Loading...
HomeMy WebLinkAbout2014-00932 - land alteration � ,. CITY OF ORONO * 2 0 1 4 - 0 0 9 3 2 * � 2750 KELLEY PARKWAY DATE ISSUE�: 11/03/2014 • ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS : 4460 FOREST LAKE LANDING PIN : 07-117-23-24-0015 LEGAL DESC : TONKAVIEW GARDENS : LOT O10 BLOCK 000 PERMIT TYPE : ZONING PERMIT PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : LAND ALTERAT'ION (0-500 CU YDS) NOTE: $2,500 S/B COLLECTLD IN ESCROW 1'1�.1. HOW DID TH�Y PAY?CH�CK&WHO PAID?LEE'S I,ANDSCAPING ESCROW PGRMIT#: 2014-01066 ESCROW FEE FOR: GROSION CONTROL& ENGINEI?RING RI',VIEW COSTS RF;I'AINING WALL AND LAND ALTGRATION APPLICANT MINOR LAND ALTERATION 50.00 ENGINEER[NG REVIEW COSTS LEE'S LANDSCAPING & DESIGN RETAINING WALL<4' S0.00 7990 69TH AVE N ROCKFORD, MN 55373- TOTAL 100.00 (763)688-1217 Payment(s) Minnesota State License#: BUIL-BC665790 CHECK 1702 100.00 OWNER BARTA, TOM &JANICE 4460 FOREST LAKE LANDING MOUND, MN 55364- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State[�uilding Code. This permit is for only the work described and does not grant pennission for additional or rela[ed work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void il�construction authorized is not commenced within I 80 days of the date of issuance,or if construction is suspended for a period of' I 80 da}�s at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.�This permit may be revoked at an��time for due cause. 11 � �Za `1 ��✓12�r� ! �v� �/ Ap ieant P rtee Signature Date Iss d E�y Signature Date , ,� City of Orono Zoning Permit Application Mailing Address: Permit number: o��/ T —Dd �3� ���J PO Box 66 Date received: � o� I 0 Crystal Bay, MN 55323-0066 Escrow#and �� - � � Street Address: amount: �'—010 � �, 2750 Kelley Parkwa Permit Fee: yF � Orono, MN 55356 � `- Approved by: �KE 5 H���� Fax: 952-249-4616�� na� �� Notes: � Main: 952-249-4600 �^'W`�`��i.orono.mn.us � Id This application form must be completed in full and all required information must be submitted. (Please print.) Job Site Address: 1 f(o��pQ,�L/�..�� `� � j Nl p , ����..� �5 3�y CONTRACTOR/APPLICANT INFORMATION: Name: ��FFS ��l4Mi���l���F�(�-C( Phone: '�G,'3—�1-- 777 Fax: �3' �'l?7'S'�`'l3 Address: 7 v Cit : ZIP:5�5373 Contact Person: ContacYs phone — 2� 7 7 Email STE�16@Lf�SLan 5�an�s•c.a.{�PPlicant is: ontractor Homeowner (Circle One) PROPERTY OWNER INFORMATION: Name: �n,,,� �.-'�'/�, Phone (day): — � Mailing Address: N�t(Qp ���Lg51' L.�-1,(F '�i �t[o�ORoC�t ri ZIP: �''3(e�/ Email and/or Fax �to�n b��.-fis4 @ c,r•ca i ��o,� Overall Project Description: p�,� �����'�h i t`t RF��`a--/�R n �BoXk TYPE OF PERMIT COST* Dock, Commercial $50+ engineering review costs Escrow for erosion control and en ineerin review costs $2,000 Dock, Residential — Permanent dock on any lake or initial seasonal dock not $50 + engineering review costs on Lake Minnetonka ermanent dock re uires CUP � Hardcover Permit: Driveway, Patio, Sidewalk, Etc. (New or Replacement) No charge Also requires is a Minor or Major Land Alteration Permit Land Alteration, Major(grading, filling, or excavating) more 500 cubic yards $50 or more than 10 cubic yards in lakeshore setback (also requires CUP) Escrow for erosion control and en ineerin review costs As determined b CUP � Land Alteration, Minor(grading, filling or excavating)—500 or less cubic $50+ engineering review costs yards outside of lakeshore setback or less than 10 yards in lakeshore setback Escrow for erosion control and en ineerin review costs $2,000 Retaining Wall measuring under four feet require a zoning permit. $50+ engineering review costs / Retaining walls measuring more than four feet (from bottom of footings to top vof wall) require a building permit. (Tiered retaining walls are considered one wall unless the walls are separated by twice