Loading...
HomeMy WebLinkAbout2009-00696 - addn/remodel/repair CITY OF ORONO PERMIT NO.: 2009-00696 - 2750 KELLEY PARKWAY � ORONO, MN 55356- DATE ISSUEu: 1U04/2009 952 249-4600 FAX: 952 249-4616 ADDRESS : 95 HACKBERRY H[LL PIN : 33-118-23-44-0013 LEGAL DESC : DANIELS LONG LAKE HEICHTS : LOT 007 BLOCK 002 PERMIT TYPE : ADDITION /REMODEL/REPAIR PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : ADDN/REMODEL/REPAIR ACTIVITY : 434-RESIDENTIAL VALUAT[ON : $ 47,345.00 NOTE: SEPERATE PERMITS REQUIRED: PLUMBING, MECHANICAL, ELECTR[CAL(STA"IE) ESCROW PAYMENT RECEIVED 10/16/09$2500.00 2009-00714 PLAN KEVIEW FEF,RECEIVED 10/12/09$429.16 2009-00695 APPLICANT PERMIT FEE SCHEDULE 660.25 M& M HOME CONTRACTORS STATE SURCHARGE(VALUATION) 23.67 205 WINKLER TRAIL COLOGNE,MN 55322- MISC FEE 0.00 (612)554-2556 TOTAL 683.92 Minnesota State License#: 20560376 OWNER SULANDER, DUANE 95 HACKBERRY H[LL LONG LAKE, MN 55356 AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State I3uilding Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances goveming this type of work shall be compied with whether or not specitied herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if consVuction is suspended for a period of 180 days at any time afrer work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at y time for due cause. C,�� �S-u�.�-�,...�.e�, l( / � / 0 � �l/ D 7� � Applicant Permitee Signature Date I s By Signature Date SEPARATE PERMITS REQU[RED FOR WORK OTHER THAN DESCRIBED ABOVE. i � . City of Orono Building Permit Application for New Structures or Additions �_ STRUCTURE INFORMATION: � . 1. Structure Dimensions 1. Structure Dimensions (continued) 2. Type of Construction ' a. Length (ft.)= ,Z� Number of bedrooms =� Wood/Frame �Masonry b.Width (ft.)= Z Z Number of garage stalls: ❑ Metal Attached = ❑ Pole Bldg. Areas in square feet Detached = ❑ ICF c. Basement- SZ� ���''"� ❑ On-site Prefab SP � ❑ Off-site Prefab d. 1 S`Story = 5 Z`cs ❑ Other(please specify): e. 2"d Story = f. Yz Story = g. Total Area= REQUIRED SUBMITTALS: All of±he information must be submitted in order for your application to be processed: N ot Enclosed Applicable �' ❑ Permit A plication ❑ Pro osed Buildin Plans � � MN State Ener Code Calculations and Mechanical Code Re uirements Form � L� Surve meetin all re uirements � � Stormwater Pollution Prevention Plan � ❑ Hardcover Calculation(s) � Se tic S stem Site Evaluation Re ort � �. Access Permit � �.. Wetland Buffer Im rovement Plan � � En ineered Plans for Retainin Walls 4 feet or above � ❑ Plan Review Fee � ❑ Other APPLICANT ACKNOWLEDGEMENT: • Agrees to provide all information required or requested by the Building Department; • Agrees to pay the City of Orono for engineering consultant review costs in excess of$500; • Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative but to reject it until it is complete; • Acknowledges the Escrow Agreement is completed and signed; • Some or all of the information that you are asked to provide on this application is cfassified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If you refuse to supply the information, the application may not be issued. ApplicanYs Signature: Date: �U�Z��R Last Updated: 9/29/2009 - 18 - . Plan Review Checklist for New Structures / Additions Address/ PID/ Legal: _ ��'� �"�}�- � � (�p� r„� 1�i / / Description of work: �� (� �U��- �l��- "� II�,�CGf'� ��Q�((G( � Septic review by: lV Date Approved: f(�� fJTj g Zoning review by: '� Date Approved: [���-�1 �� Building review by: � Date Approved: f d�n�'�7 - ��( Grading review by: �� �'� � l Date Approved: Zoning File#: Resolution#: Resolution Date: Zonin District Fire Department Post Office School District . Zoning: Lot Area: G �1�0 SF/AC Width: f OQ Depth: z�� Survey Submitted: es 0 No Date of Survey: �n��2�0� Pro osed Setbacks: Front(�L-ei� Rear(Sd�aB�) (� S E W ) ( N ((� E W ) Other Buildings Wetland Side Side YX� C��— J (C) �( � �10 c � Z 7 ` S r v��(c e. s h mc's L e ,�c.