Loading...
HomeMy WebLinkAbout2016-01258 - demo � CITY OF ORONO * 2 0 1 6 - 0 1 2 5 8 * 2750 KELLEY PARKWAY DATE ISSUED: 1ll0U2016 ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS : 2649 CASCO POINT RD PTN : 20-117-23-24-0029 LEGAL DESC : SPRING PARK : LOT 138 BLOCK 000 PERM[T TYPE : DEMOLITION PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : DEMO-PRINCIPAL STRUCTURE NOTE: I. FOUNDATIONS/ALL DEMO DGBRIS TO BE REMOVED FROM GROUND&DISPOSED OF OFF SI"I'E,PER PCA REGULAT'IONS. 2. WELLS MUST BE ABANDONED. 3. INSPECTIONS DONE BEFORE BACKFILLING. NOTE: A 24-48 HOUR NOTICE IS REQUIRED FOR ALL INSPECTIONS. CALL(952)249-4600. SEWER MUST BE DISCONTINUED AT THE CITY SERVICE BY QUALIFIED CONTRAC'I'OR BEFORG DEMO PERMIT IS ISSUED. CHECK TO MAKE SURE TH[S PERMIT HAS BEEN PULLED BEFORE ISSUING THIS PERMIT. APPLICANT DEMOLITION-PRINCIPAL STRUCTURE 75.00 STATE SURCHARGE DEMO 1.00 M& M HOME CONTRACTORS DEMOLITION-ACCESSORY STRUCTURE 50.00 413PAULAVES COLOGNE, MN 55322- TOTAL 126.00 (612)220-4521 Payment(s) Minnesota State License#: BUIL-BC560376 CHECK 9210 126.00 OWNER KINDL, DUSTIN&CASIE 2649 CASCO PT RD WAYZATA,MN 55391- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Quilding Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compicd with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may bc revoked at any time for due cause. �. � � \ ( � / / plicant r ee Signature Dat Issued By Signature Date O City of Orono � x c Y USE ONLY Q� �- NO P.O.Box 66 Date Receivc� Permit#��rO'� 5 O 2750 Kelley Parkway Crystal Bay,MN 55323 Amount $ SAC Credit: , (952)249-4600 '� a Homeowner(s)Signed: ❑Yes � F' �,� Resolutions(if any)Signed:❑Yes ❑None Required lqkESHv�� Zonin Disclosure Si ned: ❑Yes ❑NoneRe uired CITY OF ORONO - DEMOLITION PERMIT (All permits must be approved by the Building Official and/or Zoning Department) �CV C,�V t V Job Site/ Owner Information: OC� Q � �a16 Type: �Residential ❑ Commercial CITY OF ORONO Site Address: ���0`1 �f LA-Sc=-E� �c��n��— �iZ Dvs,, ,,� � �,fi r��4� Owner: �-I ri ��� Mailing Address: city: C��N�C�t )co� zip: Phone: Email: Contractor/Applicant Information: Contractor/App.: �`� '� �`1 �,,;,i._ � �,�;;,��,z�iz jContact Person: I�lVt-Z � i�yy�,3�,�,,-,/ Address: � ,� , �!�-,� `j C'.� State License#: -l��(' .`- �-E'�=5�](,.. City: "_' Zip: `�`��- Expiration Date: Phone: �1�,3- y�-I � �'S� Email: � ��;,ri l. c� , {y. �c.,,.,._, � �L��� <-� vl�..i-z,7 SPECIAL CONDITIONS 8� HOLD HARMLESS AGREEMENT General Instructions: 1. You may be required to obtain other permits, i.e.: well abandonment, sewer, etc. 2. Work must not begin unless the permit card is available on the job site. 3. A 24-48 hour notice is required for all inspections. Call (952)249-4600. 4. Sewer must be discontin ed at the City service by qualified contractor before demo permit is issued. Demolition by means of: Manual Disassembly �eavy Equipment ❑ Other Permit(s) Issued: ❑ Sewer Disconnection ❑ Well Abandonment# In return for issuance of said Demolition Permit, the undersigned owner hereby agrees to: 1. Submit a survey, aerial photo or sketch showing all structures on the property. Note which structures are to be demolished. 2. Submit a survey, aerial photo or sketch showing proposed erosion control measures in accordance with Chapter 79, Construction Site Runoff Control. 3. Submit a copy of permit approval from the Minnehaha Creek Watershed District (MCWD). The City will not issue a demolition permit without a copy of the permit(s) from the MCWD or documentation stating permit(s)are not required. Form Last Updated: July 2015 � VC '� I 150784 4. Submit a $2,500 escrow and an escrow agreement signed by the property owner(copy attached). 5. Keep all structure(s)enclosed and/or secured until such time as demolition is complete. 6. Keep all demolition debris off adjoining property and/or the public rights-of way unless specific prior approval is obtained in writing for temporary use thereof. 7. Completely remove foundation(s)from the ground. 8. Completely dispose of all demolition debris off site in accordance with all applicable PCA requirements. 9. Abandon water wells in accordance with State Health Department regulations. 10. Call for an inspection when all debris has been removed, before backfilling. 