.Gronholz, My name is leremy Barnhart, and I oversee the plan review and building permitting processes. I appreciate you taking the time to share your frustration with us,and your suggestions to improving our processes. Our goal,with every building permit, is to issue the permit as rapidly as possible,without sacrificing the thoroughness of our review. This review is a service to ensure that your project is consistent with applicable zoning and building codes and to avoid costly alterations in the field. For instance, our engineer recently noted your landscape plan,the retaining wall site plan,and the grading plan do not match. The grading plan depicts two long retaining walls. The landscape plan depicts two short walls. The Site plan from Civil Design depicts one long wall and two short walls. All three plans should reflect the same retaining walls. This discrepancy leads to confusion in the field, may require alterations of the grade, and could require you to purchase too much, or not enough materials. Please address in revised drawings. Regarding the retaining walls,the choice to install one is yours alone, however, if one is to be installed over 4 feet in height, it requires engineering. This is for your protection and a requirement of the state building code. The rain garden on your property resulted from the platting process,finalized in October after your builder submitted the building permit application in September. I trust the developer informed you of the requirement. The building plans are being reviewed by the building official,the city engineer has reviewed your plans and provided the comments above. The review of the rain garden has been completed,and the following comments will be included in the final permit: 1. The rain garden has been adequately sized to maintain proposed peak runoff rates below existing conditions and retain a volume on site equal to 1"over the new impervious surfaces. 2. The rain garden should not be constructed until the upstream areas have been permanently stabilized. 3. The installation of the rain garden should be inspected by the City to ensure it is constructed as proposed. � 4. A record survey of the rain garden should be provided after it is completed to ensure adequate volume is provided to meet requirements. Again, I appreciate your comments on our building review process,and please know we are working toward getting you your permit as expediently as possible,once we have received the revised drawings. If you have any questions, please do not hesitate to contact me directly. leremy Barnhart,AICP Community Development Director Direct 952.249.4626 Planning &Zoning Office 952.249.4620 2750 Kelley Parkway, Orono, MN 55356 Website: www.ci.orono.mn.us 2 Christine Mattson From: Christine Mattson Sent: Thursday,June 02, 2016 8:34 AM To: 'Jeff Welle' Cc: Scott.Gronholz@wellsfargo.com;Jeff@DivineCustomHome.com; Roger Peitso; Mike Gaffron Subject: RE: 1070 Hunter Drive Attachments: timeline.pdf; 5-5-16 email.pdf; 5-12-16 email.pdf; 5-17-16 email.pdf; 6-1-16 email.pdf; Mooney Lake Dev Agreement.pdf 1eff, We received the engineering for the retaining walls,thank you. Hearing your concerns regarding the timeliness of our review, attached is a timeline of the application submittal for 1070 Hunter Drive. While the City has had the application for several months, it was only recently considered "complete" and was able to be sent onto the building official and engineer for their respective reviews. Our policy is the building plans and survey are not reviewed until all planning and zoning requirements have been met, i.e.verification of number of stories, building height,setbacks,etc. An updated survey was received dated 5-13-2016. An email was sent to Mark Gronberg with comments. According to Mark's May 17th email, he is preparing a SWPPP and preparing an application for a NPDES permit(email attached). We will need both of those items before the permit will be issued. We strive to complete reviews in a timely manner, however, incomplete applications hamper this goal. We currently are processing a significant number of applications. I anticipate the building official and engineer to review the application by June 9, 2016. Any questions or concerns they have will be communicated with you. We hope to have the application ready to be issued by June 20th, however,this is dependent upon any questions or concerns the building official and/or engineer may have and the timing of your response. Please be aware, per page 14, Item S of the Mooney Lake Development Contract(copy attached) a certificate of occupancy will not be issued until the rain garden has been installed, inspected, approved by the City Engineer and an easement has been granted to the City for the rain garden. See Exhibit B of the Development Contract and the form entitled Grant of Permanent Flowage and Conservation Easement and Restrictive Covenant. A Temporary Certificate of Occupancy(TCO)can be issued due to winter or weather conditions which prohibit the completion of final grading and exterior improvements. A TCO requires a $10,000 escrow which is held until all exterior improvements are completed,vegetation has been established and an as-built survey has been submitted and approved. Please don't hesitate to contact us if you have any questions. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway I Orono I MN ' S5356(physical addressJ PO Box 66 � Crystal Bay I MN � 55323-0066(mailing addressJ "a" 952.249.4620 I 8 952.249.4616 1 �cmattson@ci.orono.mn.us � � www.ci.orono.mn.us Summer Office Hours: (Monday, May23 through Friday,September2,2016) Monday-Thursday: 7:30 am to 5 pm Friday: 7:30 am to 11:30 am OUR OFFICE WILL BE CLOSED: Monday,July 4,2016 From:Jeff Welle [mailto:JeffWelle@DivineCustomHome.com] Sent: Friday, May 27,2016 2:54 PM To:Christine Mattson<CMattson@ci.orono.mn.us>; Roger Peitso<rpeitso@ci.orono.mn.us> Cc:Scott.Gronholz@wellsfargo.com;Jeff@DivineCustomHome.com Subject: 1070 Hunter Drive Chris, Thanks for taking the time to meet with me yesterday. Sorry to be a pest, but we are just trying to put a timeline together for our home owners along with our subcontractors regarding a start date for this project. The permit process for this home really started back in Nov 2015 so everyones patience is starting to run out. I spoke with Roger yesterday afternoon and found out the permit package didn't get to his desk until Wed of this week which is weeks after our application was submitted. My new understanding is that the permit packet goes from one department to the next in a certain order. Is this correct? If this is the case I understand that the process is what it is and do not expect it to change for us. However, I am wondering if there is any reason why each department couldn't at least take a look at the permit packet and let me know if there is anything missing and or more information that is going to be needed so that�we can make sure you have everything when the time comes. Obviously we are anxious to get this project underway and we have home owners that have been very patient. With that said,we feel like we all deserve to know a timeline other than "we'll get to it when we get to it". We are more than happy to provide whatever information is needed but are asking for the city of Orono to let us know ahead of time. As far as I know we still need to turn in the following information; • Retaining wall engineering(hoping to have this for you on tues 5/31) Please let us know if there is any more information that you need from us. Thanks Jeff Welle Ce11952-449-1177 • ��„�,., z Timeline— 1070 Hunter Drive(Saved in 1070 Hunter Street file in Data drive) September 10, 2015 - Initial application and plans dropped off at City Hall. Applicant was advised that the plat had not been finalized and that the application was premature. He was advised to not submit application at this time since City would not review it until platting process was complete. Applicant chose to leave the application with City including checks and other documents. October 30, 2015 —Plat was recorded with Hennepin County, allowing City to begin building permit review. November 18, 2015—City letter to builder Kenton Hove advising of a variety of issues that needed to be resolved in order for permit to be issued. Winter 2015-2016—No contact with applicant. March 31, 2016—Received from Mark Gronberg revised surveys indicating that the grading plan for the walkout area had been substantially revised. April 1 l, 2016—Received revised application, new plans, etc. from builder Jeff Warren to go with surveys received earlier. May 5, 2016—Staff conversed with Mark Gronberg via email to advise that building height was still an issue, offering possible remedies to the height issue, and noting that we needed rain garden calculations and specifications. (See email conversation) May 12, 2016—Staff conversed with Scott Gronholz via email, noting that we had yet to receive any new information from Gronberg.