HomeMy WebLinkAbout2009-00805 - new structure .
CITY OF ORONO PERMIT NO.: 2009-00805
2750 KELLEY PARKWAY
ORONO, MN 55356- �ATE �ssuEn: 1U30/2009
952 249-4600 FAX: 952 249-4616
ADDRESS : 3355 GRAHAM HILL RD
PIN : OS-117-23-11-0008
LEGAL DESC : GRAHAM HILL PRESERVE
: LOT 000 BLOCK 000
PERMIT TYPE : NEW STRUCTURE
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : SINGLE FAMILY
ACTIVITY : 101-SINGLE FAMILY HOUSES, DETACHED
VALUATION : $ 1,991,571.00
NOTE: SEPARATE PERMITS REQUIRED: PLUMBING,MGCHANICAL, SEPTIC,FIREPLACE,LAWN IRRIGATION, WELL(STATG),
AND
ELECTRICAL(STATE)
ADVANCED PLAN REVIEW$6,471.89 PD PERMIT#2009-00804
APPLICANT PERMIT FEE SCHEDULE 9,924.75
CHARLES CUDD LLC STATE SURCHARGE(VALUATION) 896.63
15050 23RD AVENUE N
PLYMOUTH, MN 55447- TOTAL ]0,821.38
�)
Minnesota State License#: 20635245
OWNER
BPS Properties, LLC
201 LAKE ST E
WAYZATA, MN 55391-
AGREEMENT AND SWORN STATEMENT
The work for which this permi[is issued shall be performed according to
the approved plans and speciYications,applicable City approvals,and the
State Building Code. This permit is for only[he work described and does
not grant permission for additional or related work which requires separate
permits. All provisions of laws and ordinances goveming this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time atter work has commenced.
'I�he applicant is responsibie for assuring all required inspections are
requeste � c f mance with the State Building Code.This permit may be
revok at ti for due cause.
� � ��" / /
Applic t ermitee Signature Date Issued By Signature Date
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
City of Orono
Building Permit Application
for New Structures or Additions
�..-- Mailing Address:
�� ��� PO Box 66 Permit number: -QQ �
� � � � Crystal Bay, MN 55323-0066 Date received: ` �
( �� � Received by:
,� �t� '� �,) Street Address:' c�
�.�, � �`����� �ti� 2750 Kelley Parkway Plan review fee: � ��� 8/
���g�s�g,�i� Orono, MN 55356 � a � �. ���Q
�_—_�
T�tal Fee: /D
Main: 952-249-4600 Fax: 952-249-4616 www.ci.orono.mn.us 8a,1, ��
This application form must be completed in full and all required information must be s bmitted.
Incomplete applications will be returned. (Please print)
GENERAL INFORMATION: .
Job Site Address: 5 �it,��,
Will this be a Parade of omes, Remodelers Showcase Home or other Display Home? Yes ❑ No
If yes, a special event permit is required with Police Department and City Council approval 60 days prior to the event. Shuttle bus service will be
required unless applicant demonstrates suffcient on-site parking is available. Non-permitted events will not be allowed.
CONTRACTOR/A PLICANT�N FORMATION:
Name: 1{1�(u,�s Cy1� �,
State License# 20 Expiration Date: ,� •3 f •Zof 0
Phone: 2� Z• 1 0 office cell
Mailing Address: O 0 � Cit : rya�7T ZIP: �5 +��--
Contact Person: Applicant is: ontractor / Homeowner (Circle One)
Email and/or Fax: p„� a� e . torvt,
PROPERTY OWNER NFORMATION:
Name: ��,�,� �� (�,
Phone (day): (�i2-�S32•47`�
Address: 0 3'`-�� - Cit : � mJt�T ZIP: -`�5�� �"
Email and/or Fax : �.
ARCHITECT/ ENGINEER INFORMATION: j
Name: Gi�py�S �vj�,Z� f,�,.Sp�6Q
Phone (day): (�12•332•'�7q7
Address: � Cit : �yA1UJ'T ZIP: G�� �
Email and/or Fax: �o � � !� V , ��,�,�
PROJECT INFORMATION:
1. Type of Project 2. Proposed Use 3. Structure Type 4. Sewage Disposal 8�
Water Supply
�lew Construction '�Single Family with �Residence
�]Addition attached garage Garage/Accessory Bldg. ❑ Public Sewer
❑Accessory Building ❑ Single Family with ❑ Deck
❑ Relocation detached garage ❑ Office/Commercial � Private Sewer
❑ Other: (specify) ❑ Multiple Family/Condo ❑Warehouse
❑ Public ❑ Storage ❑ Public Water
"*Any earth movement may require ❑ Commercial ❑ Other(specify)
MCWD review&permits. ❑ Industrial � Private Well
Minnehaha Creek Watershed District(MCWD) ❑ Other: (specify)
18202 Minnetonka Blvd
Deephaven, MN 55391
Phone: 952-471-0590
Fax: 952-471-0682
www.minnehahacreek.or
Estimated Construction Valuation (excluding land) $ _fT�9J � g�e
Last Updated: 9/29/2009
- 17 -
STRUCTURE INFORMATION:
1.Structure Dimensions 1. Structure Dimensions (continued) 2.Type of Construction
i (i
a. Length (ft.)= �?i _� Number of bedrooms= � �Wood/Frame
l � Masonry
b.Width (ft.)= �D1 -v Number of gar ge stalls: ❑ Metal
Attached = ❑ Pole Bldg.
