Loading...
HomeMy WebLinkAbout2016-00507 - shed � CITY OF ORONO * Z 0 1 6 - 0 0 5 0 7 * , 2750 KELLEY PARKWAY DATE ISSUED: 07/OU2016 ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS : 627 FERNDALE RD N PIN : 36-118-23-11-0029 LEGAL DESC : LAURENT ADDN : LOT 000 BLOCK 001 PERMIT TYPE : ZONING PERMIT PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : SHED< 120 SQ FT NOTE: MANUFACTURED SHED 8'X 12' NOTE: WH FI L INSPECTION IS COMPLETED PLEASE CONTACT ME SO I CAN START THE ESCROW REFUND PROCESS. INITIAL: � �, APPLICANT STRUCTURE PERMIT 50.00 TOTAL 50.00 KENNEDY, STEPHEN Payment(s) 627 FERNDALE RD N CHECK 11229 50.00 WAYZATA, MN 55391- OWNER KENNEDY, STEPHEN 627 FERNDALE RD N WAYZATA, MN 55391- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of l80 days at any time after work has commenced. The applicant is responsible for assuring all requir inspections are requested' c nformance with th $tate Build' Code.This permit may be ked a an time for due caus � � � �� , , /� c°� �c ��r l' � � 7`� � � � � pli e ' e Signa re > Date Issued By Signature Date City of Orono Zoning Permit Application O Mailing Address: Permit number: �G��P—��/ cJ�� ` A /�rO PO Box 66 Date received: "'� � — ��p I 1— ` v Crystal Bay, MN 55323-0066 Escrow#and l! Z� Street Address: amount: 2750 Kelley Parkway � y ; Orono, MN 55356 Permit Fee: �! �,�' Approved by: �KE S H�� Fax: 952-249-4616 Main: 952-249-4600 Notes: waniv a orono mn us This application form must be completed in full and all required information must be submitted. (Please print.) Job Site Address: 627 Ferndale Road North, Orono 55391 CONTRACTOR/APPLICANT INFORMATION: Name: Stephen Kennedy Phone: a�a s�a osaa Fax: ACId�@SS: 627 Ferndal Road North City: orono ZIP: 55391 COIItaCt P2fSOIl: Stephen Kennedy ContacYs phone number 414 614 0644 Email sckennedyo8@gmaii.com Applicant is: Contractor Homeowner (Circle One) PROPERTY OWNER INFORMATION: Name: Stephen Kennedy Phone(day): 414 614 0644 MBiling Add�ess: 627 Ferndale Road North ZIP: 55391 Email and/or Fax sckenned O8 mail.com Overall Project Description: q� Check TYPE OF PERMIT FEE Box collected when ermit is issued Dock, Commercial $50+engineering review costs Escrow for erosion control and en ineerin review costs $2,000 Dock, Residential — Permanent dock on any lake or initial seasonal dock not on Lake $50+engineering review costs Minnetonka ermanent dock re uires CUP Hardcover Permit: Driveway, Patio, Sidewalk,etc. (New or Replacement) No charge Also re uires is a Minor or Ma'or Land Alteration Permit Land Alteration, Major (grading, filling, or excavating) of more than 500 cubic yards $50 beyond the lakeshore setback OR more than 50 cubic yards within the lakeshore setback (also requires Conditional Use Permit) (Reference: Citv Code Sections 78-967, 78-1247 and 78-12861 Escrow for erosion control and engineering review costs As determined b CUP Land Alteration, Minor(grading, filling or excavating)of 51 to 500 cubic yards beyond the $50+engineering review costs lakeshore setback OR 50 cubic yards or less within the lakeshore setback lReference: Citv Code Sections 78-967, 78-1247 and 78-1286] Escrow for erosion control and engineering review costs $2,000 Retaining Walls which exceed two feet in height above existing grade; or result in more $50+engineering review costs than 20 cubic yards of imported fill; or are located less than five feet from the property line. Escrow for erosion control and engineering review costs $2,500 (Reference: Citv Code Section 78-1405(5.1)1 Retaining Walls which measure more than four feet(from bottom of footings to top of wall) require a building permit. Tiered retaining walls are considered one wall unless the walls are se arated b twice the hei ht of the lower wall. Stairway or Lifts to Lake(New or Replacement) fReference: Citv Code Sections 78-12821 $50+engineering review costs Escrow for erosion control and engineering review costs $2,000 Structure Permit for other structures 200 sf or less not requiring a buildin ermit but $50+engineering review costs X regulated by the zoning code Reference: Ci Code Section 86-66 _1 Escrow for erosion control and en ineerin review costs �C1 $2,500 Tree Removal or other vegetation removal within 75 feet of lakes No charge. Reference: Cit Code Section 7s-1285 Pre-inspection required. Tempora Construction OfficelTrailer(associated with buildin permit) $30 Updated: May 2015 APPLICANT/OWNER ACKNOWLEDGEMENT: . ApplicanUOwner agrees to provide all information required or requested by the Planning Department; • Owner agrees to pay the City of Orono for engineering consultant review costs where applicable; . ApplicanUOwner certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative but to reject it until it is complete; • Applicant acknowledges the attached Escrow Agreement is completed and signed by Owner; • ApplicanUOwner understands their project may require an initial andlor as-built survey per City Code Section 86-68. • Some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If ou refuse to su I the information, the a lication ma not be issued. The undersigned certify that the information suppl� d is true and correct to the best of their knowledge. Applicant'sSignature: 4�w Date: � �- `7 ' �� Property Owner's Signature: 't�Y,. Date: s -- f —�� SUBMISSION REQUIREMEN Except for tree removal permits, all permits require a completed TYPE OF PERMIT: application form, escrow agreement (signed by the property owner) and escrow check from owner, two copies of each,where applicable, plans, landscape plans,grading plans,surveys or site plans. DOCk,COmme�Clal 1. Structural plans for the dock 2. Survey/site plan showing the proposed location of the dock 3. Copy of LMCD permit DOCk, Residential Seasonal Dock—survey showing proposed dock Permanent Dock—plans as approved b CUP and cop of LMCD permit(if applicable) Hardcover Permit 1. All Minor or Major Land Alteration Permit requirements apply as appropriate 2. Hardcover calculations,existing and proposed 3. Survey Land Alteration,Major 1. Surveylgrading plan including existing and proposed contours as approved by Conditional Use Permit 2. Erosfon control plan. 3. A copy of Minnehaha Creek Watershed District(MCWD)permits or documentation from the MCWD stating the proposed project does not trigger any of their permitting requirements. Please note,the City will not issue a buildin permit without information from the MCWD. LBnd AlteratiOn,Minor 1. Survey/grading plan including existing and proposed contours 2. Amount of fill to be imported and/or exported and haul route 3. Amount of earth to be moved around on site 4. Erosion control plan. 5. A copy of Minnehaha Creek Watershed District(MCWD)permits or documentation from the MCWD stating the proposed project does not trigger any of their permitting requirements. Please note,the City will not issue a buildin permit without information from the MCWD. Retaining Wall 1. Plans for wall(s) 2. Unless repair or exact replacement of existing wall,submit an updated survey with grading plan including existing and proposed contours 3. Hardcover calculation worlcsheets if in shoreland district 4. Erosion control plan 5. A copy of Minnehaha Creek Watershed District(MCWD)permits or documentation from the MCWD stating the proposed project does not trigger any of their permitting requirements. Please note,the City will not issue a buildin permit without information from the MCWD. Stairway O�LiftS to 1. Construction plans for stairway or lift,including footings Lake 2. Topographical survey of property with proposed stairs or lift shown 3. Erosion control plan 4. A copy of Minnehaha Creek Watershed District(MCWD)permits or documentation from the MCWD stating the proposed project does not trigger any of their permitting requirements. Please note,the City will not issue a building permit without information from the MCWD. Structure Permit 1. Construction plans. 