Loading...
HomeMy WebLinkAboutdemo of house r 4 � O� O O � � C ITY of 4RON0 ti Municipal Offices �� G� Street Address: Mailin Address: B `9�f'EgH04'� 2750 Kelley Parkway P.O. Box 66 Orono, MN 55356 Crystal Bay, MN 55323-0066 September 2, 2004 , Jon D. Blackstone 4465 Forest Lake La�lding Mound, MN 55364 Re: Demolition of House at 4475 Forest Lake Landing Dear Mr. Blackstone: The recent demolition of your holise at 4475 Forest Lake Landing was coinpleted without first obtaining the necessary City pernlits and approvals. We understand tllat priar to the btu7i,discussions occurred Uetween the Excelsior Fire Department and City representatives;however,the need for City pern�its was somehow overloolced. Please take carefill note of the following infonnation,some ofwl�ich requires your action now, and some of wlZich will iinpact fiihire use of the site for residential purposes: 1. Yoti must apply to the City of Orono for an after-the-fact demolition pennit-the appropriate fornls are attached. 2. Cleanup of the site inust include the following actions: a) Removal from the site of all reinaining building materials, foundation,concrete, and other debris. The remains of the building cannot Ue buried on site. b) The sewer line must be cut off at the street lot line and capped. You must call the I�lspections Department for an iilspection of tlus work while it is occurring(24-hour notice required) 3. The attached Zoning Disclosure and Declaration must be read Uy you, si�ied and returned when you apply for the demolition permit. We would call your attention to a nuinber of specific items: a) You indicated the intent is to construct a new residence on the two lots. This would require that the two lots be le�ally combined at Hennepin County. The appropriate fonn for accomplishing this coinbination is attached-return it to the Citywith a copy of your deed(s)for the two properties.The City Clerk will then forward this to Hennepin County for processing. The result of the combination is that you will henceforth receive one tax Telephone(952)249-4600 • Fax(952)249-4616 www.ci.orono.mn.us n , 4475 Forest Lake Landing September 2, 2004 Page 2 statement instead of two,and the two properties will henceforth be considered as one parcel for zoning putposes. Future separation of the parcels would require a subdivision approval.The combination process must be completed before a building pernlit for a new hoine can be issued. b) Additionally,because the coinbined lot width will not ineet the 140'minimum standard for the LR-1B Zoning District, and will not meet 80% of 140' in order to meet the exception for existing lots,you will have to apply for and obtain a lot width variance. This is typically a 2-month process. The appropriate application package is attached for your use. c) Whenever the principal stnicture on a property is removed, all non-conforming accessory stnictures on the property must also be removed. The sinall shed near the street will have to removed from the site; if you plan to corrunence construction oFa new residence within the next 30 days,an alternative to complete removal would be to relocate the shed to a conforming location on the property. A pennit is required for such relocation. We look forward to working with you to finalize the above items regarding the demolition process and preparation for reconstruction on the site. If you have any questions,please fell free to contact me ar other members of the Building and Zoning staff at 952-249-4600. Sincerely, ,:% ,.r. ��..�--�� �L� ',�,/r" ,� r Michael P. Gaffron Plaruzing Director encl. cc: Ron Moorse, City Administrator