HomeMy WebLinkAboutAs-built survey review . �
Christine Mattson
From: Adam Edwards
Sent: Wednesday, September 14,2016 4:18 PM
To: Christine Mattson
Subject: 787 Boulder Drive
Chris,
I've reviewed the subject as built.
An inspector should conduct a site visit and confirm the following:
1. The survey accurately depicts conditions on the ground.
2. The site is stabilized to the point the any remaining erosion control can be removed.
3. The retaining walls are built(they are listed as proposed in the legend of the as built).
4. The retaining walls on the east side of the building are separated by at least twice the height of the upper
wall. If not then a copy of the design must be submitted signed by a licensed engineer.
Adam
Adam T. Edwards, P.E.
Director of Public Works/City Engineer
City of Orono
(952)249-4661
aedwards@ci.orono.mn.us
