Loading...
HomeMy WebLinkAbout2011-00732 - addn/remodel/repair'' � CITY OF ORONO PERMIT NO.: 2011-00�32 F K 2750 KELLEY PARKWAY � ORONO, MN 55356- DATE IssuEn: 08/15/2011 952 249-4600 FAX: 952 249-4616 ADDRESS : 4195 HIGHWOOD RD PIN : 07-117-23-44-0022 LEGAL DESC : HIGHWOOD LAKE MTKA : LOT 000 BLOCK 000 PERMIT TYPE : ADDITION/REMODEL/REPAIR PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : ADDN/REMODEL/REPAIR ACTIVITY : 434-RESIDENTIAL VALUATION : $ 255,000.00 NOTE: SEPERATE PERMITS REQUIRED: PLUMBING,MECHANICAL, ELECTRICAL(STATE) APPLICANT pERMIT FEE SCHEDULE 1,986.75 PAQUETTE CONSTRUCTION STATE SURCHARGE(VALUATION) 127.50 3730 SHADY OAK RD MINNETONKA,MN 55305- TOTAL 2,114.25 O PAID WITH CC# 5784 Minnesota State License#:3225 OWNER SMITH,DOUGLAS&ROBAN 4195 HIGHWOOD RD. MOUND,MN 55364 AGREEMENT AND SWOR1�1 STATEMENT The work for which this permit is issued shall be performed according to --� the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permiu. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null a,7d void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections aze requested in conformance with the State Building Code.This permit may be revoked at any time for du se. � 8 � 1�'/ �� �'`�/5 / / App icant Pe ignatur Date Is d B Signature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. r * . M . � City of Orono Building Permit Application for New Structures or Additions %�,0,�.� Ma�bPO Bo�r66� Permit number: a/ - (�(� �� //Qy � Crystal Bay, MN 55323-0066 Date received: � / �� ��a ��,',�''� ` a.� StreetAddress:' Received by: �" ` �=.�- � \'�'�c,L��,t ;;t� �ti� 2750 Kelley Parkway ;�a' Plan reviewfee: / /, �� ����` � Orono, MN 55356 ; \`?FtESH��`'/ :7�C'//` �t� 7� � ---�� Total Fee: c� Main: 952-249-4600 Fax: 952-249-4616 www.ci.orono.mn.us ' ��-i ,•;, � �n/`�;� This application form must be completed in full and all required informafion must be sub ted. � �'l� Incomplete applications will be returned. (Please prinf) GENERAL INFORMATION: Job Site Address: E t �c�� � ' � '�S r � C,C Will this be a Parade of Homes, Remodel s Showcase Home or other Display Home? ❑ Yes �No If yes,a special event permit is required with Police Department and City Council approval 60 days prior to the event. Shuttle bus service will e required unless applicant demonstrates sufficient on-srte parking is available. Non-permitted events will not be allowed. CONTRACTOR/APPLICANT INFORMATION: Name: ���• , _,� ��•U � �•� L State License# '3�`�� � Expiration Date: `� -'' Phone: 6 � � �`_���� S �- �33 r- 3C> office) • � ,,�.3'-_5,' � ' cell) Mailing Address: 3 � ,��� Cit : � � , • -,LZIP: r � Contact Person: � ��'" � s Applicant is: � ontractor � / Homeowner J (Circle One) Email and/or Fax: ' � �c � c �' " 3 3 -3�� PROPERTY OWNER INFORMATION: ` ` Name: I���� 1c:�� � ��b,o.,ll S�l T Phone (day): � ;` -7-. �r y Address: �''_ Cit : � ZIP: �'SS'�� y Email and/or Fax 'y� -�-- � ,�-� ARCHITECT/ ENGINEER INFORMATION: ���,`����;,��,;�, ;�.asc��. Name: .�-i ��� �lii1�1[,tA �5��,r.�f < ��-n � Phone (day): �� - �� "—� � Address: 3. , ` '� Cit :` >. , � % / , � ZIP:.�� -s':` Email and/or Fax: �,��_?� ; '` L`y — ; c�5�, PROJECT INFORMATION: 1.Type of Project 2. Proposed Use 3. Structure Type 4. Sewage Disposal � Water Supply ❑ New Construction ❑ Single Family with '�f�esidence • .Addifion attached garage ❑ Garage/Accessory Bldg. ❑ Public Sewer �Accessory Building � Single Family with ❑ Deck ❑ Relocation detached garage ❑ Office/Commercial ❑ Private Sewer ❑ Other: (specify) ❑ Muitiple Family/Condo ❑Warehouse ❑ Public ❑ Storage ❑ Public Water **Any earth movement may require ❑ Commercial ❑ Other(specify) MCWD review 8�permits. ❑ Industrial ❑ Private Well Minnehaha Creek Watershed District(MCWD) ❑ Other: (specify) 18202 Minnetonka Blvd Deephaven, MN 55391 Phone: 952-471-0590 Fax: 952-471-0682 www.minnehahacreek.or Estimated Construction Valuation (excluding land) $ �S.JS' �r;�, �� w . STRUCTURE INFORMATION: . 