HomeMy WebLinkAbout2000-P02995 - mechanical � PERMIT
�ITY OF ORONO
2750 Kelley Parkway - PO Box 66 Permit Number: Po299s
Crystal Bay, Minnesota 55323 Permit Type: Mechanical Permits
(612) 249-4600 Date Issued: 9i2oi2oo
SITE ADDRESS: 225 Hollander Rd
WAYZATA,MN 55391
P�D: 25-118-23-44-0007
DESCRIPTION:
Proposed Use: Residential
Permit Class: General
Permit T e: Mechanical Permits Permit Sub-type(s): Heating Systems
YP Air Conditioning
DETAILS:
Approved per resolution#:
Separate permits required:
NOTICES/REMARKS:
FEE SU1I�MARY: Permit Fee: $ 77•66 Valuation: $ 6,213.00
State Surcharge Fee: $ 3.11
Misc. Fee: $ 1.50 MAIL IN
TOTAL FEE: $ g2,27
APPLICANT: DITTER INC& DITTER PROPERTIES OWNER: L N NEUMANN&M M MACMILLAN
820 TOWER DR 225 HOLLANDER RD
HAMEL, MN 55340 WAYZATA MN 55391
THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED
AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITI�ALL CITY OF ORONO ORDINANCES AND
STATE OF MINNESOTA BUII,DING CODE REQUIREMENTS.
�� -} � ( - ,��� _�.c C) 1 z t � 1 ��_J
(� i 1 �1 r .�
APPLICANT PERMITEE�I NATURE ISS ED BY SIGNATLJRE
Copies: City,Applicant,Assessor,Finance Page 1
CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT
Box 66 (2750 Kelley Parkway)
Crystal Bay, MN 55323
GENERAL INFORMATION
1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be
reviewed and a permit will be issued within 2 working days.
2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL
YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON
THE JOB SITE.
3. Mechanical Designs - Complete calculations, details and specifications are required for each heating,
ventilation, humidification-dehumidification, and air conditioning installation including heat loss/heat gain
calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model.
Data shall be presented on form provided. Identification of and specifications for water heating equipment
shall also be provided.
4. When any new construction or remodeling is involved, a separate building permit must be obtained.
5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements.
6. All work must be inspected (rough-in and final). Call 249-4600. 24-hour notice required.
7. House Heating Test Record must be submitted before final.
Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification.
INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 249-4600.
Please check one: New Addition Repair � Replace
t Residential Commercial _.
JOB SITE• •��'S_ Ti, ;�,.�, � �, /�c Zip: S S��'(
Owner'sName: ���u� c°l�� (�'�- TelephoneNumber: J���l y�
Mailing Address: ''��) � ��i; �(�7� " 1 City: ;;t,-i�;�a l�t Zip: �)��r
Contractor's Name: ' t�Z ���- Telephone Number: ��,�'-��5��
Mailing Address: ��� TZ�ri� rZ . City: ,`�=����ii r�- Zip: �>��•y��
,
SYSTEM DESCRIPTION
HEATING SYSTEMS
Quantity: % _
Make: ' r��(�7�-
Model: 5 a�n�IZ��
Fuel: /t�--C� -
Flue Size: .��" �
Input BTUs: �Z���'�'
Output BTUs: ?:`' �C�� -
CFM: ��;�;
COOLING SYSTEMS
Quantity:
Make: "'-;�'�_:t��k'
Model: - -;�;� �,��.
Tons: �-/
H. Power
FIREPLACES
Gas factory fireplace
Wood burning factory fireplace with flue
Wood Stove
Wood stove with flue
Brand Name Model No.
VENTILATION
No. Kitchen Exhaust ducted recirculating cfm
No. Bath Exhaust (must be ducted outside) cfm
No. Other Fans: Locations cfm
FUEL STORAGE (MUST BE APPROVED BY FIRE MARSHAL)
Installation Removal
Fuel oil: gallons underground inside outside
LP Gas: gallons
Other Gas opening
PERMIT FEE CALCULATION
l. 1.25% of Contract Price* or N�inimum Fee ($35.00)
�C/ � �� x .0125 $ �1� ��%�
(contract price)
2. State Surchar�e. ** Add the State Building Code Division �
Surcharge to each permit. x .0005 $ �•�l
or $.50, whichever is greater (contract price)
3. Posta�e and Handlin� (Only mail-in applications) $ 1.50
4. TOTAL PERMIT FEE (Add lines 1-3 above) $ ���'7
* CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted
work including materials, labor,prof t, and other fixed costs. It is the amount to be charged to the customer
for the work done. If any material, equipment, labor, or installation are furnished by the owner, tenant or
any other party the reasonable market value of such items must be added to the estimated cost or contract
price for permit fee purposes. In the event that there is a dispute on the amount of the job cost, the City may
request the submission of a signed copy of the actual contract.