Areas in square feet Detached = ❑ ICF
�,t ❑ On-site Prefab
c. Basement= 2r0�"t ❑ Off-site Prefab
d. 151 Story = �� ❑ Other(please specify):
e. 2"d StOry= ��
f. '/z Story =
g.Total Area= ��
REQUIRED SUBMITTALS:
All of the information must be submitted in order for your application to be processed:
Not
Enclosed A licable
❑ Permit A lication
❑ Pro osed Buildin Plans
❑ MN State Ener Code Calculations and Mechanical Code Re uirements Form
❑ Surve meetin all re uirements
❑ Stormwater Pollution Prevention Plan
❑ Hardcover Calculation s
❑ Se tic S stem Site Evaluation Re ort
❑ 1�. Access Permit
❑ Wetland Buffer Im rovement Plan
❑ � En ineered Plans for Retainin Walls 4 feet or above
�, ❑ Plan Review Fee
❑ ❑ Other
APPLICANT ACKNOWLEDGEMENT:
• Agrees to provide all information required or requested by the Building Department;
• Agrees to pay the City of Orono for engineering consultant review costs in excess of$500;
• Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they
are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative
but to reject it until it is complete;
. Acknowledges the Escrow Agreement is completed and signed;
• Some or all of the information that you are asked to provide on this application is classified by State law as either private or
confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data.
Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and
intended use of this information is to annually update our records and records of other governmental agencies required by law.
If you refuse to supply the information, the application may not be issued.
- ,\ ,
�-- ___--� I !
ApplicanYs Signature: Date: �1 � J7 '�
�
�---
Last Updated: 9/29/2009
- 18 -
. �- � �°��� �����.
�� 7 � 'S �{ q � I�
�r: ': _. ��..` ,,,
REScheck Software Version 4.3.0
Compliance Certificate
Project Title: Graham Hill - Lot 7
Energy Code: 2006 IECC
Location: Orono, Minnesota
Construction Type: Single Family
Building Orientation: Bldg.faces 90 deg.from North
Conditioned Floor Area: 8624 ft2
Glazing Area Percentage: 29%
Heating Degree Days: 8037
Climate Zone: 6
Construction Site: Owner/Agent: Designer/Contractor:
3355 Graham Hill Rd Charles Cudd Co. Charles Cudd Co.
Orono, MN 55356 15050 23rd Ave N. 15050 23rd ave n.
Plymouth, MN 55447 Plymouth,MN 55447
612-332-4790 612.332.4790
tom@charlescudd.com
. . . . • .
Compliance: Maximum UA: 1232 Your UA: 1043
. .
. - . . � . .
- .
Basement Wall 1:Solid Concrete or Masonry 1710 28.0 0.0 65
Orientation: Front
Wall height: 11.0'
Depth below grade: 10.5'
Insulation depth: 11.0'
Wall 1:Wood Frame, 16"o.c. 1521 28.0 0.0 60
Orientation: Front
Window 1:Vinyl Frame:Double Pane with Low-E 242 0.300 73
SHGC:0.24
Orientation: Front
Door 1:Glass 81 0.320 26
SHGC:0.21
Orientation: Front
Wall 2:Wood Frame, 16"o.c. 961 28.0 0.0 41
Orientation:Right Side
Window 2:Vinyl Frame:Double Pane with Low-E 151 0.300 45
SHGC:0.24
Orientation:Right Side
Wall 3:Wood Frame, 16"o.c. 2971 28.0 0.0 83
Orientation: Back
Window 3:Vinyl Frame:Double Pane with Low-E 1270 0.300 381
SHGC:0.24
Orientation: Back
Door 2:Glass 37 0.320 12
SHGC:0.21
Orientation:Back
Wall 4:Wood Frame, 16"o.c. 1856 28.0 0.0 75
Orientation:Left Side
Window 4:Vinyl Frame:Double Pane with Low-E 291 0.300 87
SHGC:0.24
Orientation:Left Side
Door 3:Glass 62 0.320 20
SHGC:0.21
Orientation:Left Side
Project Title: Graham Hill - Lot 7 Report date: 11/03/09
Data filename: F:\Drafting\Signature Developments\Graham Hill\94XX-2010 Spring Preview\graham hill-lot 7.rck Page 1 of 2
F
., -
Ceiling 1:Flat Ceiling or Scissor Truss 2779 44.0 0.0 75
Furnace 1: Forced Hot Air 97 AFUE
Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other
calculations submitted with the permit application.The proposed building has been designed to meet the 2006 IECC requirements in
REScheck Version 4.3.0 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Name-Title Signature Date
Project Title: Graham Hill- Lot 7 � Report date: 11/03/09
Data filename: F:\Drafting\Signature Developments\Graham Hill\94XX-2010 Spring Preview\graham hill-lot 7.rck Page 2 of 2
� �
�oU Site Address: , � PLACE YOUR CITY LOGO HERE �
Provided fbr your use-courtesy of the
� City of Inver Grove Heights
"CATEGORY 1" ALTER.NATE FOR �
ONE & TWO FAMILY DWELLINGS � 65�_�So_�sso �
INSTRUCTIONS: This alternative may be used for one- and t�vo-family d�ti�ellings built to meet the Catego�y 1 requirements of
Minnesota Rules,Chapter 7670. Complete Parts A,B,and C. Clearly mark plans with: insulation R-values; window and skylight U-
values; size and type of e�uipment; equipment contro]s; and location of vapor retarder and wind��ash baniers. More detailed
infom�ation can be found in the A4innesotn Ene�bo}�Co�le summary sheets available from the Minnesota Deparm�ent of Commerce.
Part A. BUILDING ENVELOPE
_
Check proposed envelope joint sealing option -� ❑ Prescriptive(caulking,gaskets,etc.) ❑ Perfomiance(tesi per 7670.0470 subp.7.C.)