1. Structure Dimensions 1. Structure Dimensions(continued) 2.Type of Construction a. Length (ft.)= Number of bedrooms= ❑Wood/Frame ❑ Masonry b.Width (ft.}= Number of garage stalls: ❑ Metal Attached= ❑ Pole Bldg. Areas in square feet Detached= ❑ ICF ❑ On-site Prefab c. Basement= ❑ Off-site Prefab d. 151 Story = ❑ Other(please specify): e.2"d Story= f. '/z Story = g.Total Area= REQUIRED SUBMITTALS: All of the information must be submitted in order for your application to be processed: Not Enclosed Applicable ❑ ❑ Permit Application ❑ � ❑ Pro osed Buildin Plans ❑ ❑ MN State Ener Code Calculations and Mechanical Code Re uirements Form ❑ ❑ Surve meetin all re uirements ❑ ❑ Stormwater Pollution Prevention Plan ❑ ❑ Hardcover Calculation s) ❑ ❑ Se tic S stem Site Evaluation Re ort ❑ ❑ Access Permit ❑ ❑ Wetland Buffer Im rovement Plan ❑ ❑ En ineered Plans for Retainin Walls 4 feet or above ❑ ❑ Plan Review Fee ❑ ❑ Other APPLICANT ACKNOWLEDGEMENT: . Agrees to provide all information required or requested by the Building Department; • Agrees to pay the City of Orono for engineering consultant review costs in excess of$500; • Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative but to reject it until it is complete; • Acknowledges the Escrow Agreement is completed and signed; • Understands some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other govemmental agencies required by law. If you refuse to supply the information,the application may not be issued. • Agrees that in the event that weather or other conditions prevent the completion of an as-built survey at the time the Certificate of Occupancy is requested, a temporary Certificate of Occupancy may be issued upon receipt of a $10,000 escrow agreement to ensure completion of the as-built survey and all site improvements. .- � _�__-_---..._�.�____- _�__--- _ ApplicanYs Signature� : � � __---� Date: � "- o ��/� ' —., .� � � Plan Review Checklist for New Structures / Addi#ions � Address/ PID/ Legal: Ll � � 5 M I lo)�l w u O� 20�4�1 Description of work: /���� ?7 p � � a Se tic review b `" � � � � • P Y� � v ��r��,'`� �� � �Date Approved: �� � �� � ��� �..., Zoning review by: Date Approved: ' Building review by: Date Approved: �'1 - cC1 ' � Grading review by: � � `�� 4� � ` Date Approved: � �� � � � .� Zoning File#: Resolution#: Resolution Date: Zoning District Fire Department Post Office School District Zoning: Lot Area;� ..�`�"�� �Z� SF/�AC Width: Depth: Survey Submitted: `` ���'es ❑ No `` Date of Survey: � � � �1 � a Pro osed Setbacks: � Front(Lake) Rear(Street) ( N S E W ) ( N S E W ) Other Buildings Wetland Side Side � .�'`"��.-° .� � Building Defined Height: � Building Peak Height: #of Stories Ok?; 1'���S t:i FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A'BUILDING ON A SLAB FOUNDATION: ��' START WITH the distance between the basement floor!crawl START the distance between the slab and the highest space floor and the highest roof peak, the top of WITH roof peak,the top of the cornice of a flat roof, the cornice of a flat roof,the deck line of a the deck line of a mansard roof, or the mansard roof, or the uppermost point on a round uppermost point on a round or other arch-type or other arch-t e roof roof SUBTRACT half the distance between the highest window and SUBTRACT half the distance between the highest window hi hest roof eak of a itched roof and hi hest roof eak of a itched roof SUBTRACT the distance between the basement floor/crawl