the height of the lower wall.) Escrow for erosion control and en ineerin review costs $2,500 Stairway or Lifts to Lake (New or Replacement) $50+ engineering review costs Escrow for erosion control and engineering review costs $2,000 Structure Permit for other structures not requiring a building permit but $50+ engineering review costs regulated by the zoning code (including, but not limited to accessory building of less than 120 square feet, detached deck or platform and sport court) Escrow for erosion control and en ineerin review costs $2,500 Tree Removal or other ve etation removal in 0 to 75 foot zone No char e. Pre-inspection required. Temporar Construction Office/Trailer(associated with buildin permit $30 (over) *Permit fee will be collected when the permit is issued. Updated: January 2014 � �" �� �LAN REVIEW CHECFCLIST FOR NEW ST�UCTURES / ADDITIONS �� +��� ���- � - �`. Address/Permit Number: � - , Description of work: �1�1� 15� Q,�'M��� " �9 n �i,� Septic review by: Date Approved: ---� , Zoning review by: Date Approved: Q. Building review by: Date Approved: 4 Grading review by: Date Approved: Zoning District: ���� Zoning File#: Reso#: Reso Date: Zoning: Lot Area: {� � SF AC Width: Lot Goverage: SF _% Survey Submitted: �es � No Date of Survey: �•��'�� Revised date(?): �'l�'L� Pro osed Setbacks: F�(Lake) ar(Street) ( N �S E W ) (� S E W ) Other Buildings Wetland 1J 'Side {k Side I� �r _�" t�i �r B,� Defined Height: Peak Height: FFE: FFE minus 6 feet= (Existing Contour) Perimeter(linear feet) = 50% _ #of Stories Ok? 0 YES FOR A BUILDING WITH A BASEMENT OR CRAIlVL SPACE: The distance between the lowest FOR A BUILDIPlG ON A SLAB FOUNDATION: START WITH proposed floor(of the basement or crawl space)and the highest point of the roof. START WITH The distance between the top of slab and the highes4 point of the roof. If you have a... If you have a... • GABLE OR HIPPED ROOF(no • GABLE OR HIPPED ROOF(no window : Subtract half the windows): Subtract half the distance dis ce between the highest point between the highest point of the roof the roof to the low point of the to the low point of the corresponding SUBTRACTION corresponding gable or hipped roof SUBTRACTION gable or hipped roof (BASED ON ROOF . GABLE OR HIPPED ROOF(with (BASED ON • GABLE OR HIPPED ROOF(with T�'PE) windows): Subtract half the ROOF TYPE) windows): Subtract half the distance F: distance belween the top of the between the top of the highest highest window and the highest window and the highest point of the point of the roof roof • ALL OTHER ROOF TYPES(flat, • ALL OTHER ROOF TYPES(fla4, mansard,etc):No subtraction. mansard,etc:No subtraction. ADDITION Add the distance between the top of slab S TRACTION Subtract the distance between the (BASED ON and the highest existing grade adjacent to ASED ON EXISTING basemenUcrawl space floor and the EXISTING the foundation. ': GRADES) highest existing grade adjacent to the GRADES s' foundation OR 10 feet(whichever is less). EQUALS Defined building height EQUALS Defined building height ShorelancE District flACWD Permit Received A�era e La�eshore Setbacic IViet? Bluff ❑ Yes � No � N/A � Yes No �s � No �es 0 No � N/A Permit Number: Setback: Starmvvater Quality Existing Proposed �ariance Required CUP Required Overla Di�trict Tier Hardcover Hardcover �G�� � Yes No � Yes No _ � ��7� Type�s�: Type�s�: L Updated: January 2013 v:\forms�plan review checklist 2013.docx �,� Y� � . . . . ..... ._._....z . _. _ . � _ . ��r,.