Check thermal energy calculation option used� ❑ "Cookbook" (complete worksheet belowj � MnCheck method(attach report)
❑ Perfom�ance (attach U-value calculations) ❑ Systems Analysis method(attach analysis)
"Cookbook" Worksheet MINTA9UM REQUIRENIENTS
(for"Cookbook"o tion onlv)
❑ Ceiling Insulation: Minimum R-38 with 7%"energy heel; or
INSTRUCTIONS Minimum R-44 with low truss heel; or
Step 1. Check item(s)that design meets on h4iniminn Reyuiremen�s list Minimum R-38 with R-5 sheathin when no attic.
to the right.Must meet all items to use"Cookbook"option. ❑ Ent Doors: Max.U-value of 030 or 13/4"solid wood with storm
Step 2. Indicate proposed wall t��pe on table below. 0 Rim 7oist Insulation: Minimum R-19
Step 3. Indicate Window U-value and source. ❑ Floors over unconditioned s aces: Minimum R-24
Step 4. Verify total window(including area of all foundation windows) ❑ Foundation Tnsulation: Minimum R-]0
and door area is equal or less than allowable percentage. ❑ Foundation�a�indows: '/"insulated lass,wood or vinyl frame
TABLE FOR DETERMINING MAJ�IMUM WINDOW AND DOOR AREA
Maximum AllowaUle Total Window and Door Area as
a Percentage of Exposed Wall ]2% l4% 16% 18% 20% 22% 24% 26% 28%
Wall T e (Standard Framin ): Maximum Avera e Window U-va]ue(exce t foundation windows):
❑ 2x4,R-13 insulation, R-7 sheathing 0.55 0.47 0.41 0.36 033 030 0.27 0.25 0.23
❑ 2x4,R-15 insulation, R-5 sheathing 0.52 0.45 0.39 035 0.31 0.28 Q.26 0.24 0.22
❑ 2x6,R-19 insulation,<R-5 sheathin 0.48 0.41 0.36 0.32 0.29 0.26 0.24 0.22 0.21
❑ 2x6,R-19 insulation, R-5 sheathing 0.56 0.48 0.42 037 034 031 0.28 0.26 0.24
❑ 2x6,R-21 insulation,<R-5 sheathin 0.51 0.43 038 034 030 0.28 0.25 0.23 0.22
❑ 2x6,R-21 insulation, R-5 sheathing 0.58 0.50 0.44 039 0.35 0.32 0.29 0.27 0.25
Wall T� e (Advanced Framin ): Maximum Avera e Window U-value(exce t foundation windows):
❑ 2x6,R-19 insulation,<R-5 sheathin 0.52 0.45 039 0.35 0.31 0.28 0.26 0.24 0.22
❑ 2x6,R-19 insulation, R-5 sheatl�ing 0.58 0.50 0.44 0.39 035 0.32 0.29 0.27 0.25
❑ 2x6,R-21 insulation,<R-5 sheatliin 0.55 0.47 0.41 0.36 033 030 0.27 0.25 0.23
❑ 2x6,R-21 insulation, R-5 sheatl�ing 0.60 0.52 0.46 0.41 0.36 0.33 0.30 0.28 0.26
----._..__.__., - - - - -- - -- ___ ... .....
Window U-value: ; ; Source: ❑NFRC 0 ASHRAE 1993 Handbook
--------....-- -----..�----------....---____.._._.__..._.__,....----------------�
._..._..---..�_ --- _._ _. _ _-- .._ , .�_. ..__�_ ,._
�oo x �--- _ ____._ �l = ! � - ► _ _ . % l < f %o.i
_ . �..... ._p .._.._ .... - _..._ _. � )
window&door area oss ex osed wall area DESIGN ALLOWABL� fran taUle aUove
MINNESOTA ENERGY CODE - WHICH RULES MAY I USE ?
TYPE OF RESIDENTIAL BUILDING APPLICABLE RULES
Detached R-3 occupancy l-and 2-Tamily dwellings Chapter 7672; or
Examples: sin le famil ,twin homes,duplexes Chapter 7G70"Catego 1" with statutory depressurization and ve�itilation requirements
Attached R-3 occupancy dwellings Chapter 7674; or
Exam les: tri lex townhouses and row houses Cha ter 7670 with either"Cate o 1" or "Cate o 2" rovisions
R-i occupancy buildings of 3 stories or less Chapter 7674; or
Exam les: condominiums or a artments. Cha ter 7670 with either"Cate o 1" or "Cate�o 2" rovisions
R-1 occupancy bnildings o��er 3 stories high Chapter 7676
Lxamples: hi h rise condos or apartments �;.,�».,
�
,Part B. DEPRESSURIZATION PROTECTION
Check option used: J7�Fuel bur�ling equipment (complete sclledules Uelow) 0 No fuel bui-ning equipme�it
INSTRUCTIONS EXHAUST/MAKE-UP AIR SCHEDULE*
Step 1. Complete tl�e Combirstion Eqanpme�zt Schedirle below. Only equipment Exhaust devices over 300 cfin � Flow
with a Y(Yes)may be selected under the"Category 1"alternate. cfin
Step 2. Complete ExhausdMnke-up Air Schedule on the right if direct or power cfm
vented or solid fuel atmospheric vent space heating equipment is cfin
selected. -
COAIBUSTION EQUIPMENT SCHEDULE
(check all t�es proposed)
Space heating-nonsolid fuel Sealed combustion�- Y Hearth - nonsolid fiiel ealed combustion I Y
❑ Direct or power vented �� ❑ Direct or power vented
Y*
Atmos hericall vented N Atmos hericall vented N
Water heating-nonsolid fuel ❑ Sealed combustion Y Space heating-solid fuel ❑ Atmospherically vented
o y*
Direct o ower vented Water heatin -solid fuel ❑ Atmos herically vented Y
Atmospherically vented N Hearth-solid fiiel ❑ AUnosphericaliy vented Y
* If atmospherically vented solid fuel or direct or power vented nonsolid fuel space heating is installed,then make-up air to match
flow is required for each individual exhaust device which exceeds 300 cubic feet per minute.
�a�t C1. ��ll�'�'I�1�7�I01lT
VENTILATION QUANTITY
(Mechanical ventilation must be provided per the larger quantity calculated below)
�� cubic feet x 0.00583/minute = ��� cfm ( �_ x 15 cfm/bedroom)+15 cfm= � cfm
volume of habitable rooms number of bedrooms
VENTILATION FAN SCHEDULE
Check method(s)proposed -� ❑ Exhaust only Balanced (heat recovery ventilator,air exchanger, etc.)
