HomeMy WebLinkAboutMCWD permit �°'�o
C ITY OF ORONO
�, �, Street Address: Mailing Address: Telephone(952)249-4600
�' 1 2750 Kelley Parkway P.O. Box 66 Fax (952)249-4616
F
1,9 F,G Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us
kESHO�
October 26, 2016
Michael Miller
1987 Fagerness Point Road
Wayzata, MN 55391
Dear Mr. Miller:
We have been informed by the Minnehaha Creek Watershed District that you intend to install riprap on the
property at 1987 Fagerness Point Road in Orono, MN. Because riprap is often part of a larger project, we want to
alert you to some related City code provisions so you can avoid the hassle and expense of obtaining an after-the-
fact permit or even having to undo some of the work.
With few exceptions, including riprap and lakeshore steps, City code prohibits the installation of impervious
surfaces within 75 feet of the lake. Any sort of fabric is considered impervious. This means that riprap rock may
be extended farther than allowed by the riprap permit but no fabric may be installed under it.
The following activities require a permit from the City:
• Any earth movement outside the area where the rip rap will be placed
• Replacement of retaining walls and/or installation of new retaining walls within 75 feet of the lake (regardless of the
height of the walls)
• Construction or replacement of lakeshore steps
• Removal of trees(dead or alive)six inches in diameter or larger within 75 feet of the lake
• Removal of vegetation on any slope within 75 feet of the lake that is too steep to easily walk
. Removal of vegetation or trimming of trees larger than six feet to provide a view of the lake from the house
. Total or near total removal of vegetation within 75 feet of the lake not part of another permit
A tree removal permit can be arranged by calling 952-249-4600. For the other permits your contractor must
submit a permit application and plans for review. Additional information can be found at the City website,
www.ci.orono.mn.us.
If you have any questions feel free to contact me at cmattsonCc�ci.orono.mn.us or at 952-249-4620.
Sincerely,
CITY OF ORONO
�V I��
Christine Mattson
Planning Assistant
MINNEHAHA CREEK 1NATERSHED DISTRICT
�:;
QUALITY OF WATER `�� QUALITY OF LIFE
Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information
contained in the permit appiication, correspondence, plans, maps, and all other supporting data
submitted by the appiicant, and made a part hereof by reference, PERMISSION IS HEREBY
GRANTED to the applicant named below for use and development of land in the Minnehaha
Creek Watershed District.
Issued to: Michael Miller Permit No: 16-568
Location: 1987 Faqerness Point Road, Orono
Purpose: Shoreline and Streambank Stabilization- 115' Rip-Rap
Date of Issuance: 10/20/2016 Date of Ex iratio : 10/20/2017
By Ot'tl�r of the Boa of ana�ers
� � � �, �
�°�/�'������� �� 1 _
� Rache� Workin
Distri�t Technician
�
This permit is not transferable without District approval, and is valid to the date of expiration. No
activity is authorized beyond the expiration date. If the permittee requires more time to complete
the project, an application for renewal of the permit must be received by the District at least 30
days before expiration.
The applicant is responsible for compliance with all District Rules and for the action of their
representatives, contractors, and empfoyees.
Conditions: Project to be completed as described in plans submitted to the
MCWD office on October 14th, 2016 according to the provisions of this permit.
• All equipment intended for use at a project site must be free of prohibited
invasive species and aquatic plants prior to being transported into or within
the state and placed into state waters
• All equipment used in designated infested waters must be adequately
decontaminated prior to being transported from the worksite
• Properly install and maintain all required erosion control measures until the
disturbed areas are re-stabilized
• Notify MCWD in writing upon completing installation of perimeter and
sedimentation controls
• When the site is re-stabilized and the MCWD staff has performed a final
inspection, all perimeter control must be removed
(Statement concerning fees for inspections, violations, etc... on following page)
We collaborate with public and private partners to protect and improve land and water for current and future generations,
.......................................................................................................................................................................................
.......................................................................................................................................................................................
.......................................................................................................................................................................................
.......................................................................................................................................................................................
15320 Minnetonka Boulevard,Minnetonka,MN 55345 • (952)471-0590 • Fax:(952)471-0682 • www.minnehahacreek.org
. , ,
MINNEHAHA CREEK � WATERSHED DISTRICT
QUALITY OF WATER """'`� QUALITY Of LIFE
Inspection/Ana v onitorina Fees
A site inspection and monitoring by Disirict staff will be performed where the activity involves:
• a commercial/industrial/multi-family resid�ntial development
• a single family residential development greater than 5 acres or of any size if within the
Minnehaha Creek subwatershed
• any alteration of a floodplain or wetland
• dredging within the beds, banks or shores of any protected water �r wetland
• a violation
• any project which in the judgment of the District staff should be inspected due to project
location, scope, or construction techniques
In these cases, the applicant shall pay to the District a fee equal to the actual costs of field
inspection of the work, including investigation of the area affected by the work, analysis of the
work, and any subsequent monitoring of the work, which in the case of a violation shall be at
least $35.
Standard Fee Schedule
District professional staff $ 57.74*
District interns $ 36.44*
District clerical staff $ 42.16*
Consulting Senior Engineer $ contracted rate
Consulting Engineer/Technician $ contracted rate
District Counsel $ contracted rate
Application fee $ 10.00
Copy costs $ .25 + actual staff time
Color copy costs $ 1.00 + actual staff time
* Hourly
We collaborate with public and private parrners to protect and imprave land and water for current and future generation:
�[�7l1 AAinnc+nn4n Rn��la��arrl Minnatnnka MN 55345 . (9521471-0590 • Fax:(952)471-0682 • www.minnehahacreek.org