� K " �', x r ,;nRRj � REMARKS (in-house): Fee�to �e Char ed YES NO Permit Plan Review State�urcharg� Investigation Fee SAC—I�umber of SAC Units Other(specify) S uare Foota e $ er S uare Foota e Basement X - � 15`Floor X = � 2"d FIOOr X - � Garage X - � ; Estimated Construction Value: $ Orono Inspections Required Work Requiring Separate f�errnsts Required State Permits � Site � Plumbing � Grading / Filling 0 Well �� � Hardcover Removal � Mechanical � Fire � Electrical 0 Footing 0 Septic � Water Connection � Poured Wall 0 Fireplace � Sev✓er Connection � Foundatior� Sunrey � Masonry � Lawn Irrigation 0 Radon Rock Bed � Mfg. � Framing 0 Other(specify) � nsulation ! � Built Survey �' 0 Final 0 Wetland Buffer 0 Other(specify) ; ,� e . .. E . �� •� , E . 4� , `� � �� = ' ��. ,� � - . (_,._,- — ' � ��'�C=� �` e C���--��` _� ;�.�'����'� � '4_-�� �,�:=�;%� y'�� ��.. �'�, � � '�,�-�, �,� REMARKS (in-house): �- � t � Other Review: Revievired by: Date Approved: " Access: Existing: 0 YES � NO New: � YES � NO OFFfCIAL REMARKS TO BE NOTED ON PERMIT AND INITIALLED p- i ? � ,i � � ._�`7 � � � � .% Il / � —b-�'" � M. y���F�� ). s �'•�i % � �""- ,� ��.e „i`.;�.�—• �J�t. �,.i;�" •K,�. �„f� t.� � ;!; a t.J..;,, ��� f�'�j 4.�, �' 1 �, `Z, v c� :� , - �� �s - ; +�, J�'>� ,i ,��` � �.. � G;� � e.� �/�`_��� ` �^.`'�`, '����`� ��`''��C.�E ���'`,.` ��'�"� L.+�_�`�G°� 4` Updated: January 2013 v:\forms�plan review checklist 2013.docx � � 0 0 0 COPY � City of Orono . ,zC�NG �lardcover Calculation Works ee _ ` _�� Property Address: 7(��^ _ _ � � � l O � �G'Ji��?� �!+YC.' clV�T=.:/� �S ;.o/ [`� ♦ Prepared by: .- _ , , _ Date: - — %'` '�.;�:r-,: �- pF f"' � ll�v _ �� - �_�. Stormwater Quality Overlay District Tier: (Circle one) '�Tier.� Tier 2 Tier 3 Tier 4 Tier 5 Step 2: PROPOSED HARDCOVER In the following table, identify all items of proposed hardcover on the property, keyed by letter to Certificate of Survey (survey must accompany this form). Include all existing hardcover items that are intended to remain, as well as all proposed hardcover items that will be added. Use as many lines as necessary to accurately depict proposed hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at the 75' setback line and calculate hardcover square footage se aratel for each portion. Key to Hardcover Item (Describe) Length x Width Totat Surve S uare Feet Exam le Gara e 24'x 30' 720 S.F. A i�'�.�:' �� �7 �t S.F. B ,t.�`� . - .. .s S.F. C ir.,! % /. f .ii:�Jf' S.F. p � � � ,a. `'-' r1z 3�; ' � t S.F. E - � .> ;,: ,. ,� ,:- � S.F. F S.F. G � �,•. t`..;; S.F. H .'�: :__ �,��_ .- i S.F. I o !'�' .��'r "�: �'"_" S.F. � S.F. K S.F. � S.F. M S.F. N S.F. p S.F. p S.F. Q S.F. R S.F. S S.F. T S.F. U S.F. �/ S.F. W S.F. X S.F. Y S.F. Z S.F. 1 Total Pro osed Hardcover � �'S� S.F. Excludable Hardcover See Cit Code Sec 78-1684 : r� f�= �.t_ r��� S.F. S.F. S.F. S.F. S.F. 2 Total Excludable Hardcover S.F. 3) Net Pro osed Hardcover Subtract line 2 from line 1 =' " '�� S.F. 4 Total Lot Area S.F. Proposed Hardcover Percentage [(3)=(4)] �y_` . ':% % January B,2013 � � � ORO�� COPY Melanie Curtis From: Steve Zimmer[steve@leeslandscapes.com] Sent: Tuesday, October 28, 2014 4:02 PM To: Melanie Curtis Subject: FW: MCWD No Permit Needed From: Lora Pohtilla [mailto:lgohtilla@minnehahacreek.org] Sent: Friday, September 12, 2014 12:42 PM To: Christine Mattson (Orono) Cc: Steve Zimmer Subject: MCWD No Permit Needed Hi Christine, Steve Zimmer with Lee's Landscape and Design sent in his plans for a proposed patio located at 4460 Forest Lake Landing.The MCWD has determined that he will not be needing a permit. If you have any questions please feel free to contact me Thanks! Lora Pohtilla District Representative Lpohtilla@minnehahacreek.or� Direct:(952)641-4580 15320 Minnetonka Blvd Minnetonka, MN 55345 .