Fan descri tion or location -� i 3 �k'[ � TOTALS
VENTILATION Intake cfin cfm cfin cfin Qa cfrn
AS DESIGNED Exhaust ZZD cfm �..10 cfiii 1�� cfrn cfrn cfin
Statement of Compliance: The proposed building design represented in these documents is consistent witli the building plans,
specifications, and other calculations submitted.�vitli�he permit application. The proposed building has been designed to meet the
`_� ---
requir ments of the innesota Energy Code. ��, ,
�o v � �. F��r1T `�---=�-c��__._. (� � 3 b t Z• 33Z� �l 1`10
Applicant(print name) Sign�re_ _ _ �_ Date Telephone number
Part C2. VENTILATION (Submit Part C2 upon completion of system verification-j�l
ai
�� -------------------------------------------------------------
Job Site Address: Permit Number
Fan descri tion or location TOTALS
MEASURED Intake cfm cfm cfin cfm cfin
PERFORMANCEt Exhaust cfm cfm cfin cfm cfm
-� Ventilation rate must be measured and verified when the perfonnance option is used in lieu of the prescriptive option for the
sealing of joints in the building conditioned envelope(from Part A).
Compliance Statement: Installed ventilation system is in compliance with MN Energy Code and is sized to provide the design air
flow.
Applicant(print name) Signature Date Telephone number
MEMORANDUM
Date: Friday the 13th of November (Muwahahahahha)
To: Tom Kellogg, City Engineer
From: Melanie Curtis, Planning & Zoning Coordinator
RE: 3355 Graham Hill Road, Building Permit #2009-00805
Please review the enclosed information for a new home and provide comments
by November 23 or before.
Please call me at 952.249.4627 if you need additional information or if you have
any questions on the attached information.
Thank you,
MEMORANDUM
Date: 25 November 2009
To: Tom Kellogg, City Engineer
From: Melanie Curtis, Planning & Zoning Coordinator
RE: File # 2009-00805 for 3355 Graham Hill
Please review the revised survey for a new home and provide comments by
December 2"d or before.
Please call me at 952.249.4627 if you need additional information or if you have
any questions on the attached information.
Thank you,
2335 Highway 36 W
St.Paul,MN 55113
Tel 651-636-4600
Fax 651-636-1311
www.bonestroo.com
November 23, 2009 � Bonestroo
Ms. Melanie Curtis
Planning and Zoning Coordinator
City of Orono
Post Office Box 66
Crystal Bay, MN 55323
Re: 3355 Graham Hill Road
File No. 000139-09000-2
File No. 2009-0805
Dear Melanie:
We have reviewed the plans for a proposed new home construction at 3355 Graham Hill Road.
The plans are dated 11-08-09 with an emailed updated version received 11-20-09. We have the
following comments with regards to engineering matters:
• It appears that the proposed retaining wall on the southeast side of the house is
approximately 6 feet high. Engineered design and details should be submitted for review
and approval for all retaining walls over four in height, and for all tiered walls with a
separation of less than two times the wall height.
• It is our understanding that the retaining wall around the driveway is a cast-in-place
concrete wall integrai to the house foundation. This design will be reviewed by the City
Building Official.
• This project will disturb more than 100 CY of material. Sediment and erosion controi
information meeting the requirements of Orono's City Code 79-7(c)(z) must be
submitted. The minimum $2000 sediment and erosion control financial security should
be required of the owner for this permit.
If you have any questions, please call me at (651) 604-4894 or send an email to
darren.amundsen@bonestroo.com.
Yours very truly,
�--�:..._�_��--�-��
�
Darren Amundsen
Cc: Tom Kellogg
� �� � v
� TF,�/� TIME
CITY OF ORONO CALLED IN �f/
INSPECTION NOTI nG;SCHEDULED 0 ,/�
PERMIT NO. —l�DI�KJCOMPLETED
ADDRESS �/�J S�S �`���(L�iL�L lF-
OWNER CONTR.
TELEPHONE NO. - -� � — �� '�7�
� DESCRIPTION ���—C
� ❑ FOOTING ❑ MECHANICAL RI ❑ EXCAV/GRADING/FILLING
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ LAKESHORE/WETLANDS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE
Q ❑ TREE REMOVAL
Z ❑ WA�L BD. ❑ WATER HOOK-UP ❑ SITE INSPECTION
Q ❑ FINAL ❑ SEWER HOOK-UP ❑ PROGRESS
� ❑ DEMO-SITE ❑ SEPTIC MAINT. . ,_� ❑ COMPLAINT
v ❑ DEMO-FINAL ❑ SEPTIC INSTALL.
���� ❑ FOLLOW-UP
_ ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ HARD COVER REMOVAL
J ❑ PLUMBING FINAL ❑ FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
W
a
j r.
�� ,
O ��
� r' � l� -j � r, r��`�
0
�
w
�
Q
�
z
W
�
W
�
�
Cj `i
W� ,,�V(VORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLETE
W ❑CORRECT WORK&PROCEED C' ISSUE CERTIFICATE OF OCCUPANCY
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITNIN HOURS. � pHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call forthe next inspection 24 hours in advance. �952� 24Q�
OwnerlContractor on site: � �
�
Inspector. �`.. �. �L '�;,U' �`_: ...5
White Copy/lnspector's File Canary Cop�
E TIM E ✓
CITY OF ORONO CALLED IN ��.�
INSPECTIONJ��I E�� SCHEDULED
PERMIT NO.� COMPLETED
ADDRESS �J�S / -[(�:�f�1��J��
OWNER TELEPHONE NO.
CONTRACTOR
>; DESCRIPTION r��IL%��1 / i" ` G
�
� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL
O ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPL4INT
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
W
0.
