HomeMy WebLinkAbout2006-P09939 - retaining wall PERMIT
CITY�OF ORONO
2750 Kelley Parkway- PO Box 66 Permit Number: P09939
Crystal Bay, Minnesota 55323 Permit Type:
User Defined Surc Building
(952) 249-4600 Date Issued: 6/27/2006
SITE ADDRESS: 2920 Fox St Unit#
Long Lake,MN 55356
PID: 04-117-23-31-0018
DESCRIPTION:
Proposed Use: Residential
Permit Class: General
User Defined Surc Buildin Permit Sub-type(s): Retaining Wall
Permit Type: $
DETAILS:
Approved perresolution#:
Separate permits required:
NOTICES/REMARKS:
Permit doesn not cover grading bettween proposed pool and wetland
FEE SUMMARY: Pernut Fee: $ 441.75 valuation: $ 30,000.00
Plan Review Fee: $ 287.13
State Surcharge Fee: $ 15.00
TOTAL FEE: $ 743.88
APPLICANT: Keenan&Sveiven, Inc. OWNER: Mr. &Mrs. Chad Abraham
15119 Minnetonka Blvd. 186 Seminary Dr
Minnetonka, MN 55345 Meulo Park, CA 94025
THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED
AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF
MINNESOTA BUILDING CODE REQUIREMENTS.
0 �
AP ICANT PERMITE SIGNATURE [SSUED BY SIGNATURE
Copies: 1-File(Signatures Required), 1-Applicant, 1-Monthly Reports, 1-Assessing,(If Septic, 1-Septic) Page 1
`0�1� City of Orono FOR CITY USE ONLY }
, ;j�¢ `��r P.O.Box 66 Date Received: ,, -5�,� Permit# �U�l����
`' 2750 Kelley Parkway
( �,".- + C stal Ba MN 55323 O�0 d
y'� �`�r��:vy��i� (952)249-4600 �� Amount: $ 7�f3. �0 C.U.P Filed:
�asxoe �.�
�
Approved By: �•!. Site Plan: 6- �.Q
Recommends: A roval Denial ❑
CITY OF ORONO - USER DEFINED/GENERAL PERMIT
(/�II permits must be approved b��the E3uildine Official and/or Zoning Deparlment)
Job Site/Owner Information:
Site Address: 2920 FOX STREET
Owner: CHAD ABRAHAM Mailing Address: 2920 FOX STREET
City: ORONO Zip; 55356
Home Phone: Alternate Phone: (650) 898-9476
Contractor/ Applicant Information:
Contractor/App.: KEENAN 8� SVEIVEN, INC. Contact Person: KEVIN KEENAN
Address: 15119 MINNETONKA BLVD. State License #: 7252
City: MINNETONKA Zip: 55345 Expiration Date: 03/31/07
Phone: �952) 475-1229 Alternate Phone: 612-328-2560
TYPES OF USER DEFINED PERMITS
❑ Stairwa� to Lake � Retaining Walls ❑ Te�nporary Trailer
General—User Defined Surcharge General—User Defined Surcharec Gencral—User Defined
* (Per UBC) * (Per UBC) * $30.00
*Estimated Cost: $ * Estimated Cost: $ 30,OOO.p
❑ Docks—42" ar Greater ❑ Land Alteration ❑ Zonin� Review
General—User Defined Suroharge General—Uscr Defined General—User Defincd
❑ Commercial—(Per UBC) ❑ 0-500 Cubic Yards *ForO-75'Zone-�30.00
* EStlmatCd COSt: $ $50.00(Needs Site Plan)
General—User Defined ❑ S��+CUb1C�'aCdS
❑ Residential- $30.00 $50.00(Needs C.u.P.)
❑ Tree Removal
General—User Detined
* Within 0-75' - $30.00
I herby apply for a User Defined Permit and I acknowledge that the information above is complete and
accurate;that the work will be in conformance with the Ordinances and Codes of the City and with the State
Building Code; that I nderstand this is not a permit and work is not to start without a permit; and that the
work will be in ac rdance �ith the approved plan.
� ' 06/02/06
Applicant Date
Reset Form �°��°0�°edpe�,;t3"S'°4,
�HECK OFF i.IST FOR ISSUANCE 4�F PE��IITS
FOR OFFTCE USE ONLY
ADDRESS OR LEGAL: �G��ZC� -Fc>/�
PID:
DESCR�i�IO�i OF WORK: r�f/�m i�� � ��'� S�
--- -----------____--_-------------------
-----------------------------------------�
ZO.�i G REVIEtiV BY: E'�� DATE APPROVED: Z�v C /�'
SULLDING REVIE`V BY: ,v /� DATE AP'PROVED:
FEES TO BE CHARGED: Misc. Fees Calculated By:
PERMiT Yes No
PLAN REVIE`V Yes No SE�VER CONNECTION
STATE SUR.CHARGE Yes No `VATERCONNECTION
INVESTIGATION FEE Yes No PARK FEE
SAC Yes No SITEINSPECTION
Number of SAC Units OTHER (specify)
ZO��IG CH�CK LIST Zoning Districr. _ .