� MI�INEHAMA CREEK WATERShFED DISiRICt 1 �o�o C ITY OF ORONO � � Street Address: Mailing Address: Telephone(952)249-4600 S' G� 2750 Kelley Parkway P.O. Box 66 Fax (952)249-4616 F ! �, Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us �kFSH�� August 28, 2014 Lee's Landscaping&Design 7990 69`h Avenue Rockford, MN 55373 Re: Building Permit Appiication#2014-00932 4460 Forest Lake Landing On August 21, 2014 the City received a zoning permit application for a deck &stair replacement and installation of a paver patio. Your application is incomplete. The following items must be submitted or revised in order for your application to be considered complete and for the plan review to continue: 1. Certificate of Survey. The survey dated 7-31-14 is incomplete. Please provide two copies of an updated, full size certificate of survey which meets all of the City's survey standards (enclosed) indicating existing and proposed topography (and any proposed grading). Clarification is aiso needed as the stairs on the survey dated 4-10-14 do not match the stairs shown on the survey dated 7-31-14. 2. Building Permit. Construction and/or replacement of a deck and stairs require a Building Permit application. Enclosed is a Building Permit application, please complete and return. 3. Building Plans. Please submit construction plans for the deck and stairs. 4. Hardcover Calculations. The property is located in Tier 1 of the Stormwater Quality Overlay District. Hardcover calculations were submitted date 7-31-14, but the stairs do not appear in the calculations worksheet. Please have the surveyor update the hardcover calculations, showing existing and proposed hardcover. Attached is a copy of our hardcover information packet. 5. Escrow& Escrow Agreement. Permits involving grading and/or review by the City's engineer require submittal of an escrow and an escrow agreement. The purpose of the escrow is to guarantee reimbursement to the City for out-of-pocket costs incurred during the review of your plans. Additionally this escrow will guarantee conformance with City Code Chapter 79 relating to erosion control and stormwater.The required escrow amount for this project is $2,500. The escrow agreement is enclosed. The property owner must sign the escrow agreement and submit a check for$2,500. Your project may trigger the Minnehaha Creek Watershed District's (MCWD) permitting requirements; please contact the MCWD directly at 952-471-0590 regarding your project. Please note, the City of Orono will not issue a building permit without a copy of MCWD permits or documentation from the MCWD stating the proposed project does not trigger any of their permitting requirements. The above information is required in order for the plan review to continue. Please feel free to contact me at 952.249.4620 or by email at cmattson@ci.orono.mn.us if you have any questions on the above requirements. Sincerely, CITY OF ORONO . �/v Christine Mattson Planning Assistant c Steve Zimmer via email Tom Barta via email Tom Barta;4460 Forest Lake Landing; Mound, MN 55364 Tom Barta;705 Greenfield Trail;Carmel, IN 46032 Lyle Oman, Building Official enclosures Melanie Curtis From: Melanie Curtis Sent: Tuesday, October 28, 2014 2:40 PM To: 'steve@leeslandscapes.com' Cc: 'tom.barta@cnoinc.com'; Lyle Oman; Christine Mattson Subject: RE: 4460 Forest Lake Landing /#2014-00932 Attachments: Escrow Agreement- Building Permit w Erosion Control 2014-00932.pdf Steve Christine is out of the office for the next 2 weeks. I apologize if I've missed something already submitted but it appears we are still waiting for submittal of the $2500 escrow and escrow agreement(form attached), the construction plans for the deck and stair refurbishment—or a description of this portion of the project. The following are comments from our City's engineer, please address: 1. The silt fence should be installed and inspected by the City prior to any land disturbing activities. The Contractor must provide a minimum 24 hour notice prior to inspection. 