ADD the distance between the slab and the highest space floor and the highest existing grade within existin rade within the foundation the foundation or 10 feet,whichever is less. EQUALS Defined buildin hei ht EQUALS Defined buildin hei ht ���k7�`���►����� ' �� V� Lot Coverage: �'� SF % Shoreland District MCWD Permit Received Avera e Lakeshore Setba`ck Bluff" � � � �" 0 Yes ❑ No ❑ N/A ❑ Yes ,0'No ❑ Y�s ❑ No ❑ Yes ❑ No �N/A . �- � � _-��-�_� Permit Number: `� �a"� � Setback: �. � : Hardcover Zones Existin Proposed Variance R�quir�d CUP Reqt{� ed o-7s� �� � �_��=��� .��� � o Yes ���o [�' ❑ Yes ��l�.No , 75-250' ��. ��1 �;� �� .��,�1 TYPe�s)� �TYPe�s)� . 250-500' 500-1000' REMARKS (in-house): Updated: 09/11/2009 z:lforms\plan review checklist.docx Fees to be Charged YES NO • 7P,p.��frnl����"'�p J�M�Kr...xFM1�SaT�T,' "s�`•"t a �i�� rI '*�w 's �_�9 � i�j��.�,m � u -� �;'f • �k�. � ,:a+a.��w�'G�s,�{��"j�"Y`r, . + : s.af .w,.s _ x •,f:t*� P{an Review S�ate��u�r � �, � ��� ��, ��p �N r �...a � ,t -0 , �� cha�r e��i���` ��'�� '� '' "" ���.�°�� ��.,s �, .i,'�1"`m'�..,�x` sY���S��t" ��+� ��, ?�� Investigation Fee �',��`� �,�Talu�raber.�v�f'�A��UU�a�#s�.�4��� ��`��"��. �;�iq� � �� Sewer Connection �1Naxe�r�Co.n�necfiion ��-`�� } �� � � = F � ��� � ��'' -���;� .. . . t.��.;_ „ .: Park Fee �S'ite lnspection = ��� ��'���y����� � �R���r�� ` - �,rt� Other (specify) � `iis�e�Jlan" <��_ �,� s,��� � � eou° s�F.�ee�� .�, �R. ,<<.,�.�������;:���4''�4���,s��:� � . �„ ,. ; ..E ,�-� ,,�. ,_ ._. ., : Calculated By: Square Foota e $ per Square Foota e Basement X = � 1 St Floor X = $ 2"d FlOor X = � Garage x = $ Estimated Construction Value: � ZS�,pdp `'a' � Orono Inspections Required Work Requiring Separate Permits Required State Permits � Site ,�Plumbing � Grading/ Filling ❑ Well ❑ Hardcover Removal Mechanical � Fire Electrical ❑ Footing 0 Septic � Water Connection � Poured Wall ❑ Fireplace ❑ Sewer Connection ❑ Foundation Survey ❑ Masonry ❑ Lawn Irrigation ❑ Radon Rock Bed ❑ Mfg. Ja' Framing � Other(specify) ��nsulation `"Fd.,As-Built Survey ,0' Final ❑ Other(specify) REMARKS (in-house): Other Review: Reviewed by: Date Approved: Access:Existing: � YES ❑ NO New: ❑ YES 0 NO REMARKS (TO BE NOTED ON PERMIT AND INITIALLED BY PERSON PULLING PERMIT) �'�,��-u�°r,,�'* "'�- f'�r�,'� .�,.'�'.,�/2 �i°D��-C, C� d� Updated: Q9/11/2009 z:\formslptan review checklist.docx , . � 2335 Highway 36 W St.Paul,MN 55113 Tel 651-636-4600 Fax 651-636-1311 www.bonestroo.com August 9, zo�� �eonestroo Ms. Melanie Curtis Planning &Zoning Coordinator City of Orono Post Office Box 66 Crystal Bay, MN 55323 Re: 4195 Highwood Road File No. 000139-11000-1 Building Permit No. 2011-00732 Dear Melanie: We have reviewed the plan for the proposed home addition located at 4195 Highwood Road. The plan is dated July 11, 2011. We have the following comments with regards to engineering matters: . The plans are acceptable from an engineering standpoint. If you have any questions, please call me at(651) 604-4894. Sincerely, BONESTR00 �J � . Darren Amundsen Cc: Tom Kellogg . , �� ■ n� � ���� 3730 Shady Oak Road •% =���. �� Minnetonka, MN 55305 � � a Phone (952) 933�3930 Cell (612) 723-5248 CONSTRUCTION COMPANY Fax (952) 933-3033 June 2, 2011 Douglas and Roban Smith 4195 Highwood Road Mound, MN 55364 The following proposal covers the complete remodel and expansion of the Douglas and Roban Smith residence per the cunent plan noted as Option"A". 