(cl� v�, Building Defined Height: Building Peak Height: # of Stories Ok?: ❑ YES FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATION: START WITH the distance between the basement floor/crawl START the distance between the slab and the highest ; space floor and the highest roof peak, the top of WITH roof peak,the top of the cornice of a flat roof, the cornice of a flat roof, the deck line of a the deck line of a mansard roof, or the mansard roof, or the uppermost point on a round uppermost point on a round or other arch-type or other arch-t e roof roof SUBTRACT half the distance between the highest window and SUBTRACT half the distance between the highest window hi hest roof eak of a itched roof and hi hest roof eak of a itched roof SUBTRACT the distance between the basement floor/crawl ADD the distance between the slab and the highest space floor and the highest existing grade within existin rade within the foundation the foundation or 10 feet, whichever is less. EQUALS Defined buildin hei ht EQUALS Defined buildin hei ht Lot Coverage: 2. Z Z F 1� • � % Shoreland District MCWD Permit Received vera e Lakeshore Setback Bluff � Yes � No � N/A 0 Yes ❑ No ❑ Yes No � Yes ❑ No 0 N/A Permit um r: Setback: Hardcover Zones Existin Proposed Variance Requir CUP Required 0-75' ❑ Yes No 0 Yes 0 No 75-250' Type(s): Type(s): 250-500' 500-1000' REMARKS (in-house): �-Xish c�a S�. = � 3056 � r��( lSI1�Gc �('er A�C. ��� � Updated: 09/11/2009 �Ll��� z:\forms\plan review checklist.docx SL� � (�E-rht � 2 2?3 `'�� �'�,�`� ��, �a � � �c ��s � Fees to be Charged YES NO Permit � Plan Review � � State Surcharge � Investigation Fee � SAC— Number of SAC Units Sewer Connection Water Connection Park Fee Site Inspection Other(specify) Miscellaneous Fees Calculated By: Square Foota e $ per Square Foota e Basement X = $ 15� Floor X = � 2nd FIOo� X = $ Garage X = $ Estimated Construction Value: $ `17�3�5 � Orano Inspections Required Work Requiring Separate Permits Required State Permits 0 Site ,� Plumbing � Grading / Filling ❑ Well 0 Hardcover Removal J�' Mechanical � Fire �f Electrical � �'Footing 0 Septic 0 Water Connection � Poured Wall 0 Fireplace � Sewer Connection ❑ Foundation Survey 0 Masonry ❑ Lawn Irrigation 0 Radon Rock Bed � Mfg. �'Framing ❑ Other(specify) Insulation 0 As-Built Survey �Final ❑ Other(specify) REMARKS (in-house): Other Review: Reviewed by: Date Approved: Access:Existing: ❑ YES ❑ NO New: ❑ YES 0 NO REMARKS (TO BE NOTED ON PERMIT AND INITIALLED BY PERSON PULLING PERMIT) Updated: 09/11/2009 z:\forms\plan review checklist.docx � � � °� 0 0 � � CITY of ORONO � � ;rN `�I � G�tS� ' Municipal Offices � �` .� Street Address: Mailing Address: ��fEggO�' 2750 Keiley Parkway P.O. Box 66 Orono, MN 55356 Crystal Bay, MN 55323-0066 14 October 2009 M & M Home Contractors, Inc. 205 Winkler Trail Cologne, MN 55322 Re: Building Permit Application # 2009-00696 95 Hackberry Hill INCOMPLETE The City is in receipt of your building permit application which was received by this office on October 12, 2009. This permit for the construction of an addition is incomplete. The following items must be submitted in order for your application to be considered complete and for the plan review to continue: 1. Certificate of Survey. Please provide an updated certificate of survey meeting the City's survey standards (enclosed) indicating the location of the existing house and proposed addition (and any proposed grading) as well as all existing structures, landscaping and retaining walls on the property. 