HomeMy WebLinkAbout2005-P09446 - mechanical PERMIT
CITY OF ORONO Permit Number:
2750 Kelley Parkway- PO Box 66 Po9446
Crystal,Ray, fui►nnesota 55323 Permit Type:
Mechanical Permits
(952) 249-4600 Date Issued:
11/23/2005
SITE ADDRESS: 1270 French Creek Dr Unit#
Wayzata, MN 55391
PID: 10-117-23-32-0014
DESCRIPTION:
Proposed Use: Residential
Permit Class: General
Permit Type: Mechanical Permits Permit Sub-type(s): Heating Systems
DETAILS:
Approved per resolution#:
Separate permits required:
NOTICES/REMARKS:
FEE SUMMARY: Permit Fee: $ 62.19 valuation: $ 4,975.00
State Surcharge Fee: $ 2.49
Misc.Fee: $ 1.50
TOTAL FEE: $ 66.18
APPLICANT: Sedgwick Heating&Air Conditioning Inc. OWNER: Mr. &Mrs. Siegert
8910 Wentworth Avenue S 1270 French Creek Dr
Minneapolis,MN 55420 Wayzata MN 55391
THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED
AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF
MINNESOTA BUILDING CODE REQUIREMENTS.
c � �f
� ��; �_ _t �_ , -j.
, "•. -- y._ �_. %" � ;. � �..
APPLICANT PERMITEE SIGNATURE ISSUED BY SIGNATURE
Copies: 1-File(Signatures Required), 1-Applicant, 1-Monthly Reports, 1-Assessing,(If Septic, 1-Septic) Page 1
�� ����
. � �
I
CITY OF ORONO APPLICATION FOR NIECFIANICAL PERtiIlT
' Box�66 (2750 Kelley Parkway)
Crystal �ay, MN 55323
GENERAL INFORMATION
1. You may apply for mechanical pernuts by mail or in person at the City offices. Applications will be
reviewed and a permit will be issued within 2 working days.
2. Pemut cards will be sent by retum mail after a review is completed. PERMITS ARE NOT VALID
UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS
POSTED ON THE J�B SITE.
3. Mechanical DesiQns - Complete calculations, details and specifications are required for each heating,
ventilation,humidification-dehumidification, and air conditioning instailation including heat loss/heat gain
calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model.
Data shall be presented on form provided. Ideatification of and specifications for water heating equipment
shall also be provided.
4. When any new construction or rer:odeling is involved, a separate buildir.g pe?mit must be obtained.
5. All work must be done in accordance with the Uniform lvlechanical Code/State Building Code
requirements.
6. All work must be inspected (rough-in and fina�). Call 473-7357. 24-hour notice required.
7. House Heating Test Record must be submitted before final.
Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification.
INCOMPLETE APPi.ICATIONS WILL NOT BE PROCESSED. If you have questians, call 473-7357.
Please check one: New Addition Repair � Repiace
Residential Commercial
JO� SITE: �?1� Zip:
Owner's Name: Telephone Number: ��J_�,/7,�--f�Sl/
Mailing Address• City• Zip:
Contractor'sName: SEDGVI►IC�C N�oTING&AIR CDJ`a�'T�^"'���oneNumber:
MailingAddress: �i0 Wen`;{�o�� City: Zip:
��iinneap�li�, Ni�� .,,��
SYST�M DESCRIPTION (952)881-9G�0
HEATING SYSTEMS
puantity: �T
l�lake: <
Model: �j,-�j��/O .�fc��/}
Fuel: .!�
Flue Size:
Input BTUs: �1v
Output BTUs:
CrM:
COOLING SYSTEMS
Quantity:
Make:
Model:
Tons:
H. Power
�A � ,
.
WOOD BURNING E�UIPMENT'
Wood stove with flue � �
Wood combination or add-on
Factory fireplace with flue
Factory Fireplace (s) Freestanding Masonry
Wood Stove (s) Frank.lin, other
Brand Name Model No.
Mfgr's Min., Clearances, side , rear , min. flue dia.