1. Removal and disposal a. See roofing section for tear off and replacement. b. Upper hallway materials to a11ow for redesign including flooring, wa11s at study bath and closet area. All framing and finish to allow for new layout. c. Entire central bath including old ceiling/roof framing. d. All framing, flooring, drywall, electric,heating, insulation, etc. at the east bedroom area. (Leave stairway walls.) e. Remove exterior porch as well as exterior siding per drawing. f. Remove stucco on lower front walls of two story west bedroom and study. Note: Protect master bedroom, front-northwest bedroom and west stairway during removal and renovation. � g. Remove stucco on lower wa11s of porch. h. Surfaces as necessary for conversion of 2"d floor porch to year rounds space. Dispose of all debris resulting from a—e , ; � 3730 Shady Oak Road Mim�etatka, MN 55305 � � � Phone(952) 933-3930 Cell (612) 723-5248 CONSTRUCTION COMPANY F�(9�) ��� Page 2 (6-2-11) 2. Framing—reframe the following: (see drawings)-New Option"A" a. Reframe floor,wa11s,and ceiling of study. (4 season space.) b.Reframe master suite entrance including entry doorway,walls,and closet wa11s. c. Reframe entire east end of the 2°d floor including exterior walls,new roof structure, front gable bump outs,bedroom wa11s(2),walk-in closets(2), bathrooms(2),misc.hallway framing and floor systems. d. Reframe expanded bedroom areas over main level living space. e. Frame window openings and door openings. f. Frame soffit and fascia. g. Reframe front porch including floor, columns roof and ceiling system. h. All fiaming materials included(see alternate: Angled walls at study). 3. Masonry—see front drawing Option"A" a. Pour new footings for new columns and poured concrete stoop. (Complete foundation below porch and columns.) b. Stone—supply and install new stone to the lower section of the 2 story west bedroom/office. Front(north)facing wa11 includi.ng two angled wa11s. Supply and install stone to the lower half of the porch walls and(5)columns. c. Install stone caps to new veneered stone. d. Pour a stamped concrete porch with sand fill in newly placed foundation. e. Replace first 12' of sidewalk at front door walk and mudroom walkway. f. Set block ledge to support floor and veneered stone—no ledge e�sts. (Stone based on use of veneered stone.)(See Alternates) 4. E�erior siding,sof�`it,fascia and porch finishes—supply and install the following: a. Supply and install new soffits(porch ceiling)T&G wood materials. (Pine or fir.) b. All new soffit and fascia will be aluminum to ma.tch existing. c. All new exterior wa11 swill have stucco to match balance of home. This includes new 2"d floor exterior wa11s per plan as well as repairs at front areas due to stone work. 4Y i � 3730 Shady Oak Road Minnetonka, MN 55305 . � � Phone (952) 9333930 Cell (612) 723-5248 CONSTRUCTION COMPANY Fax (952) 9333033 Page 3 (6-2-11) 5. Windows—supply and install new Marvin windows to the following openings. All new units—low maintenance Marvin windows. (all Ultrex Integrity) New units would be Marvin Ultimate casement windows with wood interiors. New units will include the removal and replacement of two windows in Sophies current bedroom. (Removal,new windows,insulation, flashing,trim—see finishing in section 16.) Exterior trim per dra.wing. Interior to match. a. South bedroom 1 —2 wide 2—single units b.North bedroom 1 —3 wide c. 2"d floor landing 1 —2 wide d. Study 1 —2 wide e. Sophies Room—Northwest 2—2 wide casements 6. Roofing -House and studio/garage—New roof,e�cisting roof and studio-garage. Remove all roofing on entire home including non-remodeled areas. (Master bedroom, study,bath and stairway—west)as well as newly expanded area.) a. Replace entire roof(new and exisking)with 30 year GAF Timberline shingles. b. Install new flashings,vents,and plumbing stacks. c. Install minimum 2 courses of ice and water shield to a11 roof edges. Insta.11 3 courses at azeas where significant i�e build up could occur. Install and ice and water to valleys. 