Loading...
HomeMy WebLinkAboutRE: sewer project /, O \\\ /�' � � ����\� ii O O '.�...., .� ,,,: , t;�._ ,� ' CITY of ORONO ; � , ti -i Mu��� ai ot��� "�+� , p � , ` ,�, ; ����� �� � ��`����`� G''� Street Address: Mailing Address: ;' � �'�9kEggOg�� 2750 Kelley Parkway P.O. Box 66 i --=�' Orono, MN 55356 Crystal Bay, MN 55323-0066 February 18, 2000 Bruce & Melanie Flessner 1190 Heritage Lane Wayzata, Mn 55391 Dear Mr. & Mrs. Flessner: The above described property is in a Metropolitan Urban Service Area (MUSA) for sanitary se�ver installation. The factors for initiating the sewer project were smaller lot sizes and non-compliant septic systems with limited replacement sites available. The residence�vas required to connect to the sewer system no later than Febniary 14, 2000. Recently, the City Council adopted a resolution allowing all sewer connections to coincide with the septic system upgrade time frame. The time frame for a septic system upgrade is seven to ten years from tlie inspection date dependant upon the property's location. Your property will need to connect to the sanitary sewer system no later than December 31, 2005, �vhich is the date your septic system was to be upgraded. A Sewer Availability Charge (SAC) fee�vill nced to bc paid to the City in the year the sewer conncction is made. A licensed plumber must then obtain a permit from the City to makc the connection from the residence to the actual se�ver line. If at any time before December 31, 2008 the residence undergo's a remodeling project that will increase the total water use, the residence must then connect to the sanitary sewer system. If at any time before the above date the system is failing, the residence must then immediately connect to the sanitary sewer svstcm. Minor maintenance can and should still bc conducted on your septic system. Pumping the septic tanks, repairing or replacing pumps, and replacement of septic tank baffles are eaamples of acceptable repairs. If the septic system needs major maintenance, such as septic tank replacement or drainfield replacement, co�ulection to the sanitary se�ver system will be required. If there are any questions regarding this letter, please contact me at(612) 2�39-4600. s ctfullv f Chris Pence On-Site Systems Manager Telephone(612)249-4600 • Fax(612)249-4616