October 13, 1998
Damian Topousis
395 Ferndale Road North
Wayzata MN 5�391
Re: Lot Drainage
The approval for the construction of the new home at 375 Ferndale Road required that yard drainage
be directed to the southwest. The building staff has inspected the large swale draining your back
yard. We believe this swale meets the above requirement.
The drain tile directed straight south was cut off and plugged ten feet back from the south property
line and should remain so. If you have questions please call me at 473-7357.
Sin rely,
,
Bruce Vang
Field Inspector
BV/jlg
cc: Ron Moorse, City Administrator
Greg Gappa, Director of Public Service
Donald Chase, 365 Ferndale Road North, Wayzata MN 55391
Telephone (612) 473-7357 • FAX 473-0510
� .
; � O�
�O O
� -�;-- !=- �1 CITY of ORONU
-�
'� ,� ,'°,`:`�r��...� �;
\,�,� E'•�, �t Y,X,� �l5� Municipal Offices
� �� � 7y;i�`k�,�G Street Address: Mailing Address:
�t'EgHOg' 2150 Kelley Parkway P.O. Box 66
Orono, MN 55356 Crystal Bay, MN 55323•0066
December 4, 1998
Mr. Donald Chase
365 Ferndale Road North
Wayzata MN 55391
Dear Mr. Chase;
This letter is in response to your recent phone calis and letter regarding drainage concerns with the
new house constructed next to your lot. We have discussed this situation �vith the Building
Inspector, Bruce Vang, and I have completed a site inspection with Bruce to view the drainage
issues.
My understanding of the history of this project from Bruce is as follows. The approved site plan for
this house showed surface drainage going to the southwest. The builder first constructed a temporary
drainaae ditch heading to the south. Because of concern for maintaining septic sites, located west
of the house, they could not determine exactly w�here the final ditch to the southwest should be
located. They later installed a perforated drainpipe in the ditch to the south. The builder's plan was
to use this pipe to drain the depressed area for the walkout basement entrance and then grade the site
to drain the remainder of the property to the southwest. The builder was informed by Bruce that
draining the walkout depression through this pipe was not acceptable. The builder then graded a
lazge ditch deep enough to drain the walkout area and remainder of the lot to the southwest. This is
a substantial ditch with a five wide bottom and approximately five feet deep. This ditch is more than
adequate to handle the drainage from the property. This ditch draining the surface water to the
southwest is in conformance with the approved site plan.
The amount of surface drainage going to the south should be reduced with the installation of the
drainage ditch. It appears that before construction of the house large part of the lot drained overland
across your drive�vay and into the wetland area to the south. The lot has now been graded to direct
much of this water into the drainage ditch to the southwest.
Telephone (612) 47�7357 • FAX 473-0510
s .
The perforated drainpipe was cut off ten feet from the property line and plugged. This pipe still
serves as an outlet to the house foundation drainage system. The amount of water that can drain
through this pipe and percolate into the ground is limited. Therefore,additional foundation drainage
can be provided by a sump pump that will pump water into the drainage ditch to the southwest.
Since the ground surface elevation above the drainpipe is higher than the basement floor elevation
the �vater will back up into the sump before surfacing to the ground. The owner of the new house
said that since moving into the house,there has never been any water in the sump. Some sandy soils
were encountered on the property, so the amount of foundation drainage is limited.
Mr. Vang's comments about the original pipe installation being inappropriate were regarding using
this pipe to drain yard surface drainage to the south. This problem has been conected by the drainage
ditch to the southwest. Use of this perforated pipe as only an outlet for the foundation drains is
appropriate and reasonable and an allowable use within the intent of the City's codes. There is
nothing in the codes to prohibit this foundation drainpipe. The water from the foundation drains is
existing groundwater and use of perforated drainpipe to discharge this into the ground is reasonable.
. I am not clear on exactly what the conversations between yourself and Bruce were. Bruce has told
me he indicated that the pipe could not drain surface water and that this problem would have to be
conected. This problem has been corrected now and the pipe does not drain surface water. He also
indicated that the pipe would have to be plugged and removed from within 10 feet of the property
line. This has also been accomplished.
Regarding the comments that Bruce made about sending a letter saying that Bruce Bren
Construction and the City of Orono would have to correct any future water damages caused by this
pipe. Bruce does not have the authority to make these statements or send letters providing these
assurances. We have discussed this situation with Bruce and he understands that it would be
inappropriate to make such commitments. The City's regulatory function is to take adequate and
reasonable steps to facilitate projects to minimize adverse impacts to the environment or adjoining
properties. We cannot offer 100% guarantees that everything will be perfect without exposing the
City to future liabilities. We believe that the diversion of the surface drainage to the southwest,using
the perforated drainpipe only for foundation drainage, and plugging the end of this pipe 10 feet from
the property line aze adequate and reasonable steps to handle the drainage in an appropriate manner
and protect the interests of all parties involved.
We offer our apologies that this issue was not dealt with in promptly. As Bruce's immediate
supervisor, I have to admit that I was not totally familiar with the situation and exactly how this
issue was being handled. We have discussed this situation with Mr. Vang regarding the importance
of promptly responding to citizens and not making promises or commitments that he cannot fulfill.
We hope this letter clarifies the history of the project and the City's position on the corrective actions
taken to ensure that the drainage from the new house is handled appropriately.
. .
If you have continuing concerns,we are available to meet with you to review how the drainage will
be handled on the site. Thank you for your assistance in this matter. Please contact us should you
have any questions regarding this issue.