11. Within 5 working days of superstructure removal, a final inspection shall be requested. The site shall be left clean and clear of all debris, with any excavation filled with earth level with the adjacent ground elevation (except when such excavation is to be used as part of a new building and such new building is actually under construction). 12. Abandon septic systems per Minnesota Rules Chapter 7080. All septic tanks must be pumped, crushed and filled with native soils. An inspection is required after the tanks are pumped and before the tanks are crushed and filled. 13. The undersigned owner shall and hereby does indemnify and hold harmless the City of Orono, its agents, employees and assigns from and against all claims, damages, losses or expenses, including attorney fees, against the City, its agents, employees and assigns arising out of or resulting from the demolition described herein as performed by the property owner, his employees, agents, subcontractors or assigns. PERMIT TYPE AND FEE CALCULATION [� $75.00 — Principal Structure $ �7`'> � []`$50.00 —Accessory Structure x�(how many) ��= � � ��. 1. Subtotal of above permit requested $ `��:�5 2. State Surcharge 1.00 3. TOTAL PERMIT FEE (add lines 1-2 above) $ � -� The undersigned herby applies to the City of Orono for issuance of a Demolition Permit, agrees to do all the work in a strict accordance with the ordinances of the City and the regulations of the State of Minnesota, and certifies that all statements made on this application are complete, true and correct. �\ -� Applicant's Signature:- sL.w.� Date: t �-� c � Owner's Signature:• L� � _ Date: 1 �� � � (L.-- Approved By: � Date: l� Z � � uilding fficial) *Zoning Disclosure Required? ❑ YES �NO SQA. �1 �-Qrl�l T" ��D ' `This must be filled out by Zoning Department- For eit r answer, a Zoning Official m st ign all applications. 41�] *Approved By: Date: (Zoning Official) Form Last Updated: July 2015 150784 � -' Hennepin County Property Map . � ,.� -��� Da te: 10/4/20 T� wr°' � ��. � F� �,,. �'�- �,}, �i�- , �� q�� - �� � � 7i �� , �• ... ����, _.�..: _ ,,,�. , .• � � � �`f�4'� >�-� �' ,` +#� �� #-i+� f '�: i . �. � ,';� + . t �C ♦ �.���� "0_�'M �t(� � ''� �t �� ,' `� �� �- �.�� � '�t�� ���..-�-R � ' ' 9 . � � � t= ���-``�'��' �*� �. ., . , .��� . .,T:�, , i rR` ��,ey.� � 4 fi��� 'r . �'�'n" � ~�"��••' �t , �'� "�" � Ay', µ i' � . �:;: � . •' ,t� . .` e,ptt.. , pt � r - ,� :t �., r ' - r ' ... � .� _ �,� �,� � ;�`� � ,,z - '� '.�,� ,.,��� t d J�i- ..�• � •�yZ."�.'' � �c �"-�` � ��� , i , a�. r�� � ,��-y� - . � } . ,�� '�,�� ��F ... . '�� vt � � ����"i�a � ��r �� ♦ .�+� ~ �y �'�:#we���.m1� ' '. .:� � � �`�i'•-, �j < ... �.'a . ` l� � S= "� � Ywf��....�� f`��'':�n� i'A. � • � r � �Y'k. . . f .�fi���i, �r ..,.� .��4— � � , a,. �. �+`,t •. � � . � : � ;� �..,,��`�. ,.�.�, ' n ,�*��• � � /f) o �. � »�+� F .�'1���4� y�e �t �1.�� ��.. , f � � �,h �... � Z • � =�i" �'i �� �NTg. Y �,��^ ,f� ',� ' wi a . , ., � ., �_ �k „ , . . , " +�y`v ,.�� i ', �' _ .. ��� < � � ��Er ' �.. ���'. ��'. . `.. �.. . � � w� J �•44 �+i� . .. ' ',�- [. . . � �� � ��� �.':# !' 7"��� � i . l ` • � � i . j ' , . . .- �. . •• AR }fi .'j I ' � �yl! ..�� ._. ...�... .. ... � � �F Y�� tl ., - ; � � z � , � e�, ; 1 inch = 50 feet PARCEL ID: 2011723240029 Comments: OWNER NAME: Dustin Kindl & Casie L Kindl PARCELADDRESS: 2649 Casco Point Rd, Orono MN 55391 PARCELAREA: 0.23 acres, 10,155 sq ft A-T-B:Abstract SALE PRICE: $720,500 SALE DATA: 06/2016 SALE CODE: Warranty Deed This data(i)is furnished'AS IS'with no representation as to completeness or ASSESSED 2015, PAYABLE 2016 accuracy;(ii)isfurnished with no PROPERTYTYPE: Residential Lake Shore Warrantyofanykind;and(iii)isnotsuitable for legal,engineering or surveying purposes. HOMESTEAD: Non-Homestead HennepinCountyshallnotbeliableforany MARKET VALUE: $721,��� damage,injury or loss resulting from this data. TAX TOTAL: $8,296.32 COPYRIGHT OO HENNEPIN COUNTY 2016 ASSESSED 2016, PAYABLE 2017 PROPERTY TYPE: Residential Lake Shore HOMESTEAD: Non-homestead MARKET VALUE: $737,000 LEGAL DESCRIPI]ON: Lot 138,Spring Park Hennepin Counry,Minnesota. GRADING&EROSION CONTROL NOTES: LOT AREA: I 1,780 SF oe tmoN ntmcRM � M a�:t aa�stwll prompUy�bes��nspected dyly and if litter or sails has bea+ Insmll silt frncdbw roll uo�nd e puimeter of ihe mnstrucrirn�rea