Fire Department: Post O�ce: School District:
I,ot Area: Sq.ft. Acres Widch _ Depth
Survey Submit[ed: Yes No Date of Survey:
Proposed Setbacks: �1� .
Front (Lake): Righ[Side:
Rear (Street): Left Side: _
Adjacenr Srn,ctures, Wetland:
Suil�ling Hei�[: Def. Hgt. Peal:Hgt.
Lot Covera�e:
Grading: Staff Approval Date: By: Council Approval Date:
Septic: Staff Approval Date: � �Y� _��
Zoaing File: � Resolutioa: � Resolution Da[e:
Shoreland Dis[rict:
Avg. Se[back: Bluff Setback: I.o[Coverage:
E�istinQ Proposed
0
Hardcover: G-7�'
7�-250'
2�0-500'
500-1000'
H��dco��er Variance Rzquired: Yes No Da�e of Council Approval:
�E�L4RkS (in house):
BUII�DING REVIEtiV CIiECK LIST
�C� CONSTRUCTTON TYPE:
Sq Footage $ Per Sq Ftg
Basement x _
lst Floor x _
2nd Floor x _
Garage z _
x —
TOTAL
Estimated Coastruction Value: $
Inspections Required: `York Requiring Separate Permits:
S ite Plumbing Fire
Hardcover Removal Mechanical Water Conaection
Footing ' Septic Sewer Coanectioa
� Framing Fireplace Lawn Inigation
Insuiation (Masoary) Other
Wa11 Board (�Nlfg,) Wetl (State Permit)
F�� Grading/Filling Eleccrical (State Percnit)
O cher
RENIARK� (IN HOUSE): �
-------------------------------------------___---------------------------------------------------------
REVIEtiV BY OTHERS: DATE:
Access: Ezisting New
Access Approval: Date gy;
---------------------------------------------------------------------
REI�IARKS (TO $E NOTED ON PERitiII'I�: ���{c� {�� L ��Ua
,�C �i L�Z,ti' 4, �vl �,�111�� ����'L, �>,'o � � �,� i
�.
V��1 C;�vNP c 1 ��r� c�� c c�w� � � �� �
I��s ���vw�,�- d.c�es �to� c�,� ��r��n� b�� e.��
I�✓�c��o��� ��ool � U�:���.vtc� ,
8
���"y;��c� , : a .
� ;..
' j DESIGN • Bl11LD • L/�NDSCAPE ARCHITLCTURE � � � � � � � or�otener2006.doc
' � ������ '�' ' �. � ,�� � Pagelofl
15119 Minnetonka Boulevard
i\tinnetonka �linnesota 55345
Telephone 952 475 1229
Facsimile 952�75 1667
www.kslandarch.com
KEENi1N ,
�
,�.
SVEIVEN
June 26, 2006
City of Orono
Attn: Evelyn Turner
2750 Kelley Parkway
Orono, MN 55323
RE: ABRAHAM RESIDENCE RETAINING WALLS
Dear Evelyn:
As the general landscape contractor for the Abraham Residence project at 2920 Fox Street, Keenan&
Sveiven will ensure all boulder retaining walls will be built per ariginal specification. There will be
periodic inspections done by Itasca Engineering. Upon project completion, Itasca Engineering will
submit a letter to you certifying that all walls were properly built per their specifications.
Sincerely,
KEENAN & SVEIVEN INC.
�
J f ulner
Landscape Architect
Jun O1 21 11 : 25a LSamstadItascaEngineering (9521445-2106 P, 2
r y '�"`�` '�^�r,: ; �„'�.�.
� ���' ;��'�� � � �
s�:�- i a� , ,
June 2, 2005
ITASCA ENGINEERING, Inrc.
1342 TENTH AVENUE EAST
SHAKOPEE, MN 55379
952-445-79g3
Mr. Eric Dunaway
Boulder Works, Inc.
5535 North Arm Drive
Nfinnetrista, MN 55364
Re; Retaining �Vall at Single Family Residence, 2920 Fox Street, Orono, MI�1.
Dear Mr. Dunaway:
I have inspected the above premises with you and the Landscape Site Plan —�,I. you Were to instal]
several boulder retaini.ng walls. You have agreed to install them according to my directions. The
retain�ng wall should consists of the following:
� Large boulders, approximatel}�2 ft in average dia�neter, installed over a cut face that ranged from 2
to 12 feet in height.
