Loading...
HomeMy WebLinkAbout2000-P02212 - mechanical , . PERMIT CITY OF ORONO PERMIT TYPE: Plumbing 2750 Kelley Parkway - P.O. Box 66 Permit Number : �Daa(a Crystal Bay, Minnesota 55323 Date Issued: 02/O1/00 (612) 249-4600 SITE ADDRESS: 1950 Fox Ridge Road Orono, MN 55391 H.N.B. 03-117-23 13 0010 DESCRIPTION: Mechanical 1 Heating System Make Lennox 1 Cooling Make Lennox REMARKS: FEE SUMMARY: Valuation $8,877 Base Fee $110.96 Surcharge 4.44 Total Fee $115.40 CONTRACTOR: Watertown Sheet Metal OWNER: Phelps THE UNDERSIGNED HEREBY REQUEST PERMISSI�ON�TO M,4KE THE REAL IMPROVEMENTS�SPECIFIED�AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCGS AND STA'I,E OF MINNESOTA Bl11LDING CODE REQUIREMENTS. t � . APPLICANT/PERMITEE SIGNATURE ISSUED BY: SIGNATURE CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT Box 66 (2750 Kelley Parkway) Crystal Bay, MN 55323 GENERAL INFORMATION 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be reviewed and a permit will be issued within 2 working days. 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON THE JOB SITE. 3. Mechanical Desi�ns - Complete calculations, details and specifications are required for each heating, ventilation, humidification-dehumidification, and air conditioning installation including heat loss/heat gain calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model. Data shall be presented on form provided. Identification of and specifications for water heating equipment shall also be provided. 4. When any new construction or remodeling is involved, a separate building permit must be obtained. 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements. 6. All work must be inspected(rough-in and final). Call 249-4600. 24-hour notice required. 7. House Heating Test Record must be submitted before final. Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification. INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 249-4600. Please check one: New �Addition Repair Replace �Residential Commercial J(�B SITE: /��ri �o k' /9:�q � �� L d n� �A �� Zip: ���S� Owner's Name: �q r!;� � ,�/ � elephone Number: Mailing Address: ��p 6 /P,' City:L�>M ,qk � Zip: �-r� ��lp Contractor's Name: ��g�,�fo,.�„ 5f1�'t��'f.�/ Telephone Number: ���,-�S j-�S'i7 Mailing Address: �y�7� o ,h/w., 7 City: /�_q_T� Zip: ���� v SYSTEM DESCRIPTION HEATING SYSTEMS Qt: �ntity: / M.;'<e• ��tir�oX Model: r'�.b Gz3-50 Fuel: �,� q.a 5 , Flue Size: ��� p v� Input BTUs: SO, oa � Output BTUs: y�, D�o � CFM: �� o/�o� COOLING SYSTEMS Quantity: / Make: ���n o X Model: h/S:`�7-�a2� Tons: � H. Power %3 FIREPLACES Gas factory fireplace Wood burning factory fireplace with flue � � Wood Stove Wood stove with flue Brand Name Model No. VENTILATION No. Kitchen Eachaust ducted recirculating cfm No. � Bath Exhaust (must be ducted outside) �,"�'> cfm No. Other Fans: Locations cfm FUEL STORAGE (MUST BE APPROVED BY FIRE MARSHAL) Installation Removal Fuel oil: gallons underground inside outside �,�/�� LP Gas: gallons Other Gas opening PERMIT FEE CALCULATION 1. 