7. Drywall—sheetrock ceilings and walls and tape smooth the following areas: a. Bedrooms and bedroom closets 2—complete. b. Study—complete. c. Bathrooms—complete. ' d. 2"d floor landing—complete. e. East stairway—repair. f. West landing—repair to match adjacent surfaces. g. Master bedroom entrance and closet. h. Repairs due to elimination of skylight. � ' � f, i 3730 Shady Oak Ro�i Minnetonka, MN 55305 . � � Phone(952) 933-3930 . Ceil (612) 723-5248 CONSTRUCTION COMPANY F�t9�) ��� Page 4 (6-2-11) 8. Insulation—insulate or re-insulate the following: a.New walls—R-21 bedrooms and study. b. Upper level attic ceiling—R-44. c. Bath wa11s—partial. d. Separation areas between porch ceiling and upper level floor. e. Install house wrap prior to siding. f. Install roof and soffit vents. 9. Millwork—supply and install trim and interior doors to the following: a. Doors,door frames and trim. *Bathrooms(2). *Bedrooms(2)and bedroom closets(2). *Master bedroom doors(2). *Master bedroom closet(2). b. Window trim—new window openings. Total('n. c. Base trim throughout new and remodeled areas. d. Closet shelving and closet rods. e. Window benches(2). 10. Cabinets—study and bath vanities—by others. We will install new ca.binets per drawing in baths and study. Note: I have not seen the final design which rnay change this cost slightly. 11. Tile a. Bathrooms—standard pattems. 1. Floor tile- prep floors,tile, grout and seal. Tile allowance$5.00 per sq. ft. 2. Tubs and showers—tile deck to ceiling prep wa11s with dura-rock. Tile,grout and seal a11 new tile. 3. Tile base in both baths. Supply and install. Note: Pending final tile selections. 3730 Shady Oak Road Minnetonka, MN 55305 � � � . Cell (612) 723-5248 CONSTRUCTION COMPANY Fax(952) 9333033 Page 5 (6-2-11) 12. Flooring—supply and install new carpet and pa.d to the following areas: a. Bedrooms and walk-in closets. b. West landing and east landing. c. Study. d. Master suite. e. Replace carpet at west stairway and master suite. (Remove,replace including carpet.) f. Replace the carpet at west stairway from main level to lower level. 13. HVAC a. Lennox 80%efficient na.tural gas furnace. b. Lennox 13.0 seer a/c package. c. Add basement return airs. d. Add supply riser duct to front knee wall to supply two bedrooms,two bathrooms and one study(duct size: 12"round, 16X8, l OX 12). Route TBD. e. Add 5-6 supply openings off of ductwork. f. Vent two bath fans. 14. Plumbing—modify the existing waste,vent and water lines to finish two full baths. a. Increase water line capacity to feed two baths. b. Rough-in(2)tubs,(2)lavs and(2)water closets. c. Supply and set new f�tures and faucets. (2—baths). 3730 Shady Oak Road Minnetonka, MN 55305 � � � Phw�e(952) 933-3930 Cell (612) 723-5248 CONSTRUCTION COMPANY Fax (952) 933-3033 Page 6 (6-2-11) 15. Electric—rewire the new bedrooms,baths,closets, study,landings, and hallway. a. Run new circuits to upper level from existing panel. b. West landing *2 outlets. *3 recessed lights with 2 new switches. *Clean up existing wiring. c.Master bedroom *Closet light and switch. *Hallway recessed with switch. *Clean up wiring due to wall changes. *Add(1) switch.. d. Hallway *3 way switching. *Recessed hallway light. *Add(1)outlet. e. Study *4 outlets. *Cable/phone. *2 recessed lights. *Ceiling light switch. f. Baths(2)—same for both baths. *Recessed tub lights. *Vanity lights. *Bath fans. *3 switches. *GFI outlets. g. Bedrooms *Outlets per bedrooms(5). *Closet lights with switches. � *Ceiling light with switch. h. East landing *3 way switch. *2 recessed lights. i. General *Smoke detectors. *Cazbon mono�de detector. � ''� '�i i� 3730 Shady