Loading...
HomeMy WebLinkAboutRe: summary of mtg re home project - � � Butler Squere, Sufte 650C 100 North Sfxth Street Minneapolis, M N 55403-1513 612 339 2257 phone ,,_,_ ,�;a�,_._.. 612 349 2930 lax �_:;�:r 1 9 1998 www.sheaarch.com MEETING NOTES �� � � � � �� �-��``�� Re: The Olson Residence Our Commission #4479.00 Attending: Landform Engineering Co. Darren Lazan -C, ,, � 7-�- City of Orono '` � '-�.'` r Lyle Oman Shea Architects, Inc. Ed Wilms Date: October 14, 1998 The following is a summary of the meeting on the above referenced project. Item Comment 1. Septic system is approved. 2. Per the City of Orono, rip rap is not approved according to the current plan. At the City's direction, run off water from the north side of the house must either be released at the top of the hill at the 75'-0" setback from the lake or directed with a swale around the east side of the house. It could also be piped and released somewhere else on the site. The owner has directed us to release the water at the top of the hill. Landform will be supplying the city with plans showing this condition. 3. The City of Orono has agreed to allow a cut through the 75'-0" lake setback for the 4'-0" wide walkway to the guesthouse. This walkway will start at the edge of drive, which is lower that the existing grade and meet up with a lanair�g ihat wiii be na larger thar� 32 SF. The land will be sloped up from the walk to meet the existing grades as quickly as possible. 4. Landform supplied the city with a stamped and certified survey of the lot. 5. Signed structural drawings have been delivered to Emerald Builders. Emerald will submit to city. 6. The roof slope must be %:' pet foot according to code unless the structure can be shown to be sufficient to withstand the load of ponding water. Structural to verify and Shea Architects, Inc. to make changes as required. 7. Separate pool and irrigation permits are required. 8. R-values have been submitted to the city. If the city requires additional information, please contact the architect immediately. A R C H I T E C T S , I N C . . �. 2 The Olson Residence Our Commission#4479.00 October 14, 1998 9. Hand laid sod over secondary septic site is acceptable. Area should be disked, not excavated. Light tilling is acceptable. This work cannot be performed if soil is wet. 10. Set back at the cul-de-sac is 50'-0"for any structure that is 4'-0" or higher. There is also a 5'-0" side yard setback. These notes reflect our understanding of the meeting. If there are any discrepancies, please contact the architect immediately. Notes by: Edward Wilms cc: Attendees Ron Olson Marlys Enger Pat Keenan H:w.nu�av.rrc�ou.00T