� (�G � �z-/ �C"�
0
a
�
0
�
W
�
Q
�
Z
W
�
W
�
j
d
W ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
� ❑CORRECT WORK&PROCEED SSUE CERTIFICATE OF OCCUPANCY
W
p ❑ CORRECT WORK,CALL FOR REINSPECTION TEMP
V BEFORECOVERING ERMANE
❑CORRECT UNSAFE CONDITION WITHIN HOURS. � HO
INSPECTOR W4LL RETURN
7 CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑ INSPECTION REQUIRED.CALI TO ARRANGE ACCESS.
Cail for the next inspection.�4 hours in advance. (g52) 249-4600
OwnerlContrac 'te: �
Inspector.
White Copyllnspector's File Canary CopylSite Notice
�- s�-- �
DAT TIME
CITY F ORONO CALLED IN �D
INSPECTION N �J SCHEDULED � d
PERMIT NO. � v� COMPLETED
ADDRESS ��5� � �'Z � J /�d
OWNER _ TE EP ONE O ��� ��777
CONTRACTOR C%��c� � �
�: DESCRIPTION
�
� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS
O�AMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
J ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
T ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
Z OWN MEET YOU�ES_NO
� COMMENTS:
�
W0. �n(�
� ���7 C /�C���t /I�� ���� J �✓.��' �(1� • r�OL�
�
�
� —Ll.,��"c�`� �,�q f�� /.—�—�ltt�.��' �S' ��c}:�
�
� S A � .'��' C�S'S�?
z ,�i�� �'�r'��� �
W
�
W
� �,,} � � � i v c.�L /}T f:�Q C%� 1�✓'�
�
a
W ❑WORKSATISFACTORY:PROCEED CI PROJECTCOMPLETE
� �y�ORRECT WORK&PROCEED _� ISSUE CERTIFICATE OF OCCUPANCY
W
0`�S�,BRECT WORK,CA�L FOR REINSPECTION TEMPORARY
V ��BEFORECOVERING PERMANENT
❑ CORRECT UNSAFE CONDITION WITHIN HOURS. C PHOTO TAKEN
INSPECTOR W4LL RETURN
❑STOP ORDER POSTED.CAIL INSPECTOR '� CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. �952� 24Q-46QQ
OwnerlContractor o si�e:
Inspector. �_�r � �
�
White Copyllnspector's File Canary CopylSite Notice
Ci � �'� DATE TIME �
CITY OF ORONO �LED�N L �
INSPECTION NOTICE SCHEDULED � QZ• �C�
PERMITNO.t�CX;� ~�%�'��� cornP�E1Eo
`� --,
ADDRESS �`� ��� ����i��y'�1� � I I ��-
OWNER TELEPHONE NO. C���U�I���
CONTRACTOR � -
>: DESCRIPTION
-
�
� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL
O ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC;FINAL ❑ FOUNDATION/REMOVAL
� OWNERICONTRACTOR TO MEET YOU:�YES_NO
� COMMENTS:
�
W
a
�
�
O . _
� v �
�
�
W
�
Q
�
Z
W
�
W
�
�
� �W. . WORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLETE
W❑CORRECT WORK&PROCEED C ISSUE CERTIFICATE OF OCCUPANCY
� ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
� BEFORE COVERING
PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. ❑ PHOTOTAKEN
INSPECTOR WILL RETURN ❑ CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
C INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. �952� 249-46QQ
Owner/Contractor on site:
Inspector. ��-�� Lf`( IS � �
White Copyllnspector's File Canary CopylSite Notice
r /
C �� �.� �- ,
/ C�AT� TIKAE �/
CITY OF ORONO CALLED IN f � �1 y (°"� �
INSPECTION NOTICE scHE�u�E� ) 1��l I��''� �
PERMIT N0. %��'C��� --����'.���connP�ETE� �
ADDRESS �-����—� ��'r"Z'�I�X� I''Y) ��-�I ��
OWNER CONTR. ��� �'1�C�((���S �.�A��
TELEPHONE NO. �� � � ��� `��h �Ct - ��C��
� C''l_�r'�Cl �L� �
� DESCRIPTION � ���� I � C�l� �
� ❑ FOOTING � MECHANICAL RI ❑ EXCAV/GRADI /FILLING
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ LAKESHORE/WETLANDS
y ❑ INSULATION ❑ WOOD BURNER/FIREPLACE
Q ❑ TREE REMOVAL C-�-
Z ❑ WALL BD. ❑ WATER HOOK-UP ❑ SITE INSPECTION
� ❑ FINAL ❑ SEWER HOOK-UP ❑ PROGRESS �--f��lC'D
� ❑ DEMO-SITE ❑ SEPTIC MAINT. �`�
❑ COMPLAINT
� ❑ DEMO-FINAL ❑ SEPTIC INSTALL. ❑ FOLLOW-UP
_ ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ HARD COVER REMOVAL
J ❑ PLUMBING FINAL ❑ FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU•�_YES_NO
� COMMENTS:
�
W
a
�
J
O
�
�
O
�
W
�
Q
�
Z
W
�
W
�
�
d
��FACTORY:PROCEED ❑ PROJECT COMPLETE
W ❑CORRECT WdRK&PROCEED C ISSUE CERTIFICATE OF OCCUPANCY
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN
INSPECTOR WFLL RETURN
❑ CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑ INSPECTIONREQUIRED.CALLTOARRANGEACCESS.