(see email) May 13, 2016—Received updated information from Gronberg. May 17, 2016—Emailed Gronberg with additional issue resulting from revised grading plan and initial review by City Engineer, noting that disturbed area calcs are needed—if exceeding 1.0 acre, requires SWPPP and NPDES permit, and since newly-proposed retaining walls exceed 4 feet in height,will need engineered wall design. Gronberg will followup. MPG advised Gronholz we would try to have permit ready to issue "middle of next week". (see emails) June 1, 2016—Email from City Consulting Engineer Bob Bean confirming that rain garden calculations and design are acceptable, and including construction details to be adhered to. (see email) � Mike Gaffron From: Mark Gronberg <markg@gronbergassoc.com> Sent: Thursday, May 05, 2016 2:38 PM To: Mike Gaffron Subject: Re: 1970 Hunter Drive I have to run it by the owner but yes,the would do a plan that works now and hope to amend the retaining walls later. Sent from my iPhone On May 5, 2016,at 2:07 PM, Mike Gaffron<MGaffron@ci.orono.mn.us>wrote: I assume you intend to lower the house,which means more than 500 cy excavation to create the walkout level. We would have to see a plan that works within the 500 cy limit now(or close to it)with the idea that maybe retaining walls later on could be removed and an excavated area widened to work without them. We would need to see a plan in order to make a final determination on this. Michael P.Gaffron Senior Planner City of Orono (Street Address)2750 Kelley Parkway (Mailing Address)P.O.Box 66,Crystal Bay,MN 55323 Phone:(952)249-4622 Fax: (952)249-4616 From: Mark[mailto:mark�@�ronber�assoc.com] Sent:Thursday, May 05, 2016 1:51 PM To: Mike Gaffron<MGaffron@ci.orono.mn.us> Subject: RE: 1970 Hunter Drive Thanks for the information. If it can be worked out now,would there be a possibility of asking for some additional excavation in the future in the back yard? From: Mike Gaffron fmailto:MGaffron@ci.orono.mn.us] Sent:Thursday, May 05, 2016 1:31 PM To: 'Mark'<mark�@�ronber�assoc.com> Subject: RE: 1970 Hunter Drive Mark— You are using an old Building Height info sheet. See attached 2014 sheet. For a gable or hipped roof that has no windows within the roof svstem,you subtract half the distance between the highest point of the roof system to the lowest point of the gable. You can't take into account windows that are below the roof system. So I agree with the 8.5' subtraction the architect used on his building plans, rather than your 9.3'. The 1019.4'existing spot elevation at the perimeter of the proposed house needs to be shown on the survey.That likely helps them out. 1 Do not even think about revising the grading plan for the site.This lot had no grading, and there is no apparent justification at this late date to suggest a grading plan amendment. You can only take advantage of the extra 1 foot of fill in determining whether a basement is a story or not, but not in determining the defined height. See the attached definitions sheet. Mike Michael P.Gaffron Senior Planner City of Orono (Street Address)2750 Kelley Parkway (Mailing Address)P.O.Box 66,Crystal Bay,MN 55323 Phone:(952)249-4622 Fax: (952)249-4616 From: Mark [mailto:mark�@�ronber�assoc.comJ Sent:Thursday, May 05, 2016 11:25 AM To: Mike Gaffron<MGaffron@ci.orono.mn.us> Subject: RE: 1970 Hunter Drive Mike:The existing grade goes up from the 1018 contour to 1019.4 at the proposed house. Attached is what I came up with for height based on the current house plans. If they can raise the grade 1 foot which they are allowed can they lower the house 1 foot and be in compliance? They would then have to bring the retaining wall in a little tighter to stay under the 500 CY of excavation.Would that work?Or could we have George revise the grading plan for a couple of feet?The problem is they don't want to have the back of the house face County Road 6. From: Mike Gaffron fmailto:MGaffron@ci.orono.mn.us] Sent:Thursday, May 05, 2016 9:16 AM To: 'Mark'<mark�@�ronber�assoc.com> Subject: 1970 Hunter Drive Mark— I hope to get a letter out today on this, but here's the main issue: Our review confirms that the lowest level of the proposed house is a basement by definition, but the defined building height exceeds the 30- foot maximum. The building plans show the upper dormer with window has been removed,which we advised was necessary. However,the defined height is required to be measured based on the existing grade where it abuts the house, not the proposed grade that was used by the architect/designer on building plans(see attached two sketches). The survey suggests that the highest existing grade at any point on the house perimeter is at or near elevation 1018'. The lower measuring point used in the height depiction on the plans was approximately 1.5' below the main floor elevation,or about 1022', which is the proposed grade. Based on the 1018'correct measuring point,the building's defined height is approximately 34',exceeding the 30' limit. The building plans(and potentially the survey)will have to be revised so the house meets the 30' maximum. There may be a variety of ways to accomplish this, perhaps a combination of reducing the roof pitches, lowering ceiling heights, reducing joist depths, and lowering the house further into the ground (which impacts the amount of cut and retaining walls). 2 Christine Mattson From: Christine Mattson Sent: Thursday,June 09, 2016 11:23 AM To: JeffWelle@DivineCustomHome.com;Jeff@DivineCustomHome.com; 'Scott.Gronholz@wellsfargo.com' Cc: 'Mark Gronberg'; Roger Peitso; Mike Gaffron;Jeremy Barnhart Subject: 1070 Hunter Drive Hello, Updated surveys and engineering for the retaining walls were dropped off yesterday,lune 8, 2016,thank you. The survey received yesterday is dated 5-9-16 however, it is not signed. When comparing the recently received survey, we noted the previously submitted survey is also dated 5-9-16, however the sunreys do not match. • Rain garden is missing annotations and the weir is no longer shown. Grading around the proposed rain garden is different. Has the design changed since the last review? Please clarify. • Proposed earth excavation annotations are missing. . Please have the surveyor submit two, signed copies of the survey for our review. Thank you! Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway I Orono I MN � 55356(physical address) PO Box 66 � Crystal Bay � MN I 55323-0066 (mailing addressJ '� 952.249.4620 I 8 952.249.4616 � cmattson@ci.orono.mn.us , � www.ci.orono.mn.us Summer Office Hours: (Monday, May 23 through Friday,September 2,2016) Monday-Thursday: 7:30 am to 5 pm Friday: 7:30 am to 11:30 am OUR OFFICE WILL BE CLOSED: Monday,July 4, 2016 1 Mike Gaffron From: Scott.Gronholz@wellsfargo.com Sent: Thursday, May 12, 2016 12:09 PM To: Mike Gaffron Subject: RE: 1070 Hunter Drive-Building Permit Mike, Mark will be bringing over the new drawings and rain garden calculations tomorrow morning. I hope that you have some time to review tomorrow so the Building Official is able to review on Monday.We will push back our start date a day or two. Scott From: Mike Gaffron [mailto:MGaffron@ci.orono.mn.us] Sent:Thursday, May 12, 2016 10:28 AM To: Gronholz, Scott Subject: RE: 1070 Hunter Drive - Building Permit Scott— I have received nothing from Mark regarding your permit application. Also our Building Official has not begun the plan review and he is out today and tomorrow. We will not be able to issue a permit until I receive the information from Mark, nor until we have had a chance to review it and review the building plans. You should not expect to be able to start Monday. Mike Michael P.Gaffron Senior Planner City of Orono (Street Address)2750 Kelley Parkway (Mailing Address)P.O.Box 66,Crystal Bay,MN 55323 Phone:(952)249-4622 Fax: (952)249-4616 From:Scott.Gronholz@wellsfar�o.com [mailto:Scott.Gronholz@wellsfar�o.com] Sent:Thursday, May 12,2016 9:25 AM To: Mike Gaffron<MGaffron@ci.orono.mn.us> Subject: 1070 Hunter Drive- Building Permit Hi Mike, Thought I'd save a trip to City Hall and dragging you away from your work, but I wanted to make sure Mark Gronberg delivered the revised drawings yesterday and see where we are in the permit process. Hopefully you have everything you need to process the permit. Please let me know if you have any other concerns.As you know we have grading scheduled for Monday and hope to be able to stick with that schedule. Best, Scott Gronholz � Mike Gaffron From: Mark<markg@gronbergassoc.com> Sent: Tuesday, May 17, 2016 5:02 PM To: Mike Gaffron Cc: Adam Edwards; Scott.Gronholz@wellsfargo.com Subject: RE: 1070 Hunter Drive I get 1.1 acres of disturbance not including the septic area that will also need to be disturbed. I will prepare the SWPPP plan and get the application ready for a NPDES permit. In talking with the builder he has someone working on the engineering for the retaining walls. From: Mike Gaffron [mailto:MGaffron@ci.orono.mn.us] Sent:Tuesday, May 17, 2016 1:36 PM To: 'Mark'<markg@gronbergassoc.com> Cc:Adam Edwards<aedwards@ci.orono.mn.us>; 'Scott.Gronholz@wellsfargo.com'<Scott.Gronholz@wellsfargo.com> Subject: 1070 Hunter Drive Mark— We have received the rain garden calculations and revised survey for 1070 Hunter Drive. I have reviewed the revised floor elevations and find that the confirmed highest existing adjacent grade of 1019.4' and lowering of the house by approximately 2.5 feet have resulted in defined height being just under 30'which conforms to the code. Accordingly I have approved the zoning review. However, in reviewing the site plan there are two grading issues that need additional information before we can issue the permit: 1) We will need engineering on the retaining walls that exceed 4 feet in height. 2) We need a calculation on the square footage of ground to be disturbed, as it appears to be close to an acre and may require an NPDES permit. Please provide the required information as soon as possible. Call me or Adam if you have any questions. Mike Michael P.Gaffron Senior Planner City of Orono (Street Address)2750 Kelley Parkway (Mailing Address)P.O.Box 66,Crystal Bay,MN 55323 Phone:(952)249-4622 Fax: (952)249-4616 1 Mike GafFron From: Robert Bean <bobbe@bolton-menk.com> Sent: Wednesday, June 01, 2016 8:57 AM To: Mike Gaffron Cc: David P. Martini; Adam Edwards; 'Scott.Gronholz@wellsfargo.com' Subject: RE: 1070 Hunter Drive-Rain Garden Calcs Mike, I have completed review of the information submitted. Following are my comments for your consideration: 1. The rain garden has been adequately sized to maintain proposed peak runoff rates below existing conditions and retain a volume on site equal to 1" over the new impervious surfaces. 2. The rain garden should not be constructed until the upstream areas have been permanently stabilized. 3. The installation of the rain garden should be inspected by the City to ensure it is constructed as proposed. 