Oak Road Minnetonka, MN 55305 � � � Phone(952) 933-3930 Cell (612) 723-5248 CONSTRUCTION COMPANY Fax(952) 933�3033 Page 7 (6-2-11) 16. Decorating/Painting a. Prime and paint new exterior surfaces including the following: *Front columns *Soffit and fascia. *Porch ceiling. b. Prime and paint walls and ceilings—New azeas *Prime and paint ceilings. *Prime and apply(2)finish coats to walls. c. Millwork—window trim,doors and trim—finish a11 new windows,window trim,doors,door trim and frames as well as all new base trim. d. Refinish azeas affected by addition and remodeling. *Master bedroom wa11s and ceiling. *Master bedroom entry,hallway and new closet. *First floor wa11s and ceilings as necessary. e. Finish two windows in Northwest bedroom. Repaint two wa11s. 17. Misc. Items—supply and install the following: a. Mirrors(2). b. Towel bars—(4). c. Toilet paper dispensers(2). d. Shower rods(2). e.New door hardware- $50.00 allowance per door. Tota1(8). 18. Adjacent Space Remodeling—I have included a$3,500.00 allowance for first floor repairs and restoration due to the 2°d level additions and remodeling. Note: I have included this allowance to cover possible ceiling repairs due to new floor system as well as a possible new chase to expand heat or run new plumbing from the mechanical room to the 2°d floor. All or a portion of this maybe necessary. � 3730 Shady Oak Road Minnetonka, MN 55305 phone(952) 933-3930 • • • Cell (612) 723-5248 CONSTRUCTION COMPANY Fax (952) 933�3033 Page 8 (6-2-11) 19. General a Supply a11 necessary permits. b. Coordinate a11 inspections. c. I have included a$1,200.00 allowance for engineering. (sizing of floor system,headers,roof supports.) d. Dumpsters ha.uling. e. Daily site clean up. Alternates 1. New shower—includes the following: a. Framing b. Plumbing—rough-in and finish(faucet allowance $350.00) c. Prep for tile. Dura-rock,rubber pan,poured floor. d. Tile—Tile allowance $5.00 per sq. ft. (This may need to be increased pending tile selctions.) e. Standard shower door plus glass panels to two additional azeas shower. 2. Angled e�cterior corners of 1 St floor study a. Pour footings and lay founda.tion block. b. Frame exterior walls—material and labor. c. Additional stone veneer. d. Insulation. e. Demo of stucco as necessary. 3. Sidewalk—extend new sidewalks from porch to driveway. This is azea from spilt in walks to driveway. Stamped concrete. 4. Driveway replacement a. Remove the existing driveway and base fill. b. Supply and insta114"of compacted fill to entire surface. c. Pour 4"concrete reinforced driveway of similar layout as existing. Pour to existing apron. 5. Solar Tubes a. Add one solaz tube(10")to each of the girls baths. b. Add one solar but(10"to the master suite hallway. 6. HVAC a. Upgrade equipment to a 97%efficient furnace and 16.0 seer a/c. b. Add additional ductwork to put entire 2°d floor on one zone. c. Provide and install Venmar HRV to basement furnace. d. Provide and install U1traAire DH90 whole house dehumidifier interlocked with main furnace. Provide and install Honeywell Vision Pro 9000 IAQ controller. % �� \ Minnet nkaa MN 55305 �■ .: � � � Phone (952) 933�930 Cell (612) 723-5248 CONSTRUCTION COMPANY Fax (952) 933-3033 P�� �� July 11, 2011 Douglas and Roban Smith 4195 Highwood Road Mound, MN 55364 Addendum to proposal dated June 2,2011 Item 1 —Tile Due to final selection of tile for the girl's bathrooms, the tota.l amount for tile in Item 2—Stucco Section 4 - Stucco form the deck and screen porch proposal should be added to the 2°a floor addition proposal of June 2, 2011. All stucco related repairs will be completed by Roach Stucco. Stucco—deck,porch and side stoop related stucco. a. Repair stucco at the following areas due to the deck replacement and screen porch construction: 1. Bottom and top edges of new rim joists. 