Call for the next inspection 24 hours in advance. �952� 249-46QQ
OwnerlContractor on site:
Inspector. �
White Copyllnspector's Fiie Canary CopylSite Notice
� YJ-^ / ATE I TIME V
CITY OF ORO O CALLED IN �I /Q9
INSPECTION NOTICE �Sds HEDULED 9 � v
PERMIT NO. v�G-rl�-d��MPL TED
ADDRESS �3 SS I� / 1
OWNER C NTR �S
TELEPHONENO. DY� �OY��P� �P14� "8�r
� � �s�v
� D SCRIPTION
OOTING ❑ MECHANICAL RI ❑ EXCAV/GRADING/FILLING
❑ FR,4MING ❑ MECHANICAL FINAL ❑ LAKESHORE/WETLANDS
y ❑ INSULATION ❑ WOOD BURNER/FIREPLACE
❑ TREE REMOVAL
Z ❑ WALL BD. ❑ WATER HOOK-UP ❑ SITE INSPECTION
Q ❑ FINAL ❑ SEWER HOOK-UP ❑ PROGRESS
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ COMPLAINT
v ❑ DEMO-FINAL ❑ SEPTIC INSTALL. ❑ FOLLOW-UP
_ ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ HARD COVER REMOVAL
J ❑ PLUMBING FINAL ❑ FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
W
a
� �I� �I [� G' --T
0
�
�
0
�
W
�
Q
�
z
W
�
W
�
�
GW ��VORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLETE
� ❑CORRECT WORK 8 PROCEED - ISSUE CERTIFICATE OF OCCUPANCY
W
� ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
� BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. G PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR � CITATION ISSUED
❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952� 249-46��
OwnerlContractor on site: '
Inspector. _/�l � �
White Copylinspector's File Canary CopylSite Notice
�— � �� %�ATE TIM
CITY OF ORONO CALLED IN �Z`O��
INSPECTION NOTICE SCHEDULED ����1,�.�' /. :3�
PERMIT NO. ����-�a��COMPLETED
ADDRESS �3�5 �r�CQ�'YL �l I�
OWNER CONTR. �
TELEPHONE NO. � � � �� �S�—�'l�o�
�- DESCRIPTION � �
�OOTING � MECHANICAL RI ❑ EXCAV/GRADING/FILLING
Q ❑ FRAMING ❑ MECHANICAL FI L ❑ LAKESHORENVETLANDS
y ❑ INSULATION ❑ WOOD BURNER/FIREPLACE
❑ TREE REMOVAL
Z ❑ WALL BD. ❑ WATER HOOK-UP ❑ SITE INSPECTION
Q ❑ FINAL ❑ SEWER HOOK-UP ❑ PROGRESS
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ COMPLAINT
Q ❑ DEMO-FINAL ❑ SEPTIC INSTALL. ❑ FOLLOW-UP
i ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ HARD COVER REMOVAL
J ❑ PLUMBING FINAL ❑ FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
W
a
�
J
O
� cZQ -fi A %� ��,..s c .�»��-- � r
0
� FC�v -����c
W
�
Q
� r v oV�'
z
w
�
W
�
�
d
WORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLETE
W RRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
�CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952� 249-460�
OwnerlContractor on site: ^
Inspector. � �
White Copyllnspector's File Canary CopylSite Notice
c� �- ./
DATE TIME
CITY OF ORONO CALLED IN �I Zlo I IO
INSPECTION NOTICE SCHEDULED �zR 1 ir� �1�•3l�
PERMIT NO. �C�4 —DOgD�OMPLETED
ADDRESS ��� � � C /� ��j� �/ l�
OWNER CONTR.��(�� .�� ,
TELEPHONENO. 5 � —�� 5 — / ���
� DESCRIPTION ���'J�—�-��-�I�ZSYI — (1�1 �a�so/
� ❑ FOOTING ❑ MECHANICAL RI ❑ EXCAV/GRADING/FILLING v
Q ❑ FRAMING ❑ MECHANICAL FINA� ❑ LAKESHORENVETLANDS
y ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ TREE REMOVAL
Z ❑ WALL BD. ❑ WATER HOOK-UP ❑ SITE INSPECTION
Q ❑ FINAL ❑ SEWER HOOK-UP ❑ PROGRESS
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ COMPLAINT
J ❑ DEMO-FINAL ❑ SEPTIC INSTALL. ❑ FOLLOW-UP
_ ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ HARD COVER REMOVAL
J ❑ PLUMBING FINAL ❑ FOUNDATION/REMOVA�
Z OWNERICONTRACTOFi TO MEET YOU�YES_NO
� COMMENTS:
�
� �a-
o � ' �io�T t, iL �b �oL�
�
�
0
�
W
�
Q
�
Z
W
�
W
�
�
d
� �6RK SATISFACTORY:PROCEED I_i PROJECT COMPLETE
W ❑CORRECT WORK&PROCEED '� ISSUE CERTIFICATE OF OCCUPANCY
� ❑CARRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTO TAKEN
INSPECTOR WlLL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. �95Z� Z49-46��
Owner/Contractor on site:
/ �
Inspector. . / � � ��
White Copyllnspector's File Canary CopylSite Notice
D TIME ✓
G(i� � �
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED �3
PERMIT NO.0�00�^��� COMPLETED
ADDRESS 3�5� �';1��� l�a�C�c !�-f�
OWNER TELEPHONE NO.�(l?`�D `i"7�7
CONTRACTOR �� �Q�
� DESCRIPTION ����Vl U � `�'��'
� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS
� ❑ FRAMING ❑ MECHANICAL FINAL
Q ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
J ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOILOW-UP
Q
i ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNERICONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
W
a
�
J
O
�
�
O
�
W
�
Q
�
Z
W
�
W
�
�
d
W� .�WORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLETE
W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
0 G CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR n CITATION ISSUED
❑ INSPECTIONREQUIRED.CALLTOARRANGEACCESS.
