HomeMy WebLinkAbout2001-P04476 - attached deck � , PERMIT
CITY OF ORONO
2750 Kelley Parkway - PO Box 66 Permit Number: Po44�6
Crystal Bay, Minnesota 55323 P@t'CTllt Typ2: Addition/Remodel/Repair
(952) 249-4600 Date Issued: i vsi2ooi
SITE ADDRESS: 635 Ferndale Rd N
Wayzata, NW 55391
PID: 36-118-23-11-0009
DESCRIPTION: UBC Occupancy R3
Construction Type VN
Proposed Use: Kesicientiai
Census Code 434
Permit Class: Building
Permit Type: Addition/Remodel/Repair Permit Sub-type(s): Deck-Attached
DETAILS:
Approved per resolution#:
Separate permits required:
NOTICES/REMARKS:
FEE SUMMARY: Permit Fee: $ 111.25 Valuation: $ 5,000.00
Plan Review Fee: $ 72.28
State Surcharge Fee: $ 2.50
TOTAL FEE: $ 186.03
APPLICANT: Owner/Self OWNER: Larry Jacobson&Victoria O'Neill
1VII�1 635 Ferndale Rd N
Wayzata MN 55391
THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIF�D
AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND
STATE OF NIINNESOTA BUILDING CODE REQUIREMENTS.
- �-��� ���� ����
APPLI NT RMITEE I NATUR ISSUED BY SIGNATURE
Copies: 1-File(Signitures Required), 1-Applicant, 1-Monthly Reports, 1-Assessing, 1-Finance Page 1
�
Total Fee: $ � `C<<� � � ' Date Received: �G"I�' ��
Entered By: Permit#: ��}L/�/��
CITY OF ORONO - BUILDING PERMIT APPLICATION
All information must be submitted in full before plan review will be started.
(please print all information)
----------------------------------------------------------------------------------------------------------------------
THE APPLICANT IS: (circle one) OWNER OR CONTRACTOR
JOB SITE ADDRESS: �_S� N �'���u,�L I��,� ZIP: `_� }�y j
NAME OF OWNER: ���Q�� �.�l�p�S�/ PHONE: (home)��.Z.- �}7� '�`���
(work) `t S2- ��.� 3�y �
MAILING ADDRESS: �3`� /j��n c�cc1� ��CITY: (.,/�i.zy,�, ZIP: �j�3�t )
CONTRACTOR: F�w-v�_ PHONE: ��2-`fi a� -3`3 `��
CONTACT PERSON: �,�,�,, ,J��o_��v�✓ MOBILE/PAGER:
MAILING ADDRESS: (��S n/. �,,.,�Cuf� Pa CITY: t,/e�, zu� ZIP:�S ` )
STATE LICENSE: #
ARCHITECT/ENGINEER: J��s�,� ,,)��v��a�,/ PHONE: 5�,•••,�
MAILING ADDRESS: y�r� CITY: ZIP:
NAME: REGISTRATION#
TYPE OF WORK: New X Addition Accessory Structure
Move Remodel/Alteration Land Alteration
PROPOSED WORK(describe in detai�: ��� �i-}�,�,� -}�, ��}-�,�-,e� ��-�-
/�/2z..�1 � ��,G�"'�_:J ��s� C'�
STORIES: SQ. FEET OF EACH FLOOR:
NO. OF BEDROOMS: GARAGE STALLS: ATT. DET.
ESTIl�IATED CONSTRUCTION VALUATION (excluding land): $ ��c�
I hereby apply for a building permit and I acknowledge that the information above is complete and
accurate; that the work will be in conformance with the ordinances and codes of the Ciry and with
the State Building Code; that I understand this is not a permit and work is not to start without a
permit; and that the work will be in accordance with the approved plan.
APPLICANT'S SIGNATURE: DATE: 1 n��/ � (
NOTE! Parade of Homes events r quire separate permit approval by Police Department and
City Council 60 days prior to the event. Non permitted events will not be allowed.
5
,�►
Sec.13.04 RIGHTS OF SUBJECTS OF DATA
Subd. 1. Type of data. The rights of individual on whom the data is stored or to be stored shall be as set forth in this section.
Subd.2. Information required to be given individual. An individual asked to supply private or confidential data concerning himself
shall be informed of: (a)the purpose and intended use of the requested data within the collecting state agency,political subdivision,or statewide
system;(b)whether he may refuse or is legally required to supply the requested data;(c)any known consequence arising from his supplying or
�efusing to supply private or confidential data;and(d)the identity of other persons or entities authorized by srate or federal law to receive the data.
This requirement shall not apply when an individual is asked to supply investigative data, pursuant to section 13.82, subdivision 5, to a law
enforcement officer.
The commissioner of revenue mav alace the noace reauired under this subdivision in the individual income tax or provertv tax refund
insttvctions instead of on those forms.