Sincerely;
�
�
V� � �f ,
� ��
Gregory A. Gappa
Director of Public Services
Copy: Ron Moorse, City Administrator
Bruce Vang, Building Inspector
Mayor Jabbour and Orono City Council Members
s .' ` /�! 1��
�t/✓
11/14/98
Niayor Gavriel Jabbour
k City of Grono -- - �-�
2750 Kelly Farkway
Orono , T�iinn. 55 356 ��- 1
..>;��. 1 7 1��?�
llear �iayor Jabbour, _ ,�-,
,�. ; .,. ... .�.��
N�y problem started on Feb.9 , 19a8 and as of this writing is .
still unresolved . I reside at �65 No . Ferndale Rd . .t� New house
was built at 4z5 r�o . Ferndale Rd . - adjoining lots - by Bruce
Bren Construction Co . I phoned Bruce Bang, building inspector
fnr �rono � and told him that $ren had excavated a trench running
south to my property line . I told T�:r. Bang that I did not want
water drainage directed at my property because of previous erosion
to my driveway from run off and a 4" drainage pipe would aggra.vate
+�1G rT'!'�?�?_T.. T'ti. �3:i� u�i C:;.�.� �11�11 iTiC c2'lii �tS I recall SalQ tY13t
he told Peter Bren that they could not drain to the south in my
direction. He said he would call then again to rer�ind them. I
mailed a letter to Mr. Bang with a copy to Bren stating my
opposition to this drainage .
On June 11 � 1998 Nir. Bang told me he would not give final
inspection to Bren until this drain pipe was removea . Gn �iuly 6
the pipe had not been removed and iYir. Bang said he would call
Fsren and tell �iim to reMove the pipe . He gave finGl inspection
so ovrners could move in but the pipe was not removea. This was
contrar-y to w}iat T,ir. Ban� haci Dromiseri . t,�r. Ban� saic:i re would
rvrite a letter statin� that I��ir. Brer� ha�. not Gbided by the city' s
instructions and I would �et a copy .
On hugust 12, 1998 I asked for a copy of the letter and was told
it would be mailed shortly.
On �eptember 3, 1998 Tr;r. Bang said I would get a copy in one
week.
Gn �eptember 25 , 1998 I told kon niorris of the above situation
and he said he would find out about the letter and advise me .
On October 5 , 1998 Ivir. I�iorris said he was told �the arain pipe
was resolved by running the pipe to the southwest . I told him
this was not true and the ori�inal south running �ipe still
remained . iie would recheck and get back to me .
On October 30 , 1998 I called 1�':r. l�:orris for informGtion. . He was
out of town. I called l�ovember 2, 1998 and Y�e was in a meetin�.
I called November 3, 19�8 and again he �vas in a meetin�. On
I�ovember 4, 1998 T�'.r. P�:orris called and said he would ad�ise me .
Un I�ovember 5 , 1998 I t�lked to iv:r. rlint oi the city council and
advised 'nim of my problem. He would get back to me . It is
November 14 and I have not heard from anyone .
. _
I would not be writing this letter if persons involved had done
their job. Secondly, this would have been resolved if the people
had not procrastinated.
Being a resident of Orono for over 30 years � I am surprised that
this type of performance exists in Orono .
I would like to have a letter within 10 days stating that any
water problems caused by this drain pipe will be corrected and
paid for the Bruce Bren Coonstruction or the City of Orono .
Please renew my faith in Orono government .
� Regards
/g�7i?
Donald B. Chase
365 No . Ferndale
Wayzata, lv�inn. 55391
r:ncl . letter 8/10/ 98 to bruce Band
CC Bruce Eand
CC Ron A�iorris
CC Dick Flint
CC Larken, Hoffman, Daly and Lindgren
u►ct� �'���r� �- ��3-- SSB�� � � .
�,
. � �� _ 7���
Marc2i 10,1998
�,y� � � ��•�r-�✓
City of Orono , �{j/J �1 U �J�l S � c�Ty /�'Qi`'1 �
Box��:66
Crys tal Bay, T�in. .55323
Ref. Phone Calls
2/9/98
3/9/98
Htt : t�ir. Bruc�= Ban�
�ui�.din� Inspection Dept.
L�cizi iir'. DGI1V�
This letter will confirm my recent phone discussion with you
concerninb water run off from nerv construction adjacent to my
property.
I do not want the proposen drain tile system rieGded my direction .
The water run off prior to development frequently caused erosion
to my road . In addition the loss of natural �;round absorption aue
to construction could make m�tter� �:orse .
The contractor stated that the pitch of driveways etc . v�ould
not be in my direc�:�on . I assum�, you have discussed t'r.is and
will direct their water run off ir. a airection and manner that
will not affect my property.
Re�ards ,
��
�� G�«��
�^/l�-,
ll. B . .Chase
cc Bruce Bren Co . o/o Peter Bren
10i: �o . Broadway
'v�ayzata, f�in. 55391
�� �'i�✓,�- � i Z�
.�t " ���� , 7'�� G��`'f� S�rg"l�7 7/�C�� C.�-�.w�. �7 /`' T
7/��'��
/'Jo��-� T v�i �. �+���' E S 2�0 �ti'��
�_ G_ �� �,e� �° �.PJ �� d- ��� I��
�-�4 `� � 'f y,t��'`'�l�
c� _ I Z_g� ,C!�T I'-t o�S S F�P C��7/ a � �. �b�f�.
�_3-��'/�-1�� ���' �i�2 l r,�/�.