2. Escrow & Escrow Agreement. Building permits involving grading and/or review by the City's engineer require submittal of an escrow and an escrow agreement. The purpose of the escrow is to guarantee reimbursement to the City of out-of-pocket costs incurred during the review of your plans. Additionally this escrow will guarantee conformance with City Code Chapter 79 relating to erosion control and stormwater. The required escrow amount for this project would be $2,500. The escrow agreement is enclosed. The property owner must sign the escrow agreement and submit a check for $2,500. The above information is required in order for the plan review to continue. Please feel free to contact me at 952.249.4627 or by email at mcurtis(c�ci.orono.mn.us if you have any questions. Sincerely, City of Orono - t L���i..7' Melanie Curtis Planning and Zoning Coordinator c: Lyle Oman, Building Official Carol Sulander, Property Owner Attachments • Survey Requirements • Structural Coverage • Height Limitations • Escrow Agreement Telephone(952)249-4600 • Fax(952)249-4616 www.ci.orono.mn.us NOV-04-2009 12�59 P.02i02 d n ����z + �"�� ` ��� � ���s �°��� �� � j� �(`� '° '"', 4 r� , �, ., ' ����+�� t �� � 7��,�������V. s �y�����r� -I I�• rd'i��+�lII��./�IJ������I��IJ��h � k�'. � , � � � 1�'"�:� rv o � , G:�rz;:. . _ � ���.,;.. ��^����,��u'��y��1,,>� � . IMPROVING QUALI]'Y OF WATER, aUALITY OF LIFE I Pursuant to Minnesota Statutes Cha ter 103D and on the basis of sta p , . tements � and information contained in the permit application, correspondence, plans, heMinnehaha Creek maps, and all �ther supporting data submitted by the appiicant, and made a part hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant atershedOistrictis named below�or use and development of land in the Minnehaha Creek committed to a Watershed Di�t�ict. leadershrp role in pratecting,imprvving Issued ta: Duane Sulander Perrnit No: 09-322 and managingthe Location: 95 Hackberry hill, Orono surface waters and Purpose: Rule B� Erosion Control a liatedgroundwatcr Date of Issuance: 11/04/2009 Date of Ex iration: 11/04/2010 sources within the Dis �cc,inctud;�y rne;► By Order of the Board of Managers . elation�hips to Che tosyste�sofwhich BBCky udek District Technician they re an m�egral part. Weachieve�urmission This permit is not transferable without District approval, and is valid to the date of expiration. No activity is authorized beyond the expiration date. If the permittee t rough regulation, requires more time to complete the project, an application for renewal of the I �aP��l projects, Permit must be received by the District at least 30 days befiore expiration. ed t�o��,FooPerarive The applicant is responsible for compliance with all District Rules and for the endeavor�,and other action of their representatives, cohtractors, and employees. � progra�sbasedon � CO�dltlons: Project to be completed as described in plans submitted to the MCWD office on Ocfiober 30, 2009 according to the provisions of soultd srience, = this permit, innovative thinking,an • Properly install and maintain all �equired MCWD Ruie B, erosion control measures until the disturbed areas are infnrmedan engaged restabilized constituen ,and the • When the site is restabfilized and the MCWD staff has performed a final inspection, all silt fences must be removed tost eff� ve use of � public funds. (Statement cancerning fees for inspections, violations, etc... on following page) � � 1qOA9 Uiw....a,.,.l..D....I...._...1 n...._�_.