4. A record survey of the rain garden should be provided after it is completed to ensure adequate volume is provided to meet requirements. If you have any questions or comments, please contact me to discuss. Thanks, Robert E.Bean,Jr,P.E. LEED Green Assoc. Bolton & Menk, Inc. P:(952)448-8838,ext 2892 F:(952)448-8805 email: bobbe@bolton-menk.com From: Mike Gaffron [mailto:MGaffron@ci.orono.mn.us] Sent:Tuesday, May 17, 2016 1:27 PM To: Robert Bean<bobbe@bolton-menk.com> Cc: David Martini<davidma@bolton-menk.com>;Adam Edwards<aedwards@ci.orono.mn.us>; 'Scott.Gronholz@wellsfargo.com'<Scott.Gronholz@wellsfargo.com> Subject: 1070 Hunter Drive- Rain Garden Calcs Bob— Attached are rain garden design and calculations for Mooney Lake Preserve Lot 3, Block 2 (1070 Hunter Drive). Please review them and advise whether there are any issues. We hope to issue a building permit for this property next week. Mikes Michael P.Gaffron Senior Planner City of Orono (Street Address)2750 Kelley Parkway (Mailing Address)P.O.Box 66,Crystal Bay,MN 55323 Phone:(952)249-4622 Fax: (952)249-4616 i Christine Mattson From: Adam Edwards Sent: Wednesday,June 01, 2016 4:00 PM To: Christine Mattson Cc: Mike Gaffron Subject: RE: 1070 Hunter Drive/#2016-00589 Chris, I've reviewed the grading plan with respect to Retaining walls and offer the following comments: 1. The land scape plan,the retaining wall site plan and the grading plan do not match. The grading plan depicts two long retaining walls. The landscape plan depicts two short walls. The Site plan from Civil Design depicts 1 long wall and 2 short walls. All three plans should reflect the same retaining walls. Please also note that Bob Bean completed a review of the raingarden and provided that input back to Mike. Copied below. Mike, 1 have completed review of the information submitted. Following are my comments for your consideration: 1. The rain garden has been adequately sized to maintain proposed peak runoff rates below existing conditions and retain a volume on site equal to 1" over the new impervious surfaces. 2. The rain garden should not be constructed until the upstream areas have been permanently stabilized. 3. The installation of the rain garden should be inspected by the City to ensure it is constructed as proposed. 4. A record survey of the rain garden should be provided after it is completed to ensure adequate volume is provided to meet requirements. If you have any questions or comments, please contact me to discuss. Thanks, Robert E. Bean,Jr,P.E. LEED Green Assoc. Bolton & Menk, Inc. Adam From:Christine Mattson Sent:Tuesday, May 31, 2016 8:36 AM To:Adam Edwards<aedwards@ci.orono.mn.us> Subject: 1070 Hunter Drive/#2016-00589 � Adam, We received a building permit application for a new single family home at 1070 Hunter Drive. Please review and provide comments. Thank you! Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway I Orono I MN 0 55356(physical addressJ PO Box 66 I Crystal Bay � MN I 55323-0066 (mailing addressJ S 952.249.4620 I 8 952.249.4616 �cmattson@ci.orono.mn.us I �] www.ci.orono.mn.us Summer Office Hours: (Monday, May 23 through Friday,September 2,2016) Monday-Thursday: 7:30 am to 5 pm Friday: 7:30 am to 11:30 am OUR OFFICE WILL BE CLOSED: Monday, May 30,2016 2 Christine Mattson From: MPCA.OnIineServices@state.mn.us Sent: Tuesday, May 24, 2016 8:01 AM To: Scott.Gronholz@wellsfargo.com Subject: MPCA Online Construction Stormwater Permit Application Status Follow Up Flag: Follow up Flag Status: Flagged Dear Applicant: On 23-MAY-16,the Minnesota Pollution Control Agency(MPCA) received your application for construction stormwater permit coverage for Project Name: Divine Custom Homes Project Location:Orono MN 55391 Owner: Scott Gronholz Contractor: Divine Custom Homes Permit ID number: C00043315 Payment Confirmation Number for$400 application fee: MNPPCA000025189 The persons identi�ed as the applicant,owner,and contractor are copied on this message. (If the same email address is used for multiple roles,that email address will receive multiple copies of this message.) Based on the information submitted in the application,the project qualifies for the general permit and coverage will start on 31-MAY-16. Tomorrow you can access your notice of coverage letter and coverage card letter. Letter: http://services.pca.state.mn.us/api/v1/wimn/sites/documents/document?documentld=1865750 Card: http://services.pca.state.mn.us/api/v1/wimn/sites/documents/document?documentld=1865749 You were identified as a permittee of this project on the application form.As a permittee,you are responsible for compliance with all terms and conditions of the permit.To view these terms and conditions,see the permit at http://stormwater.pca.state.mn.us/index.php/Construction_stormwater_permit At the end of the project, after the entire area disturbed on the construction site has undergone final stabilization and the maintenance activities required by the permit have been completed,a Notice of Termination Application form must be submitted to the agency to end your liability under the permit.This form is also available at http://www.pca.state.mn.us/index.php/view-document.html?gid=7389 If you have any questions, please visit http://www.pca.state.mn.us/index.php/water/water-types-and- programs/stormwater/construction-stormwater/index.html.You may also email program staff at CSW@state.mn.us or call the Stormwater Hotline at 651-757-2119(800-657-3804, non-metro only). 1 You may be able to reduce your regulatory requirements and save money through prevention activities that minimize waste, emissions,water use, and energy use.Visit MPCA's website at http://www.pca.state.mn.us/pollutionprevention for more information. If you are not a permittee or you are not the person identified on this correspondence, please contact the MPCA e- Service administrator at the email address or phone number listed below so we can correct our information. We look forward to working with you to protect our valuable natural habitat and water resources. Please do not reply to this message. It was sent from a notification-only address. If you have questions about this e- service,email us at onlineservices.pca@state.mn.us or call the MPCA e-service administrator at 651-757-2728 or 1-844- 828-0942,8:00 a.m.to 4:00 p.m.CST, Monday through Friday. 2 . .,,r � ,-�,���TO � Y� �'�'�"�:'� ;�''��' �� �`-�� �.� £�1 � _ _ , _ , _ .. �� , . � . ; �;..� _. �„:� Street Address: Mailing Address: Tefephone{952)249-4600 '�� 1 �'~ ' 2750 Kelley Parkway RO.Box bb Fax (952)249-4616 �SH��� Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us November 18,2015 I4e�� �e-�- �'l,�C'� ���� ( �A►U L1%, 7 l s 7�o o ��-a-�i� Divine Custom Homes 397 Eagle Bluff Court ��..�.� ��„������ Hudson, VVT 54016 � ��, 3 3 (l� (.f� j � _� Re: Building Permit Application, Lot 3,Block 2,Mooney Lake Preserve Dear Mr. Hove: The plat of Mooney Lake Preserve has been approved and filed with Hennepin County, allowing the City of Orono to proceed with review of the building permit appfication you submitted to this office an September 11 for Lot 3, Block 2. Our initial site plan review indicates the following issues that must be resolved in order for the application review to proceed: ' 1. Wetiand Crossing. The proposed driveway crossing of the wetiand and wetland buffer ``"`r`c' cannot be approved, as these areas are protected via City ordinance and the�looney Lake �L�'`^� Preserve development covenants. � r.ic�' 2. Driveway Relocation. Additionally,per City Code,any driveway location that is within 35 feet of the wetland boundary or within 10 feet of the septic system soil treatment area �'�c ss-�-�' ��ot be approved. It would appeaz that the only feasible driveway location will be ` easterly and southerly of the proposed septic areas as depicted on the submitted survey. '` Any driveway proposed in this azea must be desxgned to have no impact on the tree buffer 'J ' "�K� required by the develogment approvals along the southeast border of this property. Alternatively, if it is feasible to shift the septic sites further east,a driveway might be located between the wetland and the septic sites;this will require analysis and approval from youz ISTS Site Evaluator/Designer. � � 3. Eacavation for Walkout—CUP Reqaired. The proposed excavation to create a reaz � ���' waikout configuration is estimated at 5,000-6,000 cubic yards,and requires a Conditional � ,,,� e�,t�S L'se Permit(CLP) because it exceeds the Sd0 cubic yard threshold allowed for the normal , , and customary grading in the area of a ro sed house er Orono Zonin Cade Sections `�� : �c�''���� ' 78_966 thru 78-968. The CLP applicati p ocess typically takes approx mately 60 days �e G�� from the date of submittal of a complete application,and there is no guarantee of > �t�•�'�'t�� aPProval. 4. Potential Wetland Impact. The proposed rear walkout excavation has the potential ta '� have a negative impact on the wetland at the northeast corner of the property, because the �1 '��"- `' wetland is at approximately tlze 1016' elevation and the proposed excavation within 50- �. `:�'� " �`'�� 80 feet of the wetland is as much as 8 feet lower than the wetland elevation. This has the potentiai to result in draining of that wetland which would be prohibited. RECEIVED APR � 1 2016 Q�' CITY OF ORONO . � .� Lot 3,Biock 2,Maoney Lake Preserve november 18,2015 Page 2 5. Building Height. A preliminary review of the building plans indicates a 3rd story window within a gabled dormer on the front roof. This feature is not shown on the proposed r�of rj�U�� ���`"�- plan. The potential issue is that if this is in fact a window,per City Code the buitding �,�v��S ,�� height is measured from the highest elc�isting grade to the midpoint of the roof from the top of that window to the peak. With the window in place,the defined height of the -�-<<'�''l` '^``�' home is approximately 33 feet,exceeding the 30-foot height maximum allowed by City `'`' ' �`d°'� Code. The simple solution is to remove the window in that gabled dormer,or remove the dormer entirely. 6. :Ylinnehaha Creek Watershed District(MCWD). As a mini.mum,you will need an �v,. �,r�c��5 MCWD Erosion Con�,trol Pernut. Your project may trigger other MCWD permitting requirements;please contact the MCWD d'uectly at 952-471-0590 regazding yottr project. Please note,the City of Orono will not issue a building perm.it without a copy of the MCWD Erosion Control Permit or documentation stating the proposed project does not trigger any of their permitting requ.irements. � 7. Landscape Plan. Prior to the issuance of the building permit a landscape plan must be ',������� submitted showing aIl the proposed exterior/landscaping irnprovements, i.e.patios, �`,` P��) o�� grading,sidewalks,retaining walls,etc. The plan should include the name of the 4�y �����5 individual performing the work. The landscape plan shauld match what is shown on the survey. 1� J v� Y�'� 8. ISTS Design. The septic design dated May 28, 2015 is not a complete design. Your ISTS Designer(Rusty Olson)must complete a design based on the proposed house size, �r��� n-�-'^� location and drainfield sites. His final design must be submitted and also shown on the ��,�� ��� survey. �vv vv� �-vs�'l U�S�i✓� Please feel free to contact me at 952-249-4622 or via email at ,� `; � '^, � �i, ::� to discuss the above issues which cunently make it impossible to issue a building permit for this site. Per your voicemail, I am available to meet with you Friday aftemoon this week if that works for you. Sincereiy, CITY OF OROl�TO � Ivlichael P. Gaffron Senior Planner Cc: Christine Mattson, Planniug Assistant Roger Peitso,Building Officiat George Stickney � �� 1 ��Ic,'��`� -� �1 �-c�P�J �f-F ._-.