Laserfiche WebLink
i <br />CITY OF ORONO <br />REGULAR COUNCIL MEETING <br />MINUTES FOR FEBRUARY 10, 1997 <br />ROLL <br />The Council met on the above mentioned date with the following members present: <br />Mayor Gabriel Jabbour, Council Members J. Diann Goetten, Charles Kelley, Barbara <br />Peterson, Richard Flint, and Charles Kelley. <br />Representing Staff were City Administrator Ron Moorse, City Attorney Tom Radio, <br />Building and Zoning Administrator Jeanne Mabusth, Planner /Zoning Administrator <br />Elizabeth Van Zomeren, Public Services Director Greg Gappa, City Engineer Glenn <br />Cook, and Recorder Sherry Frost. <br />Mayor Jabbour called the meeting to order at 7:00 p.m. <br />( #1) OATH OF OFFICE - COUNCIL APPOINTEE, RICHARD FLINT <br />City Administrator Moorse administered the Oath of Office of Council Member to <br />Richard Flint. Mayor Jabbour welcomed Flint to the Council. <br />( 92) RESIDENTS OF ORONO LANE AND COUNTY ROAD 15 INTERSECTION <br />RECONSTRUCTION INFORMATION AND COMMENTS - RESOLUTION NO. <br />• 3840 <br />Moorse asked Bruce Polaczyk of Hennepin County to present information on the site <br />distance concerns related to the intersection of Orono Lane and County Road 15. <br />Polaczyk related the existing design of the intersection and the proposed design. He said <br />discussions over the intersection included neighbor concerns, visual impacts, wetlands, <br />safety, and cost. <br />The existing site distance of the intersection according to Polaczyk is 49 meters or 150' <br />allowing for a 2 -1/2 second reaction time. The proposed design would have a site <br />distance of 108 meters or 355'. The negative side to the proposed design is its impact <br />into the hillside requiring removal of trees and brush. The County is proposing a 150' <br />long retaining wall to reduce the impact of the construction line to the side of the hill. It <br />would have an impact on a total of 3300 s.f. or 1 /10th acre. Polaczyk noted that design <br />requirements had to be met including a clear zone and site distance requirements. <br />• <br />