Subd. 3. Access to data by individual. Upon request to a responsible authoriry,an individual shall be informed whether he is the
subject of stored data on individuals,and whether it is classified as public, private or confidentiaL Upon his further request, an individual who
is the subject of stored private or public data on individuals shall be shown the data without any charge to him and, if he desires, shall be informed
of the content and meaning of tha[data. After an individual has been shown the private data and informed of its meaning, the data need not be
disclosed ro him for six months thereafter unless a dispute or action pursuant to this section is pending or additional data on the individual has been
collected or created. The responsible authoriry shall provide copies of the private or public data upon request by the individual subject of the data.
The responsible authoriry may require the requesting person to pay the actual costs of making,certifying, and compiling the copies.
The responsible authoriry shall comply immediately,if possible,with any request made pursuant ro this subdivision,or within five days
of the date of the request,exduding Saturdays,Sundays and legal holidays, if immediate compliance is not possible. If he cannot comply with
the request within that time, he shall so inform the individual, and may have an additional five days within which to comply with the request,
excluding Saturdays, Sundays and legal holidays.
Subd.4. Procedure when data is not accurate or complete. An individual may contest the accuracy or completeness of public or
private data conceming himself. To exercise this right,an individual shall notify in writing the responsible authoriry describing tha nature of the
disagreement. The responsible authoriry shall within 30 days either. (a)correct the data found to be inaccurate or incomplete and attempt to notify
past recipients of inaccurate or incomplete data,including recipients named by the individual;or(b)notify the individual that he believes the data
to be correct. Data in dispute shall be disclosed only if the individual's statement of disaereement is included with the disclosed data.
The determinadon of the responsible authoriry may be appealed pursuant to the provisions of the administrative procedure act relating
to contesred cases.
DATA PRIVACY ADVISORY
In accordance with M.S. 13.04, Subd. 2, "Rights of subjects of data", we would like to inform you that your
request for a permit or license from the City of Orono or any of its departments may require you to furnish certain
private or confidential information.
You are notified that:
1. The information you furnish will be used to determine your qualification for the permit or license
requested.
2. You may refuse to supply data, but refusal may require that the Ciry deny the permit or license.
3. The information may be shared with other local, state or federal agencies to the extent necessary to
process the permit or license.
4. If your requested permit or license requires Council action to approve, some information may become
publ ic.
5. You have certain rights under M.S. 13.04 (available upon request) to review private data on yourself.
6. Your full name is required to process this application or permit.
1 �Q� � J +�w����.�
First �) Middle, Last
�j�� /v. ��v�n!�Li�Z, �`�C,�
Address � ��
(�/ti z u,�e, �1-✓ �>�� > Gl S�-y 3�� z`��
City State Zip Phone
I understand my righy�as stated above.
C �
�
i � �/
s�g�
6
CHECK OFF LIST FOR ISSUANCE OF PERMITS
FOR OFFICE USE ON�Tr"Y
ADDRESS OR LEGAL: �3 � �. �e�nd�a,(� �Q
PID:
DESCRIPTION OF WORK: ��L
------------------------------------------------------------------------------------------------------------------------
ZONING REVIEW BY: � DATE APPROVED: !! - �3-d �
BUILDING REVIEW BY: {?�c��c Ocw��s DATE APPROVED: r �- z 3. o t
------------------------------------------------------��------------�o��_--------------------------------------
FEES TO BE CHARGED: Misc. Fees Calculated By:
PERMIT Yes � No
PLAN REVIEW Yes � No SEWER CONNECTION
STATE SURCHARGE Yes No WATER CONNECTION
INVESTIGATION FEE Yes No PARK FEE
SAC Yes No SITEINSPECTION
Number of SAC Units OTHER (specify)
------------------------------------------------------------n------------------------------------------------------------
ZONING CHECK LIST Zoning District: �2/� JB
Fire Departmentf�(/��`2a'� Post Office: �e,c.,Z`�– School District: 4i'G...y�47�
�
Lot Area: Sq.ft. z'� � Acres ����� Width f �y���1� Depth _
— ,—
�
Survey Submitted: Yes �0 No Date of Survey: D`J �/�'2
Proposed Setbacks: �
Front (Lake): d � Right Side: G�
Rear (Street): �� Left Side: G 3• 1
Adjacent Structures: � Wetland: ��
Building Height: Def. Hgt. Peal:Hgt.