2. Survey/site plan of property with proposed structure shown and with setbacks to property lines,other structures on property and the septic system indicated.The general Iocation of any sewer and water services should be shown if applicable. 3. Grading plan if grading is proposed. 4. Hardcover calculation worksheets 5. Erosion control plan. 6. A copy of Minnehaha Creek Watershed District(MCWD)permits or documentation from the MCWD stating the proposed project does not trigger any of their permitting requirements. Please note,the City will not issue a buildin ermit without information from the MCWD. Tree Removal Call: 952-249�600 to schedule an inspection for removal of an individual tree(s). A re-planting plan/erosion control/ mana ement lan ma be required for clear cuttin ,buckthorn or other intensive ve etation removal. Updated: May 2015 PLAN REVIEW CHECKLIST FOR ZONING PERMIT APPLICATIONS Address: UJ �� Description of work: Type of permit: Zoning review by: _ Date Approved: � �� L�'l� Grading review by: Date Approved: —� Other Review, Reviewed by: � Date Approved: — Zonin Information: Zoning File#: Resolution #: Resolution Date: Lot Area: SF/AC Width: Depth: Survey Submitted? Yes 0 No Date of Survey: Revision date: Existin Setbacks: Front(Lake) Rear(Street) ( N S E W ) ( N S E W ) Other Buildings Wetland Side Side Pro osed Setbacks: Front(L e) Rear(Str t) ( N S E W ) ( N S E W ) Other Buildings Wetland Side Side Shoreland District MCWD Permit Received Average Lakeshore Setback Met? Bluff 0 Yes � No N/A � Yes No �Yes � No � Yes 0 No N/A Permit Number: Setback: Stormwater Quality Existing Proposed Variance Required CUP Required Overla District Tier Hardcover Hardcover IZ(�� ` Z�►'7b � Yes o 0 Yes No � Type(s): Type(s): � �. ( � � ��� � � ��� File# File# Updated:January 2013 z:\forms\plan review checklist for zoning permit applications 2013.docx � Earth Movement -Cubic Yards In Out Total Haul Route? ? � Yes � No Explain haul route in detail: � Fees to be Char ed Amount Orono Inspections Required Permit Fee Amount � � Site � Hardcover Removal Escrow Amount ./ ��(� p Footing U Escrow Agreement received? 0 Poured Wall 0 As-Built Survey �es 0 No � Planting Plan 0 Wetland Buffer Escrow Money received? Final 0 Yes jd' No � ther(specify) / Engineering review needed? � Yes No REMARKS (in-house): Other Review: Reviewed by: Date Approved: REMAR (TO BE NOTED ON PERMIT AND INITIAL ED BY PERSON PULLING PER IT) _ �� �� Updated:January 2013 z:\forms\plan review checklist for zoning permit applications 2013.docx � Christine Mattson From: Christine Mattson Sent: Tuesday, June 28, 2016 9:53 AM To: 'Stephen's Mail' Cc: leremy Barnhart Subject: 627 Ferndale Road N /#2016-00507 Stephen, The zoning permit application for your shed is ready to be issued. When you come in to pick up the permit piease bring along a check for$750($50 for the permit fee and $700 for escrow). Please note our summer office hours below. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway # Orono e MN ; 55356 (physical addressJ PO Box 66 '�.;: Crystal Bay '. MN � 55323-0066 (mailing addressJ 'R 952.249.4620 ' 8 952.249.4616 � cmattson@ci.orono.mn.us ; � www.ci.orono.mn.us Summer Office Hours: (Monday, May 23 through Friday, September 2, 2016) Monday-Thursday: 7:30 am to 5 pm Friday: 7:30 am to 11:30 am OUR OFFICE WILL BE CLOSED: Monday,Ju/y 4, 2016 1 PLAN REVIEW CHECKLIST FOR ZONING PERMIT APPLICATIONS Address: � ��� T l..f ��/,�. ��-�-� I `� �-1,J�� �W�7 Description of work: �P,-Wr�vl� ��(.��VU �$ Y�Z- 1 q�0 SQ t'CPiC � ��I'��Q �. Type of permit: Zoning review by: Date Approved: i Grading review by: Date Approved: � Other Review, Reviewed by: Date Approved: f Zonin Information: 1� " (� Zoning File#: Resolution#: Resolution Date: Lot Area: SF/AC Width: Depth: Survey Submitted? � Yes � No Date of Survey: Revision date: Existing Setbacks: Front (Lake) Rear(Street) ( N S E W ) ( N S E W ) Other Buildings Wetland Side Side Proposed Setbacks: Front (Lake) Rear(Street) ( N S E W ) ( N S E W ) Other Buildings Wetland Side Side Shoreland District MCWD Permit Received Average Lakeshore Setback Met? Bluff 0 Yes � No 0 N/A 0 Yes No Yes � No 0 Yes � No �N/A Permit Number: Setback: Stormwater Quality Existing Proposed Variance Required CUP Required Overla District Tier Hardcover Hardcover 0 Yes No 0 Yes No � Type(s): Type(s): File # File# Updated:January 2013 z:\forms\old stuff�plan review checklist for zoning permit applications 2013.docx � a ;c � p � m m � m = rn � o�- m 3' m ' n � a c � � � � � � � �• cmn v�i � 3 v � 3 o a � � � c�e o o � � � °c � �; � < � = � � D m w � cn � � � � c � ` v c� = cc � D o D �J A �,z � � �� � a cfl � -, 3 '. v j 0 �- � � � � � � ° �'' � � � w oo � � �• � 3 " � � m p ,� � � � F� Z m' °- 3 � ' � � a m ' c � � � � �� � � � � � m m o. Q � c�i c� � n � fp � N 3 � � Q `� � Q � .J 0 C�D � � � tQ o Z � � � � Q Z y N � � � � O p m cn tn cn �' � � � m � � 0 0 � D � p o 0 0 � �� Z v � � D D `� r � � r c W v ' a � � 0 C � v '� rn �, � � O D z � -D � c < � � 0 � � 0 � � � r r a p � g � D � � = cn � � fA O O � — O +n � � � .�-h � � �• fl- � Q min a ca ,_; fl' �° ° � � � � � � � `� � 3 � � v c �' � m � v m � � m .��, � � o 0 < � v y — � �D C � � O Q � 5I8/2016 Everton 8 ft.x 12 ft.Wood Storage Shed , Home Furniture,Home&Patio Patio Sheds&Barns O�O NO COPY w , '�;�:'.. � �� � " Everton 8 ft. x i2 ft. Wood Storage Y�� � � t Shed . __ : Features:Solid 2"x 4"Wood Framing,740 Cubic Feet of Storage,Pre-cut and Ready for Assembly � �� ► �� �.,.. � Compare product 1m.�o::,;. .,� � ; • 3"" ****�k write a review Stonecroft 12'x 10'Wood ���.._. Storage Shed .�� � Share This Product: Print this Page �t*.. -,. (17) � � ` $2,599.99 � '� item tt596416 a,' 4:� _ . � $1,499.99 � Your Price •-.- i Shipping&Handling induded" ,.}.,. �� '� x_.—� . ' �s�.«:�. QUANTITY 'I .. '.':� �'`.`: �_... :. � �'.w; . " , Add to Wish List ' � ": ` �� � �« � ��-' '.� �a►._. _-- Assembly Manual ~ �, &�, �-n,,...r. Lif� t.x 15 Spxifications Shipping 8 Terms Returns/Warranty Reviews ft. Stv�age Slieu �'#4�ri:r R5) BEFORE ORDERING-Be sure to check your local building and zoning codes to ensure that atl appropriate $1,399.99 permits have been acquired. Always check with your local building auchority 8 homeowners association for any restrictions/requirements before finalizing your purchase. At this time orders for this item cannot be detivered to Florida addresses Paint and shingle to match your home or suit your taste(paint&shingles shown,but are not included) '`�C�,�� It is recommended that all seams be sealed with caulk prior to painting D MA� j 7z01s Product details have been supplied by the Manufacturer,and are hosted by a third party. CI, r OF QR AI Stylish,Functlonal,and Affordable O/YO The Everton storage building by Yardline offers the space you need and the styling you've been looking for.The Everton is an 8'x 12'building that features an extra talt 10'roof peak creating storage space rarely seen in a gable style unit.The steep roof pitch and extended overhangs provide a styling normally found only in expensive custom designs.The double doors on the Everton are 28"wide creating a 56"opening that atlows access for virtually any riding tawn mower.A transom window and decorative strap hinges add dass and elegance to the front of the Everton.Style,Versatility, Fundionality and Elegance are just of few of the adjedives that dexribe the Everton by Yardline. Everton 8x12 Wood Storage Shed http://www.costco.com/EvertorrB-R.-x-12-ft.-Wood-Storage-Shed.product.11672496.Mm1 �/g SURVEY FOR: S'EPHEN �(ENNEO� � pROPERTY ADDRESS: 627 Ferntlale Roatl No�tr, ;)ror.o, M!��eso!