�'�-, �� s ���� � � �G�-�- � �,--� c�.�� � ��,-� �9� - J 1 -1 S �5�rn{�1�' `�"� ���� �� ._ �. �� � j � f � ��L C,% I �b�Y�-f-►�1 I ►�q lJ� ----� i c� i l ��o ���1 � � �`� � � � I� � C�� �- � }---E--,� � 0 4-- � � � ___ ..:...— � � �i�c�� i�'�r� � �s� c� �b�i� — ��`�C r`v�-�--' � 2 ��GC� �� CD �- `� 10 5 2 Z- � � ��� �� � e� � y , �� .�� � �. io�� � -=-��� 11,�� i I�-� � `�_ I�1�- �-�--� � �--�- �a5 ._,,,��. � - `�.■�- i��-'�►�'� .� � l E�� �G-�' � c�cic�l ��5���-�� � � - - � ��� - ��,�, �� ��� � S�S i �� �- � __ ��� ca ---�� -�- (��� ��� U�.T� �� �- � - � � ��� C ��� ��.1.�1'1����� . �J�bY�� c��l � S_S ��� ��C .----_ � -�n-I c���! �r ti�n� + � L�Y� � � �-����ss�S i � ���V � �� � `�S � �1��1� . C � �c-i �10��� 2� � S � � f c�-1�cz � �� 1� �� , ,��� � C�c�- t,� �r l� , . ��� � _ � � � '� I N b � ---------. _--_ a.�:.'^"w"' m � Fn �as�lvd 1 lf � 3 � a � �r�i �� � � a S i I � __ ! �S1� � - ' I=;�,� �y �� - � �---- � - . �,., � s - � �� � �� � � � � � �- � - � � � - -- ._ � _ _ ; � g�i � � ! � a I . .__.._. I N _ _ J fi—�-� � �J3 � � •,,, o t�r� ` g � 1 �� i — I � `, t ^. ,(h � � � I . , "_ _— �. � .. . .�. _K � �� 4 � � ...,, � � � � i '', -- �,� � i � � ' � ; , ; � . ����� - � � , m � , , � s � � , ; �� � � - _ : � � . g � pi _ � � . . . �p2� . . . � . .. �� i . � . .. . � �� � I � ` � I I �a� � � d I I C I � I .. . ......._. _ _... . . .� � y ���� .�b��y'_- . : I a ' ;� r � � I� z�o „�.._=.�..,- i m =�r � _ �. '�9•'�d � � � � 1 j a ��� - � �,e i I i �'I �..� I I � � . I � m 4 � B'ri°I � 3 ����II a . -' .'IbY'£ ____ ;� I ���\ ,� �a '� _ �� � � ; � _ ;� . O - � r� � / _ . � _ . e,� Q , , s.�;., ��� � - -- - --� - � � � ;�� � � . ��� � � � ❑❑ � � � � �� � � � � � � � �� `� I �� �� �� � � ; � �r�� �� � ��� i � � � � ��I, i �� ��}'' �F � ��; � � _ . � J£ � i' � , ;� ��I � �'p � - MLLYi'i - V} 9�I � ���lS ____—_ 3 . � � 1 —— ? S F�� . �� � � � •I __ �� � ��g�bll �. � _ r ����'� / 1 . . � -L�tMd � I I �P �� -ci ,o , ,An -,�, -, � p I s � � I i i � I _ 1 l � Ii � I c � � � z�a __`�,_ l ��� 1 ���' I ! ! � ! l a ,IdN �m� . � ti`+vK - � _r�, v .Sr`� � � f i ;��� � i �.� m .�iai ;z ;n �c .. . �� � �. � aiooa� �.�/ ���`'�� � I � / '� / � �� I� I � ;� �'-- �•�� � - — a �j, I �� � �' �, �-+ — \�� _ /� — � �I� I I �� I - � $�-s X/��� � \�� } / � � � I� '�� I � �� ;=_ �\ � _ �; � ���- �� � --- �� � � � � � " r -- j - - • �� � �-�"' '��� I �. ;� ... . � . . ' .. .� 6��r � .. i _ " , ' .... - . JF�� . � . �3 ...�. ... �� . � i _ M3 1 I� •� —, � , . � ; � . ,o _, � � p �S g I -�$. --� i���I—�-- � -O �8 ' �� l�' � �� " � i a j m "� �E ~ m � , . � L_ , � i , �, �� , \ �I � � , � �� � � : �: � j ,,,�- �� a - T�_ , . � � T ,�' m � � s ( �`-�' I I � ` l�,�—'�i 5 I I f�, I,__ � ��� �� � � � �µ �nZ F I � �x I I . S' ,I , __ -� - . � _ �Q �. 1 I( �., > I I .�� _ ��� .. � � �_ ' so. i �i � �o� ' ' I� �� I . � " � _ __ -�— _ �, 4 N+'l�- I 2� — 1 I iI I t•O''.J�fd � _ 'o-; �— — — —�._ A,� ��� S�t\£e 9 — — — _ � I �_ I �-�g � _ � _ � � I o— �� i- _ = i�� � M � ,� � � - -� �- - _� -�-� _ -- t.�F�� � � � a � 2� � � _•� i � � alY�I�� i ��J '�6�� � � � � � ! � a o� / F � // / � ��_ , / / � � �/ ��� � i �iL . ,y��� � � � � � �; � ,� i � � ��2� � �, o ��` , 6 � � .�° � ; ��� �. m , , D�� � � T , � , ���� g , j b� � ��g 4� e+v¢ �� .. .. . o . m- � � �: y _ � ��. a•.0 • 3 � � � � _ - _ � ��Q �"{ N O . +g '6 \ \\ Mi . ., t .3 . � ei \ - - . . r _ ;, ��! � _, � a �.� � � N I S �! � � � � I _ � - . � � ��I- � I R F � J � � � i e b � �! � =— � � , ; dr+'3�.�nn , O � .- - 1 —. 7 � , I I �� � � . � _ _ i,� _ f, � - � � . � � t --�� I I IIg'a g g� � $S ,_ O — � --��I,� — � � �3 I d �� '�-- o'4 p � -i --II -- ? 6;d�r � � I � � � I i I . . �Erroz � osobdZ � i � � �p, I I i I 7 ' I � � I � � � � N� � ��u �_ � y� F� � � I' ^�� � � � � � � a � ; �� � � � � ���, � ; , _ _ � �� � � �� ��� o - � - - ��� __ f.�—� � 3 ' . � � t � � . ..� I�_� i �� - .. ��@34--♦ � � � . .� � � � � a�� - �i � a � � i � � I � g , _� � ; , � ; § �_ � o - ; �--� � .;� - : _ ' �� �_� � � � .. .- � � L_� �� � . 1�� _ —j � , i�- -- +If �--1' , � L_I I ; i _ .,.,... _ __.� .� i, � -_ . ! � - ���- i. . . : , � . � . �. . �. � . I� � : -// . . � , � - . .. .. .-, /� . - . . . _.. ,.l,N. _ . � — �. � . . � . i _t. - � . . .. . � v i �-_ ! - � '�_�—_ . _'.TF , ' � i ' i � � � I ° ., t • ` -- n i � ii 1 J a'�; , � , > --- � , - � � — - � -- �; �� � i- . ��f� _ , � °+ . � � -- — ! �� � . ; � � �I ��� � il�� � ' �f �-� , � — �; i� i j .I i {a'. a ,/, � , . - ' - j . - �; hiN � �I . . 1 � : � � ' /'—'4 . i . _-- -- - - 0 -- ---- - � �, i __ __ - � . � m � No - .� � a "-'r .... ,5 �; � '��i� �� , �� s� � t , �� _� � �.a r � _ I � - � , i . ... ,Ys, p� . j 6� - , r � * — -__ . �---i.,-�*I � . �'�I� I r � � {I _ p . � I� II �III r g � ' � !! � � },, � � i��_�� �tl, ,��.' i. �m � ��� � �I i�� , �� r.�� , , ,�;� ��I � � i'� ,� � i � _ I � � N .!- ..__. . �..i �- ' . '�. ___ _ _"_I -__ _ � . . . . . ,, -- I I e � � � i (, b }g � -1� �-I� � I o �J �� �a� - ,� , % � ' i ' � � � � I ; .i, , .n,-�� , „. ,; � , � i , � : • I � " DIVINE CUSTOM HOMES . LOT 3, BLOCK 2,MOONEY LAKE PRESERVE RAIN GARDEN CALCULATIONS May 12,2016 RE�EIVED MAY 13 2016 EXISTING CONDITIONS C��( QF ORONO Drainage area = 1.72f AC. Runoff"CN"no. = 58 Time of conc. = 15 minutes Q1 = 0.06 CFS Q10 = 1.45 CFS Q100 = 5.81 CFS PROPOSED CONDITIONS Drainage area = 1.72f AC. Runoff"CN"no. = 69 Time of conc. = 10 minutes After ponding,NWL = 998.5 Q1 = 0.90 CFS --> 0.03 CFS,Elev = 998.58 Q10 = 3.72 CFS —► 0.52 CFS,Elev = 999.02 Q100 = 10.06 CFS —� 2.49 CFS,Elev = 999.85 INFILTRATION(1"over impervious surfaces) Proposed house,sport court&porch = 5,540 SF Proposed drive,walk&patio = 10,120 SF 15,660 SF 15,660 SF X 1"/12 ft per in.= 1305 CF required ELEVATION(F1� AREA(SF) VOLUME(CF) 998.5 2200 > 1500 CF 997.75 1800 � ��� Drawdown = 9"=0.3 in/hr for B soils = 30 hours a��'�g� _����_������_�������_�_�_� I �������.����—��_����������� _�___�_—_�_____ �__�__��_ _�__�__�__�_��—'�������_�_�__�__��__�—_ ��y}�'`'��,`}/, Tt�Ao �\ AyF — V, ♦, Y�____ � A Tn y --- = N 00°31'57"E 429.10 \ r -- -------------- -----� — � _------ .' � \ ' � �� yt �---�----�""�1�---=—_�---�-�-\-� �=___-- ---� �-- 1 0 § $' � SOS°W 80.Op 00��£L 3� -_�=1\ � \ \\ �\\\\b. I I ' � �� a I Zo���=��_---------�_�"'� �L \ F'\ ��\ � � � I �. � - � 4�,\\ \ \� \ � �� \�� I I " " i c no�L_ _�-------- �� � �� � � „ i m�� ---� �� DCZyO �� ��\ �\ �� �� � DoA�_� �-_ \� � \\\\ \\\ ���Om i��t� \\ yFs���° \� �\ \ \ I 3Z � � �. . -� \%V �� o"o�A ���.!���\C� 1 `�a�\��L �� \\ � �� � Zm I I � �� ��7����: _1�y"�L�S �� s4?\ " ���\oso\ ` \\�\� \�� A� j I o `��� —� — _ �— �v�,,`� �'���j �%� \; �\J �s�.� ��� � � � �. '�pl,,��17�\� ��� � � I I l� � 'I o� $$ \� � � �/' �.�`.c�� O 1\S��\bV I I � cn � �$�� z ' ;�� �' i�� �- � F`���. � � ,I I � ��� � � �o��, p� i'� � / ��� i /��� �\ ��� ��\�DO , �� omo / / i j i _ \ I I � i z / j���� �� /��� �����_, �� ��A �� �' � i � / �\ ,- � � � '� N � - --�-�-- " �- .,!_� A —��qa���� �� �� �� �i� / � �� r���j �i /�t_--' mFo �\�\\ OT`�9o\�---� -�-\- �A � �' / /� � /i / '� � \ fV �/ / / I /� / �tio�n � � ��% ���j�� %/�/ 1�i�-�\ ��.� � � �3�0\'�N1� \. �� 1��. I � �. / /ti� � �// j / j / � � . �� 1 � � i � � � �i / �� / • � / / �i/ �� \ ���� ��� �i �/ � y � /� / / � / � / / i � \�� � ` ���� � 0� �/ /� / j% ��% /j� � ��----�� � \` �� I �� � i � , � � ¢ � r �� ' \ �� � ',� ,, \ �� �\. i a � • /� i �� % � /�'' � I ` I ��, � � �� �`�� � �� � ��C, / / �� �� i I�\\ j 1 � � \ I / l/ � � � . % __ �� \ � � � �� / � i � � J 'l, �� �/ / / � � �-- _ •� � I I / 1 1 �� O � �V /� �_��� / � �� � � I I � / �� �� i \�I I� � � /� % �� � i �j� � a / �� �\ N---' j ! j � � � \ � ' i�\� � I � / / \ � I i� � �/ � � � � � % i� I � �, �� `�=�� �� � � � j � � �O� \� � � I � cODO l � , / y s �r � // \\\ \� / � � � � � � � ' � �� � I y\� �� � � � � / H� g„� � � j j �� � / � � r � � � � �,� �� � � c; -----� �� i� /\ � � 't' / m°�� � _-- � � � � �\\ �\ %i \� � / ��T � �J/Q�S�ad a \ � '�I l� % \ � y �o S3��M �L� � \� I j N \��\___'/i ��y\/ /�\\ � � ea't I� ce�o ,�.o I\\ i i � /i S���� / \� � �� ' \�1 �I, 3C �� �Tr��� � �l� �^ � � � � �o� � 30 � ���� � � � � \ � y y I � I \���j� \\\\' \`Y \ �� a�� �� *�n�~ i i i /) � I\ � ��'s� � � � `�� \�\ � \� \� �� �\� / +.�'r" I I I \�� �� �l\\� ���o `� „ �� j �i�� I �1 �l I �' �\\ l�� \ �o _�/ � I /, I �� I / 1.� � � � I I I � l � I a I ` _i�/ �" � 'i_ � / � � / � � ��C \ \ _-�� i ,-� j� � / / / � � 1 �i � �� / / _/ LZ�'� ` � � j � /�'�� j � \� \ � j��� ��� / � i �,°��� �' ��i / / / � \�� \� \� � ��t�_i A � '�r � � % �'`� a�.. \ \/� �, ti<< � � � '+,�,. i � � .a �n .` I`. sb,��� �► � i �� �� �-- r� \. F`���\ 6E -� � i� � � t � `�s� �'�� T�� q / / \ . �''i� �. `� gj pp Oi I �I� j/ `�� ��__ \�—M oV�N� }I-� �1---��\ ��\ o��� _--- _''� a,� � � � I I�. � � ----t- — �, � � � � �� �------------__�-�_�" t-- jI S 00�3-1'S7'rW 121.25 ��. REC�iVED ���� 13 2016 CITY OF ORONO new u ca ._� � CSubCBt> ��Reach� on �Llnk I Routing Diagram for Divine Custom Homes existing 5-12-16 � � L _� Prepared by{enter your company name here}, Printed 5/13/2016 `-�' HydroCAD010.00-12 s/n 04529 �O 2014 HydroCAD Software Solutions LLC - Divine Custom Homes existing 5-12-16 Prepared by{enter your company name here} Printed 5/13/2016 HydroCAD010.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (acres) (subcatchment-n um bers) 1.720 58 Meadow, non-grazed, HSG B (1 E) 1.720 58 TOTAL AREA - Divine Custom Homes existing 5-12-16 Prepared by{enter your company name here} Printed 5/13/2016 HydroCAD� 10.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC PaQe 3 Soil Listing (all nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 1.720 HSG B 1 E 0.000 HSG C 0.000 HSG D 0.000 Other 1.720 TOTAL AREA - Divine Custom Homes existing 5-12-16 Prepared by{enter your company name here} Printed 5/13/2016 HydroCAD010.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC Paqe 4 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 1.720 0.000 0.000 0.000 1.720 Meadow, non-grazed 1 E 0.000 1.720 0.000 0.000 0.000 1.720 TOTAL AREA - Divine Custom Homes existing 5-12-16 Type ll 24-hr 1 year Rainfa11=2.50" Prepared by{enter your company name here} Printed 5/13/2016 HydroCAD� 10.