2. All areas at screen porch affected by screen porch removal and new porch conshuction. 3. Areas above rubber roof areas (2) and at wall edges of new rubber roofs 4. Areas outside office doors(west) including area where roof was removed and stoop and step removal. � Item 3—Rubber Roofing �� Section 5 —Rubber roofing from the deck and screen porch proposal should be added to �do the 2"d floor addition proposal of June 2, 2011. Rubber Roof— �,,,,� a. Replace the-�wc3-sections of rubber roofing at the west end of the deck(exterior of family room). Replace the plywood decking prior to new rubber membrane. b. Re-flash the new roof at the exterior walls and roof edges. (Note: Due to extensive amount of water damage at the interior due to the roof structure we may find added repairs necessary. This would be determined upon demolition.) Item 4—West side deck, steps and roof structure. (Patio door entrance of office) Remove west facing stoop, steps,rails and narrow roof structure over the stoop and steps. Prep areas for stucco. Haul away debris. Note: This item(section 2.f.)was removed from the deck and screen porch project and will be completed as part of the 2°d floor addition project. 3T30 Shady Oak Road Minnetonka, MN 55305 . . , Phone(952) 9333930 Cell (612) 723-5248 CONSTRUCTION COMPANY F��9�� ��� ��io June 15, 2011 Douglas and Roban Smith 4195 Highwood Road Mound,MN 55364 Addendum The following items should be considered as part of the 2"d floor addition proposal dated 6-2-11: 1. Windows—all windows have been quoted as Marin-Ultimate clad casements. ****Section 5. Windows—the wards(all Ultimate Integrity)should not be included in section S line 2. 4 S�te df At�irtfiesota < ' ` �orr�trucbon Codes�nd Licensing �ivision < ;C�epartrnent of Labor and industry Tel�phone. �651�284-5034 ' 'P.O. Bo�t 64217 ' E-m�il address: dli:license�state.mn.us ' �' St. Paul, MN 55164-�217 Website address: www_dli.mn.gov ' RESiD�iVTfAL BUILDING CONTRACTOR LIC��IS� . Leg�N�me PA�U�7'TE CONSTRUCTION CO Btisirte�Q��tructure: �BA CORPfi.�RATION Address: 3730 SHADY�AK,R� � HOPKINS, IVI1+1 55�Q5. >, , , ,; , >< ,. <.: >: License Identification Number. 3225 Qualifying Person: DAVID J PAQU�7TE ' k.i�s�se E�cpir��lo� D�#e D3/31/2012 Contlnu�ig Etluca�tOn.'t�4 ht�ur�due by 03/31/2012 - ::: _ -__..._ ;,. � _ � I MINNESOTA DEPT.OF LABOR S INDU3TRY ` Construction Codes and Licensing Division P.O. Box 64217 St. Paui� MN 65164-0217 PAQUETTE CONSTRUCTION CO 3730 SHADY OAK RD HOPKINS,MN 55305 I � — f�� I DAT// TIME i�,� l ' CITY OF OR NO CALLED IN INSPECTION NO�IC SCHEDULED � _� ��� PERMIT NO. � �0�3�OMP ETED� ADDRESS � OWNER E ONE . � d ' � CONTRACTOR � >; DESCRIPTION � � l� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING � ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS ti O ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL 0 SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W C � � O � � O � W � Q � Z W � W � � GW �K SATISFACTORY:PROCEED ❑ PROJECT COMPLETE � ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W p ❑ Ct�RRECT WORK,CAIL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Ca11 for the next inspection�hours i�edvance. (g52) 249-4600 Owner/Contractor on si��� � Inspector. White Copyllnspector's File Canary CopylSite Notice �J `� I� D TIME CITY OF ORONO CALLED IN ��` INSPECTION NOT/I E 2 SCHEDULED �/-/D-// -� PERMIT NO.�` ����✓�COMPLETED �� �( ADDRESS ZI�J I-� G'r`I,l�� K-E`' OWNER TELEPHONE NO. �-`� Z3g ?3 9J� CONTRACTOR �a-Cl, !