-: DE�CRIPTION�. ����� PARCEL C: That part oi _ot 1, Block 1, LAURENT ADDiT10N, adescribea as foilows: Beg�nning at the northeast corner of Lot i p ��� on on assumed beoring oi South 89 degrees 58 minutes 33 secontls West, o distance ot 53.86 teet tnence South a �egrees 28 mmutes 8 s c ds West, o distance of 237.00 feet; therce Soutn 34 degrees 28 minutes 58 seconds Wesl, o distance of 59.46 feet co the so�th i;ne o! sa�d �o: ' tnence North g9 degrees 59 minutes 30 secontls Eost olonq said south �ine, a distance of 83 68 feet to the southeost comer of so�d :ot '; tnerce North 4 tlegrees 28 minutes 58 seconds East, aionq tne east :ine o� soid Lot 1, o tlistance of 286.17 feet to the point of peg�nn�ng. PARCEL D: Thot part ot Lot 2, Biock 1, ��AUREN? ADDITION, except thot part descr;bed os foilows: Commencmg ot the northeast corner of �ot 1. Biock +� LAURENT ADDITiON; thence on on ossumed beoring of South 89 tleqrees 58 min�tes 33 secontls West along the �ortheriy line of saG Lot ', a d�sta�.ce ot 53.86 teet; thence South 4 degrees 28 minutes 58 seconds west, a distance of 237.00 feet; tnence So�th 3a degrees 28 minutes 58 seconds West; o d�stonce of 59.46 feet to the south line o� so�.d Lot 7 ond the Dolnt of beginning of the tract oi olnd to De aescribetl; thence continuing South }4 deqrees 28 minutes 58 seconds West, a tlistance ot 708.31 feet; thence South 89 tleq�ees 59 minutes 30 seconCs west, a aistance ot 69.28 feet to 0 westeriy iine ai so�tl Lot 2 be�ng 225.59 feet in iength; tnence North a degrees 28 mir,,,�es 58 seconCs East aiong soid westeriy ��ne a distance o' ?8 58 feet to an ong�e point in sad westeriy iine; thmce South 89 oegrees 59 minutes 30 seconds West �long a soutneriy ,,ne of so�tl �ot 2, o tl�stonce of 108.56 teet to the most wester�y comer oi said �ot 2; thence Norte 8 tlegrees 54 minates 33 seconds ;.es! a,ong the most westeriy iine o� Lot 2 a alstancr oi 7� 51 teet to tne so�tnwest co��e• �� so:a ..o: '�, ;nence Nortn g9 �eg�ees 59 minutes JO secx es �ost aiong the so�mery �ine ot sa�tl ��ot , a tl�sta�ce o� :26.6a +eet ce r�.e oo�nt o' oeg:��.n,�,g. 589'S8'33"W ��,�r� 10000 -1 ' Base survey Informafion provideC by Egan, Fieltl, ana NowaK ���.nc. V i 2. Wetiantl bountlary anC type as dN�neotetl Oy Antlerson Engineerfng, � wos opp.oved by Minnehaho Creek Watershetl Distric? May 12, 20t6. I �^���� I� �J , �. 3 — , �o �o �� ;�n Y N N � r N� 'C, W �ry �aw �n U 1 H; � � Q a _ _,�1 _ ___ _ _ ,0y�3� � � �. �.__ ..-. .._ .. ` yh . - - � r�£ '. •:� • - O + � ; �••, a.r . f Y / � � � _ ' � �� u��.+o.0 p,e a. . . V89'S430"E ♦♦♦���,,,��� °00 �...� �-.� ....` 69.28 � ' ?�.�ae"a 7C� ,,v�'''�' � � S , � Y � ��~ Co'.o-`, _ ryQ � H :•"""'""""- 11 m 0 / S �.� .� �\ .. vC. r.ti •� SJ� _ ••` `, r c�. � `} Dslineated Wetland \' __._.__, ���^ Type 2 ��..----- \ i� �. ,'•�`.- ,o m "_'._ �N . :1'� �_'. � � 255'C . . - . • 586'22bCw .L ANDERSON "'°"°°�°"'^�^°��� �«�,•,�,..w.�,. F���e s s�s�so,s �■r-ENGINEERING � 627 Ferndale Road North —,-r w sw� WeUsna Delinaetiwt . • ��:,��.,,�e�,,,:,ao, Orono,MN , . . .. . . ._ .. „. . Kannetly Parcel AE#14370 bepinn�ng. .--�o it. puw�cc u+o unm ewso�+r � S89'Se'3rW was prepo�ed by me or under my _ • � ��� n a duty Regiatered Lond Surveyor _ _ _ — — ' � ��'� � � � � Minnesoto. i ( 8` ,� � ; � �` ! V/�J it ` � : � � � , o � t i � }--:--, � � ��- � � � � b � � � � bY-- ----- ' Jack Bolke ,. 1 h ' � , Minnesota License No. 20281 'i`��� ,� � � tem is bosed on the eost line �� � �`' � IOIV which is o�sumed to hove a � W� '� � inutes 58 seconds West. ' � ������� t � � " � I OI e preporation ot this survey to � �$ �_� {^ � �f � � existence of any eoseme�ts or I I�� /�/1 �N -� � f� � �„ � �.�� � � � �reon is 90,265 aquare feat or � � ��'.�� 1 � RECEIVED �- ��-�aa� � __ � � �.ti;_�., , -_, � J �, �i '��- � MAY 1 1 ?_Q 16 �� '1� ,� � � � ! �� � . ; � � �' r CITY , �ea, � �� i� ( ; �t� OF ORONO , , -y� � . � � � _ ------- ' V' / I f� '_•�o------------ � �f � � � �'� � y /r ! ; ,; �F�LL'!+G : � / J/ + ` �� ' � � / I 1 S— � � , `. �� �O� �J � � Z ���23v3'Z v � f'� � y z -S F1. pRA1NACE ANp UT1Utt EASEYENTS-� ,�'�+s h� � 0 / �p � D� E' -- - ,SS - - - - - - �,�— �—' "S'L�^1l ��� ,'� � � �7 �`-SOUTH LINE OF l0T 1 T a'�^ -- 83.68 -�"� � g1� � i �1b ,,�p / ' ��' �t -�-----na.i----- (_ yj` ,cb �,, 1 1� � • � , � , oa : ' ^ �i_� �L] ' ' '•T��_ �''j� �a io� � �� • 9 M.a , z — — — — �'� �'S � 2-SOMEit�c� � � i D� i — � . ,y. � � . �rt�smM[na° � N89'S9'30'E /� '�}� / ��.. --s�.- � �•_ iOUND utoN•- _ 69.T8 - .i � �" � •° s'o ,' �;�'�0'�,�' � � ,�� ,, , �; � ,�s°' � /. � � � ' , ; 11• �'� 3 , � � � W � ;--- _ � �/ ..�. � I � , ,-1 ,��� '� ��� �' � i 5►� ��/ W --L � ; N o � �- � ;' � , s,b � � � � �m � � �, •-- � .��k '�e'o � �� � _ ?9_�� � ` `— ` ,��C � •��' 4 � ,_ , � '•,�_�p�C sE,s�« ur�Es--, �.. , � R � _ _ _--- - ' -'�.T- � ��� � � 4 �TM $ �,�,�T---- $� : a�v+�+�cE , -_�,__. S� , 'd • . : , , — � �o wa+ . __�. � : ----- � % � 255.20 � �-------- sea7�'�"w � "Y , EGAN, FlELD B���IOWAK tNC.��4�s. we�°c�$4: . s�.V�oRs _s�s,���� J�,: :� � � }'.y� ' "4 � � ��.� n��Y� S '� . +� �9i�:� - r' 'q� �' � J. ',��z n - .. �� �. � �� 1 � �� tt�� �� �+, . I � u . � ,��� ,� t �`�� � � � � �''`� �� .�"� ��;l ��..��-;.�"»aw�^rt'"s�.."',+�,, � �`��k�� ,.r�"�4s �.,�.,, f„ky„ �dHR""` . �y.. ^' s4s F,4,'1 �.�.� . . � 4 � y'€� w:�+, +iil. >'�6: /�r �:3R"^��R��'�rya" _.. �7 ' � �� �. a �:!� �+�'�����r�{� s , � �d�+ �V��"�5�,h'� v "" _ �`� �a r _w., , ! �.. � . ��� wi1��`�� p,��\V ���� � '�. ' y � K � II�I ! ��FI II� ����:� ,�, l'. . ��N �a:.ly "?'y.�� � Y G- � ��` . S.��y'g���, . q� 5•.."r7. ..�,.'��.y, .F�<` °v>�� +:�".+ .4: � �. �.us*, !±� �"�.x " q� p�� 3 �"q � } ` F � � � {` _ � � � . �a _,. 7�a.�� .: .� 4 w^��.�'`� '� � � �,� .` ..�, '�'ie �' e�. � fi a ,�a � , g ��x �� � ;�, �' *p � `,� � a � ��> `� ` � � � � '���'�n � � ��� `� . �� � �-..�' ` � Ms ,� �< ,� � � 7r +, � . � „� �q� t � } �' �. . '�r.�r ,. 3, , , ���us d�` n�'� r � r az, xa; � . � � -- - .�' �p g � :. .n. �,�' �,�, � � e+a�� .. ��., _,. �,� .. *� ,� .� ��� � �� .t� ri. '� xr,�, KT��a,' ,n' .� . R cyM i �,,,� �`��`_" �� � � *o" �' az i5S � �i � 4�w� '��»��h'' � y� � � e i ��� �s, , � �, > . � �r �c .. a{�` i t. ,` � e s. "# �"� � °� a . .d y��m�� r � �. x'�� ,���, �a .kt �w `"�� � ' � '�s� `�� i'� r �.�> � � �, ,4 �% x ��}� d, � j p:,`I'4p� d' � M y' u� > e, �q- �� `��#e .,�� ,a �dd'' . � �� �,�r Ar,���`;�4. '��- e<+�d' .� {Xf 1��' � i� T : p - `'�. '���? a, � � ,'�'� �� � J�# r M' . . � X �. � '�`t �,� �;�� � ,�n ` ^ � s .. ;� .. � � s` � � � +} � � '�" *��" � �g; � : . .� �F: i .�i" �� m:�� �� � �"; �` �F � � ;�, � �� "� �.' ,5,� � �� �` ;��, a ' ` �'{�� �` r .r�, �a�i Y 44d T �f A �4 N^ �, . �:Irn � YIWi3# yY �'`+�`s . +�y�.�F� '�'�P� G ti i p�. � '�� 1 -k � �#`b 1KK� ..� '�, �,-,J `+, � . ,� "�' ,'-+�r' � '4 A� h t: � .��•"9 x I " '�'I "i'�t`�F fy�, 2�,�. 4 � � . ^.� � ��� � y�r.' M .! � ��r,� ..� , ,'�� � ��+�'nes1A� ,� �1;' ���..�k. t¢ ��R rk� � � � .��F� ��L.�� � �.� ����� ,� "-� . � ' ' . � ' "".� ` * � � u, � '�� ;�+�. �y �y . a e � �i �' ��� :'��t � `�����k���'� �,, ��F,; �'������' � � ° ` �� +t7' Ky � � ,� �', �y^,'��„ � w rr r �`� - . ,� `��� 0.W��.� r�+§� �..� ��,. K�, w , ti: �{�,�f+� '`r x�., � ��� �.� �. �" � .. ,� °' °` �z x,� t "r �` r 4� �. � � � � �4� 5�.� �6�9 p,r t S.� � .k F 4f.: 5�:4� �v :i� ` ,.,�'�k. � �r �� '� . a�`'�`�t '�.�r �br��x . �i� � o- $� ;.: � � � a1 s �, ���a�,,"�"�� ,�� s��"� r-,.�.� �g. :s'� � `� �`� ����� }�! �''�i� ,� } " .�'° "j '�.�i',, o-��r� ���W`�.�fi � e.k� "'�t � ��'�;, ��� ' � �4&�' �dl ,x < ,�N�S � I , � � a �a� � . ,�e ^'��'� `�li. I �� $ . ����' �"A' '� :;�6., :� � t�y � y}�1� p y � 3 3 4 I t��� �' � j� % '� Le4end �„ �` ��� � �� ' ,��. � . ���, � �14 � ,� , '` � °� � ��1 *� r 3 Project Extent �, F � � � �-� x k� � � �, Hennepin Co. Parcels �� 5 ` 'x 4 *� �,k�"�r�s �`���� � �`�,' `� ; .1 �j� , x . , ��� '� � �,r�-•� r�.,�.;�� � r Field Delineated Wetland � s , 1 ,�� t � 4/13/2016 ` �,, t �„�� t� r�'` ��yr,. ' ��..� � � r'0. 