SCOPE OF WORK k LR.9TA7iONS: ICnecessmy,vehicles,�het have mud on tluir wheds,shail be cleaned beforc cciting the Sedimrnt control masura muri rttnein in plaoe imtil final siabilintim has bem siie in the rod:mtrana ffieaa. � I. Showing the Imgth and direction of boundary lina of the legal description listed above. The ��y����d then shdl be rertaved Sedimm[convols may be removed to scope of our scviees doa not include detertnining what you own,which is a legal meiter. accommodau short tam conswetion acuviry but must be replaced before ihe nenn rain. Moisture shall be appGed to distmbed areaz to convol dust as needed. Please check the legal description with your recor�k or w�ult with competmt legal counzel,if neoessary,to make wre that it is correct and that any matters of record,such u easementt,that A lemporary rock consuuc�on rntiance shall be atablisfed at pch aceets poin�lo the porlable takt facilitic shall be placed on sitt for use by worl:ers and shall be propedy you wish W be included on the survry have been shown. site and a 6 inch layer of 1 to 2 inch rock ectmding at Imsl 50 Ceet from the strea in�o maintained. 2. Showing the laadon of observed exisang improvemmts we dam necessary for the survey. �he site and shall be unde�lain with permeable geot�6le fabrie.The mhma sfiell be 3. Seaing survry markea or verifying existing survry markers to establish the wmers of the �1o�ncd diaing conswction by wp dreuing or washing to prevmt uscl�ng w�ow of �[i�becomes necessary to pump Ihe aecava�ion during wnswction,pump dischage P�o�y, seAimrnts onw pub�ic sueets.walls or alleys.Potential muances thet are na w �p��10 ihe stoc{.pile areas w thet�he double silt Cmce around ihae areaz can Nter 4. Existing building dimensions and set6acks measurcd w outside of siding or sacco. P����shall be closed by fmung lo prcveM�mprotec�ed«it Gom Uro site. the wata beCore it Ipvet the vle. 5. Showing and tabulating imperviou4 sudace wvenge of the lot for your rcview and for the DURINGCONS77tUC770N: review of such govanmenul agrncia that may have jurisdiction over th�se requiremmts to Tempo'ary uaaion conwl shatl be instdled no la�er�han 14 days aRer ihe site is(rst When din stocV.pilc have bem crmted,a double row of silt fmce shall be placed to yy�y�y�d shall consist of broedcast seedin wilh Minnnota De veri[y thry ue cortectly shown bdorc procceding with conswcuon. revrn�aca e oCsedimmt ladrn nmod and if the Oes or otha disturbed areat are to 6 partmmt oC 6. Showing elevatio�u on the site at selected lo�tioru to give some indicadon of the wpography oC P P P TranspoMafion Seed Mixuue 22-111 at 10016/xrc followed by eovering with spray rrnuin in plaee Cor more thm�14 days.ihay shall be seeded wiih Minnesoa Departrnmi mW�. ihe site. We have also provided a benchmark fa your use in determining elevations for of Transportaaon Seed Mixture 22-I I 1 at 100 IWecre fdlowed by covenng wi�h zpray conswGion an this site.The elevations shown relate only to the benchmark provided on this muldi. SRE WORK COMPLE770N: survey.Use t}ut benchmark and check at least one other feature shown on the survty when When final�ding has been compined but before placemen�of seed or sod m•hs buil�" determining otha elevations for use on this site or beforc beginning construction. A dumpsttt shall be placed on the site for prompt disposd of consvuetion debris.ihese �,�y��y�done per City of Orono rcquircments�o insure that gnding wat properly 6. While we show a proposed location for this home a addition we nre not as familiu with your dumpsters shall be suviced resWarly ro prevmt oveRlowing and blowins onto adjacmt d�, propased plans as you,your architect or the builda ara Review our proposed location of the propertia. Disposal of solid wastes from the site shall in accordance wiih Minnaaa �mprovemems and proposed yard glnda cerefully to verify that thty matdi your plans before Pdlution Control Agmry requiremeoLs. Whm my remedial gr.