• The lowest row of boulders was buried at least 1.S feet below the lower ground surface and became
the foundatioa for the upper portion of the wall. The reason for bur,vitig the first layer was to
stabilize the upper rows of boulders.
• The face of the boulders should set bad<at least I S degrees from the vertical.
� The boulders were to be placed on a porous 6Iter mat laid against the prepared clean sand face.
• Horizontal drain tile to be placed behind the wall an brought to `daylight' towards the horizontal
ends of the wall.
� Roof drains for the house were to be installed uuder and tltrough the low�er tier of wall boulders.
• At the time of my visit grading, sodding and final Iandscaping had not been completed, but the
lower boulder were beginning to be put in place as I directed.
� Keep any concentrated surface drainage &om flowing across and over the wal!.
If these specifications are foliowed the retaining watls should be safe and will keep erosion frorn
oecurring on the cut surface and also stabilize the soii that lies behind the wall. I hereby eertify that
this letter re_port been prepared by me and that I am a duly registered Professional Civil Engineer
under the taws of the State of Minnesota. If you have any further questinns or if I can be of any
further assista�ice, please do not hesitate to phone or write, If necessary, I will inspect and approve the
wall when they are completed.
Sincerely,
I1'ASCA ENGINEERING, Inc.
��E` �����,
c� '
� ��� M�,� ��
I.awrence E. Sarnstad,P. ,;�' i gi e , t.71 �` �� �'�� �
]vlinrt. Reg.No. 6220 �=�ROi"��.:,S;O';,y; � � y� ��,v" �` �� �
Encl. Brief resume. 1 ��•, "t:��::,:;`_�d , � r '�� O� ��.��`�'.�� 5
'�r:�.: u��, � •�,'; 'V ,{` r� � � yc�v,
;� +t,.\`4_/ ',v � ��I � ��7" \' �� \�.
`''' ll,:l'����' � 1N� \���'"y.�� �.� �,, ���
e �>� .� � o
��
Jun O1 21 11 : 25a LSamstadItascaEngineering (9521445-2106 p. 3
,.
• �
$RIEF RESUhiE: 4 � � , � ��� �` �
LAWRENCE E.SAATSTAD, PROFESSIONAL ENGINEER I��N�T�� �
as of -
�I/03�2(pb (neg.iVo.6220,State of Minnesota)
(Reg. No.8449,Sta te of Wisconsin)
ITASCA ENGINEERING
P.O. Bvx 616 Phone No. 952-445-7993
Shakopee, MN 55379-p616 FAX No. 952-�5-2106
ConsuIting Civil Engineer
Kegistered Civil Engineer since 1959 (Stata oE Minnesota}
also have been registered 6 other states as necessary.
Work Experience:
January 196p to Present
Owner and Chief�ngincer for Itasca Engineering a CiviI Engineering Consuiting Business.
Supenrised and headed firm for over 45years.
Consulting Engineer for the Lower Minnesota River Watershed District for 42 years.
Manager for the Lower Minnesota River Watershed Di��ict represenHng Sco(t Caunty since
August,2002.
Categories of Work: Watershed and Sti'ater Alanagement Engineering
_ Drainagc, Water Coretrol, Fiood and RainfalI Frequencies, Siltafion
Control and ProjecE I,andscapirtg
Structural Designs
Soil and Foundation Analyses and Designs
Project Developrnent
Mapping - Aerial Photo Interpretations - Surveys - Reports
Desigc�s for Y�'ater Mains, Sanitary and Storm Sewers, Roads aitd
Street�
Permit Handling
Construction Irtspection oEall types
Forensic Drainage, Soils and Sh-ucturai Consultation
Environmental Real Estate Investigations
Jurisdictional Delineation of Wetlands in i�4innesota
Litigarion ConsultaHon-Trial wcrk as expert witness.
Work wiEh Federat,State and Loca!Agencies as required.
1952 to 1959-Worked full and part time for the University of Minnesota I'hysical Plant as Engicteer on
new construction, new designs, drafted plans, wrote specifications on new work and a1s� on
maintenance and repair of buildings and infrastructure oE the U of M.
EDUCATION:
19�3 Univ.of Minn. Degree- I3,C.E.
with Distinction
1955 Ui�iv. oF Minn. B•S.C.E. (Honorary) with Distinction
Degree- t�1.5.C.E. Major; Structural Engineering
1955-59 Univ,oE Minn. 3 Z'ears Post-grad Major,CivitoEngineer nlg Soi Nieclhanhcs
work on PhD Mirior: Geology
Course work completed but not thesis and languages.
1953-1955 TaughtShructuraI Engineeri�ig(3rd}'r.) at the University of Minnesota.
Life Meutber in Chi Epsilon(Honorar��Civii Enbineering FraEern;ty).