1F-��� F ��, O Sample Point � ��,,,, __ __�1, PROJECT LOCATlON SOURCE: MN DNR,USDA,ESRi,TIGER,Bing,Hennepin Co.,Anderson Engineering :_, � -.�;�, � � ���..�---.� .��__ RECE�VED � 1 in = 100 feet e . MAY � � 20�6 o so �oo Zoo --`� CIT�'OF ORONp Feet ! - 627 Ferndale Road -Y `l ��'-- ��J'�� '� Orono, Hennepin County, MN Hennepin County City of orono PID: 053-3611823910029 State of Minnesota Henne in Coun MN � ,� A N D E RS O N Anderson Engineenng of Minnesota,LLC D E L I N EATI�N - F I G U RE 5 13fi051stAvenueNorth KENNEDY DELINEATION Suite 100 ^ _�. E N G I N E E R I N G plymoulh,MN 55441 ENGINEERING • ARCHfTECTURE � LAND SURVEYING 763-412-4000(o) 7 63 4 1 2-4090(fl ENVIRONMENTALSERVICES � LANDSCAPEARCHITECTURE wwwae-mn.com AEComm.#94310 Date:4/11/2016 By:JLA ' �ECEIVED Stephen's Mail r�n� -� �, �n�r From: Christine Mattson <CMattson@ci.orono.mn.us> Sent: Thursday, March 31, 2016 10:18 AM CITY OF ORONO To: 'Stephen's Maii' Subject: 627 Ferndale Road North Attachments: septic.pdf; wetland map.pdf; HC parcel annotations.pdf; copy of 1982 survey.pdf; copy of 1998 survey.pdf; Hardcover Information Packet -2014.pdf; Survey Requirements - August 2015.pdf; reso 4054.pdf; Building Permit Application for New Structures or Additions - August 2015 updated.pdf;Zoning Permit Application May 2015.pdf Stephen, Following up on our conversation yesterday regarding the possibility of an accessory structure to be located behind (to the south of) the principal structure, I have attached additional information for you. The copy of the survey you provided is from 1982. There is an updated survey in the file from 1998 showing a different boundary (also reflected on Hennepin County parcel annotations attachment). The wetland map indicates a wetland on the property(copy attached); however the map does not depict the delineated edge of the wetland. The survey from 1998 shows a drainage easement. This may or may not coincide with the actual wetland. C� Code Section 78-1605(c) states any project within 150'of a wetland must be delineated. Please contact the Minnehaha Creek Watershed District for more information on wetlands and hiring a wetland delinea�a+-� l��c'.�� I have also included a copy of the as-built drawing of the current septic location from our file. -S�� "t7`��b„/ v� If you would be interested in placing the accessory structure forward of the principal structure (between the house and the road) a variance would be required. Reference City Code Section 78-1435. A variance was granted in 1998 to allow the placement of the current accessory structure. A copy of variance approval resolution number 4054 is attached. Attached is a copy of the Zoning Permit Application for an accessory structure under 200 sf in size. If over 200 sf it will require a building permit application, also attached. A revised survey will likely be necessary; the survey requirements are listed in the Building Permit application. Your property is located within Tier 3 of the Stormwater Quality Overlay District which allows 35%of the gross area of the lot to be covered in hardcover. Hardcover calculations will be required with any application submitted, attached is the City's Hardcover information packet. Please don't hesitate to contact me if you have any additional questions. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway Orono MN 55356(physical addressJ PO Box 66 Crystal Bay MN 55323-0066(mailing address) '� 952.249.4620 '= 952.249.4616 �; crr��ttson�ci.orono.rT�n.us �?i www.ci.orono.mn.us 1 �--���V�� May 8, 2016 �,;,�� ; .I ���� C17`Y UF ORONO Hello. Per our conversation Thursday,the shed has a wooden floor and will simply sit about a%2 foot above the grass using a couple of bricks in each corner to raise it up. Please call with any questions. The shed is being delivered May 24, so if you think there will be an issue getting approval, please advise so I can cancel the order. Thanks, Stephen Kennedy 414 614 0644 627 Ferndale Road North City of Orono � �o�o Hardcover Calculation Worksheet =:�� Property Address: � /J , - �Tti�d� /e � , ����-�t ',��a'` Prepared by: S ,� �y Date: � . v16��, Stormwater Quality Overlay District Tier: (Circle one) ier 1 Tie� Tier Tier 4 Tier 5 Step 2: PROPOSED HARDCOVER In the following table, identify all items of proposed hardcover on the property, keyed by letter to Certificate of Survey (survey must accompany this form). Include all existing hardcover items that are intended to remain, as well as all proposed hardcover items that will be added. Use as many lines as necessary to accurately depict proposed hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at the 75' setback line and calculate hardcover square footage se aratel for each ortion. Ke to � Surve Hardcover Item (Describe) Length x Width S tuare Feet Exam le Gara e 24'x 30' 720 S.F. A " � _3 S.F. , B L' c' S.F. � � � -- 3. S.F. D S.F. E S.F. F S.F. G S.F. H S.F. I S.F. � S.F. K S.F. L S.F. M S.F. N S.F. � S.F. P S.F. Q S.F. R S.F. S S.F. T S.F. � S.F. � S.F. W S.F. X S.F. Y S.F. Z S.F. t Total Pro osed Hardcover / S.F. Excludable Hardcover See Cit Code Sec 78-1884: S.F. v S.F. S.F. S.F. S.F. 2 Total Excludable Hardcover � S.F. 3 Net Pro sed Hardcover Subtract line 2 from line 1 S.F. 4 Total Lot Area c e ' = �y S.F. Proposed Hardcover Percentage [(3)+(4)] �� °/, This is an inlormation packet regarding Hardcover. Every el/af has been made lo insure the accuracy o(the in(amation Contained herein:however.i/any inlormation is not consistent wdh provisions ol the City Code,the Code provisions will prevail Page 9 of 9 � � a i �� �.. ; v ; �� � , r s= ; . � �� � �r , � m "�•7 unun yN y�„�,� � '� .�o�-, � ' ��� � ��� .'�, "_" _�-�_---' �M.00.QLK � . �, � w,�., a I Z ..'_ "... __ ' �•4� ,tNM�.� ..y�y� � I�y � � r�1101J0�j�� � � . . �- i 3• (•'� +u4n awrO T � _ _ — ---• -'� _ � �.,} ,+� I � �,� � il�Y] �►tiv�10�9 . R. -- - ,-,.;,n,,,:a.,.�.� . �y� pp� � � �� �!" ---�'�`��rr>�1_— — . __ ' '` �• y' � ,p�`°►`'�.• �n� � 1-- .�.e�_ � � � � ti �S� � � -i- - -�s►�i"�TO"� � �. �,�.`'� -,�''=.r�-_'_s1LD n t i� m �' ` \ ` �!O�e /�• �g �'t ���<' - , -'-r- - -���_�. —�`� - - :� � �� �`�a�� '�:/ r� �w�u --• I-- $: � ' �b i' R } \ a��/ ay l� ._.._...__ R' �n�o.oue,,,,aw3 ',� �:o � �1� �� .....o ��n� y� � � � ; � oo�crz �`'d'����" 'c � 5 \/ � 1 ��. � �.ac.�.s -•-- ---- •,`� 9` �}.�,! 0° , 7 3 I t � t� � , � ss •1�!\t.,`�_ _�. , .eonc---• � � �� � ���� � � , ; � ,:'� '''� � I' Y, �� � �s W � I ''�-'� �- t5' ����"'',�°` s+'' ���''� 1 � �d �� � � ',_i,�� �'+� +'`�s�� � I � ,, � �� " ; � � � � �� � i 8� ' N c4 �� S � � ! i � o �, �1 ant'� �I � � � �� I " ` �� a �§ � �'I � � '•� , � � - +�y-�► g� � _ ��� �� . �,,r�. g , i a � _$ ' �.-� ��. � � o�p �e $ � r 1 T Eo � m � Es 5$ � � ��� r - - 1 _ 8' ; �.�i �m� � .�v � e � � $� � �.� � p o � ° o �n .� � �i i ! a � '--- --^ �'�,� wOn � � �V,,O p1•L� �j .�O fV ; I � �.OG�MV -.�..�'�' a ��° �'S°a� L `o e m N b `-+K�vsri.ur�n an x�v�.wo 6 c�� �� $ Y� =' �...�4- ' I I a uo� u � p � '1 � o �Os ,�', � ��; �� S � !