2. A financial security of$2,500 from the Applicant is recommended for erosion control and engineering oversight. The financial security is intended to provide protection in the event that it becomes necessary for the City to install or maintain erosion and sediment controt within the project area and covers the cost of vegetation re- establishment if the applicant is unable to follow through with the conditions of approval. 3. The applicant may be required to obtain Minnehaha Creek Watershed District (MCWD) approval and permitting for their Erosion Control rule. A copy of any approved permit or confirmation that no permit is required should be submitted prior to any land altering activities. Melanie Curtis � 952.249.4627 � mcurtis@ci.orono.mn.us From: Christine Mattson Sent: Thursday, August 28, 2014 10:02 AM To: 'steve@leeslandscapes.com' Cc: 'tom.barta@cnoinc.com'; Lyle Oman; Melanie Curtis Subject: 4460 Forest Lake Landing / #2014-00932 Attached is a copy of the letter and attachments being mailed today. Please don't hesitate to contact me if you have any questions. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway Orono MN 55356(physical addressJ PO Box 66 Crystal Bay MN 55323-0066 (mailing address) �' 952.249.4620 8 952.249.4616 �' cmattson@ci.orono.mn.us �? www.ci.orono.mn.us Summer Office Hours: (Monday, May 19 throuqh Friday,Auqust 29,2014) Monday-Thursday: 7:30 am to 5 pm Friday: 7:30 am to 11:30 am OUR OFFICE WILL BE CLOSED: Monday, September 1, 2014 1 Melanie Curtis From: Robert Bean [bobbe@bolton-menk.com] Sent: Thursday, October 23, 2014 3:32 PM To: Christine Mattson Cc: Andrew Mack; Melanie Curtis; David P. Martini; Brian Simmons Subject: 2014-00932 -4460 Forest Lake Landing Christine, I have completed review of the Building Permit application package for 4460 Forest Lake Landing. Following are my comments for City consideration: 1. The silt fence should be installed and inspected by the City prior to any land disturbing activities. The Contractor must provide a minimum 24 hour notice prior to inspection. 2. A financial security of$2,500 from the Applicant is recommended for erosion control and engineering oversight. The financial security is intended to provide protection in the event that it becomes necessary for the City to install or maintain erosion and sediment control within the project area and covers the cost of vegetation re- establishment if the applicant is unable to follow through with the conditions of approval. 3. The applicant may be required to obtain Minnehaha Creek Watershed District (MCWD) approval and permitting for their Erosion Control rule. A copy of any approved permit or confirmation that no permit is required should be submitted prior to any land altering activities. If you have any questions or comments, please contact me to discuss. Thanks, Robert E. Bean,Jr, P.E. LEED Green Assoc. Water Resources Engineer Bolton & Menk, Inc. Consulting Engineers&Surveyors 2638 Shadow Lane, Suite 200 Chaska, MN 55318 P:(952)448-8838, ext 2892 F:(952)448-8805 email: bobbe@bolton-menk.com www.bolton-menk.com This email has been scanned by the Symantec Email Security.cloud service. For more information please visit http://www.s�manteccloud.com i � �� ��e� MEMORANDUM Date: October 21, 2014 To: Bob Bean, City Engineer From: Christine Mattson, Planning Assistant c Melanie Curtis, Planning & Zoning Coordinator Dave Martini, City Engineer RE: Building Permit Number 2014-00932 4460 Forest Lake Landing Attached are building plans and survey for patio and retaining wall. Please review the attached information and provide comments by Tuesday, October 28, 2014. Please contact me at cmattson@ci.orono.mn.us or at 952-249-4620 or Melanie Curtis at mcurtis@ci.orono.mn.us or at 952-249-4627 if you need additional information or if you have any questions. Thank you Christine Mattson From: Christine Mattson Sent: Thursday, August 28, 2014 10:02 AM To: 'steve@leeslandscapes.com' Cc: 'tom.barta@cnoinc.com'; Lyle Oman; Melanie Curtis Subject: 4460 Forest Lake Landing /#2014-00932 Attachments: letter.pdf; Escrow Agreement- Building Permit w Erosion Control 2014-00932.pdf; Hardcover Calclulation Worksheet From 2014 Packet.pdf; Survey Requirements - March 2014.pdf; Building Permit Application Packet for New Structures or Additions 4-19-2013.pdf Attached is a copy of the letter and attachments being mailed today. Please don't hesitate to contact me if you have any questions. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway Orono MN 55356 (physical addressJ PO Box 66 Crystal Bay MN 55323-0066 (mailing addressJ �' 952.249.4620 � 952.249.4616 � cmattson@ci.orono.mn.us � www.ci.orono.mn.us Summer Office Hours: (Monday, May 19 throuqh Friday,August 29, 2014) Monday-Thursday: 7:30 am to 5 pm Friday: 7:30 am to 11:30 am OUR OFFICE WILL BE CLOSED: Monday, September 1, 2014 �,�"v �v . ��� Q-�� �`� �D•�3' ``� �� � ' . : • • � • emo To: Finance Department From: Christine Mattson, Planning Assistant r J, ' ' CC: Street File ` Date: May 4, 2016 G/L: 101-22205 Re: Escrow Refund Building Permit #2014-00932 pertaining to 4460 Forest Lake Landing is complete. Please refund $2,500 to the property owner, Tom Barta. The following is attached: • Original signed escrow agreement • Copy of cash register receipt showing escrow amount received Mail to: Tom Barta 4460 Forest Lake Landing Mound, MN 55364 w:�street files\forest lake Ianding�4460\escrow refund 201400932.docx � ✓ � BUILDING PERMIT ESCROW AGREEMENT Orono Building Permit#2014-00932 AGREEMENT made this �'"'� day of .S 1..� , 20,�, by and between the CITY OF ORONO, a Minnesota municipal corporation ("City")Tom Barta ("Owners"). Recitals 1. A building permit application has been filed a deck and stair replacement and installation of a paver patio located at 4460 Forest Lake Landing the ("Subject Property"), legally described as Lot 10 Tonkawa, Gardens, Hennepin County, Minnesota. 2. Owners request the City to review this application. 3. The City will commence its review of the application and incur costs associated with said review only if the Owner establishes an escrow to ensure reimbursement to the City of its costs. NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owners shall deposit $2,500 with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of $500, or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be responsible for under a building permit apptication. The escrow will also guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work (including planning, engineering, or legal consultant review) associated with building permit #2014-00932 if compliance with the approved building permit is not accomplished. 3. MONTHLY BiLLING. As the City receives consultant bills for incurred costs, the City will in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the timeframe outlined in #3 above, shall issue a Stop Work Order until the Owners pay all expenses invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eligible expenses the City has incurred. 5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the Owners when all requirements related to the project are complete. City Staff shall review the terms of this escrow agreement two times per year to determine whether the requirements of the project have been successfully completed and whether it is appropriate to return the funds. Owner may also request the release of the funds, and such funds shall be released upon City Staff receiving the appropriate verification that all requirements of the project have been successfully completed. 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligibfe expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn. Stat. §§ 415.01 and 366.012. CITY: CITY OF ORONO OWNER: By: ��n1�1���W1��^-� . Its: n Y� ���J � �Gi. E � � �- ------.,-�- --____ «----.