�ding has bem tompleted,sod or seeding shall be completed construction begins. Also,we ue not as familiar witfi local coda and minimum requirenenis u p sepante wntniner shall be placed Cor disposal of hwvdous waste. Hv.ardous wasta �nduding any aosioo eontrol blankels for steep arcu. the local building and zoning officials in this community are. Be sure ro show this survry W said ���y�disposed of in accordance with MPCA requirement�. µ���(�y��blished,silt Crnce and iNet otection and dher erosion conwl devica officials,or any other officials that may have jurisdiction ovc the proposed improvemecNs and P� obtain their a rovals befae b inni conswcuon or lannin �m rovemmts w the ro shall be dispased oCm�d adjacmt sVats,dlrys and w�lks shall be deaned u needed to PP �6 �B P B� P P P�nY� Conaete Wd washout shall be in the plastic lined ditch�nd dispose of washin�s as deliver a site thu is erosion rcsistant and clean. 7. Note that all building dimensions and building ae dimensio�u to the property lines,are taken wlid watte. from the siding and or stucco of the building. 8. While we show the building setback lines per the City of Orono web site,we suggat you show Sediment conlrol devices stull be regularly inspected v�d afla myor rainCall even�s and Uiis survry to the appropriate ciry o�eials to be sure that the setbadc lines are shown corteuly. shdl be eleaned and repaired u necasary Io provide dawnstream praxdon. Do this BEFORE you use this survey to daign enything for this site. �. STANDARD SYtaffiOI.S&CONVENI70NS: �;''°P`"!' / �nqo "�"Denota iron survry muica,found,unless o�hmvise noted. �� ; �u^ � � � 1 �azo �►� II� � i � j' �' � na�� iy I; � ,`, I ' o 'a' �.vo �, .� � , q �� � � � , , , � . . � , i � l � � ' .� , , O �� � , �� , , , � , , , --.-,.,. , . - wr �sha,4-va+r�yr. � ' ' ' S 9 p 9 � � I u i I ,�� , ;' � � Q Exi tin we//' es 'I I9��' � M / � � • -�c;-----•----`�.�9 _, i , �,�;' n�.; E � ' sue`1_ 7'-: .-J_i-- �p- , � o & '� 1 � 41" s 44��� Exs, I � �,(, '�Ren,1,r�� i � , , ' � '-� .29 1°'�• Go� � 9y �----� Y---r:.__,�sl.� ' � . --shv c7,,0�� o9e I c4 � ? X� O �1 ! �. '-�-�R•--r,- � �_'-J-�_' ; �.�.. � �. �; � i ,�,,� � V��'�,.�� �t_.�/� I J �,"� 1 ��-' J_ `aiC I' �°� ,� ° � � � �vn�� �I Im ^��� ''ri�X�- � � 35,O - � � �E+b� Myfs- � X � T,� • � � ��� 1 "4'"�n i �w.rx� /� ! '__" -- "y. e ce�ved `/�,, � � " u - , " .:�°� � � '/' ��h�i I � �sa'F� � r raor.owEu.n+o '�.` ;� r.� ,��.« '«r � � rv o /i;�',:, ' :O�O' ; I � � /z � t. isr�t..-vss.os / � � �� �'', o ,� �/� �l f � ; �C � TOPFWND.-95)I6 j ry� �, Sed .��� L� r � l� "` `'�'h�z 1 Iro�l � a o 7� w..�• 11: pm azMfF7..-9M.'ro/ � 'ProO°So;� � � S o � r� ^r- ("� j /�}. � ' y�� [�0�1 � "��,D,�*� i }n.�� �� � a/c�nnaerz..-csxio J� �' �. .o„w*aiF;�: � a r� N).D ��` "� v.. I :j V L U 1� a �J' , lI"Tiye' ', ' ' � i _ �l�y�1� M J � 6� �CC . r ' .,,� �' 'M' ._�,,.hetd/Rac4 °"i,���➢� Sfm�. 1`s :e -� _ � � r.: �a�r.��, O X en ` CmsbveHar Tr.s� N{aY ��sB.`�7rw� I f��l . '�i,, �� � � �OI� 'I � O £nhvrce(ReM vas . ' � � 1 �h1'� � � fe Horv) � � '� 1 � , 1 � -/, '� - _! �' "'� " P h .��� uu, : S h e o, ,, .`.�.. ' i , 'l./l/ �y�,=-- > �� .' stc�e-I.��,i, 1 �Try�, �/� �a'q5� q1j Y! ,pit! '� : aR7SlJNC�L77A717f/�4 --..-.445 -- , oqS,� ' � � �_i./,� � � , ]rOq ^ � a ^' � � .�� � ra�;:a .. _ � � I �� /=_..i � � � t 4. __ x,sa� � �� -vr�e. v • � 6.IZSTlNG SPOT d'L8Y•f7TON ... '�X��:s �'��h� � ��/^q a''�.�°"f�� �B3S220"E-`'sae F n`�,.�� - --- PBOPOS60 CON7}�UR -yR,T- � � 1�� O1 i 9 a �� ra r �' Exs. I � �I i; ;�/ % iw Goroge I �w P.FOPoS6D BLd'V.UTON/SPOT 6L6'4.IT/ON g.�s� � �'�;�%,���' i I DRA/NIC�'ARRO�-FLOI � � ''I;;!�/;� � Ekisting Owd/in9 � I x. .. ' � ";������ � v � nu n m SlLT FBNCE'/STRA/LOG:S -SF - � � �:x16 i�'i�I,'.', , � O o�rz rtcvisiw ocscnwnon , owo aueaT�ra� �F CUEMIJOB�ODRESS / ��o�ir�ioi o er a um K� u,�re surtvereo: sHeer rme sHEET N0. 9-39-16 PENOYFD DEp(ANp AO.USTFD Dq1Y[V�Y AI¢� zraw r Mi✓1 MI�AlT Ymlo On FEBRUARV 8.7016 � Advance � ���.� �x6� DUSTIN&CASIEKINDL � eumeveoer:�ov,weEos�nv. PROPOSEDSURVEY SwvsY�+D6 fi�gai�eennD.Co. a enwn[enwa.co. � � N 2649 CASCO POINT ROAD wre ort�vreo: DpAWING NUMBER !]W�utl�M.r.Howt �6 ORONO,MN �"^"��"'^^�+� pUpUgT 18,2018 #I60775 JR � ���R� ,rypwl te.]018 a�EitaFt MINNEHAHA CREEK WATERSHED DIST ICT QUALITY OF WATER QUALITY OF LIFE Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information contained in the permit application, correspondence, plans, maps, and all other supporting data submitted by the applicant, and made a part hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant named below for use and development of land in the Minnehaha Creek Watershed District. ��(Q - O�Z�8''� ��V! ' � �7 �� Issued to: M & M Home Contractors Permit No: 16-551 ��`'� Location: 2649 Casco Point Road, Orono Purpose: Erosion Control - Single Family Home Date of Issuance: 10/25/2016 Date of Ex iration: 10/25/2017 By Order of the Board of Managers� . ��_ G���d.