�_� uu ee�n� nr.� �I-,. nrnn r_.._n.n r.. •.n. . . , . . . , I TOTAL P.02 /��rt-DO J� � lc�5 Ha�k��ry h��/i , BUILDING PERMIT ESCROW AGREEMENT • Orono Building Permit#2009-00048 • AGREEMENT made this � J day of (�;--�-,-,G�..� ; , 20��, by and between the CITY OF ORONO, a Minnesota municipal corporation ("City") and �c%nr��.,��t�� �.����C S�c��!�.•���.� ("Owner"). Recitals 1. Building permit applications have been filed for an addition located at 95 Hackberry Hill the ("Subject Property"), as more fully shown and described on Exhibit"A" attached hereto. 2. Owner requests the City to review this application. 3. The City will commence its review of the application and incur costs associated with said review only if the Owner establishes an escrow to ensure reimbursement to the City of its costs. NOW THEREFORE, THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owner shall deposit $2,500 with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of $500, or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owner would be responsible for under a building permit application. The escrow will also guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work (including planning, engineering, or legal consultant review) associated with building permit #2009-00696 if compliance with the approved building permit is not accomplished. 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send a bill to the Owner. Owner shall be responsible for payment to the City within 30 days of the Owner's receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owner does not make payment to the City within the timeframe outlined in #3 above, the City may draw from the escrow account without further approval of the Owner to reimburse the City for Eligible expenses the City has incurred. The City shall notify the Owner the Owner of such draw and the nature of the expense for which the reimbursement is being made. If the Escrow amount falls below 75% of the original escrow amount the Owner shall deposit additional sums as directed by the City, or the City shall discontinue review and post a Stop Work Order. 4. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the Owner when the review has been completed and written notification is received from the Owner requesting the funds. 5. CERTIFY UNPAID CHARGES. If the project is abandoned by Owner, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn. Stat. §§ 415.01 and 366.012. CITY: CITY OF ORONO OWNEF�' � ,� By: ,� BY� �./ .u..r�-, � � i Its: � �� By: � l�� �L��°:.��.�'ti..- Internal Use Only: � Original to Finance Department � Copy to Street File � ' � �`/��' TE TIME " CITY OF ORONO CALLED IN /� ��� INSPECTION NOTICE SCHEDULED d -���'� PERMIT NOQ� '�D COMPLETED ADDRESS l L� OWNER CONTR. y TELEPHONENO. /�%I� ' �la � S�cS � 43�>.> � � DESCRIPTION � — � ❑ FOOTING ❑ MECHANICAL RI ❑ EXCAV/GRADING/FILLING Q�.�RAMING ❑ MECHANICAL FINAL ❑ LAKESHORE/WETLANDS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE Q ❑ TREE REMOVAL Z ❑ WALL BD. ❑ WATER HOOK-UP ❑ SITE INSPECTION Q ❑ FINAL ❑ SEWER HOOK-UP ❑ PROGRESS � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ COMPLAINT � ❑ DEMO-FINAL ❑ SEPTIC INSTALL. ❑ FOLLOW-UP _ ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ HARD COVER REMOVAL J ❑ PLUMBING FINAL ❑ FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W a o �� ,.