� Y � e � � o� � i I SURVEY FOR: STEPHEN KENNEDv PROPERTY ADDRESS: 627 femtlole Road No•th, Ororo, Mlnnesoto. DESCRIPTION: PARCEL C: That port of Lot 1, Block 1, LAURENT AODITiON, otlescribed cs follows: Beginning ot the northeast torner oi Lot 1, Biock 1, �AURENT AD�ITION; Mence on an assumed bearing of So�th 89 degrees 58 minutes 33 seconds West, a distonce ot 53 86 feet: thence South 4 degrees 28 minutes 58 seconas West, a distance of 237.00 feet; thence South 34 degrees 28 minutes 58 seconds Wesi, o distance of 59.46 feet ;o the so�tn Gne of soid Lot 7; tnence North 89 degr�es 59 minutes 30 seconds Eost olong sa�d south iine, a distonce of 8J 68 teet to the southeast corner of soia Lot 7; tnence North 4 degrees 28 minutes 58 seconds East, oiong the eost line ot saiC Lot 1, o distance of 286.17 feet to the pomt of beginn�ng. PARCEL D: ThOt part of Lot 2, Block 1, LAURENT ADDiT10N, except tnot port deacrlbed as follows: Commencing at the northeost comer of i.ot 1, Biock � LAURENT ADDITION; thence on a� essumed beoring of South 89 degrees 58 minutes 33 seconds West along the northerly iine of said Lot 1, a distance of 53.86 teet; thence South 4 aegrees 28 minutes 58 seconds west, a distonce ot 237.00 feet; thence South 34 degrees 28 minutes 58 seconds West; o dlstonce of 59.46 feet to the souih iine of said Lot 1 ond tne oolnt of beginning of the trect oi olnd to be described; thence continuing South 34 degrees 28 minutes 58 seconds West, a distonce of 108.31 feet; thence South 89 degrees 59 minutes 30 secontls West, o distonce of 69.28 feet to 0 westeriy Iine ot sa�a Lot 2 beinq 225.59 feet in ie�9th; thence North a degrees 28 mir.utes 58 seconds East olong saitl westeriy iine a distance o� '.8.58 feet to an angle point in said westerly fine; thence South 89 degrees 59 minutes 30 seconds West along o southeriy !ine of soid Lot 2, a dismnce of 108.58 feet to the m ost westerly corner oi soid Lot 2; tnence North B degrees 54 minutes 33 seconds Eos; along the most westerly line ol ;ot 2 a distance of 71.61 feet to the soothwest corner of soitl �ot 1; thence North 89 tlegrees 59 minutes 30 secontls East aiong the southerly iine ot saiG Lot 1, p distonce of 226.64 feet to the point of beginning. 589'S8'33'w 100 00 —� NOTE s�ea — ?. Bose survey informoNon provided by Egan, Field, ona Nowok �nc. V . I 2. Wetlantl boundory anp type os dellneotetl �y Antlerson Enqineering, � j was approved by Minnehaho Creek Wotershed District Moy �2, 2016. I ��� � i � !� . ' � \ 3 — �o ion ' r� N J � 3 � �� � A m W �e,, ;�� N- U �+K:i,,�c � a � o-" � - ,� 4 _ ���1 � �^ — ��a_ -�� ,� � C y}~ , - ' �� �5 „� ,�� ,. R ��.� ».t #Y Q �t/ � i-�,�...,u. " o�'� £����� A ' ,_r.. v_`-, N8959'30"E �00 . . 69.28 �` _ �{ ,aq P Ir � � 7C� "���C�s�,a,� ��� ` _f` � � `°`°� 10�''�' .r � �0 ti ... •- �"'._ ,.`' � W N O '•``� f iD r. f ,�� �G. �ti0 Sf`li. _� �—....�� -' O Z `T alineated Wetlond� `�� ���' r Type 2 I ,•,�.�N � �; � t, ,,�-�--... r._' I 'n� SCA�� � �I N �r � • r^_.,. .. 255.20 J, 586�2'00"w ,,�ANDERSON '^"^°^�""'�°°�� �� '�'p°"""Mo0' F' ure 5 6I&2016 ��� NGI�NG�. lo,,."„',Rw x„• 627 Ferrulsle Road North WeUarW Delinoetion ei w�rra.»n�:"�ww✓i.�.�,r i w�.w«,�o��n�+��+roe• OronO�MN KennedyPa�Ce� � AEft 14370 City of Orono �oNo Hardcover Calculation Worksheet .`�`'�r" �.; Property Address: �'' �� 7 `�fit/�4 �� /�,� ��� �-f � "'^'��'� Prepared by: „ Date: _ rn� . �a -,�h �b Stormwater Quality Overlay District Tier: (Circle one) Tier 1 Tier 2 ier 3 Tier 4 Tier 5 Step 1: EXISTING HARDCOVER In the following table identify all items of existing hardcover on the property, keyed by letter to Certificate of Survey (survey must accompany this form). Use as many lines as necessary to accurately depict existing hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at the 75' setback line and calculate hardcover square footage separately for each portion. Surve� Hardcover Item(Describe) Length x Width TO�� S uare Feet Exam le Ga e 24'x 30' 720 S.F. A '� ' .S S.F. B � � S.F. C - --- S.F. D S.F. E S.F. F S.F. G S.F. H S.F. I S.F. J S.F. K S.F. L S.F. M _ S.F. N S.F. O S.F. P S.F. Q S.F. R S.F. S S.F. T S.F. � S.F. V S.F. W S.F. X S.F. Y S.F. Z � S.F. 1 Total Ex�stin Hardcover " S.F. Excludable Hardcove� See Ci Code Sec 78-1684: S.F. ---- S.F. S.F. S.F. ----- S.F. 2 Total Exctudable Hardcover � S.F. 3 Net Existin Hardcover Subtract line 2 from line 1 ` S.F. 4 Total Lot Area - �'r S.F. Proposed Hardcover Percentage [(3)T(4)� y� (Proposed Hardcover next page) This is an inlormafion packet regarding Hardcover Every effort has been made to insure fhe aCcuracy ol lhe infamation contained here�n: however.i/any in/wmation is not consisfent with provrsiorrs of the City Code,the Code piov�sions will prevail. Page 8 of 9 SURVEY FOR: STEPHEN KENNEDY PROPERTY ADDRESS: 627 Ferndale Road North, Orono, Mlnnesota. DESCRIPTION: PARCEL C: That part of Lot 1, Block 1, LAURENT ADDITION, adescribed as follows: Beginning at the northeast comer of Lot 1, Block 1, LAURENT ADDITION; thence on an assu med bearing of South 89 degrees 58 minutes 33 seconds West, a distance of 53.86 feet; thence South 4 degrees 28 minutes 58 seconds West, a distance of 237.00 feet; thence South 34 degrees 28 minutes 58 seconds West, a distance of 59.46 feet to the south line of said Lot 1; thence North 89 degrees 59 minutes 30 seconds East along said south line, a distance of 83.68 feet to the southeast corner of said Lot 1; thence North 4 degrees 28 minutes 58 seconds East, along the east line of said Lot 1, a distance of 286.17 feet to the point of beginning. PARCEL D: That part of Lot 2, Block 1, LAURENT ADDITION, except that part described as follows: Commencing at the northeast comer of Lot 1, Block 1, LAURENT ADDITION; thence on an assumed bearing of South 89 degrees 58 minutes 33 seconds West along the northerly line of said Lot 1, a distance of 53.86 feet; thence South 4 degrees 28 minutes 58 seconds West, a distance of 237.00 feet; thence South 34 degrees 28 minutes 58 seconds West; a distance of 59.46 feet to the south line of said Lot 1 and the point of beginning of the tract of olnd to be described; thence continuing South 34 degrees 28 minutes 58 seconds West, a distance of 108.31 feet; thence South 89 degrees 59 minutes 30 seconds West, a distance of 69.28 feet to a westerly line of said Lot 2 being 225.59 feet in length; thence North 4 degrees 28 minutes 58 seconds East along said westerly line a distance of 18.58 feet to an angle point in said westerly line; thence South 89 degrees 59 minutes 30 seconds West along a southerly line of said Lot 2, a distance of 108.58 feet to the m ost westerly corner of said Lot 2; thence North 8 degrees 54 minutes 33 seconds East along the m ost westerly line of Lot 2 a distance of 71.61 feet to the southwest corner of said Lot 1; thence North 89 degrees 59 minutes 30 seconds East along the southerly line of said Lot 1, a distance of 226.64 feet to the point of beginning. 589'S8'33"W 100.00 N 0 TE: 5}.86 1. Base survey information provided by Egan, Field, and Nowak Inc. V � 2. Wetland boundary and type as delineated by Anderson Engineering, i was approved by Minnehaha Creek Watershed District May 12, 2016. i 3 � v°Ji o � i �� i N^] �N IN I J i 3 �� h rn� '� W i �'N� a U � `+�WEILINC � I I � b�� e I i ��' i a 3.� '` 83.68 p y�^. ` �wJ O � 2�STORY FRq E f`� N � �JNf/ 0 62�Dt'[pN��LF R0�0 �'� 200 rouNo iaoN N89'59'30"E 69.28 ,. W ' �ph �y z w��scM� S to`O 0 O��' � P ti� � � N O RT H .'"_"""-..._� � w ��- �n O ' ````��•. SFO. ,`°i o ;�, , � �. � Z 6 J i �". 6 � � } Delineated Wetland �' A 2F ' ------� `--------" .. Type 2 � , , i ' ' •,,;:�-- � � ., 3 � , ",., ..o w ' ;' �. ' . ; o!n � , . � � •,�` � ry� i ' �__.,,. �� v�;N ' ' •."