�-- Renae Clark Planner Project Manager This permit is not transferable without District approval, and is valid to the date of expiration. No activity is authorized beyond the expiration date. If the permittee requires more time to complete the project, an application for renewal of the permit must be received by the District at least 30 days before expiration. The applicant is responsible for compliance with all District Rules and for the action of their representatives, contractors, and employees. Ov�-a�tr ��h Conditions: Project to be completed as described in plans submitted to the MCWD office on , 2016 according to the provisions of this permit. • Properly install and maintain all required erosion control measures until the disturbed areas are re-stabilized • Notify MCWD in writing upon completing installation of perimeter and sedimentation controls • When the site is re-stabilized and the MCWD staff has perFormed a final inspection, all perimeter control must be removed (Statement concerning fees for inspections, violations, etc... on following page) We collaborate with public and privare partners to protecr and improve land and water for current and future generations. 15320 Minnetonka Boulevard,Minnetonka,MN 55345 • (952)471-0590 • Fax:(952)471-0682 • www.minnehahacreek.org MINNEHAHA CREEK WATERSHED DIST ICT QUALITY OF WATER QUALITY OF LIFE Inspection/Analysis/Monitorinq Fees A site inspection and monitoring by District staff will be performed where the activity involves: • a commercial/industriai/multi-family residential development • a single family residential development greater than 5 acres or of any size if within the Minnehaha Creek subwatershed • any alteration of a floodplain or wetland • dredging within the beds, banks or shores of any protected water or wetland • a violation • any project which in the judgment of the District staff should be inspected due to project location, scope, or construction techniques In these cases, the applicant shall pay to the District a fee equal to the actual costs of field inspection of the work, including investigation of the area affected by the work, analysis of the work, and any subsequent monitoring of the work, which in the case of a violation shall be at least $35. Standard Fee Schedule District professional staff $ 65.51* District interns $ 40.35* District clerical staff $ 46.69* Consulting Senior Engineer $ contracted rate Consulting Engineer/Technician $ contracted rate District Counsel $ contracted rate Application fee $ 10.00 Copy costs $ .25 + actual staff time Color copy costs $ 1.00 + actual staff time * Hourly We collaborate with public and private parmers to protect and improve land and water for current and future generarions. 15320 Minnetonka Boulevard,Minnetonka,MN 55345 • (952)471-0590 • Fax:(952)471-0682 • www.minnehahacreek.org LEGAL DESCRtPI70N: Lot 138,Spring Park,Hennepin Counry,Minnesota. GRADING&EROSION CON1'ROL NOTES: ` Slreets and oU�tt public ways shall be inspected dyly and if liuer or soils hu been LOT AREA: 1 1,760 SF AEFORE DEMOLRION nND GMf1ING RGGIN deposited it shall prompUy 6e removed. Install silt fmceJbio roll around the pttimaer of ihe rnnstruction area _ SCOPE OF WORk&LIA9TAiiONS: If necasvy,veYticla,that have mud on iheir wheds,shall be cleaned before e<iung ihe Sedimmt wntrol measures must remain in place wul final swbilirvtim has heen site in ihe rock envana azeas. I. Showing the length and dirmtion of boundary lines of the leyzl desaiption listed above. The atablished and then shall be removed. Sedimmt controls may be rertroved to swpe of our services doa not include detertnining what you own,which is a legal maner. accwnmodate short tertn consuuaion utiviry but must be replaced before ihe nert rain. Moisture shall be appGed to distwbed areas to conaol dust az needed. Please check the Iegal description with your records or wnsult with compe[ent legal counsel,if necessary,to make sure that it is comect and that any maxers of record such as easements,that A tempofary rock conswction ent�nce shall be atablished a qch xcess point to the pawy��roilet Cualities slull be placed on site for use by worl:ers and shall be propedy you wish ro be included on the survey have been:hown. siu u�d a 6 inch layer of 1 to 2 inch rock e�tending at leut 50 fett Gom ihe street ima mynuined. 