Lot Coverage:
Grading: Staff Approval Date: �-- By: Council Approval Date:
Septic: Staff Approval Date: ' By:
Zoning File: # Resolution: # Resolution Date:
Shoreland District:
Avg. Setback: Bluff Setback: Lot Coverage:
Existing Proposed
Hardcover: 0-75'
75-250'
250-500'
500-1000'
Hardcover Variance Required: Yes No Date of Council Approval:
REMARKS (in house):
7
BUILDING REVIEW CHECK LIST
UBC: �—3 CONSTRUCTION TYPE: �/t/
Sq Footage $ Per Sq Ftg
Basement x =
lst Floor x =
2nd Floor x =
Garage x =
x =
TOTAL
Estimated Construction Value: $ $-O�O
Inspections Required: Work Requiring Separate Permits:
Site Plumbing Fire
Hardcover Removal Mechanical Water Connection
�Footing Septic Sewer Connection
1C Framing Fireplace Lawn Irrigation
Insulation (Masonry) Other
Wall Board (Mfg.) Well (State Permit)
� Final Grading/Filling Electrical (State Permit)
Other
REMARKS(IN HOUSE):
------------------------------------------------------------------------------------------------------------------------
REVIEW BY OTHERS: DATE:
Access: Existing New
Access Approval: Date By:
------------------------------------------------------------------------------------------------------------------------
REMARKS (TO BE NOTED ON PERMI�:
8
F �
����� � �
��=�'GIAL t�i;:;J�'�
SEE �R7'T��i-;�D C�?'�' C�F ���t���
r
1"iEC7� E3l.''i.i.��'iora PCi���ti��T F`�;`Li�� F�i�.�'i'�11U
F"�R ��N'1 sjrz-'t� n" C �� INS?ECTCIR_�GLI'ti �Gt,�
C��E r[L�..�V ib���i��'� r C;�_' _��_Z.�r'O !_ --- F'r.F',2lli�r Nl.—_�___._.
rg �: ;,,; ;;,,��, .. ,. ,.�`'°`,-i�'�`�-D.
.,�;;:,:_ .���: ��
� F r ..',",,�r -ri_t ;� 'r�:� r-�-�• r�nc r ir ` r.�
h;."i;���J. il 4'.'��i .i.,ii C.V�1 ���1•J �: `.i
r: i..:�1 Pi:'i'�i.�i��,l1=L,l -•�.:v�`,!'�.;::,1 '.x ii__.i . 1
';f�. .�c'.�:Il'"�.'?[.,.. �r^`:';'OU'',�r.`Or'T1L'�'vil i+.•I vvOfl<�i'�.' � . r0
If� � .':i'...,_.., 14`l;i� ,.:I'', �!:j�I!,�,.... ,;Vll:iill; c.f`.. ?�'� .- "
R�. • ',i��afF::�:f��, r'
ha��r� l ri�;�r�:�;v:,�i Ci�d�t i L F:I HLl'�;��,�3
i
� 1✓�
� 3 2k�Z �n.� �''��(�-�r� � 1
! �
� ��j,�� � - --__-_.�..�--�..�,f,i
F�--- ,y 11 -- __._-- � ----- �_ .
; - .
c
� �--- ------- - ---
� d3L • (l �
-" — �
��n� �
: W � �
�9 n
� `� I � ��k b \ � �
� i � �� �, �
� � � � N
v � I� � '3 �
� � r J�" � �-
�'" r� I� I ,� o g .�
� �
k + � 1� � � �
�. ,� ; �
. '� �I � � � �v `' ',9�� � �.
� ;; � � o �: `= ' (
� '' 2 � !
� I� j �. �
j �3 Ja3� Z��`Z � r
___ � i �� I
'3�3�i�i Zf)C,2 �
Y
L
�
P �
� J
� � �
� �
U !
� �
. t �
� ' � � 2fl��i,'� , ���
; ;
� ; .
1 I �
i ,
�-i----------�---------�-� _
r--- : ' ------------------ ': �
! , � .
i � �
� t .
�
� , � � �
� !
�„ � . .. '_� __ �_ _______________. _-�
� '� � i '-. .. . � ' ` I � ..
1 � � 1
.� 1 � j � `�� � 1
� ' ' 1 `�. �I ' .. . . �
1 � O `\� � �( �
� � I Z. ,�` �' f �t 1 � � �
� � t . i :: 1
� I-.T____�'_'�/� � '�___' �__�� �� � �: � '
� I 1 -1 UJ.___ j i � !: �
� , ��7 . / I f� ' '
� � � � ii �
! � j N � . . / � - i
� ..
i �-,- /D� ,� , /'� � �
� f U■ �� i 4J _ � � .
i� ; m ; D ;
I1 ��' .� I j '/'�1 t i. 1 .
� � - I rC� - �SJ + �; 1
' ' ' a i�`"" � � ------ " �
i • ; ' �t:-.�:, ;� � �
#_:.; ,, ,: o � ;' � � _
1 � � � ; ;: o� :,: � �
'3��..,; - . _ .z. -- , i � .
'i� :
_l �
� � � ___ i. . � . -
♦
T � (, 1 I _
\ � � � I
I �
� 1
. '.�w -� 1 . � .
�
� C' Rt i
� X �
,
- ,6,81 � -u'-i '
�
�
�., . . � ----------------------�
� �
� �
. , ,, _ ,
,
i �� Q _ ;' . �
�
i `. C % i
i �`. � '! . � �
� � � f., `� ITl '
i � � �
i . i �
� i
i `. i � �
� .`'�� i
i �
� '
i i
i �
i �
� `
`- =------------- i
i ------------------------------ ------------
. i i
i i
i � t
� � �
i i
� � i
i • � �
• � L
I 1 I
1 I
1 I �
� � 1
� 1
I � �
� 1
� I �
. � . 1
� I I
I �
� 1
j � 1 '
. �__ __.� _ _ ' _ _ �
- I I. - �" _ _ __ _ _ _ _ _ _ - _ _ _ _ .