1.25% of Contract Price* or Minimum Fee ($35.00) �5��'7 � x .0125 $ / 10 . y� (contract price) 2. State Surcharge. ** Add the State Building Code Division Surcharge to each permit. �� 7 7 x .0005 $ �. �/ � or $.50, whichever is greater (contract price) 3. Posta�e and Handling (Only mail-in applications) $ -�-�6-- 4. TOTAL PERMIT FEE (Add lines 1-3 above) $ j�4, t�l Q * CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted work including materials, labor,profit, and other fixed costs. It is the amount to be charged to the customer for the work done. If any material, equipment, labor, or installation are furnished by the owner, tenant or any other party the reasonable market value of such items must be added to the estimated cost or contract price for permit fee purposes. In the event that there is a dispute on the amount of the job cost, the City may request the submission of a signed copy of the actual contract. ** The STATE SURCHARGE is .0005 of the contract price under$1,000,000 or $.50 -whichever is greater. For valuations over $1,000,000 call the Department of Inspectional Services for the price. � The undersigned hereby applies to the City for issuance of a Mechanical Permit, agrees to do all work in strict accordance with the ordinances of the City and the regulations of the Minnesota State Building Code, and certifies that all statements made on this application are complete, true and correct. Applicant's Signature: �� � �, ���2� Date: /�jJ'" � b Approved By: �� �����-� Date: LEIVNOX RESIDENTIAL COOLING DATA SHEET JOB NAME: }%i/1 DATE /� 3/-�ao a ADDRESS: oX ' ' I� � � �h �pkE' ✓Nn � OUTDOOR TEMP: � INDOOR TEMP: p TEMP DIFFERENCE: �2 ' SENSIBLE LOAD CALCULATIONS GLASS SINGLE DOUBLE TRIPLE NO SHADE COMPASS GLASS AREA DESIGN TEMPERATURE DIFFERENCE BTUH POINT SQ. FEET �0 15 20 25 30 35 10 15 20 25 30 35 10 15 20 25 30 �` HEAT GAIN HEAT TRANSFER MULTIPLIER N �, 25 29 33 37 41 45 20 22 24 26 28 30 15 16 18 19 20 21 7 NE & NW 55 60 65 70 75 80 50 52 54 56 58 60 37 38 40 41 42 44 E & W 80 85 90 95 100 105 70 72 74 76 78 80 55 56 58 59 60 62 SE& SW 70 74 78 82 86 90 60 62 64 66 68 70 47 49 51 52 53 54 S 40 44 48 52 56 60 35 37 39 41 43 45 26 27 29 31 32 33 GLASS SINGLE DOUBLE TRIPLE INSIDE SHADE COMPASS GLASS AREA DESIGN TEMPERATURE DIFFERENCE BTUH POINT SQ. FEET �0 15 20 25 30 35 10 15 20 25 30 35 10 15 20 25 30 �` HEAT GAIN HEAT TRANSFER MULTIPLIER N 15 19 23 27 31 35 15 17 19 21 23 25 10 12 14 16 17 19 NE& NW 35 39 43 47 51 55 30 32 34 36 38 40 22 24 26 28 30 31 E&W 50 54 58 62 66 70 45 47 49 51 53 55 35 36 38 40 42 44 SE & SW 40 44 48 52 56 60 35 37 39 41 43 45 29 30 32 34 36 38 S 25 29 33 37 41 45 20 22 24 26 28 30 16 18 20 22 24 26 SO.UARE DESIGN TEMPERATURE DIFFERENCE BTUH DOORS FEET 10 15 20 25 30 35 HEAT GAIN HEAT TRANSFER MULTIPLIER SOLID WOOD 6.3 8.6 10.9 13.2 14.4 15.5 SOLID WOOD *` 4.2 5.7 7.3 8.8 9.6 10.4 METAL URETHANE 2.6 3.5 4.5 5.4 5.9 6.4 METAL URETHANE *` 2.2 3.0 3.8 4.6 5.0 5.4 *" Weatherstripped or Storm RUNNING FEET __��T� CEILING HEIGHT �� WALLS GROSS WALL WINDOWS & DOOR AREAS �D�_ NET WALL AREA � DESIGN TEMPERATURE DIFFERENCE FRAME WALL SQUARE �0 15 20 25 30 35 BTUH FEET HEAT TRANSFER MULTIPLIER HEAT GAIN NOINSULATION 3.7 5.0 6.4 7.8 8.5 9.1 R-11, 3" INSULATION 1.2 1.7 2.1 2.6 2.8 3.0 R-13, 3-1/2" INSULATION 1.1 1.5 1.9 2.3 2.5 2.7 R-13 + 1" POLYSTYRENE 0.8 1.1 1.4 1.7 1.8 2.0 R-19 + 1/2" POLYSTYRENE 0.7 1.0 1.3 1.6 1.7 1.8 DESIGN TEMPERATURE DIFFERENCE MASONRY WALL SQUARE BTUH ABOVE GRADE FEET �0 15 20 25 � �` HEAT GAIN HEAT TRANSFER MULTIPLIER NOINSULATION 3.2 5.8 8.3 10.9 12.2 13.4 R=5, 1" INSULATION 0.9 1.6 2.3 3.1 3.5 3.8 R-11, 3" INSULATION 0.5 0.9 1.3 1.6 1.8 2.0 R-19, 6" INSULATION 0.3 0.5 0.8 1.0 1.2 1.3 SENSIBLE HEAT GAIN SUBTOTAL / Sensible Heat Gain Subtotal from Page 1 �� (��� DESIGN TEMPERATURE DIFFERENCE CEILING SnE TRE 10 15 20 25 � �` HEAT GAIN HEAT TRANSFER MULTIPLIER No Insulation 14.9 17.0 19.2 21.4 22.5 23.6 R-11, 3" Insulation 2.8 3.2 3.7 4.1 4.3 4.5 R-19, 6" Insulation 1.8 2.1 2.3 2.6 2.8 2.9 R-30, 10" Insulation 1.1 1.3 1.5 1.6 1.7 1.8 R-38, 12" Insulation 0.9 1.0 1.1 1.3 1.3 1.4 FLOOR OVER SQUARE DESIGN TEMPERATURE DIFFERENCE BTUH UNCONDITIONED SPACE FEET �� HEAT TRANSFER MULTIPLI R � HEAT GAIN No Insulation 1.9 3.9 5.8 7.7 8.7 9.6 CARPET FLOOR-NO INSULATION 1.3 2.5 3.8 5.1 5.7 6.3 R-11, 3" INSULATION 0.4 0.8 1.3 1.7 1.9 2.1 R-19, 6" INSULATION 0.3 0.5 0.8 1.1 1.2 1.3 R-30, 10" INSULATION 0.2 0.4 0.6 0.7 0.8 0.9 FLOOR SQ Ff. x CEILING HEIGHT = CUBIC Ff INFILTRATION/ VENTILATION 0.40 x CUBIC FT = 60 = CFM MECHANICAL VENTILATION CFM = FRESH AIR INTAKE DESIGN TEMPERATURE DIFFERENCE BTUH CFM 10 15 20 25 � �` HEAT GAIN HEAT TRANSFER MULTIPLIER INFILTRATION 11.0 16.5 22.0 27.0 32.0 38.0 MECHANICAL VENTILATION 11.0 16.5 22.0 27.0 32.0 38.0 INTERNAL HEAT GAIN BTUH HEAT GAIN Number of People x 300 p p Kitchen Allowance ��� SENSIBLE HEAT GAIN SUBTOTAL r' t� DUCT GAIN BTUH HEAT GAIN R-4, 1" Flexible Blanket Insulation: ADD 15°� (.15) R-7, 2" Flexible Blanket Insulation: ADD 10% (.10) TOTAL SENSIBLE HEAT GAIN 3 LATENT LOAD CALCULATIONS Conditions Outdoor Wet Bulb Indoor Wet Bulb Grains Wet 80 62.5 50 Medium 75 62.5 35 Medium Dry 70 62.5 20 Dry 65 62.5 0 Based on 75°F Indoor Dry Bulb at 50% RH. LATENT LOAD-INFILTRATION �/� 0.68 x Grains x Infiltration CFM LATENT LOAD-VENTILATION 0.68 x Grains x Ventilation CFM � LATENT LOAD-PEOPLE Number of People�x 230 TOTAL LATENT HEAT GAIN TOTAL SENSIBLE AND LATENT HEAT GAIN � NOTE: All Heat Transfer Multipliers from ACCA Manual "J" Sixth Edition and for a medium outdoor daily temperature range. CL-841-L7 002345 Litho U.S.A. LENNOX RESIDENTIAL HEATING DATA SHEET JOB NAME: vi � C � DATE - � / --�o t� �j ADDRESS: p ;l� � Go OUTDOOR TEMP: � • INDOOR TEMP: '7 TEMP. DIFFERENCE: SQUARE DESIGN TEMPERATURE DIFFERENCE BTUH MOVABLE GLASS WINDOWS FEET 30 35 40 45 50 55 60 65 70 75 80 85 90 95 HEAT LOSS HEAT TRANSFER MULT�PLIER SINGLE GLASS 39 45 52 58 65 71 78 84 90 97 103 110 116 123 SINGLE GLASS W/STORM 21 25 28 31 35 38 42 45 49 52 56 59 63 66 DOUBLE GLASS 28 32 