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC Paqe 5 Time span=1.00-36.00 hrs, dt=0.05 hrs, 701 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1E: (new Subcat) Runoff Area=1.720 ac 0.00% Impervious Runoff Depth=0.13" Tc=15.0 min CN=58 Runoff=0.06 cfs 0.019 af Total Runoff Area= 1.720 ac Runoff Volume=0.019 af Average Runoff Depth =0.13" 100.00%Pervious= 1.720 ac 0.00%Impervious=0.000 ac - Divine Custom Homes existing 5-12-16 Type ll 24-hr 1 year Rainfa11=2.50" Prepared by{enter your company name here} Printed 5/13/2016 HydroCADO 10.00-12 s/n 04529 OO 2014 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 1E: (new Subcat) Runoff = 0.06 cfs @ 12.21 hrs, Volume= 0.019 af, Depth= 0.13" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs Type II 24-hr 1 year Rainfa11=2.50" Area (ac) CN Description 1.720 58 Meadow, non-grazed, HSG B 1.720 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 1E: (new Subcat) Hydrograph 0.065- ; p Runoff 0.06 , o.oscts _ , __ � , _ � � �_ � , - � ; Type II 24-hr ! 0.055 0.05 , ; ; 1 year Rainfa11=2.50" ! : � � -�- �- :- . - - , ; o.o45 i , ' , Runoff Area=1.720 ac ! - = � .- .- .- .- � 0.04 � ' Runoff Volume=0.019 af � -- ; . = . � - " Runoff Depth=0.13" � � 0.035 0 0.03 - --- --- --- -- - - - Tc=15.0 m i n , � , , , LL � � � � � . . , � 0.025 � : � , , , , CN-58 - ' _ : � . ' — � , o.oz , � 0.015 0.01 0.005 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Time (hours) - Divine Custom Homes existing 5-12-16 Type ll 24-hr 10 year Rainfall=4.29" Prepared by{enter your company name here} Printed 5/13/2016 HydroCADO 10.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC PaQe 7 Time span=1.00-36.00 hrs, dt=0.05 hrs, 701 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1 E: (new Subcat) Runoff Area=1.720 ac 0.00% Impervious Runoff Depth=0.80" Tc=15.0 min CN=58 Runoff=1.45 cfs 0.115 af Total Runoff Area= 1.720 ac Runoff Volume=0.115 af Average Runoff Depth =0.80" 100.00% Pervious= 1.720 ac 0.00%Impervious=0.000 ac - Divine Custom Homes existing 5-12-16 Type ll 24-hr 10 year Rainfall=4.29" Prepared by {enter your company name here} Printed 5/13/2016 HydroCADO 10.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC Paqe 8 Summary for Subcatchment 1 E: (new Subcat) Runoff = 1.45 cfs @ 12.10 hrs, Volume= 0.115 af, Depth= 0.80" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs Type II 24-hr 10 year Rainfall=4.29" Area (ac) CN Description 1.720 58 Meadow, non-grazed, HSG B 1.720 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 1 E: (new Subcat) Hydrograph ` ■Runoff tae crs , ( � , , TYPe II 24-hr I ' 10 year Rainfal1=4.29" ! , , � ' Runoff Area=1.720 ac � Runoff Volume=0.115 af � � Runoff Depth=0.80" ; Tc=15.0 min �° , CN=58 o _ _ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Time (hours) - Divine Custom Homes existing 5-12-16 Type ll 24-hr 100 year Rainfall=7.42" Prepared by{enter your company name here} Printed 5/13/2016 HydroCAD� 10.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC Paqe 9 Time span=1.00-36.00 hrs, dt=0.05 hrs, 701 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1 E: (new Subcat) Runoff Area=1.720 ac 0.00% Impervious Runoff Depth=2.70" Tc=15.0 min CN=58 Runoff=5.81 cfs 0.387 af Total Runoff Area= 1.720 ac Runoff Volume=0.387 af Average Runoff Depth =2.70" 100.00%Pervious= 1.720 ac 0.00%Impervious=0.000 ac • Divine Custom Homes existing 5-12-16 Type ll 24-hr 100 year Rainfa11=7.42" Prepared by {enter your company name here} Printed 5/13/2016 HydroCADO 10.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC Paqe 10 Summary for Subcatchment 1 E: (new Subcat) Runoff = 5.81 cfs @ 12.08 hrs, Volume= 0.387 af, Depth= 2.70" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs Type II 24-hr 100 year Rainfall=7.42" Area (ac) CN Description 1.720 58 Meadow, non-grazed, HSG B 1.720 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 1 E: (new Subcat) Hydrograph �Runoff 6 s.at cfs ' , ' ' Type II 24-hr 5 ; i --�-- 100 year Rainfat1=7.42" . - - �-- , Runoff Area=1.720 ac 4 ; Runoff Volume=0.387 af v" Runoff Depth=2.70" „ , LL3 - - - , , --- , Tc=15.0 min ; ; , _ � --:- CN=58 � � ' � , , 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Time (hours) �1AY 13 2016 CITY UF ORONO � 1P ew Subcat) 1PP (new Pond) , , SubCat iReach On Link I Routing Diagram for Divine Custom Homes proposed 5-12-16 � i Prepared by{enter your company name here}, Printed 5/13/2016 `--� HydroCAD�10.00-12 s/n 04529 OO 2014 HydroCAD Software Solutions LLC - Divine Custom Homes proposed 5-12-16 Prepared by{enter your company name here} Printed 5/13/2016 HydroCAD�10.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC Paae 2 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 1.360 61 >75% Grass cover, Good, HSG B (1P) 0.230 98 Drive,Walk&Patio (1 P) 0.130 98 House, Sport Court 8�Porch (1 P) 1.720 69 TOTAL AREA - Divine Custom Homes proposed 5-12-16 Prepared by{enter your company name here} Printed 5/13/2016 HydroCADO 10.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC Pac1e 3 Soil Listing (all nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 1.360 HSG B 1 P 0.000 HSG C 0.000 HSG D 0.360 Other 1 P 1.720 TOTAL AREA . Divine Custom Homes proposed 5-12-16 Prepared by{enter your company name here} Printed 5/13/2016 HydroCAD010.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC Pa,ye 4 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 1.360 0.000 0.000 0.000 1.360 >75%Grass cover, Good 1 P 0.000 0.000 0.000 0.000 0.230 0.230 Drive, Walk&Patio 1 P 0.000 0.000 0.000 0.000 0.130 0.130 House, Sport Court 8�Porch 1 P 0.000 1.360 0.000 0.000 0.360 1.720 TOTAL AREA - Divine Custom Homes proposed 5-12-16 Type ll 24-hr 1 year Rainfa11=2.50" Prepared by{enter your company name here} Printed 5/13/2016 HydroCAD010.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC Page 5 Time span=1.00-36.00 hrs, dt=0.05 hrs, 701 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1 P: (new Subcat) Runoff Area=1.720 ac 20.93% Impervious Runoff Depth=0.42" Tc=10.0 min CN=69 Runoff=0.90 cfs 0.060 af Pond 1 PP: (new Pond) Peak Elev=998.58' Storage=1,709 cf Inflow=0.90 cfs 0.060 af Discarded=0.00 cfs 0.005 af Primary=0.03 cfs 0.022 af Outflow=0.03 cfs 0.027 af Total Runoff Area= 1.720 ac RunofF Volume=0.060 af Average Runoff Depth =0.42" 79.07%Pervious= 1.360 ac 20.93%Impervious=0.360 ac - Divine Custom Homes proposed 5-12-16 Type ll 24-hr 1 year Rainfa11=2.50" Prepared by {enter your company name here} Printed 5/13/2016 HydroCADO 10.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC Paqe 6 Summary for Subcatchment 1 P: (new Subcat) Runoff = 0.90 cfs @ 12.04 hrs, Volume= 0.060 af, Depth= 0.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs Type II 24-hr 1 year Rainfa11=2.50" Area (ac) CN Description '` 0.130 98 House, Sport Court & Porch * 0.230 98 Drive, Walk & Patio 1.360 61 >75% Grass cover, Good, HSG B 1.720 69 Weighted Average 1.360 79.07% Pervious Area 0.360 20.93% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 1 P: (new Subcat) Hydrograph � ■Runoff o.so� I � Type I I 24-h r 1 year Rainfa11=2.50" Runoff Area=1.720 ac Runoff Volume=0.060 af � Runoff Depth=0.42" � ; Tc=10.0 min LL � CN=69 � � '�� ,� � '� �� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Time (hours) - Divine Custom Homes proposed 5-12-16 Type ll 24-hr 1 year Rainfal1=2.50" Prepared by{enter your company name here} Printed 5/13/2016 HydroCAD� 10.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC Page 7 Summary for Pond 1 PP: (new Pond) Inflow Area = 1.720 ac, 20.93% Impervious, Inflow Depth = 0.42" for 1 year event Inflow = 0.90 cfs @ 12.04 hrs, Volume= 0.060 af Outflow = 0.03 cfs @ 17.62 hrs, Volume= 0.027 af, Atten= 96%, Lag= 334.6 min Discarded = 0.00 cfs @ 14.45 hrs, Volume= 0.005 af Primary = 0.03 cfs @ 17.62 hrs, Volume= 0.022 af Routing by Stor-Ind method, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs Peak Elev= 998.58' @ 17.62 hrs Surf.Area=2,845 sf Storage= 1,709 cf Plug-Flow detention time= 508.9 min calculated for 0.027 af(45% of inflow) Center-of-Mass det. time= 342.2 min ( 1,246.0-903.8 ) Volume Invert Avail.Storage Storage Description #1 997.75' 11,175 cf Custom Stage Data(Prismatic) Listed below(Recalc) Elevation SurF.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 997.75 1,800 0 0 998.50 2,200 1,500 1,500 999.00 6,100 2,075 3,575 1,000.00 9,100 7,600 11,175 Device Routing Invert Outlet Devices #1 Primary 998.50' 0.5' long x 1.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 #2 Discarded 997.75' 0.300 in/hr Exfiltration over Surface area from 997.75'-998.50' Excluded SurFace area = 1,800 sf Phase-In= 0.25' Discarded OutFlow Max=0.00 cfs @ 14.45 hrs HW=998.50' (Free Discharge) t2=Exfiltration (Exfiltration Controls 0.00 cfs) Primary OutFlow Max=0.03 cfs @ 17.62 hrs HW=998.58' (Free Discharge) L1=Broad-Crested Rectangular Weir (Weir Controls 0.03 cfs @ 0.77 fps) - Divine Custom Homes proposed 5-12-16 Type 1124-hr 1 year Rainfa11=2.50" Prepared by {enter your company name here} Printed 5/13/2016 HydroCADO 10.00-12 s/n 04529 OO 2014 HydroCAD Software Solutions LLC Paqe 8 Pond 1 PP: (new Pond) Hydrograph ; Inflow o.so crs i —'Outflow , Inflow Area=1 .720 ac i �prmarded ry Peak Elev=998.58' ; , , Storage=1,709 cf I, y w U O . . :. ' , ( � � ' � ,� ' .. � , . , � . , , . , . . . �. I � � ',, ', .. . . � . i . . . � , i . . . . ...... . . ,��003cfe .�.._ �'ii���',ri�,� . ,i, / .,t7'l�L .. .. ;o.. ,:. . . .. .. 0 00 cfs 0 03 cfs � 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Time (hours) - Divine Custom Homes proposed 5-12-16 Type ll 24-hr 10 year Rainfall=4.29" Prepared by{enter your company name here} Printed 5/13/2016 HydroCAD�10.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC Paqe 9 Time span=1.00-36.00 hrs, dt=0.05 hrs, 701 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1P: (new Subcat) Runoff Area=1.720 ac 20.93% Impervious Runoff Depth=1.46" Tc=10.0 min CN=69 Runoff=3.72 cfs 0.209 af Pond 1PP: (new Pond) Peak EIev=999.02' Storage=3,697 cf Inflow=3.72 cfs 0.209 af Discarded=0.00 cfs 0.006 af Primary=0.51 cfs 0.170 af Outflow=0.52 cfs 0.176 af Total Runoff Area= 1.720 ac Runoff Volume=0.209 af Average Runoff Depth = 1.46" 79.07%Pervious= 1.360 ac 20.93%Impervious=0.360 ac - Divine Custom Homes proposed 5-12-16 Type ll 24-hr 10 year Rainfall=4.29" Prepared by {enter your company name here} Printed 5/13/2016 HydroCADO 10.