� ; � � � b -
� � � ,
� �; � � m
� �
� �
- , : � � �
, , .
� ,- ,
� _
, .� �
.��
. `
..:.� ./�►. � � � - -- � �
������� .. �
���� `-��"""'�"��""'�.�
����
�'����� pain t 830.75;OCs��
{M.+ C¢7� Ira4'.
. �'� � � Or` dryy'7 LOf J �
Liwsxparaltat.,.:,u.a.�d 675'Sa.,;a .
�r Nuitl� l;.r�of' 7+ay't Lo.+ 3 �_ �
-- �J��
. ' ���\��
� �
� � �•-
� � ��� .
��
� /� � ��fl
� �� \�p� � ��
e � � b° � \ J�
, I� � � �� � o� si5°27'vV._.._�.....,j��'
Iv ��U � � � 17.9 � ���`'•.-. � - -�oin#',�,�
�\ �� �
r � i� �C. � o � .�
2so�° � � l� � �i �,�\ � `°`a�o � , �&y} ��,
� } � . _;
�6q6 2� �� ' � �1 .
l"Z 1
� —��. � `,� J
�i4 � �Ld 1 1� � _. I 'la't �' �� '
;'' ..�C° �
�Y�� � � �wQ o /
� N �ppo5f0 � 1
� + _ � 1
SiT-} �:.�,� l:rs�::,�iNG �A� � "` o &"R'` sa 1 j
�' Ar�'�`�L���— ��cv�c,� �,o���a� � �'Z ; � ( �
� �o �
� �'�!-� '" ��t-' ��Y'cE,J:,�{ I �
u A� Pr�`�:� . �„ � � :...; .� i i
� E�i53�r9 a � (
� DiS�,^ti'�:' ���-, � �s. _ -------+o.3.r-
, � , , ..�-- �
�Y ��1 ___ � �. : J e�
�TL. . q• 2 I-�-------�--- � � w 1 i � �
� ��_� _.'! �+ � �
' ' �y�5� Y � r
� �
�, � j ,
f � �oad Ease�nenr
f � �'
�� ���e��- �F-� 3 �
'� + a� f
� � I ; m �
:r - � � vs
w � �
�, �
\ 1 (
I,o' � �.5• ,s' r
,` ( �
,` : � I
; �,.¢�arnlf��w"r�k a+�d�269.1: (
\ ;y eP 5 i,ne�4o"'t Lot 3 l Ys.,B f
` � y �..::. I
� . - � �vc.��
,t', i G�" .�� �l��.X/ w Li'�v'G �.
>3
7
N w
City of Orono
27�0 Kelley Parkway
P.O. Box 66, Crystal Bay, MN 55323
952-249-4600
Decks
Building Permits are required for any deck or patio.
Frost Footin�s are required for any deck that is attached to a dewelling or garage that has a frost
footings.
Guardrails - All decks that are 30" or more above grade must be protected by a guardrail. Such rail
shall be 36" minimum in height. Open guardrails and stair railings shall have intermediate rails or
an ornamental pattern such that a 4" diameter sphere cannot pass through.
Overhan in� Decks - Joists should not overhang beams by more than two feet, nor should beams
overhang posts by more than one foot unless a special design is approved.
Stairwav- If a stairway is to be provided, it shall be not less than 36 inches in width. 8" maYimum
rise - 9" minimum run - 6'8" minimum headroom.
Handrails - Handrails shall be provided to all stairways having 4 or more risers (private residential
only). See page 5 for more information.
Live Load - All decks shall be designed to support a live load of 60 pounds per square foot.
Flashin� - All connections between deck and dwelling shall be weatherproo£ Any cuts in exterior
finish shall be flashed or caulked.
Joist Hangers - Header joists more than six feet long and tail joists over 12 feet long shall be
supported by approved framing anchors such as joist hangers.
Wood Required-All exposed wood used in the construction of decks is required to be of approved
wood of natural resistance to decay (redwood, cedar, ect.)or approved treated wood. This includes
posts, beams,joists, and decking.
�ecial Des�n Note- Some deck designs may not be appropriate should the placement of a screen
porch or 3-season porch on the deck platform be a future consideration. Porch setback requirements
are not the same as deck setbacks.
Rec�uired Inspections:
1. Footin�s - After holes are dug, but prior to pouring of concrete.
2. Framin� - Prior to laying decking. Framing inspection may be done when
deck is complete if deck is not enclosed underneath.
3. Final - When deck is completed.
� � ��� � � � �
� � � � �
� �
• E " _---�--- --�- � -• - -•--- ----.__-..•-
� E Rai] �
. ... . _._..___ �
'_ - - - . �- . .. .
•.- - .._.._-
� . 4"' Maximum �
� •• . � . � . ..
� • ._ .. . • • •. . . , ...
. . . � .