."".., "'_". a SCALE _ � � + = 4G' ' ieoN fOUND � 255.20 �^----- , 586'22'00"W '�Mderson EnglnaeMg W Minnesob.LLC "'ANDERS N ,„�,,,A�e��e„o�, Figure 5 �ENGINEERING 's"ne10° 627 Ferndale Road North Wetland Delineation 6/6/2016 '�arymo�m,MN ssoai Orono,MN - ',�sa.a�a�000io��su�s<oso�q Kennedy Parcel qE#14310 Jeremy Barnhart From: Stephen <sckennedy08@gmail.com> Sent: Sunday, June 26, 2016 11:24 AM To: Jeremy Barnhart Cc: sckennedy08@gmail.com Subject: RE: W16-16 627 Ferndale Road N, Orono NOD Boundary and Type Attachments: Kennedy627 Ferndale Road Wetland Info.pdf; 24511R_DelinFigure.pdf Hello Jeremy. We are finally moved into the home and I have a working PC. I've attached the completed hardtop calculation sheets, escrow form and the updated survey. Ben was able to superimpose the wetland over the existing survey, per your request. I also included the survey that showed the detached garage. Note the driveway calculation is not detailed on the worksheet because I had to do it in segments due to length and curves. It is also not on the survey for some reason. I will send you a check Monday for the escrow. Please let me know of any issues or concerns. It appears that my 8x12 shed is so insignificant to the hard-top calculation that it didn't even impact the percentage. Also, recall the shed will not sit on the ground, so I do expect some grass/weeds to grow under it. Thanks again for your assistance navigating through this process. Regards, Stephen 414-614-0644 From:Jeremy Barnhart [mailto:jbarnhart@ci.orono.mn.us] Sent: Friday,June 3, 2016 9:18 AM To: 'Stephen's Mail' <sckennedy08@gmail.com> Subject: RE: W16-16 627 Ferndale Road N, Orono NOD Boundary and Type Thanks for the update Stephen. I will gladly accept an electronic version of the survey. Just a note,though,that city office hours change for the summer and are: 7:30-5:00 M-R 7:30-11:30 Fridays. Jeremy Barnhart, AICP Community Development Director Direct 952.249.4626 Planning & Zoning Office 952.249.4620 2750 Kelley Parkway, Orono, MN 55356 Website: www.ci.orono.mn.us From:Stephen's Mail [mailto:sckennedy08@gmail.com] Sent: Friday,June 03, 2016 8:18 AM To:Jeremy Barnhart<jbarnhart@ci.orono.mn.us> Subject: Re: W16-16 627 Ferndale Road N, Orono NOD Boundary and Type 1 Hello Jeremy. We are still working on the Overlay of the wetland delineation on the survey for my shed. I'd like to send that to you electronically if possible. In the meantime, I'm going to take care of the hardtop calculation and Mail the escrow check. Hopefully I can get the last pieces in place for a decision. Thanks again for your help. Regards. Stephen Sent from my iPhone On May 23, 2016, at 10:57 AM,Jeremy Barnhart<ibarnhart@ci.orono.mn.us>wrote: Hi Stephen, I spoke with Ben last Friday on your project. He seemed to understand what we needed. I suspect he is already working on it. Jeremy Barnhart, AICP Community Development Director Direct 952.249.4626 Planning &Zoning Office 952.249.4620 2750 Kelley Parkway, Orono, MN 55356 Website: www.ci.orono.mn.us From: Stephen's Mail [mailto:sckennedy08@gmail.com] Sent: Monday, May 23, 2016 10:47 AM To:Jeremy Barnhart<jbarnhart@ci.orono.mn.us> Subject: Re: W16-16 627 Ferndale Road N, Orono NOD Boundary and Type Hi Jeremy. I expect you are busy with multiple property owner inquires, but if you get a minute,talking to Ben may help me get this done properly without further delay. I don't know Ben, but his firm has been a great resource to me navigating the wetland delineation process. I can't imagine Orono's requirements are anything new to him. I'm back in town Thursday and will send you the escrow and hardtop calculation Friday. Hopefully be. Can help me get the wetland location overlayed on the survey. Regards Stephen Sent from my iPhone On May 20, 2016, at 11:10 AM, Ben Hodapp<BHodapp@AE-MN.COM>wrote: Jeremy, Perhaps you can provide detail on what exactly the City is requiring from Mr. Kennedy. Mr. Kennedy has the plat (attached), sounds like City is looking for a survey including the delineated wetland boundary? (other site features, buildings, etc.??) z I just want to make sure we can assist Mr. Kennedy in the simplest way possible. Feel free to give me a ring as needed.Thanks for the assistance. BEN Benjamin J Hodapp, PWS Environmental Services Manager Direct: 763-412-4000 Cell: 763-439-4276 Email: bhodapp(a�ae-mn.com <image001.jpg> A Service-Disabled Veteran-Owned Small Business This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity[o which they are addressed. If you are not the nomed addressee,you are notified that ony use,dissemination,distribution,copying,or communication of this messoqe is strictly prohibiYed. Transmitted electronic data is the sole property of Anderson Engineering of Minnesota,LLC. Anderson Engineering provides no guarantee as to the occuracy,reliability,or completeness of furnished data. The user of this dato assumes all risks associated with its use. ey acceptance of this data,the user agrees not to transmit this data or provide access to another party without first obtaining the permission of the sender,and the user includes with the data a copy of this disclaimer From:Stephen's Mail [mailto:sckennedy08@�mail.com] Sent: Friday, May 20, 2016 10:16 AM To: Ben Hodapp<BHodapp@AE-MN.COM> Ct: ibarnhart@ci.orono.mn.us Subject: Re: W16-16 627 Ferndale Road N, Orono NOD Boundary and Type Thanks Ben. I know there is a version on file with the city. All I had is what I sent you, which came with the house when I bought it. Thanks for taking a look. Jeremy: FYI. Sent from my iPhone On May 20, 2016, at 10:06 AM, Ben Hodapp<BHodapp@AE-MN.COM>wrote: Possibly. I believe I got a scanned image of the survey initially. Is an electronic version available or do we know who completed the land survey? Depending upon the vintage of the original survey it might not be available electronically for us to simply insert our wetland linework into an existing AutoCAD file. Let me look and talk with land surveyors about the simplest options to fulfill the city requirement. Benjamin J Hodapp, PWS Environmental Services Manager Direct: 763-412-4000 3 Cel I: 763-439-4276 Email: bhodapp(a�ae-mn.com <image001.jpg> A Service-Disabled Veteran-Owned Small Business This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they ore addressed. If you are not the named addressee,you are no[i/ied that ony use, disseminotion,distribu[ion,copying,or communication of this message is strictly prohibited. Transmitted electronic dato is the sole property of Anderson Engineering of Minnesoto,LLC. Anderson Engineering provides no guarantee as to the occuracy,reliability,or completeness of furnished data. The user of this data assumes all risks associated with its use. ey acceptance of this data,the user agrees not to transmit this dato or provide access to another party without first obtaining the permission of the sender,and the user includes with the data a copy of this disclaimer From:Stephen's Mail [mailto:sckennedy08@�mail.com] Sent: Friday, May 20, 2016 10:00 AM To: Ben Hodapp<BHodapp@AE-MN.COM> Subject: Re: W16-16 627 Ferndale Road N, Orono NOD Boundary and Type Thanks Ben. I mailed the check last week. The city is now telling me the wetland delineation needs to be shown on my survey,to scale. Is that something you can provide? I believe i sent you the survey when we first met, but I can find and resend if you don't have it. Please let me know. Regards. Stephen Sent from my iPhone On May 12, 2016, at 3:59 PM, Ben Hodapp<BHodapp@AE-MN.COM> wrote: Please find attached to formal Notice of Decision (NOD) approving the wetland delineation. This delineation is valid for 5 years. If you should need additional information or details,feel free to ask. Thank you BEN Benjamin J Hodapp, PWS Environmental Services Manager Direct: 763-412-4000 Cell: 763-439-4276 Email: bhodapp(c�ae-mn com 4 <image001.jpg> A Service-Disabled Veteran-Owned Small Business This email and ony files transmitted with it are confidential and intended solely for the use of the individual or entity to which ihey are addressed. If you are not the named addressee,you are notified thot ony use,disseminotion,distribution, copying,or communication of this messaqe is strictly prohibited. Transmitted electronic data is[he sole property of Anderson Engineering of Minnesota, LLC. Anderson Engineering provides no guorantee as to the accuracy,reliability,or completeness of furnished data. The user of this data assumes all risks associated with its use. By acceptance of this data,the user agrees not to transmit this data or provide access to another party without first obtaining the permission of the sender,ond the user indudes with the dato a copy of this disclaimer From: Rachel Workin [mailto:rworkin@minnehahacreek.or�] Sent:Thursday, May 12, 2016 3:37 PM To: Stacey Lijewski (stacey.lijewski@hennepin.us) <stacey.lijewski@hennepin.us>; ben.meyer@state.mn.us; becky.horton@state.mn.us; leslie.parris@state.mn.us; sckennedy08@gmail.com; Ben Hodapp<BHodapp@AE-MN.COM>; Christine Mattson (Orono)<cmattson@ci.orono.mn.us>; melissa.m.jenny@usace.army.mil Cc:wboll@wenck.com; Katherine Sylvia <ksVlvia@minnehahacreek.or�> Subject: W16-16 627 Ferndale Road N, Orono NOD Boundary and Type Good afternoon, Attached is the approved wetland boundary and type NOD for 627 Ferndale Road N, Orono, Minnesota requested by Stephen Kennedy. A portion of one Type 2,fresh meadow wetland was found on the site.These boundaries were reviewed in the field by MCWD on April 26`h, 2016. Please let me know if you have any questions. Kind regards, Rachel Workin Permiffing Technician Minnehaha Creek Watershed District 15320 Minnetonka Boulevard,Minnetonka,MN 55345 952.641.4518 www.minnehahacreek.orq 5 <W16-16 NOD boundary and type (signed).pdfl <14310_Kennedy_Orono_NINJointApp_20160415. pdfl <14310_Kennedy_Orono_WetlandDelinReport_20 160415 rev00 OO.pdf� <Kennedy_627 Ferndale Rd N_Plat Image.JPG> <14310_KennedyProp_Orono_FigS Delin_20160413.pdf> 6 Christine Mattson From: Stephen's Mail <sckennedy08@gmail.com> Sent: Thursday, May 19, 2016 3:29 PM To: Christine Mattson Subject: Re: 627 Ferndale Road N /#2016-00507 Hello. I just tried to reach you. Please cal) my cell 414-614-0644 or office 763-765-6797. I've left you previous voicemails before and I've not received a cail back which is why I started working with Melanie. Looking forward to discussing further. Regards. Stephen Sent from my iPhone On May 19, 2016, at 2:36 PM, Christine Mattson <CMattson@ci.orono.mn.us>wrote: Stephen, Attached is a copy of the letter and enclosures being mailed today. If you have any questions, please don't hesitate to contact us. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway Orono ' MN i 55356 (physical address) PO Box 66 Crystal Bay MN 55323-0066 (mailing addressJ �' 952.249.4620 � 952.249.4616 �' cmattson@ci.orono.mn.us '; � www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm PLEASE NOTE: Summer Office Hours start Monday, May 23,2015 Monday-Thursday: 7:30 am to 5 pm/ Friday 7:30 to 11:30 am OUR OFFICE WILL BE CLOSED: Monday, May 30, 2016(Memorial DayJ <letter.pdfl <Escrow Agreement- Zoning Permit w Erosion Control 2016-00507.pdf� <Hardcover Information Packet -2014.pdfl i Christine Mattson From: Christine Mattson Sent: Thursday, May 19, 2016 2:36 PM To: 'Stephen's Mail' Cc: Jeremy Barnhart Subject: 627 Ferndale Road N /#2016-00507 Attachments: letter.pdf; Escrow Agreement - Zoning Permit w Erosion Control 2016-00507.pdf; Hardcover Information Packet -2014.pdf Stephen, Attached is a copy of the letter and enclosures being mailed today. If you have any questions, please don't hesitate to contact us. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway Orono ' MN '; 55356 (physical addressJ PO Box 66 ' Crystal Bay ' MN 55323-0066 (mailing addressJ `�' 952.249.4620 ' � 952.249.4616 �' cmattson@ci.orono.mn.us ; � www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm PLEASE NOTE: Summer Office Hours start Monday, May 23,2016 Monday-Thursday: 7:30 am to 5 pm/ Friday 7:30 to 11:30 am OUR OFFICE WILL BE CLOSED: Monday, May 30, 2016(Memorial DayJ i �o�o C ITY OF ORONO �1 � Street Address: Mailing Address: Telephone(952)249-4600 ��, G` 2750 Kelley Parkway P.O. Box 66 Fax (952)249-4616 �,q tt, Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us KFSHO� May 19, 2016 Stephen Kennedy 625 Ferndale Road N Wayzata, MN 55391 Re: Building Permit Application#2016-00507 On May 11,2016 the City received a zoning permit application for a 96 square foot accessory structure. Staff conducted a preliminary review based on the information provided and requests the following items be submitted or revised in order for your application to be considered complete and for the plan review to continue: 1. Certificate of Survey. A survey was not submitted with the application. Please submit two full-size copies of an updated survey showing the delineated wetland, including the 35 foot wetland setback and the location of the proposed accessory structure. 2. Hardcover Calculations. The property is located in Tier 3 of the Stormwater Quality Overlay District. Please have the surveyor prepare hardcover calculations, showing existing and proposed hardcover using the City's Hardcover Calculation Worksheet. Enclosed is a copy of the City's Hardcover Information Packet. 3. Escrow&Escrow Agreement. Permits involving grading and/or review by the City's engineer require submittal of an escrow and an escrow agreement. The purpose of the escrow is to guarantee reimbursement to the City for out-of-pocket costs incurred during the review of your plans. Additionally this escrow will guarantee conformance with City Code Chapter 79 relating to erosion control and stormwater. The required escrow amount for this project is$700. The escrow agreement is enclosed. The property owner must sign the escrow agreement and submit a check for$700. 4. Minnehaha Creek Watershed District (MCWD). A map created by Anderson Engineering shows an identified wetland. Please contact the Minnehaha Creek Watershed District MCWD directly at 952-471-0590 regarding your project. While we don't believe the proposed accessory structure will trigger their permitting requirements,the MCWD is responsible for approving all wetland delineations. Please feel free to contact me at 952.249.4620 or by email at cmattson@ci.orono.mn.us if you have any questions on the above requirements. Sincerely, CITY OF ORONO C.J� �1'+I� �v�`.' Christine Mattson Planning Assistant c via email Stephen Kennedy Jeremy Barnhart, Community Development Director enclosures �� � �� � , pyre/ nME CITY OF ORONO cnLLED IN lj INSPECTION N9iT,�C _DO�O�EDULED -/a -j�G' PERMR NO.O�V LETED � ADDRESS OWNER TELEPHONE NO. � � ^ CONTRACTOR • v � DESCRIPTiON � �l ly ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBtNG RI ❑ EXCAV/GRADING/FILLINO �O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT v �FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP i�AS BUILT-SURVEY ❑ SEWEH HOOK-UP ❑ FOUNDATION/REMOVAL J ❑ DEMO-SITE ❑ SEPTIC INSTALL Z OMfNENCOKTNACTOR TO MEET 1I�U:_YES�NO y COMMENTS: W /�. q ��cGK.S ,D.n �✓ �L � j O � I,cJo r K cd►n/J�e� �- G�,p ga�s b,�� 0 W CC Q � W W �' � }�/N7,� f /i94��c0 j � ❑WORK SATISFACTORY:PFiOCEED �6dECT COMPLEfE W O CORRECT WORK a PROCEED O ISSUE CERTIFICATE OF OCCURANC� 0 ❑OORRECT WORK,CALL FOR REINSPECTION TEMIPORARY V BEFORECdA/ERIN(i PERMANENT O(:ORNECT UNSAFE CONDITION WITHIN HOURS. p pF{OTO TAKEN INSPECTOR WFLL RETURN O STOP ORDER POSTED.CAII INSPECTOR �GTATION ISSUED O INSPECTION REQUIRED.CALL TO ARRAN(3E ACCESS. Cafl for the next inspection 24 hours in advance. (952) 249-4600 Owne�IContractor on site: Inspector: ' wn��covrnnape��ors FiN c.�ary cov�rrsn.noaee . . • . • • � • emo To: Finance Department From: Christine Mattson, Planning Assistant CC: Street File Date: October 3, 2016 G/L: 101-22205 Re: Escrow Refund Zoning Permit#2016-00507 pertaining to 627 Femdale Road N is complete. Please refund $700 to the property owner, Stephen Kennedy. The following is attached: • Original signed escrow agreement � Copy of cash register receipt showing escrow amount received Mail to: Stephen Kennedy 627 Femdale Road N Wayzata, MN 55391 w:�.street files\femdale road n\627�escrow refund form 2016-00507.docx ZONING PERMIT ESCROW AGREEMENT Permft#Z01B-00507 AGREEMENT made this��day of J ✓N� , 2p/(o, by and between the CITY OF ORONO, a Minnesota municipal corporation ("City") and Stephen Kennedy ("Owners"). Recitals 1. A zoning permit application has been filed for a property located at 627 Ferndale Road North the ("Subject Property°), legally described as OY1 E1(hib, �- A, (1(-�B(.k.QA( Hennepin County, Minnesota. 