__ _ __.._--___. . ... . , ,. . ,, . „ . .. . . . : , _ __ __. ____�.____--_____.�____15 66 ��_ ANCHOR Q BANK� 7990 69TH AVE �en�wdink.com `�n�u°Re,.n�tl� =a�� �i Mchorline 952-0OB-8083 LANOSCAPtM6 a Hes�cx ROCKFORD,MN 55373 75-1523-9�60 9/12/2014 PAY TO THE - ORDER OF - Th2 CI�/Of O!'Of10 � *"2,500.00 Two Thousand Five Hundred and 00/100"'*'"'**'`"`*•'*****"'*"*'*'*********•********•***********************************• DOLLARS The City of Orono - i, ,,�.. � � � �. 1 MEMO � ���� �� �� � AUfHORIZED SIGNATUR :v��������� . . �� 0 8 4 3 ii' City of Orono 275U Kelley Parkway Orono MN 55356 952-249-4600 Receipt No: 3.011827 Sep 19, 2014 Lee's Landscaping Previous Balance: .00 Permits 2014-U0932 4460 Forest 2,500.00 Lake Landing 101-222Q5 Deferred Rev-Developer Deposit --------------- Total: 2,500.00 --------------- --------------- Check Check No: 1566 2,500.00 Payor: Lee's Landscaping Tatal Applied: 2,500.00 -------------- Change Tendered: .00 ------------- --------------- 09/19/2014 03:28PM � �• � ITY F R � C O O ONO * z014 - 01066 * 2750 KELLEY PARKWAY DATE ISSUED: 09/19/2014 ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS : 4460 FOREST LAKE LANDING PIN : 07-117-23-24-0015 LEGAL DESC : TONKAVIEW GARDENS : LOT O10 BLOCK 000 PERMIT TYPE : ESCROW FEE-TIED TO BUILDING PERMIT PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : ESCROW FEE-TIED TO BUILDING PERMIT NOTE: THIS$2500 ESCROW IS TIED TO F3liILDING PEItMIT 2014-00932 APPLICANT ESCROW FEE-BUILDING 2,500.00 ESCROW FEE-EROSION CONTROL 0.00 LEE'S LANDSCAPING &DESIGN ESCROW FEE-GRADING 0.00 7990 69TH AVE N TOTAL 2,500.00 ROCKFORD,MN 55373- (763)688-1217 Payment(s) Minnesota State License#: BUIL-BC665790 CHECK 1566 2,500.00 OWNER BARTA, PATOM&JANICE 4460 FOREST LAKE LANDING MOLTND, MN 55364- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be perfomied according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of Iaws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for due cause. / / Applicant Permitee Signature Date Issued By Signature Date � . t , __ ; _, i � I, � €; ; ; � � e d � a; � i � �J�l.Ni I ! ��I�i C TI T; � m �:= 3 ., I = �'�� , o m;o�o, � si� �� �� d � : �;��d� � h�o'oid' � ,,:- -�t:, o � d:�;�;� . � �:d'd�z: z � 3!�'�l¢; � I e;�����i cg { �;�i��d,, W�J�J{O��,I _"� _'.`—�'_._,. d ; ' ': rT I . itl;itl�itl�illj� � i . _�_;_�_� a � ���i�l�',: [] N;�li�N t N; G � Of'0>:di d'': d. � � �i� �i�;l ...i _..q.._�..... .. I �� { y: Q.: , � I �7: ''�. ��i � �. t �N - v: c, � ��; d � m: '� ' �: ; ;�I� w �; � 3�7I� � °i � �°I �;.�i`ej m� d ' �mi€I��¢i. a d�d!d,�i ��+ �+-iaiaf��� 3':,poi pe�o� d � ' e:.S:.E��:�. t�:c!�IZ7: � �4J!N�NIQ��:; , ........ -. .-.__:- i ,OY-LT;Ol�O�` f CI C�,CS C( �.�i�C��3�'.,: • {9i,Ji�iJ:. J � . .a�la��im�m; ; Y'.Y�Yi-M!, ��!,���j�: Ny!N!N'.N�. N G�d��i��i y , O;O'Oi0'. �;�;�jLL���.l �' � � o;njn;o{� � ' ���!��i�:�:l d � ' : �� �I�i� � � �'o'blo�li C ' I �O � s ��� �;� � d � N NIN N 2 _� � �-�}�.: e'd � - _ N—i --_�-'a,.aj� i � ! j i j i • �'' ' : m � d: . a �; ;T' T i C: j d� �� F- �� :Z� ' O � s �� ��� �� � i. �: j� a i e Aim;�;. N j h = � .= = w � a;LL : `o__� _ ;_. a i � Ca7�l-:� H i �upw;! c !g;a�g:. -._.; _:_._,_. .._; '' �.�.z��;: Q;Q;Q;, y � �o�oio{� E ;o,o�c � ��� ��N � i Lf7 tO�e1':i iO�IC�C;; :N-N:N'�.� d: �T'u'>il`-li iC: ���NjN��.� �I ;�:�j����. �� ✓ ___� TIME CITY OF ORONO CALLED IN 7 INSPECTION NQTIC���HEDULED � PERMIT NO.�,�� C PLETED ADDRESS OWNER EL HONE•NO.� 3�7 a� 7 °2 i CONTRACTOR � DESCRIPTION , � / G(/� � tL ❑ FOOTING ❑ DEMO-FINAL ❑ EPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL 2 ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q t:'�fNAL ❑ WATER HOOK-UP ❑ FOLLOW-UP i ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL � ❑ DEMO-SITE ❑ SEPTIC INSTALL 2 OWNERICONTRACTOR TO MEET YOU:_YES_NO , � COMMENTS: Rd�i•K �"S /.v Q Gl o r� 3 S•c�¢s � a-�' .pa�� � ,G�r��6 - ���c � 3� �` ��s� ' 0 - G/u�r K tt�/�ts,vs' � �� ,/��� �. a� �i°�!