37 41 46 50 55 60 64 69 73 78 82 87 DOUBLE GLASS W/STORM 16 19 21 24 27 29 32 35 37 40 42 45 48 50 DESIGN TEMPERATURE DIFFERENCE SLIDING GLASS DOORS SaEE TE � � � � � � � � �� � � � � � HEAT LOSS HEAT TRANSFER MULTIPLIER SINGLE GLASS 42 48 55 62 69 76 83 90 97 104 110 117 124 131 SINGLE GLASS W/STORM ?2 26 29 33 37 40 44 48 51 55 59 62 66 70 DOUBLE GLASS 29 34 39 43 48 53 58 63 67 72 77 82 87 91 DESIGN TEMPERATURE DIFFERENCE . DOORS SaEET E � � � � � � � � �� � � � � � HEAT LOSS HEAT TRANSFER MULTIPLIER SO LI D WOO D 31 36 41 46 51 56 62 67 72 77 82 87 92 97 SOLI O WOOD'* 18 21 24 27 30 33 36 39 42 45 47 50 53 56 M ETAL U R ETH AN E 23 27 30 34 38 42 45 49 53 57 60 64 68 72 METAL URETHANE** 13 16 18 20 22 25 27 29 31 33 36 38 40 42 *"Weatherstripped or Storm RUNNING FEET � CEILING HEIGHT X C WALLS GROSS WALL WINDOWS & DOOR AREAS - �__� NET WALL AREA �n� DESIGN TEMPERATURE DIFFERENCE FRAME WALL SQUARE � � � � � � �p �r 70 75 80 85 90 95 BTUH FEET HEAT TRANSFER MULTIPLIER HEAT LOSS NOINSULATION 8 10 11 12 14 15 17 18 19 21 22 23 25 26 R-11, 3" INSULATION 2.7 3.1 3.6 4.0 4.5 4.9 5.4 5.8 6.3 6.7 7.2 7.6 8.1 8.5 R-13, 3-1/2" INSULATION 2.1 2.4 2.8 3.2 3.5 3.8 4.2 4.6 4.9 5.3 5.6 5.9 6.3 6.6 R-13 + 1" POLYSTYRENE 1.8 2.1 2.4 2.7 3.0 3.3 3.6 3.9 4.2 4.5 4.8 5.1 5.4 5.7 R-19 + 1/2" POLYSTYRENE 1.6 1.9 2.2 2.5 2.8 3.0 3.3 3.6 3.8 4.1 4.4 4.7 4.9 5.2 MASONRY WALL SQUARE DESIGN TEMPERATURE DIFFERENCE BTUH ABOVE GRADE FEET 30 35 40 45 50 55 60 65 70 75 80 85 90 95 HEAT LOSS HEAT TRANSFER MULTIPLIER NO INSULATION 16 18 21 23 26 28 31 33 36 38 41 44 46 49 R-5, 1" INSULATION 4.3 5.0 5.8 6.5 7.2 7.9 8.6 9.4 10.1 10.8 11.5 12.2 13.0 13.7 R-11, 3" INSULATION 2.3 2.7 3.1 3.5 3.8 4.2 4.6 5.0 5.4 5.8 6.2 6.5 6.9 7.3 R-19, 6" INSULATION 1.4 1.7 1.9 2.2 2.4 2.6 2.9 3.1 3.4 3.6 3.8 4.1 4.3 4.6 DESIGN TEMPERATURE DIFFERENCE MASONRY WALL SQUARE BTUH BELOW GRADE FEET � � � �' � � � � �� � � � � � HEAT LOSS HEAT TRANSFER MULTIPLIER NOINSULATION 4.4 5.1 5.9 6.6 7.3 8.1 8.8 9.6 10.311.011.812.513.214.0 R-5, 1" INSULATION 2.6 3.0 3.5 3.9 4.3 4.8 5.2 5.7 6.1 6.5 7.0 7.4 7.8 8.3 R-11, 3" INSULATION 1.8 2.1 2.4 2.7 3.0 3.3 3.6 3.9 4.2 4.5 4.8 5.1 5.4 5.7 R-19, 6" INSULATION 1.2 1.4 1.6 1.8 2.0 2.2 2.4 2.6 2.8 3.0 3.2 3.4 3.6 3.8 HEAT LOSS SUBTOTAL �/ �o�t� Heat Loss Subtotal from Page 1 ��� � DESIGN TEMPERATURE DIFFERENCE CEILING S�EET E � � � 4' � � � � �� � � 8'' � � HEAT LOSS HEAT TRANSFER MULTIPLIER NO I N S U LATIO N 18 21 24 27 30 33 36 39 42 45 48 51 54 57 R-11, 3" INSULATION 2.6 3.1 3.5 4.0 4.4 4.8 5.3 5.7 6.2 6.6 7.0 7.5 7.9 8.4 R-19, 6" INSULATION 1.6 1.9 2.1 2.4 2.6 2.9 3.2 3.4 3.7 4.0 4.2 4.5 4.8 5.0 R-30, 10" INSULATION 1.0 1.2 1.3 1.5 1.6 1.8 2.0 2.1 2.3 2.5 2.6 2.8 3.0 3.1 R-38, 12" INSULATION 0.8 0.9 1.0 1.2 1.3 1.4 1.6 1.7 1.8 2.0 2.1 2.2 2.3 2.5 FLOOR OVER AN SQUARE DESIGN TEMPERATURE DIFFERENCE BTUH UNCONDITIONED SPACE FEET � � � � � � � � �� � � � � � HEAT LOSS HEAT TRANSFER MULTIPLIER NOINSULATION 10 11 13 14 16 17 19 21 22 24 25 27 28 30 R-11, 3" INSULATION 2.4 2.8 3.2 3.6 4.0 4.4 