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC Paqe 10 Summary for Subcatchment 1 P: (new Subcat) Runoff = 3.72 cfs @ 12.02 hrs, Volume= 0.209 af, Depth= 1.46" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs Type II 24-hr 10 year Rainfall=4.29" Area (ac) CN Description * 0.130 98 House, Sport Court& Porch * 0.230 98 Drive, Walk 8� Patio 1.360 61 >75% Grass cover, Good, HSG B 1.720 69 Weighted Average 1.360 79.07% Pervious Area 0.360 20.93% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 1P: (new Subcat) Hydrograph 4 �Runoff 3.72 cfs Type I I 24-h r ' ' 10 year Rainfal1=4.29" 3 Runoff Area=1.720 ac ' Runoff Volume=0.209 af � _ _ . Runoff Depth=1.46" ° 2 Tc=10.0 min LL ; ' ', CN=69 , 0 1 2 3 4 5 6 7 8 9 1011 12131415161718 192021 22232425262728293031 3233343536 Time (hours) - Divine Custom Homes proposed 5-12-16 Type ll 24-hr 10 year Rainfall=4.29" Prepared by{enter your company name here} Printed 5/13/2016 HydroCAD�10.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC Paqe 11 Summary for Pond 1 PP: (new Pond) Inflow Area = 1.720 ac, 20.93% Impervious, Inflow Depth = 1.46" for 10 year event Inflow = 3.72 cfs @ 12.02 hrs, Volume= 0.209 af Outflow = 0.52 cfs @ 12.48 hrs, Volume= 0.176 af, Atten= 86%, Lag= 27.5 min Discarded = 0.00 cfs @ 12.00 hrs, Volume= 0.006 af Primary = 0.51 cfs @ 12.48 hrs, Volume= 0.170 af Routing by Stor-Ind method, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs Peak Elev= 999.02' @ 12.48 hrs SurF.Area= 6,160 sf Storage= 3,697 cf Plug-Flow detention time= 188.3 min calculated for 0.176 af(84% of inflow) Center-of-Mass det. time= 114.4 min ( 973.9- 859.5 ) Volume Invert Avail.Storage Storaqe Description #1 997.75' 11,175 cf Custom Stage Data(Prismatic) Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 997.75 1,800 0 0 998.50 2,200 1,500 1,500 999.00 6,100 2,075 3,575 1,000.00 9,100 7,600 11,175 Device Routing Invert Outlet Devices #1 Primary 998.50' 0.5' long x 1.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 #2 Discarded 997.75' 0.300 in/hr Exfiltration over SurFace area from 997.75'-998.50' Excluded SurFace area = 1,800 sf Phase-In= 0.25' Discarded OutFlow Max=0.00 cfs @ 12.00 hrs HW=998.60' (Free Discharge) t2=Exfiltration (Exfiltration Controls 0.00 cfs) Primary OutFlow Max=0.51 cfs @ 12.48 hrs HW=999.02' (Free Discharge) L1=Broad-Crested Rectangular Weir (Weir Controls 0.51 cfs @ 1.97 fps) Divine Custom Homes proposed 5-12-16 Type ll 24-hr 10 year Rainfal1=4.29" Prepared by {enter your company name here} Printed 5/13/2016 HydroCADO 10.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC Paqe 12 Pond 1 PP: (new Pond) Hydrograph ■Inflow 3.�z cfs — � �Outflow Inflow Area-1 .720 ac I p prmaryed 4 - Peak EIev=999.02' � , ' ' Storage=3,697 cf i 3 � w' � , 0 2 , , , , _ � , , , , , , -------------------- -- ---, � 0.52 ds /� .. .. .... 0 51 cfs ' .,�:;, . ���� � � .... � . . � .�_.�.�..� . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Time (hours) � Divine Custom Homes proposed 5-12-16 Type ll 24-hr 100 year Rainfal1=7.42" Prepared by{enter your company name here} Printed 5/13/2016 HydroCAD010.00-12 s/n 04529 O 2014 HvdroCAD Software Solutions LLC Paae 13 Time span=1.00-36.00 hrs, dt=0.05 hrs, 701 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1 P: (new Subcat) Runoff Area=1.720 ac 20.93% Impervious Runoff Depth=3.86" Tc=10.0 min CN=69 Runoff=10.06 cfs 0.553 af Pond 1PP: (new Pond) Peak Elev=999.85' Storage=9,861 cf Inflow=10.06 cfs 0.553 af Discarded=0.00 cfs 0.006 af Primary=2.49 cfs 0.514 af Outflow=2.50 cfs 0.520 af Total Runoff Area= 1.720 ac Runoff Volume=0.553 af Average Runoff Depth =3.86" 79.07%Pervious= 1.360 ac 20.93%Impervious=0.360 ac � Divine Custom Homes proposed 5-12-16 Type ll 24-hr 100 year Rainfall=7.42" Prepared by {enter your company name here} Printed 5/13/2016 �droCADO 10.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC Paqe 14 Summary for Subcatchment 1 P: (new Subcat) Runoff = 10.06 cfs @ 12.02 hrs, Volume= 0.553 af, Depth= 3.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs Type II 24-hr 100 year Rainfall=7.42" Area (ac) CN Description * 0.130 98 House, Sport Court & Porch * 0.230 98 Drive, Walk & Patio 1.360 61 >75% Grass cover, Good, HSG B 1.720 69 Weighted Average 1.360 79.07% Pervious Area 0.360 20.93% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 1 P: (new Subcat) Hydrograph 11 m Runoff . . __.'__-''_- 10.O6cfs . . . _ ._ '° ' Type II 24-hr , ---- -- - - - ---- - --- 9 100 year Rainfall=7.42" 8 Runoff Area=1.720 ac � Runoff Volume=0.553 af -- �-� � - �- � .--- . . :_ _. � 6 Runoff Depth=3.86" ; - _ � . _ ° 5 Tc=10.0 min � - ; ; ; ; : 4 - -� ----,--,- CN=69 3 i , � � , � 2 , 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 S 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Time (hours) ) � Divine Custom Homes proposed 5-12-16 Type ll 24-hr 100 year Rainfall=7.42" Prepared by{enter your company name here} Printed 5/13/2016 HydroCADC�10.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC PaQe 15 Summary for Pond 1 PP: (new Pond) Inflow Area = 1.720 ac, 20.93% Impervious, Inflow Depth = 3.86" for 100 year event Inflow = 10.06 cfs @ 12.02 hrs, Volume= 0.553 af Outflow = 2.50 cfs @ 12.24 hrs, Volume= 0.520 af, Atten= 75%, Lag= 13.4 min Discarded = 0.00 cfs @ 11.65 hrs, Volume= 0.006 af Primary = 2.49 cfs @ 12.24 hrs, Volume= 0.514 af Routing by Stor-Ind method, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs Peak Elev=999.85' @ 12.24 hrs Surf.Area= 8,656 sf Storage= 9,861 cf Plug-Flow detention time= 113.5 min calculated for 0.519 af(94% of inflow) Center-of-Mass det. time= 81.1 min ( 912.0-830.9 ) Volume Invert Avail.Storage Storage Description #1 997.75' 11,175 cf Custom Stage Data(Prismatic) Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 997.75 1,800 0 0 998.50 2,200 1,500 1,500 999.00 6,100 2,075 3,575 1,000.00 9,100 7,600 11,175 Device Routing Invert Outlet Devices #1 Primary 998.50' 0.5' long x 1.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 #2 Disca�ded 997.75' 0.300 in/hr Exfiltration over Surface area from 997.75'-998.50' Excluded Surface area = 1,800 sf Phase-In=0.25' Qiscarded OutFlow Max=0.00 cfs @ 11.65 hrs HW=998.55' (Free Discharge) z 2=Exfiltration (E�Itration Controls 0.00 cfs) Primary OutFlow Max=2.49 cfs @ 12.24 hrs HW=999.85' (Free Discharge) t-1=6road-Crested Rectangular Weir (Weir Controls 2.49 cfs @ 3.69 fps) ' , Divine Custom Homes proposed 5-12-16 Type ll 24-hr 100 year Rainfall=7.42" Prepared by {enter your company name here} Printed 5/13/2016 HydroCADO 10.00-12 s/n 04529 O 2014 HydroCAD Software Solutions LLC Page 16 Pond 1 PP: (new Pond) Hydrograph � ■Inflow �o.oscrs + �'Outflow 11 , _ _ _ __ Inflow Area=1 .720 ac � p Prmaryed � ' Peak Elev=999.85' ' 10 — _ g , _ , „ - - , Storage=9,861 cf , , , � , - , , , , , , , , g -�- , -- —� -,— ' . -�- � � , , , , , , , , , , , , , ; ; 7- • —. , —�--,- — ---'- ' ---- — — — . � � � � , � , , , � , , , , ; - — — — — - — — --- - -- -- --- -- -- ... 6 -,— --, -, - -- - , ; � , , � � ; , , , ; , , , , , o , -- - — — -- - -- -- - 5 , , , , , , —� , — — � , —� �--�--�-- � LL . � � � � � � �� � �� 4_ . ' . . . . . _ .. . . 2.SOcfs -. ._ _ __._,."""_"__-�__'___�_""_-__,__�""__,__ '_' _' '__ _. . � �. :,. _ ., . :-.-�._ .'. ��. �' � ----'.--�--=-._. ... . 3�" . . . . 2A9cfs �. ' . . . . 2� ri� / //i: ✓.' t. ., ,,, . :, , --_ , �,. 1 fs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Time (hours) Christine Mattson From: Christine Mattson Sent: Thursday,June 09, 2016 3:13 PM To: 'Jeff Warren';Jeff Welle;jeff@divinecustomhome.com; Scott.Gronholz@wellsfargo.com Cc: Mark; Roger Peitso; Mike Gaffron;Jeremy Barnhart Subject: RE: 1070 Hunter Drive Attachments: Escrow Agreement- Building Permit w Erosion Control 2016-00589.pdf Good Afternoon. We have the building permit application ready to be issued. The balance of the permit fee due is$6,975.32. Also,attached is an escrow agreement. Please have one of the property owners sign the agreement and return with a check for$2,500. We are on summer hours and are open until 5 pm tonight and 7:30 to 11:30 am tomorrow. Please don't hesitate to contact me if you have any questions. Christine^' From:Jeff Warren [mailto:warrensherman@hotmail.com] Sent:Thursday,June 09, 2016 3:04 PM To:Christine Mattson<CMattson@ci.orono.mn.us>;Jeff Welle<jeffwelle@divinecustomhome.com>; jeff@divinecustomhome.com;Scott.Gronholz@wellsfargo.com Cc: Mark<markg@gronbergassoc.com>; Roger Peitso<rpeitso@ci.orono.mn.us>; Mike Gaffron <MGaffron@ci.orono.mn.us>;Jeremy Barnhart<jbarnhart@ci.orono.mn.us> Subject: RE: 1070 Hunter Drive Hi Chris, After we talked, I did speak with Mark and he was dropping of the signed copy with the layers you referenced. lust making sure you received them and were all good. thanks Jeff From: CMattson@ci.orono.mn.us To:JefflNelle@DivineCustomHome.com;Jeff@DivineCustomHome.com; Scott.Gronholz@wellsfar�o.com CC: mark�@�ronber�assoc.com; rpeitso@ci.orono.mn.us; MGaffron@ci.orono.mn.us; ibarnhart@ci.orono.mn.us Subject: 1070 Hunter Drive Date: Thu, 9 Jun 2016 16:22:49 +0000 Hello, Updated surveys and engineering for the retaining walls were dropped off yesterday,June 8, 2016,thank you. 1 The survey received yesterday is dated 5-9-16 however, it is not signed. When comparing the recently received survey, we noted the previously submitted survey is also dated 5-9-16, however the surveys do not match. • Rain garden is missing annotations and the weir is no longer shown. Grading around the proposed rain garden is different. Has the design changed since the last review? Please clarify. • Proposed earth excavation annotations are missing. Please have the surveyor submit two, signed copies of the survey for our review. Thankyou! Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway ( Orono � MN ( 55356 (physical addressJ PO Box 66 � Crystal Bay � MN � 55323-0066 (mailing addressJ '� 952.249.4620 I 8 952.249.4616 � cmattson@ci.orono.mn.us � � www.ci.orono.mn.us Summer Office Hours: (Monday, May 23 through Friday, September 2,2016) Monday-Thursday: 7:30 am to 5 pm Friday: 7:30 am to 11:30 am OUR OFFICE WILL BE CLOSED: Monday,July 4, 2016 2 �^ o�re n�E Y t �'� � CITY OF ORONO CALLED IN INBPECTION N ICE SCHEDULEO �/�'_� PERMIT NO. COMPLEfED ADDRESS f� � � �(.l�1`�Jr ,Dl� O�WNER TELEPHONE NO.��T�'��� CONTRACTOR � � DESCRIPTION --�� �L�/� �/�rI�!'