- � Post
' au or t as any
, � i
� '1 11 cuts in .siding
�
. ; JOIST See joist :span table Ledger to be
gEqM for sizing joists same size as
DECKING See beam . ,l�ist size,
1" up to 24" 'span span IEDGER
2" over Z4" span table fo ` ; �o�sts shall rest on both OETAILS InstaTl ledger�
s i z i ng �--� , pmhp � t wi th 1 ag bo 1 ts
� bea:�s. __ that penetrate
- � � 2-1/2':. bolts. wit � into rim joist
washers (3-1/2" ' or wall studs.
bolts if beam '
ALTER��ATE members are 2x10
BEAM DETAIL or larger)
,
POST .
4 x4" up to 12'-0" Building line
beam span or 14'-0"
post ]ength. 6"x6"
over these lengt��s. Pin or other .Grade
approved fastener ' -
�
"� �
E .. Concrete Backfill material
•,- - �' o i e r
�
� ; � • Wood post
.
- 8" Minimum
N •� �
�
�,• �
-'� � g�� ,;� '• Poured concrete footi ng
� � ,., e;
� �� h�" -�
F007ING ALTERNATE
FOOTIPlG OETAIL
� NOTE: ALL t4ATERIA�S USEO FOR POSTS. JOISTS, BEAMS, ANO DECKING SHALL BE OF
APPROVEO WOOD OF NATURI�L RESISTANCE TO OECAY OR APPROVED TREATED WOOD.
�� ` '"��D D�C!;S - SA(�PLE CALCULATIO�IS FOR USI ��� iHE SPA�J TABLE
' ri�J�
d — I G�se I Solution: ReTer to taole for jcist and beam sizes .
�j
� �xample: a = 12' , Post Spacing = 8'
P.efer to the span table. Joist size may be either 2xE' s 12" G.C.
or 2x10's i6" O.C. Beam size may be either 3-2x8'x or
� 2-2x10's.
CdS2 TI Solution: Use .".a." i01" ,JOISi. SIZP dfld "d" T ��D�� i.0
ideternine beam size (The lengtn cf "b" is restricted by
,.� � �� b � both the length o` "a" and th2 size o� the joists) .
I
� cxample: a = 8' , b = 2' , Fost Sp�cing = 10'
irind the joist size required by iooking under 8 ' on ihe
I table. Joist ler.ath is indicated as 2x6' s 16" O.C. or
� Zx2's 24" O.C. �or sizirg tne bear, use a jois� ieng�h o�
; 10' (8' �- 2` = 10' ) and a ;�os� S�dC1114 c� 10' . The tabl e
indicates that 4-2x8 ' s cr 3-2x10' s are required `ar �,�;e bear��.
Case III Solution: Use "a" or "b" , whic�ever is oreater, to
dete ulfle �O1S� S �LG. USE ��d�� T ���S�� �0 dete!--;ine th� S1Z2
o� Be�� t�o. 1 ar,d use joi;� � er�th "�" to det�r;�ine the
� size o� Beam �r'o. 2. •
-- � �`- " I
� I � ^
�xample: a = 6' , b = 7 ' , Post Spacing = 9 `
i
� z ihe joist length (7 ' ) is deterired by '!�e longes� span joist
� ("b" ) . The tzble incicates t�ay 2xo's 16" C.C. or 2xo ' s 2�" C.�.
zr-e requir2d �or a 7 ' sp�n, ror E�c:�� Pio . 1 , use �ois� ienci,h
3e�:;� i 5e�n 2 - _ .
ot 13 ' (6` + 7 ' - 13 ' ) ard pes� spactng of 9' . The tabla
� ; indicates that 3-2x10's or 2-2x12's are reGuired ror 8ean ��o. i .
�or Be�,� No. 2 use joist leng�h ot 7' w�th a post swaE�ng of
9 ' . The table indicat2s tF�at 4-2x6's or 3-2x8's are
required for Bean ho. 2. --
� C�se ?V �olution: Use "?" or "b" , wnichever is greater , to
de�ermine joist s�z�. Us� "a" � "b° to deter,:,ine t�e size
of Beam ho, i and "b" + °c° to deter�ine the size or Bezm "+o . 2.
(Tne length o` "c" is restricted by bot7 th,e lergth of "b"
and the size of the jois:) . �
a I b I c
� � � �xample: a = 7 ' , b = 8 ' , c = 2' , °ost Spacir,g = 12 '
i � .
- �he 7ongest joist span is 2 ' ; therefore, the table indicates
that 2x6's 16" O.C, or 2x3's 24" O.C. are required. For
� r(o. 1 No. 2 Beam No. 1 , use joist lergth or 15' (7 ' + 8' = 15' ) ard
3eam Beam post spacing o` 12' . The tab]e indicates thzt 3-2x12 's are
required for Beam t;o. l . ror Beam tlo. Z, use joist length of
. � ]0' (8' � 2' = 10' ) and post spacing of 12' . The table
_ irdicates that 3-2x10's cr 3-2x72's ar.e required, for
. Beam tlo. 2.
HOTES : Post size must be ade�uate to provide full beam bearing , ie. , �one-member and
two-m enber beams must be placed on a 4x4 post, three-member beams must be
placed on 4x6 or 6xb posts, and four-mernber beams must be placed on 8x8 posts.