Tatal
VENTI�ATION
No. Kitchen Exhaust ducted recirculating cfm
No. Bath Exhaust (must be ducted outside) cfm
I�To. Other Fans: Locations cfm
Total
FLTEL ST�RAGE (MUST BE APPROVED BY FIRE MARSHAL)
Installation Removal
Fuel oil: gallons underground inside outside
LP Gas: gallons
Other Gas opening
P'EI2MIT FEE CALCULATION
1. 1.25% of Contract Price* or Minimum Fee 35.00
1'7S'' x .0125 $ �GvT- lC1
(contrac[ price)
2. State Surchar�e. ** Add the State Building Code Division
Surcharge to each permit. x .0005 $ ol_ �/c!
(contract price)
or $.50, whichever is greater
3. Posta�e and HandlinQ (Only mail-in applications) $ 1.50
4. TOTAL PERMIT FEE (Add lines 1-3 above) $ �Q �:/�
* CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted
work including materials, labor, profit, and other fued costs. It is the amount to be charged to the
customer for the work done. If any material, equipment, labor, or installation are furnished by the owner,
tenant or any other party the reasonab?e market value of such items must be added to the estimated cost
or contract price for permit fee purposes. Ln the event that there is a dispute on the amount of the job cost,
the City may request the submission of a signed copy of the actual contract.
** The STATE SURCHARGE is .0005 of the contract price under $1,040,000 or $.50 - whichever is
greater. For valuations over $1,0OO,OdO call the Departmen[ of Inspectional Services for the price.
The undersigned hereby applies to the City for issuance of a Mechanical Permit, agrees to do
all work in strict accordance with the ordinances of the City and the regulations of the Minnesota
State Building Code, and certifies that all statements made on this application are complete, true
and correct.
Applicant's Signature:`�� � � , �L Date: f� �� �
Ci
Approved By: Date:
� _c + ' i
HEATYNG&AIR COIVDITYONYNG CO. ���� D E�il l"i�L �I E AT'I N C D�TA S F-� E�T
Comfort you can�count ori
. �
JOB iVAME: DATE
ADDRESS:
011TDOOR TEMP: °� Z.C� INDQOR TEMP: ` �} TEMP. DIFFERENCE: f�
DESIGtV TEMPERATURE DiFFERENCE
MOVABLE GLASS WINDOWS SQUARE � � � � � r�r gp 65 70 75 80 90 95 BTUH
FEET HEAT TRANSFER MULTIPLIER HEAT LOSS
SINGLE GLASS 39 45 52 58 65 71 78 84 90 97 103 110 116 123
SINGLE GLASS W/STORM 21 25 28 31 35 38 42 45 49 52 56 59 66