� - -- 1y ❑ FOOTIN(i ❑ DEMO-FINAL / /���� ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI /��a'�;W[ � EXCAV/t'aRADIN(i/FILLINO Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL �J� ❑TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI � ❑ SITE INSPECTION � ❑ FRAMIN(3 ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑WOOD BURNERIFIREPLACE ❑COMPLAINT � ❑ FINAL ❑WATER HOOK-UP � FOLLOW-UP W ❑AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATIOWREMOVAL _ r 0 DEMO-SITE ❑ IC INSTALL � CWN9YCOKTRACfOR TO MEET 1f�01h. Y68_NO � COMMENT& �� 4 O ��'Jr �(/_ � � � � W � Q � W W � ,w snnsF�cToar:�oce� o aAaecr cowi�� W ❑oo�crwo�c a�ocE� o issue c�n�►rE oFoax�a►Ncr o� o oo�crwo�c.c�t.r�fmNs�cnoN rarvo�u►ar BEFORE CdNERINO PERMANBdT ❑QpqRECT UN3AFE CONdT10N WITHIN HOURS. O PHOTO TAKEN INSPECTOR WILL RETURN O STOP OROER P08TED.CALL INSPECTOR O CITATION ISSIIED O INSPEC110P1 REOUIRED.CALL TO ARRAN(3E ACCESS. call ra n�e next inspect�o�2�t nows in sd�ranos. (952) 249-4600 s�e: � ���'�� WMb Gop�rAnsp�ta'+FlM Gmry Capy181M Nolkt i - / v � DATE TIME CI OF ORONO CALLED IN � INSPECTION NOTI E `��� SCHEDULED _��'1 PERMIT NO. COMPLETED ADDRESS f C � ' L�- / OWNER TELEPHONE NO. "�� ��c='���� CONTRACTOR ��� �� � ��r`?!�►�i h � DESCRIPTION ���Tl I���� ���t �,� �fti( t~l� ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING y ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP _ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL J ❑ DEMO-SITE ❑' HPTIC INSTALL 2 OWNER/CONTFUCTOR TO MEET YOU:�YES_NO y COMMENTS: a� W a O '/ � : � � ). � O � W � � Q 2 � i W � W 2 J d W ❑ RKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE � CORRECT WORK 8 PROCEED O ISSUE CERTIFICATE OF OCCUPANCY W 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. p pHOTO TAKEN INSPECTOR WFLL REfURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIHED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952 - 60� OwnerlContractor on site: Inspector. White Copyllnspector's File anary CopylSite Notice ��[ �.�. DATE TIME CIlY OF ORONO CALLED IN ��`���� � INSPECT��N NOTICE - scHE�u�Eo ������' PERMIT NO.�.���,��L�S�� COMPLETED ADDRESS � C� �G � l�/� -��ii OWNER TELEPHON O.T�����I uG l I�� CONTRACTOR F' � � ����.�7 - � e r ,�fl -i-,�s � DESCRIPTION ly ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FIN Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FIILING y FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL ZR DON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP _ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL J ❑ DEMO-SITE ❑ SEPTIC INSTALL Q OWNERlCONTRACTOR TO MEET YOU:_YES_NO 2 L � COMMENTS:���� ..��o "�`ff�' ��T ' [ a �l� �l -�tj S�G��- n�;� .��r s � �--�� �"�at-c�'—cl� 0 o ' ' � �o����o� �i��✓.o✓�i�s , ��S c�G -t- W � �4ca. �'i��a �� '" Q " � W � � � /// �D��d"¢ f.rsb� `�- Dlk'✓ �4G� - w � �o r rcc�� b� � Cvr�� j W ❑WORKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE � �CT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALI FOR REINSPECTION TEMPORARY V BEFORECObERING PERMANENT ❑CORHECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN INSPECTOR WILL REfURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call forthe next inspection 24 hou �n advance. (952) 249-46�� OwnerfContractor on site: ���� Inspector: " � White Copyllnspector's File Canary CopylSite Notice �-� s,-�- ' �— - DATE TIME , ,�d CITY OF ORONO CALLED IN �o�-! —1 `' INSPECTION NOTICE scHE�u�Eo ��1,�-�� __� PERMIT NO.�U -"�5�� COMPLETED ADDRESS l D 7� �� �l V`� OWNER ' T LEPHON NO�S�� �" CONTRACTOR vG� � � � DESCRIPTION ���� /��� ly ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP _ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL J ❑ DEMO-SITE ❑ SEPTIC INSTALL 2 OWNERICONTRACTOR TO MEET YOU:_YES_NO , , � COMMENTS: ��- �� d..S J� A� ` � a J�i�i -�.2cc ��ouso� r .O r'v�ec� s�o �c � 5 '�'e5 �- C��=��,�s s.�-e - 0 � o � 2 /� �l �k GCr�f/se.lq,y, �0/'Ovrq2s' � � , /� ���+•+'l ✓oC�— W Q `��ro u�%�� a.+P�Grd�<L ��'�%��e.G t�e✓�cz G T z _ b�.:r�. �..�- s .f� � � �� f��o ve�,e G��r ass nu wcba✓s � � r� vc wQ.v --- a W ❑WORKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE � ORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W � ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY � BEFORE CO'VERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. ❑ pHOTOTAKEN INSPECTOR WILL REfURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 OwnedContractor on site: inspector. W i opyllnspector's Ffle Canary CopylSite Notice . t �J�� �� ✓ (f✓ " (" DATE TIME CITY OF ORONO �a�� CALLED IN _`�� INSPECTION NO�ICE SCHEDULED � PERMIT NO.���8� COMPLETED ADDRESS �1_L���L��- �� � ��-- OWNER TELEPHONE NO ���-�9�� � CONTRACTOR � DESCRIPTION ���� 1���� ly ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL � "�2�tdRED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING Q O�0 FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL _ J ❑ DEMO-SITE ❑ SEPTIC INSTALL 2 OMfNERICONTtiACTOR TO MEET YOU:_YES_NO c�., COMMENTS: W ! � (�bQ,i"" ,fle/' �Itsio'Iee✓c�Q ,D/�( -� o /�r.25�*�( G,,,,g, _ �. � � � `'f'I�L��'!�%4�.ti- G�'!t�s/t2"�'�S' 'T�✓ /`e� � W Q � �'o r�rt S t.t�h.�� .�a v�cv�.�' �' � z � �� � paE�/ w � J �j�WORKSATiSFACTORY:PROCEED ❑ PROJECT COMPIEfE W 0 C�, RRECT YVORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. p pHOTO TAKEN INSPECTOR W{LL REfURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Ca11 for the next inspection 24 hours in advance. (952� 249-4600 OwnedContractor on site: Inspector: � j r"'� � `., White Copylinspector's File Canary CopylSite Notice - � J t1� �,�� DATE TIME CtTY OF ORONO CALL D IN INSPECTION NOTIC �c �<� SCHEDULED ___��7 ��✓� PERMIT NO. x�.�r� �` � COMPLETED ADDRESS I �'�� ( � � �f I 7��f�' ��k___r'� OWNER TELEPHON�NO. i�;`��I � C- �S `7l>�(—1 CONTRACTOR � 'C� �-` !(�C C ��S-( F-jrnS `"T_ , /� � DESCRIPTION �- J-� l��l,.i � C� �� C�`3� ! {� �-=�l_� i'/tc 1V ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL ��I'� � � Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLIN � �Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL _ ❑ DEMO-SITE ❑�IC INSTALL ..1 ? OWNERICOKTIUCTOR TO MEET YOU: YES_NO � COMMEN • '-� � � � - c' . � � � o� � � � J � — J v� N � " � (j 1� f�1 W � Q � W � W � � J W KSATISFACTORY:PitOCEED ❑ PROJECT COMPLETE � ❑ RRECT WORK 8 PROCEED �ISSUE CERTIFICATE OF OCCUPANCY W O ❑(�RRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWRHIN HOURS. p pHOTOTAKEN INSPECTOR WFLL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Cail for the next inspection 24 hours in advance. (952) 249-4600 OwnedConiractor on sit� Inspector: 1�.b WhiM CopyAnapector's File Cs�ary CopylSlts Notke ,r �- � � v DATE TIMEI CITY OF ORONO CALLED IN INSPECTION NOTICE �j SCHEDULED � �B PERMIT NO. " 8� CO PLEfED ADDRESS �� 7� � r ��� �- OWNER - ELEPH E NO. �� "� CONTRACTO ��� � DESCRIPTION �'t�l� U .f a ��Zf/�� L11 ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL _ v ❑ DEMO-SITE ❑ SEPTIC INSTALL ? O'WNENCONTRACTOR TO MEET YOU:_YES_NO y CO MENTS: � � A.J� /� J e /' i.� O (/1 S �a✓� 1r� � ). � � e � /�, ���. •O /�O C:� � � D � .t Z ���cr� D " y r � � V � ,p � / W� 1 I.,�..t ah.w aF!" � J 4�j ❑WORKSATISFACTORY:PROCEED O PROJECT COMPLEfE � ❑CORRECT WORK h PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY � �CORRECT YMORK,CALL FOR REINSPECTION TEMPORARY V��EFORE COVERING PERMANENT �CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL REfURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPEC70R ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 2a hours in advance. (952) 249-4600 OwnerlContractor on site: , Inspector: �- � WhiM CopYMsPector's Flle Cenary CopYlSite Notke f ^ , � � (S Be�701h7All /�y. .t j! /� (� Mst�s�m ISs3 �l�V � N� t�! t e�i�tU�-�'�-- l t/ �� 1 T+/'��/�/Cf'7�--� ,{J , t 1(� t./�fV� 2:3 1 of l Member Data �/k� � Desc�ipdat:STAIR WlNDOMV Me�er Type:Be�n Appicatiwt:FtDor 511L HEADER-CARRYS WDW WGHT Top Laterai Brat:ing:Coniinuous Sottom La6erai&acirtg:Continuous Stat�ard Load: Moish�re Condition:Dry Buiding Code:IBC/IRC Live Load: 0 PLF � defled'an Criteria: V360 live,l/240 tote! Dead Load: 50 PLF Deck Cw�nedion:Naied Member Wfeight: $.0 PLF Filen�ne:Beam1 . �_�.�-�,ti���t---t,�r'�� I �' =��z-� ��r7.�C r_�� �_���r t/� �,��<.._f ��-� t=�f� �->—t <<� �� � Y ��. � � � � ��__ c.� ;,���� ,�., ,�.�.�_� � ���_�°= t $ , o m� . � a � o Bearings and Reactior� / tnput Mn l .tirav[ty Gravity Locatbn 7ype AAaderial Length tiequired Readbn l�iHt � t 0' 0.a00' Wall Steel WA 1.500" 239lf — 2 8' 1.00Q" Wail Steei WA 1.500' 23 — T Maxinun Load Case Reactions u.a ro,Wpr�pdd e.a(o.r.e.aq b�� Da�d . t z3sE 2 236/ DPS�t 5�r1S 8' 2750' Product: 5112 x 6 Rosboro Glutam Arch 1 ply PASSES DESIGN CHECKS Mninum 1.50"b��equked at b�'e�g�1 Nfnlrraim 1.60"bearin9�eWufred at bwing�!2 Design ass�anes contimmus lateral brac�g abng the top chond. Design assumes cantlnuous labrat bracing alo�the botbom chord. AllOwable Stress Design � /�htal ANorrabfe � Capacity Loca�ion Loadir�y Positive Momerrt 49t.� 5940.� 8% 4.04' Total Load D Shear 21Q.# • 5247.� 3°ib -0.06' Total Load D TL Defledion 0_0336" 0.4115" U9�9+ 4,04' Totat Load D+L conra: Posalve hk,ment DOta: Ure--t00X Snov�li5% Roo�1259E WYd=1B07G _� 1 83� rza t��l e.y��'�° � - LpG ��. 9�5 �a. � � � �— .Y�ct��� �5 � S�r�l.trs J 3 � � � 1 � -�� �� ,v-�.�r' lJ �� C � �� S d�� " li�,�,ti -�� �fl ST'c��/' C.✓5,�� , �a�.�.r. � , ,Q . :�`��. ���- �-�d'� ( - ( 3 - �� f � , � � ' C---`-- .�...- i"e='�"r� : _.-.^'.--.�*��'- a�.,t �f�� -y�� �� .�s-.�S'� • . .- - . p��. F* .� �_.._ .., s �_ „4.r � b 4 •'v, :'i : � : ., - �..xA ,�....�.._.� ....,-,: 4 �.:��, 3 ..«�. ��� 3..;�. k;._Qw/!;: .� ..:.�.: .E.._.��.. .. . .. �.- , , . ::. .. . . .: . � � � � � I �,y�Ttw LCE4'S uNY�sepi d.e�D���Y��D d16�eed i0f lipt��d � � I�.�����Wc������� ~ �� M�ATF�NyIAL•I.CH—,2Q0�0�..9��y��.ApC�LYIi1Z—{��fp8�q�M��p�LPOBZ-1�6 p.yil�g�RTf�t4 p�lye � � ' r71Ni�4�/�,��{�.���,{y1a��o..r���..� ��oc �t I.RlN��S�WD� y � �r+k'- �{+U�nwww�nww��wnM Pw."1.9'�.5. n�,,�.,,� � }'Ir,.i,." " � �������VW1ww� . -; .� ft,�"- •Il�sta/adl modit In prY's.1W�21�'bo�ms ma�l ba taed if tOdK11�1�Nc ya � : /' �,a e' L• /`. b1� CODE&See pape�tor �Key ChtR. . �--�...y� °�';' o�,,,o . ----- � �rA�earodt�S+raa.�brr�had�Wnraa►t+abapamdba�d�io�+►a�d�oleaa i�r y�pDea�atr96ua�Me Ni 1bb ep�OR drr�rNe S�man S�m@�'l�lkrd� ` �7YP � .,7beie/rr+h�a arraoor�dAat Aa�0141bo rl�tlie S�wIP�' �r/,� ' �1 LCH 6� Snla0o9K1ofmCrwC.i�rpq�1271orWasYar�f6fOLL ` �, v`Z t i i• (For4XQf6blNNI►bAI) � • ♦ "? � �rF; � � � � �/�p�I��t � � ._� _l..�t ��{s . . . � \'nlwf\^.