4.8 5.2 5.6 6.0 6.4 6.8 7.2 7.6 R-19, 6"INSULATION 1.6 1.8 2.1 2.3 2.6 2.9 3.1 3.4 3.6 3.9 4.2 4.4 4.7 4.9 R-30, 10"INSULATION 1.1 1.3 1.5 1.7 1.8 2.0 2.2 2.4 2.6 2.8 3.0 3.1 3.3 3.5 DESIGN TEMPERATURE DIFFERENCE BASEMENT FLOOR SQUARE � � � � � � � sr �p 75 gp 85 90 � HEBTUH S HEAT TRANSFER MULTIPLIER BASEMENT FLOOR 0.8 1.0 1.1 1.3 1.4 1.5 1.7 1.8 2.0 2.1 2.2 2.4 2.5 2.7 DESIGN TEMPERATURE DIFFERENCE CONCRETE SLAB WITHOUT LINEAR BTUH PERIMETER SYSTEM FOOT � � � 4'' � � � �' �� �' � � � � HEAT L SS HEAT TRANSFER MULTIPLIER NO EDGE INSULATION 25 29 33 37 41 45 49 53 57 61 65 69 73 77 1" EDGE INSULATION 13 15 17 19 21 23 25 27 29 31 33 35 37 39 2" INSULATION 6.3 7.4 8.4 9.4 10.5 11.5 12.6 13.6 14.7 15.8 16.8 17.8 18.9 20.0 CONCRETE SLAB LINEAR DESIGN TEMPERATURE DIFFERENCE BTUH WITH PERIMETER SYSTEM FO T � � � � � � � �' �� 75 � � � � HEAT LOSS HEAT TRANSFER MULTIPLIER NO EDGE INSULATION 57 67 76 86 95 105 114 124 133 143 152 162 171 181 1" EDGE INSULATION 34 40 46 52 57 63 69 74 80 86 91 97 103 109 2" EDGE INSULATION 28 33 37 42 47 51 56 61 65 70 75 79 84 89 An additional infiltration load is calculated only if the home is loosely constructed or when window infiltration is greater than .5 CFM per linear foot of crack. �` FLOOR SQ Ff. x CEILING HEIGHT = CUBIC Ff INFILTRATION/ VENTILATION 0.40 x CUBIC Ff = 60 = CFM MECHANICAL VENTILATION CFM = FRESH AIR INTAKE DESIGN TEMPERATURE DIFFERENCE BTUH CFM 30 35 40 45 50 55 60 65 70 75 80 8a` 90 � HEAT LOSS HEAT TRANSFER MULTIPLIER INFILTRATION 33 39 44 50 55 61 66 72 77 83 88 94 99 105 MECHANICAL VENTILATION 33 39 44 50 55 61 66 72 77 83 88 94 99 105 Q HEAT LOSS SUBTOTAL DUCT LOSS BTUH HEAT LOSS R-4, 1" Flexible Blanket Insulation: ADD 15% (.15) R-7, 2" Flexible Blanket Insulation: ADD 10% (.10) TOTAL HEAT LOSS �j NOTE: All Heat Transfer Multipliers from ACCA Manual "J" Sixth Edition. HL-841-L7 002344 Litho U.S.A. /n DAT�E- IME CITY OF ORONO CALLED IN � ' v� INSPECTION NOT C SCHEDULED -.�.- � PERMIT N0. ��� '� COMPLETED ��2"�0 l- 3 U ADDRESS � � � OWNER TR. �"'C.� �Lm�i: TELEPHONE N0. � 7-3 � (c� �� � DESCRIPTION lL 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADWG/R�LING � 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS � O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS � 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT v 07 DEM - L 15 SEPTIC INSTALL. 22 FOLLOW-UP � 09 PLUMBING RI �~ 23 SEPTIC FINAL 35 HARD COVER REMOVAL � MBING FINAL 36 FOUNDATION/REMOVAL Q OWNERICONTRACTOR TO MEEf YOU:_YES_NO Z � CO NTS: � � a � 5.; � J O � � O � W � Q � Z W � W � j � �Q✓�/ORK SATISFACTORY:PROCEED C PROJECT COMPLETE W ��� CORRECT WORK R PROCEED �� ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY � BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. pHOTOTAKEN INSPECTOR WILL REfURN ❑STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED G INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. 249-4600 OwnerlContractor on site: Inspector. `'` `�� ���I / White Copyllnspector's File Canary CopylSite No'