-���� �-�1�' . ��PiCn""-' �; DESCRIPTION / �5����V � � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHOREM/ETLANDS � ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Z Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT J ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP ? ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W 0. � � O a � O � W � Q � Z W � W � � GW�KSATISFACTORY:PROCEED ❑ PROJECTCOMPLETE W�O CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY � ❑CARRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT O CORRECT UNSAFE CONDITION WITHIN HOURS. � pH0T0 TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑ INSPECTION REOUIRED.CALLTO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952� 249-4600 Owner/Contracto it . Inspector. White Copyllnspector's File Canary CopylSite Notice /'1 r _ �� � DATE TIME CITY QF`ORONO CALLED IN ��� �""I/ INSPECTION NOTICE SCHEDULED il- � /��'�o PERMIT NO. l�(�7.3 � COMPLETED ADDRESS �/ CI S� f�t�5t���c.�ro--�-�� OWNER ����t� TELEPHONE NO. G(��- CONTRACTOR �5'�— �.54- �lD! / >: DESCRIPTION � � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS � L�CFRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEET YOU:�YES_NO � COMMENTS: � W a j Q.. �!�/L r•�l. . O � � � /�-�� �� � O � ti � Q ti Z W � W � � d � KSATISFACTORY:PROCEED ❑ PROJECTCOMPLETE W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY � ❑CORRECT WORK,CALI FOR REINSPECTION TEMPORARY � BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL{NSPECTOR ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Ca11 for the next inspection 24 hours in advance. (952� 249-4600 Owner/Contractor on site: Inspector. White Copyllnspector's File Canary CopylSite Notice � � � A TIME " CITY OF ORONO CALLED IN �� / INSPECTION N, TIC , S�HEDULED PERMIT NO. � �7��coMPLE ED ADDRESS �� .�' �'����� OWNER ' TE HONE NO. � ` � -� � CONTRACTOR ' ` � � >; DESCRIPTION � � � ❑ FOOTING ❑ PLUMBING FI ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHOREM/ETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL Q ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNER/CONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W a 0 IX� ,�jL '� -�=�� �C�c-, •�-. /��S" '' ��, '- /� �� _ �'�- �Pc � .�- � � � cL �Z �'c� �(� Q �.�,�,�;� , n �.e/. �,y' (3 � � L- � �Sc;/� S 1��'�` � �1 � . �f� z � 5�z � .� �= r����S � � � U'� ��-/�c�� �>/ j C� A � , a W� .�WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY � ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR � CITATION ISSUED ❑ INSPECTION REQUtRED.CALLTO ARRANGE ACCESS. Cail forthe next inspection 24 hours in advance. (J52� 24J-460� OwnerlContractor on site Inspector. � � White Copyllnspector's File Canary CopylSite Notice D TIME v CITY OF ORONO CALLED IN � INSPECTION NOTICE SCHEDULED �� PERMIT NO.a0l/—DO73Z COMPLETED ADDRESS y�g5 ��I`��v� '�` OWNER TELEPHONE NO.6 �Z 3� 3��D CONTRACTOR �a�u t��fF �-�� /�/K�N��4'�-� >: DESCRIPTION �O�l � ❑ FOOTING ❑ PLUMBING FI L ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL Q ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECT�ON Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT J ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATfON/REMOVAL � OWNER/CONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W � � �_� � ,__r t v c:� 0 � � 0 � W � Q � Z W � W � � ��.Q"GVORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLETE W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY � ❑CORRECT WORK,CALL FOR REiNSPECTION TEMPORARY � BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN INSPECTOR WiLL RETURN ❑ CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Ca11 for the next inspection 24 hours in advance. (J52� 249-4600 OwnerlContractor on site: � Inspector. ~�� � White Copyllnspector's File Canary CopylSite Notice