2 Showing the location of obxrved existing improvements we deem neassary for the survey. Ihe si�e and shall be wderlain with permeabk geote�tile fabric.The mvance shall be 3. Seping survey markers or verifying existing survty mart:ers ro establish the comers of the mainwined during cartsvucdon by top drcssing or washing to prcvmt vacung a Oow of �(��becwnes necessary lo pump Ihe eacavalion during wnstrucuon,pump dis�arge property. sedimmts ona public streeLs.walks or�lleys. Potmtial muanca thm are not so shall be inw the stocl.yile areas so Uiat�he double silt Rnce uound�hae areas can filter 4. Ezisting building dimensions and setbacAs measured to outside of siding or stucw. praeaed shall be closed by fencmg to prcvrnt wprotected e�it from�he site. �he watu beCorc it Iwva Ihe site. S. Showing and rabulating impervious su'face coverage of the lot far your rcview and for the DURING CONSTRUCTION: review of such govemmental agmcia that may have jurisdiction over thae«quirements to Temporary aasion wnvol shall be inswlled no later�han 14 days after ihe site is first Whm din stockpila have been creau4 a double row o!silt fence shall be placed to dis[urbed and shall consist of broadcast sadin p verify they ue correttly shown before procceding with consvucaon. prcvrn�escape o(sediment ladrn runotiand iC�he piles or otha diswrbed areas arc to 6�'��Minnaom De anmenl of 6. Showing elevations on the sire at selected locauons ro give some indication of the to n h of Traruponauon Seed Mi�ture 22-I 11 at 100 IWacre followed by covering with spr�y PoE P Y remain in place Cor more�han 14 days.ihry shall be secded with Minnesow Deputment mulch. the site. We have also provided a benchmark for your use in determining eleva[ions for of Tcu�sportapon Seed Micturc 22-1 I 1 az IOO lb/acre fdlowed by covering wilh spray construaion on this site.The elmtions shown relate only to the benchrturk provided on thi� mulch. SffE WORI:COMPLEfION: survcy.Use that benchmark and check at least one othv feature shovm on the survry when When final grading has been wmpleled bw befare placemrni of seed or sad an�•as buili' detcrmining other elevarions for use on this site or beFore beginning construction. A dumps�er shall be placed on the site for pranpt disposd oCcansWclion debris.The:e survry shall be done per City of Orono requiremen�s to insure ihat Srading was propecly 6. While we stww a propoxd location for this home or addi[ioa we are not as familiar with your dumpsters shall be serviced regWarly to prevmt oveRlowing and blowing onro adjxent done. proposed plans az you,your architecC or the builder are. Review our proposed loeation of the propenia. Disposal of solid w3stes from Uie site stwll in ucordance wiih Minnaota im rovements and ro ed ard da r.vefull to ven that�h match our lans before Polluaon Convol Agenry requirertKnu. y grading hyt yem eampleted sod ar seeding shall be compleied P P P� Y 6'�+ Y �fY �Y Y P When nn remedial conscuaion begins. Alw,we ue not as familiar with loal codes and minimum requiremena u including any aosion convol blankets for steep ar�u. the local building and zoning o�cials in this communiry are. Be sure to show[his survey to said A separate wntainu shall be placed for disposal of ha�ardous wute. Ha�ardo�u wasta officials,or any othtt officials that may have jurisdiction ova the proposed improvanrntz and ��I be disposed of in xcordance with MPCA requiremenLt. When turf is aublished,silt Cence and inlet protecoon and aha erosion conwl devica obrain their a rovals before be innin conswction or lannin�im rovemenis to the ro shall ba disposed of and adjacmt suee�s.alleys and walls shall be deaned as needed to PP 6 6 P b P P Pu�Y� Cmcrete wck washout shall be in the plattic lined di�ch and dispose of washings az deliver a site that�s erosion resisunt and clean. 7. Note tlut all buiWing dimensions and 6uilding tie dimensio�ro the property lines,arc taken solid waste. from the siding and or stucco of the building. 