�Z'�C /� ` � ,�', J��'�a-�� � /�} L 6(�1 +-� ��SL� � . �..� 'l� �� ° (�.� �'u �' `7G�c� (�M.A x �}t W Q � ` ` � �� �— t1l� !/1w . � Z W � W � j d ORKSATISFACTORY:PROCEED C1 PROJECTCOMPLETE W / RRECT WORK&PROCEED C ISSUE CERTIFICATE OF OCCUPANCY � ❑ RRECT WORK,CALL FOR REINSPECTION TEMPORARY � BEFORECOVERING PERMANENT �CORRECTUNSAFECONDITIONWITHIN HOURS. r�- pHOTOTAKEN INSPECTOR WILL RETURN ❑ CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTIONREQUIRED.CALLTOARRANGEACCESS. Cail for the next inspection 24 hours in advance. �95Z� 249-46QQ OwnerlContractor on site: Inspector. �,.c� ;� � � White Copy/lnspector's File Canary Copy/Site Notice �� � D E TIME V CITY OF ORONO CALLED IN `�'� INSPECTION NOTICE / SCHEDULED - � : -3C' PERMIT NO. ����'CGG.�S� COMPLETED � ADDRESS ���� �2�°+� ��� OWNER CONTR.�/�7`� TELEPHONE NO. ��� �'�y n���sG� � DESCRIPTION l�����G� � ❑ FOOTING ❑ MECHANICAL RI ❑ EXCAV/GRADING/FILLING Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ LAKESHORENVETLANDS y ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ TREE REMOVAL Z ❑ WALL BD. ❑ WATER HOOK-UP ❑ SITE INSPECTION Q ❑ FINAL ❑ SEWER HOOK-UP ❑ PROGRESS � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ COMPIAINT � ❑ DEMO-FINAL ❑ SEPTIC INSTALL. ❑ FOLLOW-UP _ ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ HARD COVER REMOVAL J ❑ PLUMBING FINAL ❑ FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W � � J ° � CUC l � 0 � W � Q � Z W � W � � GW�ORKSATISFACTORY:PROCEED [� PROJECTCOMPLETE � ❑ ORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W O ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑ CITATION ISSUED ❑ STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTIOfV REQUIRED.CALL TO ARRANGE ACCESS. Ca11 forthe next inspection 24 hours in advance. (952� 249-46�� Owner/Contractor on s' e: Inspector_ �� _, White Copyllnspector's File Canary CopylSite Notice � J �� L� TIME CITY OF ORONO CALLED IN ��� ,� INSPECTION NOTICE SCHEDULED � _���.z PERMIT NO. �L���C�I��COMPLETED ADDRESS `% � .]L,L�' C %C- ,L�'f r�/ � OWNER CONTR. /,�'� ff� �7"� CG'�Yl�. TELEPHONE NO. �� C � � � DESCRIPTION �.(�`T/lv�-� � �� � ❑ FOOTING � MECHANICAL RI T—❑ EXCAV/GRADING/FILLING Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ LAKESHORENVETLANDS y ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ TREE REMOVAL Z ❑ WALL BD. ❑ WATER HOOK-UP ❑ SITE INSPECTION Q ❑ FINAL ❑ SEWER HOOK-UP ❑ PROGRESS � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ COMPLAINT � ❑ DEMO-FINAL ❑ SEPTIC INSTALL. ❑ FOLLOW-UP _ ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ HARD COVER REMOVAL � ❑ PLUMBING FINAL ❑ FOUNDATION/REMOVAL � OWNERICONTRACTORTOMEETYOU:�YES_NO � COMMENTS: � W C � � O � � O � W � Q ti Z W � W � j d W �WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE � ❑CORRECT WORK 8�PROCEED '= ISSUE CERTIFICATE OF OCCUPANCY W � O CORRECT WORK,CALI FOR REINSPECTION TEMPORARY � BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. C PHOTO TAKEN INSPECTOR WILL RETURN i.�CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR C] INSPECTION RE�UIRED.CALLTO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. �95Z� Z49-4600 OwnerlContractor on site: Inspector. �� / � 7 � White Copyllnspector's File Canary CopylSite Notice � ��� ,; �" /�P�E� TIME CITY OF ORONO CALLED IN INSPECTION NOTICF� SCHEDULED � �+ O //�.' 1.7 PERMIT NO.