�'a rJG� ,t��.c•r • O � W n . - � -- !�'/'OYiR�a 45 - .h4�� SG✓Ue y Q � � �B/'w�.C ��vt�Ll¢D �2rta�,K k� ' �l�c• G� ,S�tt�d�� � J � ❑WORKSATISFACTORY:PROCEED �PROJECT COMPLEfE W �CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CALL FOR REtNSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN INSPECTOR WFLL REfURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Ca11 for the next inspection 2a hours in advance. (952� 249-46�� OwnerlContractor on site: Inspector: `t ��-- White Copyllnapector's File Canary CopylSite Notice . , . . LSg'S _ O�O � I.ANDSCAPING S DESIGN , NO � + _ � -_ � � � � , --� � o�:=�a,�a�,� __ , � ; ..eK��.....ae�.�. � , — � � _ , + ; , + � � '� ❑ ❑ ❑ ❑ Flowering - - -� j eAR-rA RE5IDENCE Shrubs i I I ❑ ❑ ❑ ❑ , Ii � % ; � PRELIMINARY G��UndCOVer � + I I LANDSCAPE � � _ __ P LArv � - � � � ; + - Flowering i i Shrubs i - ; '� — � ❑ ❑ ❑ ❑ i + Existing ; Deck 8� Stair �' � - I I I �� - � �e�.�e I ,�E�b' �i � ; ', - Flowering � 'I � I + Shrubs � TNIS PLAN SHALL i REMAIN THE I I ._ .,' PROPERTY OF LEES � - ; LANOSCAPIN6 & Fl�wer�n/"1 . I DE51GN INC.ANY I hr h `� I REPRODUCTION OR � S'11 U�.JS � I USE OF TH13 PLAN � WITH OUT WRITTEN � ' ,- '�, PERMISSION FROM I �'� -- I� LEEB LANDSCAPING � I Paver I � DESIGN IS I � Landing ii sTRICTLY PROHIBITED. I I I UNAUTHORIZED USE �� I SHALL ENTITLE LEES LANDSCAPING d, . - SIt.1I�S � DESIGN TO ALL �� I DAMAGES CAUSED � I � I BY SUCH U3ER INCLUDING ' PREPqRATION . i CHARGES, LOBT ' I PROFITS, DAMAGE TO �i REPUTATION, AND ATTORNEYS FEES. - . . . _ _ _ _ _ . . . __ . . � ��u� DATE TIME CITY OF ORONO CALLED IN INSPECTION N TI E SCHEDULED PERMIT NO. 009AZ COMPLETED ` ADDRESS�! WOQ rte 406kP t)Q"'Ouch i OWNER TELEPHONE NO. CONTRACTOR / DESCRIPTION A Al/ V_ W ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL m. ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS ❑ INSULATION ❑ WOOD BURNER/FIREPLAC ❑ COMPLAINT ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP ❑AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL .1 ❑ DEMO-SITE ❑ SEPTIC INSTALL 2 OWNERICONTRACTOR TO MEET YOU:_YES_NO COMMENTS: j o c 0 W Q W W aC d a ❑WORK SATISFACTORY PROCEED ❑PROJECT COMPLETE W ❑CORRECT WORK&PROCEED O ISSUE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY C.1 BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. p PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR 0 NATION ISSUED O INSPECTION REOUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection?A hours in advance. (952) 249-4600 Ownerr,orrtra r on site. Inspector: White CopyAngwctoes File Canary Copylli to Notice DATE TIME CITY OF ORONO CALLED IN INSPECTION N TI E SCHEDULED PERMIT NO. 009AZ COMPLETED ` ADDRESS�! WOQ rte 406kP t)Q"'Ouch i OWNER TELEPHONE NO. CONTRACTOR / DESCRIPTION A Al/ V_ W ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL m. ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS ❑ INSULATION ❑ WOOD BURNER/FIREPLAC ❑ COMPLAINT ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP ❑AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL .1 ❑ DEMO-SITE ❑ SEPTIC INSTALL 2 OWNERICONTRACTOR TO MEET YOU:_YES_NO COMMENTS: j o c 0 W Q W W aC d a ❑WORK SATISFACTORY PROCEED ❑PROJECT COMPLETE W ❑CORRECT WORK&PROCEED O ISSUE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY C.1 BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. p PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR 0 NATION ISSUED O INSPECTION REOUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection?A hours in advance. (952) 249-4600 Ownerr,orrtra r on site. Inspector: White CopyAngwctoes File Canary Copylli to Notice