Call forthe next inspection 24 hours in advance. �952� 249-46��
OwnerlContractor on s'te:
Inspector. r� � - � �
White Copyllnspector's File Canary CopylSite Notice
S� 9D E TIME V
CITY OF ORONO CALLED IN !��
INSPECTION NOTICE SCHEDUIED 4' _/D-/O .�
PERMIT NO.a?�1��� COMPLETED
ADDRESS a33J�'S GZ�LG��u.+
OWNER C�� '�LEPHONE NO. CU�Z �`JO �777
C�NTRACT�R �LiQ�
>; DESCRIPTION l�D ��/�G ���dr��
�
� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL
Q ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
J ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNERICONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
W
a
o `� `1��� ��'v1�t� Ci-(�.(c.�/1� � 1
� � e�C1-.J S� c,
� S �a .^��
0
�
W
�
Q
�
z
w
�
W
�
�
d
� ❑WORK SATISFACTORY:PROCEED PROJECT COMPLETE
W ❑CORRECT WORK 8 PROCEED SSUE CERTIFICATE OF OCCUPANCY
Q ❑CORRECT WORK,CALL FOR REINSPECTION TF �ORARY
� BEFORECOVERING t�
PERMANENT
�CORRECTUNSAFECONDITIONWITHIN HOURS. CPHOTOTAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR '�CITATION ISSUED
❑INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. �952� 249-46QQ
OwnerlContractor on site: .
Inspector. �/
White Copyllnspector's File Canary CopylSite Notice
3.35 Grr,c�� �t� �2r a�
,o=,s .
Qt028.9
� I I
CERTIFICATE OF SURVEY � � �a�� Q
o � NRJ�13'S�"W 87 77 hoza
FOR� CHARLES CUDD CO. � _ __ ° ' ' "��
� ?,:B ,
ADDRESS� XXXX GRAHAM HILL RD. x'"19� ' 10z� — — — a �` ' � �' �
ro = . i ,� � = i
oto '�'. mze., 31 '�. �i
PROPOSED ELEVATIONS s i� �`°o I 'j 3 �P � �
o I
GARAGE FLOOR = 1025A �o xio:a � `- I � � _
MAIN FLOOR = 1026.5 ,o ro��� ' a �
BASEMENT FLOOR = 1015A 90 �9 �w2 ' �� ` ` � a' Q
iouv ..r o 'ols.. `p11 r. r, .p �a¢e.e/Qn( I
iozi � o I ^ V
� `� ,o,s, � ro ` ' r� ;aze I
0
��...�(o� 2��� ��1�--. 9 ioia�a' � I
�...b .. . � t�`� �`..
��6. Otlw��- P��2... . LOL :J !. . I .
� �
soo� ��� ` �// � .ime� ��.fZOI `+o I , �
LEGAL DESCRIPTION `PoB°�� �`'��;`'�' '' ti Q4�°,�+�P�` � sro` � �� I
y, �a� � M ry I -.I�� I
�. .t�-5 ''. .i�S O �� 1�� . I '°. S�EBT�
NORtH Lot 7, Block 1, GRAHAM HILL PRESERVE, .�,'„ '�b, � z o. y O2 0: o� � A.��, � �T
p ;� Hennepin County, Minnesota. � � `a� a �2 � ,.� , Pa�a�ocu��
:�` 'ai \o
� yo 2Q� / / 6 oi� e�`� 0 � �\ ' � ���
1(inNhFEECOfI . ���'. "DiO� ��� j �:� . �•� Q'� � o _ 1� 15 ..ion.ex
� �sss ' / \: : r o �. .. --"�� 1.1" ' ..� ian.a `
x9851 B66 008 . ' . N . Ifi. �,R � � � 0% � EB�i�e \
�66. 'm .ioo9]o . ��. ' g.by ' a. '
s . . .�ou. r c� .� .iao a
9 6 00�• �. . � -J� �a2].] 1\2a� f" l02).] wNE �
. r6�.. . . . . . � LEBOx\ ..
b6y / . . . / . 1
Fss � ' i6a.n /o wzs i \ �.
�q�`,6 266 . �� '�O '10191 i ```� 0208 ��/ �� / �O��\�O`.:���29�.Y
98B�S,�B "V 991. �Y ,'�� . �'�, � � '/ . �� wta2. lOR5.5 .x �
.�95 �86686 ���,� ' � ' .,a,as ��pT � .A�� � ' i oz., `,azas .
�, ssaa �, ` z�aro � o
. 9gs 98)J��(.�\ /� ` �q A'Q1 .. �, i^� g O . �� . . I E! �r�PinOE/! t9 c'0 .
`AS 8 O� �J . - .�� 2.Y.� c'�
❑ DENOTES CATCH BASIN ag�' � i g g �g�`�'.`�' r
D2 DENOTES PROPOSED ELEVATION. ���F&s �� . � � �a �4„�rn m-• o
x10ll.2 DENOTES EXISi1NG ELEVATION. �Zas �: � ` �g� RN,_,p,6•,�.
����.� a,.a `2
r DENOTES DIRECTION OF DRAINAGE. ��-�Pm�'�.negs �.� . t Qa 5.�o o � uT-` o
� DENOTES WOOD HUB/METAL SPIKE �9s °� ��� � ', � rzo,
� ----' DENOTES BITUMINOUS r�s �/ "Bfi \ !i� �':O ` x`'�o
�ja DENOTES EXISTING TREE � s � / '. �pee. ,< ��... � 0 2
�� s sa.e� .� a2 0
� � s o
0�00 � 9J55/ � / � !� O
DENOTES PROPOSED RETAINING WALL a �s i °6 � hz� 90�
-•'" DENOTES EXISTING CONTOUR s,,�� � . °" �O`
rvwvv�.DENOTES TREE LINE �e'96 6 �� ' � �$ � / °o °,'� ,az�e H�USE DETAIL'
6 ' / ' / Ot1 4 � : ^
y �-./. . %99]V . . --P/1'�pQ . ���=2�'
� /p /��. �// t010.3 �.... �
.w�a . ���o ��S/lT� .ioiaz :
i �` � i�. ia�o� - t bcp v
ve '�'m// »i Qb ` `� i ` o � �P
4'I . � ��. �i . g � �4 •o\
i
�`..I , � @ \ �,. ��� ``� �-�o�o %miz.� �c�'�i0 P�.�P'
-70 ��'. . m /:. po o G�¢� ���
. � � � \, ''`/ . S�$�`oo�O �- / ,`0 `�` \
���.� Sa5*i TM e � �T � Oo �/ ` /�s \�
4 - ��. /�� Oa11 r00 ?�Oo4L a_�.: i .. S
'•� PROPOSED,. P ses.a � �200 +ima i „�- (� $Q \
-`.I� � ���SEPTIC AREA 98a3 . .. / �. Oo ' ' (VACANT)` �\ o� � ��
NOTES i Q \ ,:, s`� � .