��a y ��"�`�� conn LETED ADDRESS S � L��"y't- � � OWNER CONTR. " � TELEPHONE NO. � �la��� — ��� � DESCRIPTION ����� C����-C// �-OYL � ❑ FOOTING � MECHANICAL RI ❑ EXCAV/GRADING/FILLING Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ LAKESHORENVETLANDS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ TREE REMOVAL Z ❑ WALL BD. ❑ WATER HOOK-UP ❑ SITE INSPECTION � INAL ❑ SEWER HOOK-UP ❑ PROGRESS � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ COMPLAINT Q ❑ DEMO-FINAL ❑ SEPTIC INSTALL. ❑ FOLLOW-UP _ ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ HARD COVER REMOVAL � ❑ P�UMBING FINAL ❑ FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W a � � O � � O � W � Q ti Z W � W � j d W� ORKSATISFACTORY:PROCEED ROJECTCOMPLETE ❑CORRECT WORK&PROCEED �: ISSUE CERTIFICATE OF OCCUPANCY 0 ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED C INSPECTION REQUtRED.CALlTO ARRANGE ACCESS. Ca11 tor the next inspection 24 hours in advance. (952� 249-46�� OwnerlContr s�te: Inspecto �---- White Copyllnspector's File Canary CopylSite Notice ����� ����� . �S � �� l � � � am,�.. o���lf�����d�� _ ������ �� �� ��►R N�- �u������ 4��=.�P, / � �`�5 ���C4C�F R,�Y �-41u. ' � � , ;�;- � �E� fF�roUNua2" i�A�?. � �tio�3 z,_ � /-� _.,., __• 3 C'7(� \-_ �� �I7�V ��'1=(� LI�Q: U�._.�,A,E{=l�C� 1010Q �Du1Jq CAPPFpIRtr� (,� IOE�j,�3 `1" . 'PP�F 1�� �5--- �, tcxf-1,�-7-- � 2,2� � 5�.� - � � � � ��� -�_# � � , � � �:�, �� - �. �� � „ .,, < < � 1/ �1�InPP� 7,i �nR(��. to`�.eon�. � �-�✓ � / ''�-�+y 24.0 ,q; � I 17�� , vi =�" .�P L • ` ;� i � �� � , � (� - N ����� i �\��'f' % ,. `� � �I"'"�..1 .� r��� Q�j� ,,,�'J Q� �: � � � i � � � � � � � � � �, � � � � I �, U� ` � � O ^ v � � � 7� .k ; � 14"mADc�::. p f � ,_ , � U D � � ��/ �� O �� � � I _���,�,��,.�. ���. ;,t �� �, ; . , T o .� .� � ��� ��__._.��--= ;. �� � < _ � �._. .. , ., . ___ _ ___—__ �� , �_ ___ ____-_ _ � «; , � -' '� �, �� � ;; ��. o d� �rn.iKn���ws � �' (�1 L �' T �J��`�1 PI�..� '7.2'.i�� �''� �n� ; .23.SJ �� � � ��R�l�F U�VF`-� Q' � ( } ---- ---� `��". �'p �t�(.�t,. � � —�� — �---- �� � � C�,����, ��GVE � �� 2b«k`�(�,� , � � ` N p�i '� V�'' uF 6'� 23 ��,� ' � . � ,a � ���,- � � i� "`'� � _ < <�, � r`tDal�n Bop-?`_,s <� ��- i .� � IoE�� ��4 o Z'� �` . ���TaFF, ��u��oi2�Ki Q�-1— �Q. , � � �,,,� , C� �' �o,o � 2¢.D �' <� r x� i�`l�C�- S% �,,�� � �c�u�S� �� �; �,r�-�- ���,�= 2 l ��8 ��5��' c�r � �� City of Orono �c�c�-�.m���< ��-�� ���►�ESTRoo Pianning &.Zoning Plan Rev�ow �� 1'c�vos� do� Tc�p R�M ��cr�2Y 'MVro�tEc�L�_ �s ���4 Site Plan Review Date. _I� ' �o�,; �oiA+3��E �oA-r� 5PK5 �4�p SptC a�� PP in�l ,��� ;.`�.`��.�� APPROVED Q APPROVED WITH REVISIu�vS(see notes) ❑DENIED Bearin�s are assumed � $ ff: � ' ` "'�� Subjact to easements of record if any �� ��.:011�`��( Il�i2,5 �P�w� �i t �>�'� ��01J(,J � O Denotes set or �ound iron pipe monuments ` O�4 EklSTI�IG �}" Denotes set wood hub and tack �d garage �loor elevation "�g�{..p Denotes existing elevstion � r��j�`--},+ EktSTit�G� {}Np Proposad top of block elevation ��,� Denotes proposed finish grsde elevation Denotes direction of surface drainage Proposed lowest floor elevation ��c��� ���10�C.�PE 4i�G C►r� C.,tt��u�.�=. ����l���6����� �� b �} ��_". ��I�)Il�wwti G-r��� �=0rr ��'Ai�)�(�� .,/ � _ � 1 ,\ p �� 1 � �-) � - � ��. �.: �D V�,l/1�1U ��) �Y-�?�e.> L a (,�.0 �� . I hereby certi�y that this is a true and correct representation o� a survey of the boundaries of Lot 7 Block ����"4�5 !'���'�''� ' � ' ��.Il��,��„ �I�I��,TSi I-�(_t�11�1E{�{T�I County, Minnesota as on file and of record in the Office of the County Recorder in and for said County, also showing the proposed location of a house as staked tl►ereon, That I am a duly Regiatered Land "�uryeyor under Llie Laws of the State a Minnesota. i ,� Dated: ����)�:a �� � �i r��� _ �'"� �� �J , , _ Al�an ft. Hastings Minnesota Registration No. 17009 212 First Avenue E. s- Suite No. C ��E; �� ����� ������'�j�� ��.