8. While we show the building saback lines per thc Ciry of Orono web site.we su�at you show Sedimmt wnvol devices shall be reguluiy inspecied v�d after major rainCall even�s and this sunty to ihe appropriate ciry ofticials to be sure that the setbadc lines are shown cortettly. shall be cleaned and repaired as necessary to provide downsveam protxUon. Do this BEFORE you use this survey to daign any[hing for ihis site. vas STANDARDSYMBOLSdCONVEN7iONS: f�"'A'--F- / �xyo i , I � 9110 � "�"Denotes iron survey marker,found,unless o�herv.iu noted. � � ; � � i na.o �� II 1 i � i' �' `ti no.r � �,' � ', I V siu � , . . �; t , � 1 I, � jl y / . � .. . Q I' ;-uy,� ' � , � Existin / � vg'"� 3` � '�`°'n;�----�----�Lze�„jn� i � j � 9 Owe//mg / .e5�7 I � �, ' , r ''�'1 �'�'� '��� � o � 1�=.�- =- r ,r n,r � �� i O 4�` .�4e°�;" Exs, � u° � w� 'n----- i Rva.Y--�.:`"�.vl��1 ' , �� •29 , --sut F� °�!�}o ; Ca�pye I �8qw� a' �� ��,�`�L�. • .. � a . " -e__ >5 e_!"i � ' .♦ .. � ' e . 1�fiv . Xvn O �r �` � i. '�-----� �� 1� � -�L., �r.'an.:w•''y•� �( ��py�y�se�i'�_ I w:sX� I • � 9�0- � �.�� � as� � 1 . , 3�; A^it�',� � '�' ; � j q'i�nc�- 1 � sa -- .stri � �Ewr nbr� ,� .r �,yy^ry,(/.�� � �� /' 4�O I' � '4 0 w �waax� � /�� ! � '------- ?` xnvs �V Ye'�e� p� p� �' r�.NJ I � yt'Fist��� � � PROP.DWELLMG /�alhda� —y, t4f � ._" 3 2 p `� ' :n�I� � � � .. / r 1.0 � ,Nw Se�r MifarY 'A1 � q �T%�-.c_ p�tp � ,p � / 'I' isrr�.-vss.os � o� oa sa.„�,�,, � � ``�''Q � 1 Tnell' � a otP.' ��y7 R TOPFWND.-95JM/ "'�..'���05� 91 .: b� � �y /,' 'h�� an � � '( a", � G. BSMTFl.-9.W.)0 �� ;� ZQt� a � � � S O � GARAGE FL.-952.7a —�+ ' . �aY 1l� � (`(`� [ `�� '� l ' L/�:'�1 �a - -P'�` r° !� i �,.�fj� ,,,`�� o� a.s 4+sCsaiw i i �� ��"�- � .,�l� O J 2��� �7 ��,p,1 ia'�', ' , I =�.y,� �� y� �_ ; i ../ 6 x`ee � k9.,. �ry° '--�rva rro�c �� �� �zs�' S� 'IB"ITiee rqs�'� :.s, , � �' , � � �° � X y ��iorcet(Fe�s ves, ; /.+.. / 1 jf I�� _�w. �tri_� o� �,� �11. __,.ra ��, I I -��`'1'" h ro Nor.,,J D 9,0� 'S h e , .t �i�.l i _ � ' --' - � � d � al:xa_��rl 74�'Ti e� w' � C�g5pi � ��i1fLJ � G CDA7t7UR � ---945 -— , °qgp � 'i�f� �% 1/� x-ec ^N _ ., � e�. •' I � �� � �! �',',-i I ( �1 4. �� xrs�� Sf ��' S7[F u 6A7STWG SPOT FJSI$IT/ON �� 5 �0°aa� � ��/ wq�F�J-•_�""�{er �B.jS220"E-•.yqF;�°S�s,., _s� I e o x�� � ;�, �m w q °1 ssa� \\ f.YS � PBOPOS60 COMh9UR —Bu— I ;I i, ;%• Go�oge �I �O � ';I , V PROPOS6D EZET'.!T/ON/SPOT 6LE4'.IT/ON 9l5.5� � ,�1�� �!/;, �, DRf/MG6.[RRo,�'—FLoi � j �I����/ � .Y Existing Owd/ing � I .. , ��i '_ U �9JJ♦ , , ;',,; ;� �A, s¢r Fen�ce/sr.e���ocs ' �; � —SF — v.uS � ��' �Ir �%voi�.�;i; , , O DAR RiM510N pESCqW110N QyJG ORIEnT�TqH SCAIE CLIENT/JOB�pDRESS �i mim'nu�na nwC awri.ipx Yi f-39-�6 REYO�4D OEp(AND MJUSiFD DRIYEM�T�NFA / pp�q,s�p�R r p,�pq�y p� WTE SURVEYED' SXEET TRLE SHEET N0. 4D � Advance ��w FEBRUIIRY6,2016 ���� p0EO1 W i �[InG 6 0�Sf�iL 61�1601A DUSTIN&CASIEKINDL SURVE�'EO!'/'AOVANCEDSURV. PROPOSEDSURVG'Y N SUNBjnnyGE/1/J�MBB/lny.CO. iENG1NElRWG,CA. ^ � 2649CASCOPOIMfROAD ��„��0 :16�+. WTEDRAFfEO OR�w1MGNUYeER J ORONO.MN wm�N�m�� �.� q{�JgT�8,2f116 #I60775 JR � nnaw(es�lauea IWawi6.fit6 ww....,.e..v� a�er�oc� Christine Mattson From: Luke Menden <Imenden@minnehahacreek.org> Sent: Wednesday, October 26, 2016 3:25 PM To: Christine Mattson Cc: jstorms@mandmquality.com; Melanie Curtis Subject: RE: MCWD Permit 16-551 issued: 2649 Casco Point Road, Orono This permit does cover the demolition of the existing house and detached garage. Luke From: Christine Mattson [mailto:CMattson@ci.orono.mn.us] Sent:Wednesday, October 26, 2016 10:58 AM To: Luke Menden Cc:jstorms@mandmquality.com; Melanie Curtis Subject: RE: MCWD Permit 16-551 issued: 2649 Casco Point Road, Orono Thank you Luke. Does this permit also cover their demolition of the existing house and detached garage? Christine^' From: Luke Menden [mailto:lmenden@minnehahacreek.or�J Sent:Tuesday, October 25, 2016 2:49 PM To:Christine Mattson <CMattson@ci.orono.mn.us>; Melanie Curtis<MCurtis@ci.orono.mn.us> Cc: istorms@mandmqualitv.com Subject: MCWD Permit 16-551 issued: 2649 Casco Point Road, Orono Good afternoon, Attached you will find the permit 16-551 issued to M & M Home Contractors for erosion control at 2649 Casco Point Road, Orono. A copy of the erosion control plan is also included. Please feel free to contact me with any questions regarding this permit. Thanks you, Luke Menden District Representative Minnehaha Creek Watershed District 15320 Minnetonka Blvd Minnetonka, MN 55345 952-641-4586 MilEN[1EAN/4 CR#EIC w��c:�wt��arg+ec�€ 1 DEMOLITION PERMIToZO(�o—D/�rJ� Q�( ►�Ql (,� �� J�Zp ESCROW AGREEMENT q.N �'2011p •OI ZS-I AGREEMENT made this _day of e 1-� , 20 1(.p, by and between the CITY OF ORONO, a Minnesota municipal corporation ("City")and' i) IyJ l<,I AJx_("Owners"). Recitals 1. An ap lication for a demolition permit has been filed for �4 cL_ 2f -Jpcated at t -. 