Most of the boxes in this tabl�e contain two optional means of .support. 4tood__
m snbers may be increased above those indicated in the table, but in no event
may lesser members be used.
J06S1" LEN(�TH
6� �� 8� 9� �� ll� 12' 13" 14' ].S' 16'
JOIST 2x6 16"OC 2x6 16"OC 2x8 16"OC 2x8 16"OC 2x8 16"QC 2x8 12"OC 2x10 16nOC 2x10 12"OC .
y, 'SIZE 2x6 24"OC 2xII 24"OC 2x8 24"nC 2x10 24"OC 2x10 24"�C 2x10 24"nC 2x10 l6"OC 2x12 24"OC 2x10 16"OC 2x12 16"OC 2x12 16"OC
BEAM 1 - 2x6 1 - 2x6 1 - 2x8 1 - 2x8 1 - 2x8 1 - 2x8 1 - 2x10 - 2x 0
SIZE 1 - 2x6 1 - 2x8 1 - 2x(3 1 - 2x10 1 - 2x10 1 - 2x10 1 - 2x10 1 - 2x12 1 - 2x10 1 - 2x12 1 - 2x12
JOIST Zx6 16"�C 2x6 lb"OC 2x8 16"OC 2x8 16"OC 2x8 16"OC 2x8 12"OC 2x10 16"OC 2x10 12"OC
5, SITE 2x6 24"OC 2x8 24"OC 2x8 24"OC 2x10 24"OC 2x10 24"OC 2x10 24"QC 2x10 16"OC 2x12 24"(1C 2x10 16"OC 2x12 16"OC 2x12 16"OC
. BEAM 2 - 2x6 2 - 2x6 1 - 2x8 1 - 2x8 1 - 2x8 1 - 2x8 1 - 2x10 1 - 2x10
SIZE 1 - 2x6 1 - 2x8 1 - 2x8 1 - 2x10 1 - 2x10 1 - 2x10 1 - 2x1Q 1 - 2x12 1 - 2x10 1 - 2x12 1 - 2x12
JOIST 2x6 16"OC 2x6 16"OC 2xB 16"OC 2x8 16"OC 2x8 16"OC 2x8 1?"OC �x10 16"06 2x10 12"OC
6, SIZE 2x6 24"OC 2x8 24"OC 2x8 24"OC 2x10 24"OC 2x10 24"OC 2x10 24"OC 2x10 16"OC 2x12 24"OC 2x10 16"OC 2x12 16"OC 2x12 16"OC
BEAM 2 - 2x6 2 - 2x6 2 - 2xf3 2 - 2xF3 2 - 2x8 2 - 2x8 2 - 2x10 2 - 2x10 2 - 2x10 2 - 2x10
SIZE 2 - 2x6 1 - 2x8 2 - 2x8 1 - 2x10 1 - 2x10 1 - 2x10 1 - 2x10 1 - 2x12 1 - 2x12 1 - 2x12 1 - 2x12
JOIST 2x6 16"OC 2x6 16"OC 2x8 16"OC 2x8 16"OC 2x8 16"nC 2x8 12"OC 2x10 16"OC 2x10 12"Oc
�, SIZE 2x6 24"OC 2x8 24"OC 2x8 24"OC 2x10 24"OC 2x10 24"OC 2x10 24"�C 2x10 16"QC 2x1Z 24"OC 2x10 16"OC 2x12 16"OC 2x12 16"OC
BEAM 3 - 2x6 3 - 2x6 2 - 2xII 2 - 2x8 2 - 2xfi 3 - 2x8 2 - 2x10 2 - 2x10 2 - 2x10 2 - 2x10
SIZE Z - 2x6 2 - 2x8 2 - 2x8 2 - 2x10 2 - 2x10 2 - 2x10 2 - 2x10 1 - 2x12 2 - 2x12 2 - 2x12 2 - 2x12
v JOIST 2x6 16"OC 2x6 16"OC 2x8 16"OC 2x8 16"OC 2x8 16"OC 2x8 12"OC 2x10 16"OC 2x10 12"OC
� 8, S(ZE 2x6 24"OC 2x8 24"OC 2xQ 24"OC 2x10 24"OC 2x10 24"�C 2x10 24"OC 2x10 16"OC 2xt2 24"OC 2x10 16"OC 2x12 16"OC 2x12 16"OC
U BEAM 3 - 2x6 3 - 2x6 3 - 2x6 3 - 2x8 3 - 2x8 3 - 2x8 3 - 2x8 2 - 2x10 3 - 2x10 3 - 2x10 3 - 2x10
SIZE 2 - 2x8 2 - 2x8 2 - 2x8 Z - 2x10 2 - 2x10 2 - 2x10 2 - 2x10 2 - 2x12 2 - 2x12 2 - 2x12 2 - 2x12
aJOIST 2x6 16"OC 2x6 16"OC 2x8 16"OC 2x8 16"OC 2x8 16"nC 2x8 12"OC 2x10 16"OC 2x10 12"OC