���,�������;������; ...�.(� ���� ��' Shaltopee, Minnesota 55379 � y�,one �,z 4�5 4oa7 FtECE 1/EC� �; 0�� 2 � 2009 CITY OF ORONO � � . • . � . emo To: Finance Department From: Christine Mattson, Planning Assistant CC: Street File Date: 1/25/2010 Re: Building Permit Escrow- Refund The building project, Application #2009-00696 pertaining to 95 Hackberry Hill is complete. The Applicant, Duane Sulander, has requested a refund of the escrow. The following is attached: • Escrow Refund Request from Duane Sulander • Email from Bonestroo indicating no further WIP on this project • Email from Campbell Knutson indicated no further WIP on this project w:\street files\hackberry hill\95\escrow refund memo.doc � ����6�1�� � DEC � `�. 20�g ..�`.���c��..�..� S c..��,-.�.��—t �- GIT�' rJ�- �iF�4'J� ��� ��.�C.,�r�� :�;� �-�e �� �bc�q -c� � � �L ^��, ������. °��;��� �Qt��((D �'�-�"C i.'r j f 1�—'L��.-`� �:' -� r�S� r� „�y �-C' C'.t�,1�-�c-l.L�i-e t.'1 �_ � � � .:-_:�e c�� 0 i':..f::�.�— j� .�l:��� L�,,,,.i�.��'-t""._ �.'� ( l �•t�-�- ���---`� �i S '; � , , ; ; . . : , � � „ � i� � � � . ; , : ;� ; i � , ; ; � . ; � '1 ;1 . Christine Mattson From: Amundsen, Darren T [Darren.Amundsen@bonestroo.com] Sent: Monday, January 25, 2010 8:48 PM To: Christine Mattson Subject: RE: Escrow Refund No WIP here Darren Amundsen, PE Associate Direct 651-604-4894 Cell 651-775-5623 darren.amundsenC�a bonestroo.com � �an�stroa From: Christine Mattson [mailto:CMattson@ci.orono.mn.us] Sent: Monday, January 25, 2010 4:23 PM To: Soren Mattick; Amundsen, Darren T Subject: Escrow Refund Duane Sulander of 95 Hackberry Hill, building appiication number 2009-00696 has requested a refund of his escrow. Please let me know if you have any unbilled WIP for this project. Thanks! Christine Mattson Planning Assistant City of Orono 2750 Kelly Parkway Orono MN 55356(physical addressJ PO Box 66 Crystal Bay MN 55323-0066(mailing addressJ ^Y 952.249.4620 �952.249.4616 �cmattsonCcr�ci.orono.mn.us � www.ci.orono.mn.us OUR OFFICE WILL BE CLOSED: Monday, February 15,2010 in observance of President's Day. 1 . s Christine Mattson From: Sherry Charboneau [SCharboneau@ck-law.com] Sent: Thursday, January 28, 2010 10:44 AM To: Christine Mattson Cc: Soren Mattick Subject: FW: Escrow Refund 2009-00696 Chris: Since Soren never had a timesheet entry for the application referenced below, we did not open a billing file. Therefore, we have no unbilled WIP. Thank you. Sherry Sherry L. Charboneau, Legal Assistani CAMPBELL KNUTSON, P.A. 317 Eagandale Office Center 1380 Corporate Center Curve Eagan, MN 55121 Direct Dial: 651-234-6230 Office: 651-452-5000 Fax: 651-452-5550 E-mail: scharboneau@ck-law.com �.�� ,.,,,�._.��w.... , , ._ ��.. . ._. . ... . .:..�,...,.t�::.�,�..�.,.. From: Christine Mattson [mailto:CMattson@ci.orono.mn.us] Sent: Monday, January 25, 2010 4:23 PM To: Soren Mattick; Amundsen, Darren T Subject: Escrow Refund Duane Sulander of 95 Hackberry Hill, building application number 2009-00696 has requested a refund of his escrow. Please let me know if you have any unbilled WIP for this project. Thanks! Christine Mattson Planning Assistant City of Orono 2750 Kelly Parkway Orono MN 55356(physical addressJ PO Box 66 Crystal Bay MN 55323-0066(mailing addressJ � 952.249.4620 �952.249.4616 '3� cmattsonCa�ci.orono.mn.us � www.ci.orono.mn.us OUR OFFICE W1LL BE CLOSED: Monday, February 15,2010 in observance of President's Day. 1