** The STATE SURCHARGE is .0005 of the contract price under$1,000,000 or $.50 - whichever is greater.
For valuations over �1,000,000 call the Department of Inspectional Services for the price.
The undersigned hereby applies to the City for issuance of a Mechanical Permit, agrees to do all
work in strict accordance with the ordinances of the City and the regulations of the Minnesota
State Building Code, and certifies at all statem �s,,made on this application are complete, true
and correct.
, l�, ��� c
A licant sSi nature: 6 Date: v� ��- C�
PP � -
�
Approved By: � � Date:
,r•� �
� .
r
NEUMANN/MCMILLAN
HVAC LOAD ANALYSIS
for
�-
N�umann/McMillan
225 Hollander Rd
' �ror�o; MN
I' �
�
���� ��jQ�����
�' ���.�Q��
Prepared By:
Doug Bjork
Ditter Inc.,Cooling and Heating
820 Tower Drive
Medina,MN.55340
(612)478-9558
09-16-2000
� .
��tHVAC-Re$idential8 Light Commerciai HVAC Loads Program Elite Software Development,lnc.
� Ditter,Inc. � ' NeumannlMcMtltan
Hamel,MN 55340-9691 09-16-2000 ' Page 2
Project Summary
Project: Neumann/McMillan Company: Ditter Inc., Cooling and Heating
Client: Neumann/McMillan Representative: Doug Bjork
Address: 225 Hollander Rd Address: 820 Tower Drive
City: Orono, MN City: Medina, MN. 55340
Phone: Phone: (612)478-9558
Fax: Fax: (612)478-9524
Comment:
Design Da#a
Project Name: Neumann/McMillan
Reference City: Minneapolis, Minnesota
Daily Temperature Range: Medium
Latitude: 44 Degrees
Elevation: 834 Feet
Elevation Sensible Adj. Factor: 1.000
Elevation Total Adj. Factor: 1.000
Outdoor Outdoor Indoor Indoor Grains
Drv Bulb Wet Bulb Rel.Hum. Drv Bulb Difference
Winter: -20 N/A N/A 72 N/A
Summer: 95 75 50% 75 36
Check Figures
Total Building Supply CFM: 1828 CFM per square foot: 0.716
Square feet of room area: 2,554 Square feet per ton: 604.807
Building:Loads
Total heating required with outside air: 92,427 Btuh 92.427 MBH
Total sensible gain: 39,019 Btuh 85 %
Total latent gain: 7,091 Btuh 15 %
Total cooling required with outside air: 46,110 Btuh 3.842 Tons(based on sensible+latent)
4.223 Tons(based on 77% sensible capacity)
Notes
Calculations are based on 7th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
Saturday,September 16,2000
r RHVAC-Residential�Light Commerclal HVAC Loads Program � ' ' Elite Soflware Development,Inc.
' Ditter,Inc. Neumann/McMillan
liamel,MN 55340-9691 09'-162006 Page;5
Room Load Summary;Reports
i
i
System#1 Room Load Summary
Htg Htg Run Run Clg Clg Clg Zone Clg Air
Room Area Sens Nom Duct Duct Sens Lat Nom Adj Adj Sys
No Name SF Btuh CFM Size Vel Btuh Btuh CFM Fact CFM CFM
---Zone 1---
1 Existing Home 2400 74,592 998 13-6 600 27,277 5,128 1,278 1.20 1,531 1,278
2 Addition 154 17,835 239 5-6 588 11,742 1,963 550 1.05 578 550
System 1 Totals 2554 92,427 1,237 39,019 7,091 1,828 2,109 1,828
Main Trunk Size: 20x16 in.
System#1 Cooling System Summary
Cooling Sensible/Latent Sensible Latent Total
Tons Split Btuh Btuh Btuh
Net Required: 3.842 85%/15% 39,019 7,091 46,110
Recommended: 4.223 77%/23% 39,019 11,655 50,674
System#1 Equipment Data
Heatinq Svstem Coolinq Svstem
Saturday,September 16,2000