DOUBLE GLASS G 28 32 37 41 46 50 55 60 64 69 73 78 82 87
DOUBLE GLASS W/STORM 16 19 21 24 27 29 32 35 37 40 42 45 50
SQUARE DESIGN TEMPERATURE DIFFERENCE BTUH
SLIDING GLASS DOORS FEET 30 � � � `� `� � 6`'' �0 75 80 85 90 95 HEAT LOSS
HEAT TRANSFER MULTIPLlER
SINGLE GLASS 42 48 55 62 69 76 83 90 97 104 110 117 124 131
SINGLE G�ASS W/STORM 22 26 29 33 37 40 44 48 51 55 59 62 70
DOUBLE GLASS 29 34 39 43 48 53 58 63 67 72 77 82 87 91
SQUARE DESlGN TEMPERATURE DIFFEREIUCE BTUH
DOORS FEET 30 35 4a 45 50 55 60 C�i 70 75 80 85 90 � HEAT LOSS
HEAT TRANSFER MULTlPLIER
SOLID WOOD 31 36 41 46 51 56 62 67 72 77 82 87 ,97
SOLID WOOD"• 18 21 24 27 30 33 36 39 42 45 47 50 53 56
METAL URETHANE 23 27 30 34 3S 42 45 49 53 57 60 64 68 72
METAL URETHANE"' 13 16 18 20 22 25 27 29 31 33 36 38 40 42
"Weatherstripped or Storm
RUNNING FEET -�--��-Z
CEILIN� HEIGHT R G
WALLS GROSS WALL �
WINDOWS & DOOR AREAS - ��
NE7 WALL ApEA �
DESIGN TEMPERATURE DIFFERENCE
FRAME WALL SaEETRE � 3'' � � � � � � �' �� �' � �' � � HEAT LOSS
HEAT TRANSFER MULTlPLIER
NOINSULATION 8 10 11 12 14 15 17 18 19 21 ?2 23 25 26
R-11, 3" INSULATION 2.7 3.1 3.6 4.0 4.5 4.9 5.4 5.8 5.3 5.7 7.2 7.6 8.1 8.5
R-13, 3-1/2" INSUTATfON 2.1 2.4 2.8 3.2 3.5 3.8 4.2 4.6 4.9 5.3 5.6 5.9 6.3 6.6
R-i3 + 1" PCLYSTYRENE 1.8 2.1 2.4 2.7 3.0 3.3 3.6 3.9 4.2 4.5 4.8 5.1 5.7
R-19 + 1/2" POLYSTYRENE 1.6 1.9 2.2 2.5 2.8 3.0 3.3 �3.6 3.8 4.1 4.4 4.7 4.9 5.2
P/iASONRY WALL SQUARE DESIGN TElVIPERATt9RE DIFFERENCE BTUH
ABOVE GRADE FEET 30 35 40 45 50 �i 60 65 70 75 80 85 90 �' HEAT IOSS
HEAT TRAMSFER MULTIPLIER
NOINSULATION 16 18 21 23 26 28 31 33 36 38 41 44 4S 49
R-5, 1" INSULATION 4.3 5.0 5.8 6.5 7.2 7.9 8.6 9.4 10.1 10.8 11.5 12.2 13.0 13.7
R-11, 3" INSULATION 2.3 2.7 3.1 3.5 3.8 4.2 4.6 5.0 5.4 5.8 6.2 6.5 6.9 7.3
R-19, 6" INSULATION ' 1.4 1,7 1.9 2.2 2.4 2.6 2.9 3.1 3.4 3.6 3.$ 4.1 4.3 4.6
dESIGN TEMPERATURE DIFFERENCE
MASONRY WALL SQUARE BTUH
BELOW GRADE FEET � � � �' � � � �' �� �' � � � �' HEAT LOSS
HEAT TRANSFER MUITIPLIER
NO INSULATION 4.4 5.1 5.9 6.6 i.3 8.1 8.8 9.6 10.3 11.0 11.812.5 1 14.0
R-5, 1" INSULATION 2.6 3.0 3.5 3.9 4.3 4.8 5.2 5.7 6.1 6.5 7.0 7.4 .8 .3
R-11, 3" INSULATION 1.8 2.1 2.4 2.7 3.0 3.3 3.6 3.9 4.2 4.5 4.8 5.1 .4 5.7
R-19, 6" INSULATION 1.2 1.4 1.6 1.8 2.0 2.2 2.4 2.6 2.8 3.0 3.2 3.4 3.6 3.8
HEAT LOSS SIJBI"OTAL '�
• ► .