� 9� SIZE 2x6 24"OC 2x8 24"OC 2x8 24"QC 2x10 24"OC 2r.10 24"OC ' 2x10 24"�C 2x10 16"OC 2x12 24"OC 2x10 16"OC 2x12 16"OC 2x12 16"OC
BEAM 3 - 2x6 4 - 2x6 4 - 2x6 3 - 2x8 3 - 2x8 3 - 2x8 4 - 2x8 3 - 2x10 3 - 2x10 3 - 2x10 3 - 2x10
SIZE 2 - 2x8 3 - 2xQ 3 - 2x8 2 - 2x10 2 - 2x10 2 - 2x10 3 - 2x10 2 - 2x12 2 - 2x12 2 - 2xi2 2 - 2x12
~ JOIST 2x6 16"OC 2x6 16"OC 2x8 16"OC 2xf3 16"OC 2x8 16"OC 2x8 12"OC 2x10 16"OC 2x10 12"OC
�� �, SIZE 2x6 24"OC 2x8 24"OC 2x8 24"OC 2x10 24"OC 2x10 24"�C 2x10 24"OC 2x10 16"f1C 2x12 24"OC 2x10 16"OC 2x12 16"OC 2x12 16"OC
BEAN 4 - 2x6 3 - 2x8 3 - 2x8 3 - 2xf3 4 - 2xE3 4 - 2x8 4 - 2x8 3 - 2x10 3 - 2x10 4 - 2x10 4 - 2x10
a SIZE 3 - 2x8 2 - 2x10 2 - 2x10 3 - 2x10 3 - 2x10 3 - 2x10 3 - 2x10 2 - 2x12 3 - 2x12 3 - 2x12 3 - 2x12
JOIST 2x6 16"OC 2x6 16"OC 2x8 16"OC 2x8 16"OC 2x8 16"OC 2x8 12"OC 2x10 16"OC 2x10 12"OC
ll, SIZE 2x6 24"QC 2x8 24"OC 2xQ 24''OC 2x10 24"�C 2x10 24"OC 2x10 24"l1C 2x10 16"OC 2x12 24"OC 2x10 16"OC 2x12 16"OC 2x12 16"OC
BEAM 3 - 2x8 3 - 2x8 4 - 2x8 4 - 2x8 3 - 2x10 3 - 2x10 3 - 2x10 4 - 2x10 4 - 2x10 4 - 2x10 4 - 2x 0
SIZE 2 - 2x10 2 - 2x10 3 - 2x10 3 - 2x10 2 - 2x12 3 - 2x12 3 - 2x12 3 - 2x12 3 - 2x12 3 - 2x12 3 - 2x12
JOIST 2x6 16"OC 2x6 16"OC 2x8 16"OC 2xQ 16"OC Zx8 16"OC 2xf3 12"OC 2x10 16"OC 2x10 12"OC
�, 2x6 24"OC 2xf3 24"OC 2x8 24"�C 2x10 24'�OC 2x10 24"OC 2x10 24"OC 2x10 16"OC 2x12 24"OC 2x10 16"OC 2x12 16"OC 2x12 16"OC
DEAM 3 - 2x6 4 - Zx8 4 - 2x8 3 - 2x10 3 - 2x10 4 - 2x10 4 - Zx10 4 - 2x10
SIZ 2 - 2x10 3 - 2x10 3 - 2x10 2 - 2x12 3 - 2x12 3 - 2x12 3 - 2x12 3 - 2x12 3 - 2x12 3 - 2x12 3 - 2x12
JOIST 2x6 16"OC 2x6 16"OC 2xf3 16"OC 2xf3 16"OC 2x8 16"OC 2x8 12"OC 2x10 16"OC "-""'� 2x10 12"OC
�, SIZE 2x6 24"OC 2x8 24"OC 2x8 " 2x10 24"OC 2x10 24"OC 2x10 24"(1C 2x10 16"OC 2x12 24"OC• 2x10 16"OC 2x12 16"OC 2x12 16"OC
4EAM 3 - 2x8 4 - 2x8 3 - 2x10 4 - 2x10 4 - 2x10 4 - 2x10
SIZE 3 - 2x10 3 - 2x10 3 - 2x12 3 - 2x12 3 - 2x12 3 - 2x12 3 - 2x10 3 - 2x12 4 - 2x12 4 - 2x12 4 - 2x12
- , JOIST 2x6 16"OC 2x6 16"OC 2x(3 16"OC 2x8 16"OC 2x8 16"OC 2xf3 12"OC 2x10 16"�C 2x10 12"OC
. ly, SIZE 2x6 24"OC 2x8 24"�C 2x£3 24"OC 2x10 24"OC 2x10 24"�C 2x1Q 24"�C 2x10 16"OC 2x12 24"OC 2x10 16"OC 2x12 16"OC 2x12 16"OC
4EAM 4 - 2xQ 3 - 2x10 4 - 2x10 4 - 2x10 4 - 2x10 ENG. BEAM ENG. BEAM
, SIZE 3 - 2x10 3 - 2x12 3 - 2x12 3 - 2x12 3 - 2x12 3 - Zxl2 4 - 2x12 4 - 2x12 4 - 2x12 REQUIRED REQUIRED
. �his table is based on the use of Ponderosa Pine No. 2 or better (treated for weather and/or ground exposure).
