SCOPE OF PROJECT:
[] Interior renovations to the rooms indicated below
FOYER
1 Remove existing first riser , tread and handrail on both sides. Prep. for new.
[] Remove existing crown molding ( throw )
2 Handrail 1 Starter step
* Rail
* Shoe
* Newel
* Baluster �
'` Rosette
* Fillet
* Cap
* Trim
* Starter step
UPPER LEVEL FAMILY ROOM
[] Remove false beams from ceiling and throw
[] Remove wainscoting and throw
[] Remove base,trim,and chair rail ( throw )
3 Remove existing door and header from family room to kitchen
and prep for 4'-0" cased opening centered (relocat door to �sm±.)
[] Remove existing vac-u-flo and relocate
[] Remove existing fireplace mantel ( throw )
[] Remove existing bookcase and save for relocation to den
Page 2 of 5
DINING ROOM
[] Remove all crown molding ( throw ) prep for new
LIVING ROOM
[] Remove all crown molding ( throw ) prep for new
[] Remove existing fireplace mantel and surround ( throw )
POWDER ROOM
[] Remove ceiling fixture and install new wall mount fixture ctr. on mirror
DEN
[] Remove all chair rail, base ( throw )
[] Remove wainscoting and ( throw )
[] Remove existing closet and ( throw )
BASEMENT STAIRWAY
4 Remove existing door,header and studs and prep for new stair opening
Add temp support for new header
UNFINISHED REC. ROOM
5 Remove existing non load bearing wall and prep for new MECH.room door location
EXISTING STORAGE ROOM
5 Remove existing wall and relocate for larger game room
LOWER LEVEL FAMILY ROOM
[] Remove portion of closet and ( throw )
7 Remove existing sheetrock at ceiling for means of removing struc. header
add temp support for new longer struc. header
MECHANICAL ROOM
Page 3 of 5
8 2'8"x6'8" Oak flush HC prehung door
* Rough opening: 2'10"x6'10".
* Jamb size: 4 9/16" due to new 2x4 stud walls.
* Door swing per plan. (if swing changes adjust electric)
* Hardware:
* Trim: Birch casing, stained by OWNER.
9 Install 2'6"x 6'8" passage door from existing upper family room
NEW STORAGE ROOM
10 2'6"x6'8" Oak flush HC prehung door
* Rough opening: 2'8"x6'10".
" Jamb size: 4 9/16" due to new 2x4 stud walls.
" Door swing per plan. (if swing changes adjust electric)
* Hardware:
* Trim: Birch,casing, stained by OWNER.
UNFINtSHED AREA
11 Build and install 30" deep shelves, 4" platForm (2 x 4's and 1/2" plywood)
GENERAL NOTES
[] Any yard damage REPAIR including trees, shrubs
and all landscaping by OWNER.
[] Dumpster is for L.B.R. use only.
[] All painting, staining and decorating by OWNER.
[] Floor covering by OWNER. (unless noted otherwise)
[] Heating per coniract. Add heat runs to bsmt. , and main floor as needed
[] Plumbing per cor�`tract. insulate pipes in rec. room and game room
M
Page 4 of�
[] Electric per contract:
* ALL FIXTURES furnished by owner and installed by L.B.R., if
on job at electrical finish. (includes exterior flood lights)
* Switch and outlets to be "IVORY" color.
* CABLE N and/or PHONE rough-ins are by owner. L.B.R. will
advise owner when to call for installation.
"' Any SECURITY SYSTEM repairs or additions by OWNER.
'' No DOOR BELL BUTTON relocation is included in this contract
(door chime for basement jobs)
* No smoke detector is included in this contract, but may have to
be added depending on the condition of your existing detector.
* Note you have been charged in this contract for.
27 - standard receptacles (wall outlets)
1 -ground fault interrupter"GFI" receptacle
14 - standard light openings (no fixtures included)
2 -standard eyeball openings (no fixtures inc.)
7 - standard switches
Any changes to the above quantities will be charged or credited
accordingly.
(4) new circuits for lower level
* Indicate any special receptacles needed for computers,
entertainment centers, etc. and any special heights wanted.
[] OWNER DIRECT "Do it yourself' ITEMS:
(OWNER is responsible for all contractual obligations:
selections, schedule, cost liabilities, and callbacks
L.B.R. to assist in schedule coordination).
[] CAUTION:
DO NOT remove, tear down, or dig up anything before building
permit is on job site.
[) OWNER to protect/move all personal property from, in, or around
construction area, both interior and exterior. Please review
area before construction start-up and remove neccesary items.
N
�
Page5of5
ROOM.FINISH SCHEDULE
ROOM CEILING WALLS FINISH UNDER- BASE CASING
FLOOR LAYMENT
main floor patch,swm patch b/o n/a f-132 birch
famil rm. coat-smooth prince
dining �o n/a
room
living b/o/ n/a
foyer b/o n/a
master
bd.,bath
den patch,skim patch.,
coat,smooth skim,coat b/o Na f-132
sun ktty pine . exist existing existing existing existing
room 6" v=oint
I/I patch if patch existing existing existing birch
bed needed rince
I/I patch,skim patch existing existing existing existing
famil ,coat,smooth
rec. 5/8" s.r. 1/2" s.r. b/o existing f-132 birch
room smooth rince
game 5/8" s.r. 1/2" s.r. b/o existing f-132
room smooth
storage 1/4" cedar 1/4" cedar b/o existing
room
[] CROWN MOLDING
* f-614 - mstr. bed and den and family room
* f-614 -f-733 dining room and living room
" f-749 w/full 6" bd for a 3 pc. crown in foyer
r
i