�I � .. �..� %: �. � (,. 8�M � .� �1Y� a.1 � . •`, J�4 3Ys BYi 8-'�d a'1BA 1�0 71g �T '+ � t! � (� t12,12%1+1,L5.f11 . t. ��-, � AG� �r 6y4 1416d 1+-1�d 250D WIO - � kC4R2 i�Poi '4 7 8-18d 846d 1�34. 715 n��,�1 �;4. :.°=;. � � AC4R2 . 4 7 14-16A 41-1Ed �2900 10T0 � �; ' ,.,.. .�> � AfE4(Ai� — 434 6a8d B-i8d f070 T15 � :x.• — � �oase �o-�ea rre� wio ns.«,�� � � � tc�� — :� u-isa �aisa � u� a�,us,�ss.� '� -�:,•; I ����_, � -nse(� 5� a� a-t�a a-fsa 14�; �:t�5 . .- .� f�,l27,L4.t5,F71 y,,�.. �. 1VE� 5f4 814 1446d 14-16d •2500 1Q70 .�w,• , 1�lp11 t�{ � .AC&RZ 5 9 &18d 8-1Bd 1430 715 :�� �-: '' � G111K Iq�l � AC6RZ IMnO .6 9 i4�Pd 14-16d 2500 1Q711 i12.127.L5.Ft1 '`:3,: � �; ��pq�� � �g — 6S4 6-1Sd �'16a tQ10 - 715 f12,L4.F11 � � Il�E6(I�poQ — B!b 40-16d 'la'ISd -1768 1Q70. � � LPC�Z 3lS� �3Yf &10d &10d 3� i12,la L4.L5.F11 �ACE ieeb1b11M1 - � LPCGZ 5lf� 5Ne S-tOd &10d 915 490 tt2.F11 �_' y''. {�:_G.. 1.AIOIRbN�hM blMl r1EfEi9ld�CI WGb p'lBI�1�NII IN U�'Nllf �:. ;�:: �M'lNif�D�O�',1l�YC!�Bf�OWIf IOYdt�OIM1R �i. � _, •�, iz' 2.lO�dK epply diyMplll Upd Yt peNi. - 9.LPCZ 11at�1 kid k M tlie d��clba Pr�oi b�t bMn� �.I�M niM 9�li ad bad ra�Ye�--I��M aornd Aale� ' . IWf rie0 qr�+�d fo�d vde�—��wd axl�6da 5.Upl�bds do not pyr b sNa oadNar. �� � - &&vMeed aa�a�s�ust�d�tslM by�Owbr►to i�aim lo�e LCHZ hqWbW9 7.�I�od 6r x�wad maeran�Ons k 886�(OHSP)a 8161s.t�1 �� I�lewl lad�do�otappAr. e.�tl aonqadie 1�6er eeMm�s rN.ailees ert sqo��r er,da�tioe or Ur adMa d�in�9r�le�a.Mri�s la IAe YObs N11d IatdldNn inlo Ne aifi ho�.Sre fediaNai Oaletln T Sd.COl.i1MN totyars aw tle nrtew 6w(ed7a}. 8.IIIIt�16/�0.'I��.x3lf b1�,10d=0.1rQ'd.x 31oop. i1TN41�sqIu�O Sa p�pe��or a�w wN�s�a Idarnndon. (5qu�ra(�q i °Eb;;,�, ,n�,:, ! 'a::� te. o �; �iaisN-1 TihI1N.NF�a1aa DF18P Lpit iP� Leais � .`z°' ,y� � N L �an1 Post T� . �� o'. P e;,z , , � �� � � ra�1ed r�� � s,s _.� 1.�Re�lo�6b AuMxlotd i�6ie�elpnd LC61 ao�ts ieiYd 10 MrM�d RTC�4�itll�! �s�nlldsd�oclloa m UO pod aad�MN 6e d�IsmYiei!y tlie Deoaic 2 Cam�dors romt be WMid Yi pdrs b eckMw Mrd latl�. • �� � Df�s Il�.) iN�IN.N F�siNMrt Df1SP ll�t Lpis aPF U�tlR lo�b 1ir. N L Bwe Ppl SIi�Dw. Wil1 Dp� 7�1 8MN� 11�Mu 'NtN RTG44' �{. 435 {t6�16d (1�18d 900 9D0 1�0 T75 775 1550 � �� RT� 3l4� �'K (1�16d Ci0'11Ed 8t5 1230 178D ?86' 1060 1615 �� 1.iie�lowile do�lad iar YM mNreA RiC�4 m�eNaa k MiYd!o b�Aop d tk!�M b�s aa 1he posl a�!aM/b�determYrd b!rie 0� 2 TMe dwnily dornb�A tor ri wYn Own in ffie sqm�a!RTCM ao�a B�n1e0 to besUp d�s ba�oa�0at ad�Ir10��Mambd DY Ibe�abaa ike elde 4�1e INo�ali dswNo�d k 117011s. ' . � 3.tM aa�.eMeu�R tatls�+�+�eerns ia nie�a.eaor owt m1 omMd tl�o i�I>Ia.asw uplt Io.a IWed Y Nr maa , � �• ——-----' __ _.�_--- ,.. _ , f � ( I { �'� ' /'� DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE ���� SCHEDULED T, .��rl � PERMIT N0.�1f l�; �" � � coMP�ErEo ADDRESS /�� �G' �1c�7�,� �,�_ OWNER TELEPHONE NO. �`f- ����`� CONTRACTOR %��L�if7� ���<Sf � � � DESCRIPTION ,���' ��/� ��f f��� S LL �FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL � ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL 2 ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT � ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL _ � ❑ DEMO-SITE ❑ �E TIC INSTALL 2 OYYNERICONTRACTOR TO MEEi.���YES_NO y COMMENTS: � �j� �r c� �� 7�✓ �� �- � � SS• 0 1 /�GL�LK,� � .� ' �� �� � �7� �� '� � � / - ay�� x y��, - _ ° � - ia �� x �s� '� - - W _ Q �O� G - G l4 � 5� 54�!c� � 6 � � rc�d✓� c �c �4 ��.� �,r- loose sd• G w ^ j �p✓�Gd� � ��V/' rK� � W ❑WORKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE � /�CORRECT WORK 8 PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY O��O CARRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFOREC01/ERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REWIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-46�� OwnerlContractor on site: Inspector: ���" White Copyllnapector's File Cenary CopylSite Notice �� � .. ✓ � DATE TIME • CITY OF ORONO CALLED IN INSPECTION NOTICE �t Q SCHEDULED '?/� �:a� PERMIT NO.�L���` BV�S l COMPLETED ADDRESS �07 U �'t I,RLY��M� �Y�1 _ 01AINER TELEPHON NO ��+�S� 50 7"� CONTRACTOR , � � DESCRIPTION �'� 1��."ll�l�.+�'CTIQ?�_ "` L�G{rY��T t�Yl w ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT v �`FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP W �❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL 2 v ❑ DEMO-SITE ❑ SEPTIC INSTALL Z OWNERICOI�(TRACTOR TO MEET Y�WI:_YES,NO y COMMENTS: W � ".' � ��� C°���'�L���.s �r�u��r, � � /� /� 0 /f/ Y/'l3Uc�OC 45��4.• 'l� �urve-f �. � �O « f�ofK .5��►7�,5 cc,N►p�c�c a9G✓ W Q ����-C-�D� � � W /� W ��� .� �i I't4��� ,OG�ld��ti� G����•� � G✓'l,�r �J .lG � C, , � ❑VMORK SATISFACTORY:PROCEED PROJECT COMPLETE w ❑CORRECT VNORK 3 PHOCEED ❑I UE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFOREOOMERING PERMANENT ❑CORF�CT UNSAFE CONDITION WfTHIN HOURS. p pHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPEGTOR �GTATION ISSUED O INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. CaN br the next inspection 24 hours in advance. (952) 249-4600 OrmerlContractor on site: �nspecta:�� h=- � Whits CopyAnapxto�'s Flk Canary CopylSits Notke �, ( �,� 1 �� �,�I DATE TIME CITY OF ORONO gQ C LLED IN INSPECTION NOTIC � / SCHEDULED � �� PERMIT NO. � COMPLETED ADDRESS � ('���; '�-�I� LY"1`�-_fZ l�1� OWNER TELEPHONE NO.����I �L ' �OO1r� CONTRACTOR � � �` � Y_��.�� � DESCRIPTION �� ' �' 1 ty ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP 41 ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL _ J ❑ DEMO-SITE ❑ SEPTIC I ALL 2 O'WNEAICONTMCTOR TO MEET YOU:_YES�NO y COMM ENTS: �f%'����� l ��'(%'��� /!� �71�2�;L? a `��/��' !�Qi'�/C GZi"T T GZ���ih� S G2�1.7 �Gl' � � � - iwv rb ws a� ��,�I� � ,-�a��i �•� 0 Q ' )��P�/J fG�''��P11� �n I��. /�U-�CG Su,��' � � r✓�c�.=�--f c�.%� ���c>>'�tn�,P S on�� 7��a� rar�a� 2 � 1 � i� C�o M�f-PiT � W � J W ❑YYORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE � CORRECT VYORK 8 PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY W O CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑pH0T0 TAKEN INSPECTOR Will RETURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Cail for the next inspection 24 hours in advance. (g52) 249-46�� OwnerlContractor on site: Inspector: �'�Q��`'G"� VYhite Copyllnspector's File Canary CopylSite Notice ,�- [ ���_ I � DATE TIME '/ CITY OF ORONO CALLED IN - �� � INSPECTION NO ICE SCHEDULED 7- //-/7 � PERMIT NO. �� �-5� C PLEfED ADDRESS ld l� ����L� � ! l/`� OWNER TE EPH/ONENO. �S/- DQ-�U�� CONTRACTOR Vl�'t.� �1r1� /k- !��-!� � � � DESCRIPTION �� �' � ' l~y ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING �Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL 2 ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT � _f�FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP _�❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL v ❑ DEMO-SITE ❑ SEPTIC INSTALL . 5,�,-F G. C�-oQt.L�..'d' Q OWNERICONTRACTOR TO MEET YOU:_YES_NO - S tt.i S ��t�e��s� � COMMENTS: E /�• ��.�t�L ' � -a�-�7 ��.f..� - o K � - S�� �� 4 / o /'a � e � wc✓ r t r rc�uG � Y /'bV�� 4<� � /[�7G<<� 6.� !K � 't/`�' � ONa!/e� Lb���cv••• W � � f/ � � 4.,.�.. ni�s/.✓l- � Q 2 C��„`'P���� s� �-� s �t�.,t �✓ rd� � aSc�'Ol,c� � ' ' .� � � ' w� l P rov�(0� � _it.e�r.� r G� .�.�.�, c � � , v6� � (� resv�•�t �,s- �'t� sw���f W� WORK SATISFACTORY:PROCEED 2 QS� �� ❑ PROJECT COMPLETE W ❑OORRECT WORK 8 PROCEED (�J�� ��,p c,��f ❑ ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION��,p/�c TEMPORARY V BEFORE COMERIN(3 r PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. p p�{OTO TAKEN INSPECTOR WILL RETURN • ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED �ECT10N REQUIRED.CALL TO ARRANGE ACCESS. Cafl for the next inspection 24 hours in advance. (952) 249-4600 OwnerlContractor on site: Inspector: �� Its CopyAnspector's Flls C�nary CopYlSib Noties � � V � � ` �"� � DATE TIME CITY OF ORONO CALLED IN � __� INSPECTION NOTICE SCHEDULED �_L_'� PERMIT NO.����Je -� � ���� COMPLEfED ADDRESS ��. � �.� �I�� I"'1_,—�1� � k � �NNER TELEPHONE NO. ��"c�j - y��S -LX �_� CONTRACTOR �� I` � Y1� �r ��1�,`� �- I � �-}-I MS � DESCRIPTION � � �� " � J � �y ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL � ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLINd O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL _ J ❑ DEMO-SITE S�PTIC INSTALL 2 OMfNERICOKTRACTOR TO MEET YOU:� YES_NO � COMME � f -,' 4 > � C � �` � �` i...� o , � �, i s ^ f r � ��� � n � ����: �. a� , � – '�/ %-ti C 7 �_ Q — /�e_,a.,,, ::�'^ `' � '' �-S✓� .. ' � �C..i i � ��w..1/' i L� S ti c '�. f° /'� ".I f`.'� 'i if1 �`f � L`'i1� c�cr 1 t<:, 0.1 , � .,c✓ ^� ��% /�, W }�- � / �,(, /� �,( j1 �h�.. •i11 �) � ���JI�:G� C �:'�'�'CC;ft�'-:F.C_/ tvl�. �k/�_;.� W ❑VMORK SATiSFACTORY:PFiOCEED ❑PROJECT COMPLETE � �CORRECT YMORK a PROCEED ❑ISSUE CERTiF1G1TE OF OCxUPY1NC� 0 ❑CORRECT VMORI(,CALL FOR REtNSPECTION TEMPOMRY V BEFORE CONERINO PER6AANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. p pHpTO TAKEN INSPECTOR WFLL RETURN ❑STOP ORDER POSTED.CALI INSPECTOR ❑CITATION ISSl1ED ❑INSPECTION REQUIRED.CALL TO ARRAN(3E ACCESS. CsN 1or the next inspection 24 hours in advance. (952� 249-4600 OwnerlCoMrector on site: �nspe�ta: � ���, WhiN CopYflnspecMr's FII� Camry Cop�rf8it�Notia �-- � � ��� DATE TIME CITY OF ORONO CALLED IN ==��f INSPECTION NOTIG ("4��-l�' SCHEDULED _ ..�� _( �-�'� PERMR NO. 2 . I `��'� COMPLEfED ADDRESS I ��' 1 ��� �I�I �� ��� f�fZ j�. OWNER TELEPHONE NO. �J � ���;���5� l CONTRACTOR ��'(.'i/'1C C L�S f��'1 -�- S �� � DESCRIPTION �`--� !'�� ���-� Ck�/ C �� ✓�,�l�i r' 11 � ly ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLINd �O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT � ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL _ v ❑ DEMO-SITE ❑�S TIC INSTALL 2 O�WNEAICOKTAACTOR TO MEET YOU:�YES_NO � COMME� � f� ''� 4 i :'/ �r(�t�i�@ t f"Yvl,� l l�t,f AO . ,� j � �O � � /� ,5�//� � '�Z� .����, , 0 W � Q � W � W � � , W ❑W�OFtK SATiSFACTORY:PFiOCEED ❑PROJECT COMPLETE � ❑CORRECT YVORK 8 PROCEED ❑ISSUE CEFITIFlCATE OF OCCUPYINC� W O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERINQ pERINANENT ❑CORRECT UNSAFE OONDITION VYITHIN HOURS. p pHpTO TAKEN INSPECTOR YVILL RETURN O STOP OROER POSTED.CALL INSPECTOR �GTATION ISSUED '�ISPECTION REW IRED.CALL TO ARRAN(iE ACCESS. � CaN tor the next inspection 24 hours in advanoe. (952) 249-4600 OwnedContractor on site• i��t«: �.���- � White CaPYAnapactors Fib C�nary Cop�rlSlq Notia