�' �, � s�, � a o..��, ��
— Field survey conducted on October 29th, 2009. ss�„�i --.,�� �9i � � �:. °.' ��gg„ -�rs ss ;�'.o \ �o �$ ,°' �
— BEARING'S SHOWN ARE ON ASSUMED DATIJM. r � °' \ . $ '� "ss�_� `S, '9�s svee ' \ ."O �`�rdq ,,0°4' \\
— CONTRACTOR TO VERIFY HOUSE DIMENSIONS, `� ' �, � � \. ' ` °� i �' �. x ���� � \
AND SEWER AND BASEMENT DEPTHS. °99z �'� �
— FINISHED GRADE 10 FEET FROM PROPOSED BUILDING I �� \` ���TM -- �/ � - �� ��'�'�"y9 �� '��``� \\
SHALL BE 0.5 FEET LOWER THAN THE FINISHED GRADE ',� �/ � �� ����' S �
AT THE BUILDING. `d `96B1 ^ `"' oeac )
— FINISHED GRADE ELEVATIONS ARE TO FINISHED � PRoros�o \ �, a� c� � -�
� i
SURFACE WITH TURF ESTABLISHMENT. f' � 'sFrnc Aae� \ � a j � J''u \ ��
9919 v�S
— DRIVEWAYS ARE SHOWN FOR GRAPHIC � ' � � m�' �
�U
�U
PURPOSES ONLY. FINAL DRIVEWAY DESIGN AND 951.' ���I � s � - � � � � s�'� os'�0°� 6a
LOCATION TO BE DETERMINED BY CONTRACTOR � , \ '" ', `'�, \ i� %9�� AREA CALCULATIONS �� i
— PROPOSED RETAINING WALLS DESIGNED BY W '8� e'�'' t?.e � i
OTHERS. �? ` � -� � `�,�� - TOTAL LOT= t116,144 sq. ft. (2.67 acres) � �
� I \ ' ��.i// Dnveway�t8040695q.t.Ft \\� i�// RECEIVED
�b ` �'. . Deck = f302 Sq. Ft. \ ��
� , I `& � � ' , \
z `��.I °',n - i a r'� ��� � v� N,1
sss �� �` �. . � cse.2 IIOI � � LOO�J
i.
s �
m I Ss i`. xseoe
I
�,�.: .. � VITYOFpRONO
o�./ S 9`A� ���� I hereby certify that this plan, survey or report was prepared by
me ar under my direct supervision and that I am a duly Licensed
JOB#09504HS Land Surveyor under the lows of the State of Minnesota.
CRE LAND SURVEYING �;... "50""° � /� Revised: 11-10-09
Ham Lake,MN 55(j04 ��� �I P (/�(/ -Revised: 11-24-09
�� .__,-�,
763-458-2997 acrelandsurve �gmad.co
io �, �, �, �, �, �s �, �, �, �,a i„ �„ i„ ,,. ,,, „s ,,, ,,, ,,, � C�\Land ProJects 2008\09504hs—Grahan HII�,\dwg\09504hs.dwg 11/24/2009 11�27�01 AM CST JOS UA P. SCHNEIDER Date: �� 8 09 Reg. No. 44655
/ V
� DATE TIME
ITY OF ORONO CALLED IN '`—J�„/SC�/O
INSPECTION NOTICE SCHEDULED -_?//��'//G 3. �)
PERMIT NO. 2C���'-C2.'-'�'�S COMPLETED
ADDRESS 3 3�S �rzz�n�a,--� ,L�j f/ ,�
OWNER TELEPHONE NO. 7��'-Z�Z 37��
CONTRACTOR � � r'1 �' /f- � �LC�c�
� DESCRIPTION G� i. f<'J --��S,f�
lL ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
� ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS
�
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
J ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNER/CONTRACTOFi TO MEET YOU:_YES_NO
� COMMENTS:
�
W
a
�
J
O
a
�
O
�
W
�
Q
�
Z
W
�
W
�
�
GW �WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
W /O CORRECT WORK&PROCEED - ISSUE CERTIFICATE OF OCCUPANCY
0 ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑ INSPECTIO(V REQUtRED.CALLTO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-46�0
OwnerlContractor on site: �
Inspector. � /I ` >
White Copyllnspector's File Canary CopylSite Notice
� p DAT TIME "
CITY OF ORON _�w -1 � �v
INSPECTION �IOTI ���� SCHEDULED a " � �
PERMIT NO.�D —L��� COMPLETEO
ADDRESS v J✓-SS� ��/� ��-
OWNER ELEPHONE NO� 6 � 777
CONTRACTOR �-
�: DESCRIPTION _ _ �
�
lV ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
� ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS
ti
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU:_YES_NO
� COMM NTS:
a v,/a � I '1 (•-�
0 5 � ��6'��.i�'C ,� S c=��<�'������, ,�� � r , -;.� i i
� �..,� � �(�i'�J'+��„���
° �>� �P c,��!',Cr��t��1 j���H-
Q f� .�.��` �
�
z
W
�
W
�
�
O
W ❑WORKSATISFACTORY:PROCEED [� PROJECTCOMPLETE
� ❑CORRECT WORK&PROCEED � ISSUE CERTIFICATE OF OCCUPANCY
W
O �RRECT WORK,CALL FOR REINSPECTION TEMPORARY
V B ORECOVERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. ,� PHOTOTAKEN
INSPECTOR WILL RETURN
❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Ca11 for the next inspection 2a hours in advance. (952� 249-4600
OwnerlContractor on sit
Inspector.
White Copyllnspector's File Canary Copy/Site Notice