Heat Loss Subtotai from Paae 1 Z ��
DESIGIV TEMPERATURE DIFFERENCE •
CEIUNG S�EE RE 30 I 35 40 I 45 E,a I � 60 65 �� 75 � �` � � g`' HEAT LOSS
HEAT TRANSFER MULTIPLIER
NO WSULATION 18 2? 24 27 30 � 33 36 39 42 45 48 j 51 � �; 57
R-11, 3" INSULATION 2.6 3.1 3.5 4.0 4.4 4.& 5.3 5.7 6.2 6.6 7.0 I 7.5 7.9 8.4 �
R-19, 6" INSU�ATION j 1.6 � '.9 j 2.1 2.4 �2.6 �2.9 3.2 3.4 3J 4.0 4.2 4.; I a ,�.p �
R-30, 10" INSULATION � J �`f' I 1.0 1.2 1.3 1.5 � 1.6 �.8 �2.0 2.1 2.3 2.5 2.6 �2. �;.0 1
R-38, 12" INSULATION 0.8 0.9 � 1.0 1.2 � 1.3 � 1.4 1.6 � 1.7 1.8 2.0 �2.' 2.i �.� 2.5
FLOOR OVER AN SQUARE � DESIGN TEMPERATURE DIFFERENC� BTUH
UNCONDiTIQNED SPACE FEcT 30 35 40 45 50 5b 60 I 65 70 I 75 80 I �` � � 9`' HEAT LOSS
HEAT TRANSFEFt MULTIPLIEft
NO INSULATION 10 11 13 14 16 17 19 21 22 24 25 27 i ZS 30
R-11, 3" INSULATION 2,4 2.8 3.2 3.6 4.0 4.4 4.8 5.2 5.6 6.0 6.4 5.8 �7.2 7.6
R-19, 6"INSULATION 1.6 1.8 2.1 2.3 '2.6 2.9 3.1 3.4 3.6 3.9 '4.2 I 4.q j a.7 4.9
R-3C, 10"INSULAT!ON ; � 1.1 1.3 � 1.5 ( 1.7 1.8 2.0 2.2 2.4 2.6 2.9 �3.0 � 3.? �3.3 3.5 !
DESIGN TEMPERATURE DIFFERENCE
BF�ScMENT FLOOR SQEARE 30 35 40 45 I � I � I � � 70 � � � �` � � � � HEAT LOSS
HEAT TRANSFER MULTIPLIER
BASEMENT rL00R �0.8 � 1.0 � 1.1 ?.3 1,4 1.5 � 1.7 1.8 2.0 2.1 �2.2 2.�1 , .5 2J
DESIGN TEMPERATURE DIFFERENCE
CONCRETE SLAB WITHOUT LINEAR BTUH
PERIMETER SYSTEM F�pT 30 35 4a 45 50 55 6� 65 70 75 80 8.�` I � � NEAT LOSS
HEAT TRAN�FER MULTIPLIER
NO EDGE INSULATION 25 29 33 37 41 4.5 �39 53 57 61 65 69 73 77
1" EDGE INSULATION 13 15 17 19 Z1 23 25 27 29 31 33 35 I 37 39
2" INSULATION 6.3 7.4 �8.? 9.4 10.5 11.5 12.6 13.6 14.7 15.8 16.8�17.8�18.9 20.0
� DES1�^,�w Tc'Ib�?ERA7vn'c DiF'r'cr'iciJi,E �
CONCRETE StAB LINEAR 30 35 40 45 50 5� � 60 E5 70 75 gp g� I gp � g5 BTUH
WiTH PERIMETER SYSTE�/i FOOT HEAT LOSS
HEAT TRAPISFER MULTimL1ER
NO EDGE INSULATION 57 67 76 86 95 105 114 124 133 143 152 1621'77 181
1" ED G E I N S U LAT I O N 34 40 46 52 57 63 69 74 80 86 91 97 I 103 1 Q9
2" EDGE INSULATION 28 33 37 42 47 ( 51 56 61 65 70 75 79 84 89
An additionai infiltration load is calculated only if the horne is loosely constructed or when window infiltration is greater than .5 CFM per
Iinear foot of crack. -L� �c g�7''�c��
I ���FL OR S FT. x CEILING HEIGHT = ��� BIC F7
INFILTRATION/
VENTILATION 0.40 x CUBIC FT - 60 = CFM
MECHANICAL VENTiLATION CFM = FRESH AIR IIVTAKE
DESIGiV TEMPERATURE DIFFERENCE BTUH
CFM 30 35 ' 40 45 I 50 55 60 65 70 75 80 85 ! 90 �' HEAT LQSS
HEAT TRANSFER MULTIPLIER
INFILTRATION 33 39 44 ' 50 55 6 i 66 72 T7 83 f38 9a �9 � 5 '�0;�
MECHANICAL VENTILATiON 33 39 44 50 55 61 66 72 77 83 88 j 99 5 �y
HEAS �OSS SUBTOTAL � � ��
DUCT LOSS BTUH HEAT LOSS
R-4, 1" Flexible Bianket irsulation: ADO 154% 1.151
R-7, 2" Flexible Bianket Insulation: ADD 109% (.101
TOTAL FiEAT L�SS �
NOTE: All Heat Trans�er Multipliers trom ACCA Manual "J" Sixth Edition.