.� Acceptable Handrails - ali others must be approved by the
inspector.
11/," to 2° 1��z,; 11/.'� 1 ��2„
MIN. t� 2" MIN.
1 „2„ ��/�� to 2��
MIN.
���� 3�/z" MAX.
,�
�\2
�
�v CV
� O
�Z
��
NOTE:
OTHER SHAPES MAY BE ACCEPTABL.E
IF THEY PROVIDE AN
EQUIVALENT GRIPPING SERVICE.
SEE THIRD PARAGRAPH OF
SECTION 3306 Q).
NOT ACCEPTABLE
Handrails are required on interior and exterior stairs with 4
or more risers .
Handrails shall be placed not less than 34 inches or more than
38 inches above the nosing of treads . They shall be continuous the
full length of the stairs . Ends shall be returne� or shall
terminate in newel posts or safety terminals .
The handgrip portion of handrails shall be not less than 1 1/4
inches or more than 2 inches in cross-sectional dimension or the
shape shall provide an equivalent gripping surface . The handgrip
portion of handrails shall have a smooth surface with no sharp
corners .
Handrails projecting from a wall shall have a space of not
less than 1 1/2 inches between the wall and the handrail .
%
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED r�� /U�3o `^1
PERMIT NO. >>C��/� ��J coMP�Fre� � /'CO--a/ /�.� ;�
ADDRESS �� �X�
OWNER� �; ���%a�� CONTR.� �►v� a�..��e,—
TELEPHONE NO. �.S o� y�� ��� �-�ri
� DESCRIPTION � ' C�`'�- ��
l� G 11 MECHANICA I 18 EXCAV/GRADING/FILIING
02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y IGN 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP O6 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
� 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
? 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU: YES_NO
� COMMENTS:
�
W
C
�
�
O
�
�
O
�
W
�
Q
�
Z
W
�
W
�
�
� �ORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
� �CORRECT WORK,CALL F�R AEINSPECTION TEMPORARY
� BEFORE COVERING
PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. p pHOTOTAKEN
INSPECTOR WILL REfURN
❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. �95Z� Z49-46��
OwnedContracto site:
Inspector. ���L C��'4_ ��� �
�
White Copyllnspector's File Canary CopylSite Notice
� DATE TIME
CITY OF ORONO • CALIED IN
INSPECTION TIC SCHEDULED ��� 3 U/ _�j -�V�
PERMIT NO. COMPLETED
ADDRESS �� �� ��� �
OWNER �-���CONTR. -�`'�-'''•���
TELEPHONE N0. `�S� �� ( 73—3 / S��
� DESCRIPTION G'���
� 01 FOOTING 11 ME NICAL RI 18 EXCA�//GRADING/FILLING
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
� 04 WALL BD. 12 WATEFi HOOK-UP 17 SITE INSPECTION
Z
Q OS FINAL 14 SEWER HOOK-UP O6 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
v 07 pEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
? 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
� OWNER/CONTRACTORTOMEETYOU: YES NO
� CQ�M�f�TS:
� !�] / � !_-�_ � <. L_
y ` (�����` ` L, / '�° � i �, !a�_ � , 1
� —
J
O
�
�
O
�
W
�
Q
�
Z
W
�
W
�
�
d
W ❑WORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLEfE
� •�CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
W
� �CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
� BEFORECOVERING PERMANENT
❑CORRECTUNSAFECONDITION WITHIN HOURS. � pHOTOTAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. �95Z� Z49-460�
OwnerlContractor on site:
� ��<''-�� -
Inspector.�. � �
White Copyllnspector's File Canary Copy/Site Notice
��� DATE TIME
CITY OF ORONO CALLED IN � �
INSPECTION N�T/,ICE , i / SCHEDULED
PERMIT NO. ' v �"��lD COMPLETED
ADDRESS �.�' �� �-2tr 1'1C���-'� � 1� '
OWNER �. . ��(L(' (��'�� CONTR.
TELEPHONE NO. C��J�- � � � 3J 3c� � Z
� DESCRIPTION � �" —�i I'`�--C �
� 01 FOOTING 17 MECHANICAL RI 18 EXCAV/GRADING/FILLING
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
� 03 INSULATIGN 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
� 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
= 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
� OWNERICONTHACTOR TO MEET YOU: YES_NO
� COMMENTS:
�
W
�
�
J
O
>. — ��
� �
O
�
W
�
Q
�
Z
W
�
W
�
�
�
d
W� ❑WORK SATISFACTORY:PROCEED ROJECT COMPLETE
W ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
p ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. p pH0T0 TAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Call for the next inspe n 24 ho ance. (g52) 249-4600
Owner/Con r on site:
Inspector.
� e Copyflnspector's File Can Copy/Site Notice