2 ft ("Subject Property') legally described as Lot / AA (1J 2. In conjunction with the demolition, erosion control measures are required as shown on attached Exhibit"B". NOW, THEREOFRE, THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owners shall deposit $2,500 with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all out-of-pocket costs (including planning, engineering, or legal consultant review)the City has incurred to assure that the erosion control measures are installed and maintained so the property complies with the provisions of Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work. If compliance with the approved Land Disturbance Permit is not accomplished within the allowable time period, the City may bring the project into compliance by use of the security. 3. RIGHT OF ENTRY. The Owners hereby grant the City, its agents, employees, officers and contractors the right to enter the property to perform all work and inspections deemed appropriate by the City in conjunction with the required erosion control measures, including but not limited to constructing or completing any and all of the agreed upon improvements should the Owners' contractor not complete those improvements by the date specified herein. 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the timeframe outlined in#3 above, shall issue a Stop Work Order until the Owners pay all expenses invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eligible expenses the City has incurred. 5. CLOSING ESCROW. Any remaining amount of the financial security deposited with the City for faithful performance of the plans and specifications and any related remedial work will be released after the completion and inspection of all such measures and the establishment of final stabilization for the Subject Property. City Staff shall review the terms of this escrow agreement two times per year to determine whether the requirements of the project have been successfully completed and whether it is appropriate to return the funds. Owner may also request the release of the funds, and such funds shall be released upon City Staff receiving the appropriate verification that all requirements of the project have been successfully completed. 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn. Stat. §§415.01 and 366.012. CITY: CITY OF ORONO O By: l sk/ - ---------- Its: Internal Use Only: 0 Original to Finance Department 13 Copy to Street File Form Last Updated: January 2015 150784 • DATE TIME \/ CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED -- PERMIT NO.0242/6_-_042.54 COMPLETED 7 7.--.4' ADDRESS O1.6 1.19 61.4C A.• ,O. OWNER TELEPHONE NO. CONTRACTOR ,yolr[L egronfediaki 05 E DESCRIPTION Oa rife) ,Cdedl W 0 FOOTING 0 DEMO-FINAL 0 SEPTIC FINAL Q ❑ POURED WALL 0 PLUMBING RI 0 EXCAV/GRADING/FILLING C ❑ FOUNDATION DRAIN TILE 0 PLUMBING FINAL 0 TREE REMOVAL 2 ❑ LATHE 0 MECHANICAL RI ❑ SITE INSPECTION Q 0 FRAMING 0 MECHANICAL FINAL 0 RATED WALLS 1, ❑ INSULATION 0 WOOD BURNER/FIREPLACE 0 COMPLAINT v ❑ FINAL 0 WATER HOOK-UP ALLOW-UP ❑AS BUILT-SURVEY 0 SEWER HOOK-UP 0 FOUNDATION/REMOVAL v ❑ DEMO-SITE 0 SEPTIC INSTALL 2 OWNER/CONTRACTOR TO MEET YOU:_YES_NO to COMMENTS: a. PrYIA:t it /cadoie" [a.7e.0 * G.cG( 4,0-- rC cc o c•44I✓ustetc-Sro•^ Joel Ag-it+-D '- cc o j'hie/.*___ si G /1e ti9-A..,-- 5. /r- O. a•4 W it WIQ.. /e2r- ; )'10 to0 WORK SATISFACTORY.PROCEED ROJECT COMPLETE W 0 CORRECT WORK&PROCEED 0 ISSUE CERTIFICATE OF OCCUPANCY C ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITIONWITHIN HOURS. 0 PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED 0 INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 OwnerlContractor on site: Inspector: 94"et"—• White Coovilnsosctor s Fib Canary Copy/Site Notice