2. Owner requests the City to review this application. 3. The City will commence its review of the application and incur costs associated with said review only if the Owner establishes an escrow to ensure reimbursement to the City of its costs. NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owners shall deposit $700 with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all out-of-pocket costs the City has incurred (including planning, engineering or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be responsible for under a zoning permit application.The escrow will also guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work (including planning, engineering, or legal consuttant review) associated with permit#2016-00507 if compliance with the approved zoning permit is not accomplished. 3. MONThLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners'receipt of bill. 4. DiSBURSEMfNT FROM ESCROW ACCOUNT. In the event that the Owne�s do not make paymerrt to the City within the timeframe outlined in #3 above, sha11 issue a Stop Woric Order until the Owners pay a!I expenses invoiced pursuant to#3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eligible expenses the Ciry has incurred. 5. CLOSING ESCROW. The Balance on deposit in the escrow,if any,shall be returned to the Owners when aA requirements related to the project are complets. City Staff shall revievv the terms of this escrow agreement 1wo times per year to determine whether the requirements of the project have been successfully completed and whether it is appropriate to retum the funds. Owner may also request the release of the funds, and such funds shal! be released upon City Staff receiving the appropriate verification that all requirements of the project have been successfully completed. 6. CERTiFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shali have the righi to cert'rfy the unpaid balance to the subject property pursuant to Minn. Stat. §§415.01 and 366.012. CITY; C OF ORO OW ER: Its: � M v�� �-� Lt°� , �,^�C'�a--� ����� �-:` fl�#o�t�r��t�at�nt+�nR .;�I�py_���k " 'V� � � � � { C SURVEY FOR: STEPHEN KENNEDY PROPERTY ADDRESS: 627 Ferndale Road North, Orono, Minnesota. DESCRIPTION: PARCEL C: That port of Lot 1, Block 1, LAURENT ADDITION, odescribed as fotlows: Beginning ot ihe northeost corner of Lot 'I, Block 1, LAURENT ADDITION; thence on an assumed bearing of South 89 degrees 58 minutes 33 seconds West, a distance of 53.86 feet; thence South 4 degrees 28 minutes 58 seconds West, a distance of 237.00 feet; thence South 34 degrees 28 minutes 58 seconds West, a distance of 59.46 feet to the south line of soid Lot 1; thence North 89 degrees 59 minutes 30 seconds East along said south line, a distance of 83.68 feet to the southeast corner of soid Lot 1; thence North 4 degrees 28 minutes 58 seconds East, alang the east line of said Lot 1, a distance of 286.17 feet to the point of beginning. PARCEL D: That part oi Lot 2, Block 1, LAURENT ADDITION, except that port described as fallows: Commencing at the northeast corner of Lot 1, Block 1, LAURENT ADDITION; thence on an assumed bearing of South 89 degrees 58 minutes 33 seconds West along the northerly line af said Lot 1, a distance of 53.86 feet; thence South 4 degrees 28 minutes 58 seconds West, a distance of 237.00 feet; thence South 34 degrees 28 minutes 58 seconds West; a distance of 59.46 feet to the south line af said Lot 1 ond the point of beginning of the tract oi alnd to be described; thence continuing South 34 degrees 28 minutes 58 seconds West, a distance of 108.3'I feet; thence South 89 degrees 59 minutes 30 seconds West, a distonce of 69.28 feet to a westerly line of said Lat 2 being 225.59 feet in length; thence North 4 degrees 28 minutes 58 seconds East along soid westeriy Ilne a distance of 18.58 feet ta an angle point in said westerly line; thence South 89 degrees 59 minutes 30 seconds West along a southerly line of said Lot 2, a distance of 108.58 feet to the most westerly corner of said Lot 2; thence North 8 degrees 54 minutes 33 seconds East along the most westerly line of Lot 2 a distance of 71.61 feet to the sauthwest corner of said Lot 1; thence North 89 degrees 59 minutes 30 seconds East olong the southerly line of soid Lot 1, a distance of 226.64 feet to the point of beginning. 589'S8'33'W N OTE: t o0.00 sa.es 1. Base survey information provided by Egan, Field, and Nowok Inc. V 2. Wetland boundary and type as delineated by Anderson Engineering, wos approved by Minnehaha Creek Wotershed District Moy 12, 2016. 3 roo NO �n flN y � 3 h� '� W �io na N= < U � (''� y �tlWFLUNG � � �� Q Q �p� z a � 3� ��e� 83.68 � �� ^ U .�o �2] • � c� �e O + �.s 2—STORY PRAME '� Z �g �'J 'e°3 D�Ki p `'X � s�a Ao+o rouNo iRON N89'S9'30"E 30�0 69.28 � -a' R �e.a d �`��� � _ 4 e 3 � o°� .b � ry0 y NORTH �.�����_` ` W �•� \�`. l0.- �\ h0 'y^ NO ,, ,,,� 'V. �}N ( �i��l. Z �� Delineated Wetlond� �~ ` '��F 1 Type 2 �� ;' 1 --� ,t�t--"'"~ -0 W �``1 N W SCALE j, ----,., ,r--""__,_�`,v �� 1 :r f� 7" = 40� / iOUND IRON `; 255.20 � S86'22'00'W �ANDERSON '"°°"°^�°'"'^�°�LL� 1]W51rt��x Ibp� .�ENGINEERING A'n`�a 627 Femdale Road North Figure 5 PlymMl�.NN 654/1 WeUand Delineatlon 6/6/2016 � . .u,rR� . ,,,,m„R.E,.,� �ia�000�,)�su��ono�r� Orono,MN �� • ���� �+.� Kennedy Parcei AE#14310 � CITY OF ORONO * 2 0 1 6 - 0 PJ 7 5 1 * 2750 KELLEY PARKWAY DATE ISSUED: 06/28/2016 ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS : 627 FERNDALE RD N PIN : 36-118-23-I1-0029 LEGAL DESC : LAURENT ADDN : LOT 000 BLOCK 001 PERMIT TYPE : ESCROW FEE-TIED TO BUILDING PERMIT PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : ESCROW FEE-TIED TO BUILDING PERMIT NOTE: THIS$700 ESCROW IS TIED TO ZONING PERMIT 2016-00507 APPLICANT ESCROW FEE-BUILDING 700.00 TOTAL 700.00 KENNEDY, STEPHEN Payment(s) 627 FERNDALE RD N CHECK 11228 700.00 WAYZATA,MN 55391- OWNER KENNEDY, STEPHEN 627 FERNDALE RD N WAYZATA,MN 55391- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible fot assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for due cause. / / Applicant Permitee Signature Date Issued By Signature Date City of Orono 2750 Kelley Parkwa� Orono MN 55356 952-24g-4600 Receipt No: 3.015871 Jun 28, 2p�6 Stephen Kennedy Previous Balance: Permits .UO 2016-00751 627 Ferndale Rd N 700.00 101-22205 Deferred Rev-Developer Deposit Total: --------------- 700.00 Check --'-'-__—_____ Check No: 1122g Payor: 70U.U0 Stephen Kennedy Total Applied: 700.00 Change Tendered: �--- .00 06/28/2016 11:16AM =___---_-__ Christine Mattson From: Jeremy Barnhart Sent: Monday, September 26, 2016 9:02 AM To: Christine Mattson Subject: FW:W16-16 627 Ferndale Road N, Orono NOD Boundary and Type FYI 7eremy Barnhart,AICP Community Development Director Direct 952.249.4626 Planning &Zoning Office 952.249.4620 2750 Kelley Parkway, Orono, MN 55356 Website: www.ci.orono.mn.us From:Stephen [mailto:sckennedy08@gmail.com] Sent:Saturday,September 24, 2016 6:49 AM To:Jeremy Barnhart<jbarnhart@ci.orono.mn.us> Subject: RE: W16-16 627 Ferndale Road N, Orono NOD Boundary and Type Hello Jeremy, At long last, the shed is finished! It was inspected a couple of weeks ago (and passed) and now I'm curious when I can expect a return of the escrow money. Can you please have someone take a look and advise? Thank you. Stephen 414-614-0644 From:Jeremy Barnhart [mailto:ibarnhart@ci.orono.mn.us] Sent: Friday,June 3, 2016 9:18 AM To: 'Stephen's Mail'<sckennedv08@�mail.com> Subject: RE: W16-16 627 Ferndale Road N, Orono NOD Boundary and Type Thanks for the update Stephen. I will gladly accept an electronic version of the survey. Just a note,though,that city office hours change for the summer and are: 7:30-5:00 M-R 7:30-11:30 Fridays. 7eremy Barnhart,AICP Community Development Director Direct 952.249.4626 Planning &Zoning Office 952.249.4620 2750 Kelley Parkway, Orono, MN 55356 Website: www.ci.orono.mn.us 1