HL-$41-L7 002344 Litho U.S.A.
; � �
(.� DATE � TIME
v CITY OF ORONO CALLED IN I,��I5�-0S
INSPECTION NOTICE SCHEDULED �,�-1 q �'> %U�� '
PERMIT NO. P C���-l�!(v COMPLETED
ADDRESS /� 7�% f—,'7�i)C t� �I"�'�IC ��R .
OWNER � �/k:'I+''C Cti CONTR. ���Z�� c t�.
TELEPHONE NO. �%S� �/7S C.v ��S�L�- Ui�ri2�/�'
� DESCRIPTION �[�L.r��lc<c �
l� 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
� 02 FRAMING ME yANICAL FINA 19 LAKESHORE/WETLANDS
y
O 03 INSULATION ----2�tfP'" BURNER/FIREPLACE 34 TREE REMOVAL
Z 0 WALL BD 12 WATER HOOK-UP 17 SITE INSPECTION
14 SEWER HOOK-UP 06 PROGRESS
EM SITE 27 SEPTIC MAINT. 21 COMPLAINT
� 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
= 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
BING FINAL � � 36 FOUNDATION/REMOVAL
OWIyE ONTRACTOR TO MEET YOU:�/YES_NO
� OMMENTS:
�
W
�
�
J
O
�
�
O
�
W
�
Q
�
Z
W
�
W
�
�
d
W WORK SATISFACTORY:PROCEED PROJECT COMPLETE
� C CORRECT WORK 8 PROCEED r ISSUE CERTIFICATE OF OCCUPANCY
W
� ❑ CORRECT WORK,CALL FOR REfNSPECTION TEMPORARY
� BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. - pHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR � CITATION ISSUED
C INSPECTION REQUtRED.CALL TO ARRANGE ACCESS.
Call for the next'nspection 24 hours in advance. �952� 249-46��
OwnerlCon 't •
Inspector.
Whiie Copyllnspector's File Canary CopylSite Notice
SEDGWICK HEATING & AIR CONDITIONING CO. HEATING JOB NO. � ��
8910 WENTWORTH AVENUE SOUTH • MINNEAPOLIS, MN 55420 • (952)881-9000 TEST RECORD
ADDRESS r��a �`'�L`-'"` ���� ��� CITY �� v� 1
OCCUPANT OWNER �
c. �I �-
SOLD BY '4� � INSTALLED BY
MAKE `�'�v�`U � MODEL �`�` ������� " �
SERIALNO. �`�bs�i y �,2�3 INPUT ��li "'- O
THERMOSTAT� �' VENT SIZE � `` P v�
VALVE � TYPE OF LINER �-�
LIMIT � LINER SIZE
P
LIMIT SETTING FILTERS: SIZE NUMBER
FAN SETTING WIRING �
r'� 1 -
-�.i
PILOT TYPE TEST TAG
IGNITION MODEL ,�-J� LIGHTING INST. �
PILOT TIMING � ""�. C �
{�t ^�f0 DATE TESTED
PRESSURE �•�-1 �C. PERCENT COZ Cl � �� w� C
6 �`� COMPANY TESTING
INPUT CFH PERCENT OZ
o °�L' �
STACK TEMP. � PERCENT CO 4 NAME OF TESTER _�d,A�b] �
FORM 235(REV.11/89) FORM DISTRIBUTION: WHITE COPY-JOB FILE YELLOW COPY-CITY