Loading...
HomeMy WebLinkAboutPreliminary Septic Design � DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED PERMIT NO. cOMPLETED 8 ,� � ADDRESS �QD QY.StQ� 0'f��C� OWNER TELEPHONE NO. CONTRACTOR � DESCRIPTION �m� �S ��-�`��e����� 11� ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL _ J ❑ DEMO-SITE ❑ SEPTIC INSTALL � OWNERICONTRACTOR TO MEET YOU:_YES_NO v�i COMMENTS: � W a 0 d�� �, �., � z�( r� � � q ��S I�t/' i (�-2S l �j n W � Q � i �m s � - �1- � ,� � ; � n2BU e.2cc" u W � J d W ❑WORKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE � ❑CORRECT VYORK�PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN INSPECTOR WFLL REfURN ❑STOP ORDEH POSTED.CALL INSPECTOR �CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Ca11 for the next inspection 2a hours in advance. (952) 249-4600 OwnerlContract site: Inspector. White Copyllnspector's File Canary CopylSite Notice � � �e� �e��t�� n v�- -�G�� c��Um U�� � l � � � RECEIVED - ��� JUL 1 1 Z016 � � �) �� C�TY OF ORONO Joseph Olson D.B.A Rusty Olson's--�oil and Percolation Testing Joseph .I. Olson--��1PC.a License # 8l0 11-t81 Ri��er-��ie�� Rd. \E, Nano��er, �1� ��3-11 (763) -�9$-8779 Fax (763) -198-8290 June�". ?016 �est Ba� Homes i00 Ba��side �Trail Urono. Hennepin Count� This on-site Se��a�_e'rreatment S�stem is desi�_ned tar a T}pe I three-bzdroom hotne in accordancc�+ith [he Minnesuta Pollution Contrul A�,rnc� Cttapter?48�and local ordinances. T he periodicall� saturated soils ��ere located at?0-?8 inches(mottled soil). Due to the periodicalh saturated ;oils. a pressurizrd mound s}stem «ith 6 inches ofrock ��ill need to be installed to tT�eat the septic ettluent. (h� bottom of thr treatment area must be located at least �' abo�e the saturated �oii>. "This s�stem is drsi�ned Nith 6 inches of rock All nei��hburin�;�+ell�arz ��reater than 100' from proposed treatment areas. The soils at a depth of 1?" ha�e a percolation rate avera�in�_6.-1 '�1P1. All ne�� tanks need ro be insulated if there is less than t��o feet ot co�er o�er thz top of the tanks. Clean outs must be installed on the end of the laterals for maintenancz. .A 1000�_allon pumping chamber��ill need to be imtalled to lift the effluent to the treatment area. "The po��er supplt and s��itches mwt be (ocated outside the manholz and pumping chamber in a �teather-prooti enclosure. A tiarnin�*de�ice must be in�talled �ti ith li`,ht and sound dzvices:this i� in case of a pump failure. A flow measurement de�ice must be installed. Includin�,but not limited to a titiater meter.event count�r. runnin<�time clocks or electronicall��contr���led dusin�. tiothinP other than �ra� �+ater,tlaundr�,sho��ers,etc.) Numan ��ater and toilet tissue chould be dis�osed of into the se�tic tanks. Garbate disnosals are not recommended Additi�es mu�t not be used; thec ma� cause harmful damas�e to �our septic s�stem. It is recommended that �ou �ump the tank ever� �ear for I scntic tank,e�er� two �earc fur tHo seotic tanks Sincerel�. � �-~'" • Joseph J. Olson , ���; � /- � � � ° - - . , . .. i / / ,, ..- -- - ._ .__ ' ., � � m � ` ; � �� ' �`� � � /� � -- - - � . m . , i � �- -- __ _ , � , � / - -- . .� . - .._— '"_ _ __ '""_ fl� -. . ' � ( - � i �� � % - ., ' � .- � J - , � � ti � �- � v � - . _...... -..., . ��, . d� _.__ . _ . . . . �� � l�-� _...... . .. „ � � � � � �� ;� ,. �� . ._ ` , \ �':. a -� a' .r � : .o _ . . � � , �� a o Y, , � �\y � _ _ a_ � - - _ . , _ ; - _ _ , ; � ; � ��' -�_ � _ -� , � ; . , ; - ���, � , , . ,� : , - � � � _ - _ - �--� ; , _ _ _ _ __ . � ,. _ � _ _ - iay.. . s - . "� ' � r. � _. � \, , ' ' � �'�p � � �,dP. � �� _ .. �' . � .. - Y� �� � ," � _..'—i=_- .�.a"� _'k±�r� h _ , '�� �y � 0 , � :.� �- 1 ,� pFrg� �; ��A N�o� / � � • �\ i��� � y � � �% a- / - __ __ _ �" ' -�� c �O s !, . .I' 11 � � A"�B�,F `��\ �a�°'-' -_ . -0 � - '% . �a__,` � m _ � , . � r _ o _ _ _. _ , _- � . _ , f'� � - -\ ;:r-'"' >N , � ,� - 'i; � � . '�:� l, ,. _: v� ^ s = `. Y��_- ,!� �" �'C ..-4 1����qAit aGE ec..�-.rt„`.1N / .._ (}� . � _ v� ' `i .... 4 ._ _��'• � ` - / . •V...�. "�� �a - .r � _... iv . .. ... p'� . ,�p � l... �.. �/ .� r.._� .. ..._ � / .. ' r_ "_ - ' � r1 ' Z � _ _ 40 �� t / , o 1 .� - R..1.�/ W � � � � � � � ;, � ,.;� � s , :, � . � � i' � � o '� ��-�o ��� �_ � > � ' � . m _ � _ � � D � , '�"� � ';�;, p �. , � � � r __ \� __ .._ ��.. �g, � � ' l 3 � � �T�. - i^"� '\ ` r� x . O� ,�l r ". l � � �"� �l: . � �;� .y `\� . � � t_ � - " . \ ___--. _ �4;�C`��"e ;�.__.:� . Z 7 - � := �.�.L �' '� .�, � 3 ..: . ; c .C�?s�"`;, �"-__,_�-_=�\ '�� " o , _ � i; -� r __._ - �-, , �. . � :.. �_ - � � i� - �- . � � \ � � . � ` � � ,��� �s - \ , . _ E � � � j ..� i - .�_ . - � -. , . __� _ � � � ; : : � - - . • ,, n ' _ ° �� � �� /�� a - p� � i„ ��a.\' �z � Y�b-y�� � .� . �Q � - ' `-�"�` ;� � ��`, `� �m (��' 9 O {� �'� \ c \ f �9 � I.- 1{�✓` .,�D9 L. ..�� . ���'�' ��.y' $�'.,\ \ \♦ ``Z� ` .'c�ip ` . . V t \Z'y ,� \ }y.�..;yy�.�,� . \ . �� '_ . _ _. \� ' `��` ^..-�QnS�O S�,u�'�}y h'091� YRyr�" \� �` � � _� . . �vs' �t e_�� ,�. 5. . �t\ 7� �T: �`�!� �1�'� yC"� , � ` l^ Y'� � If� p .�G �,z �� +.; ;,� ��' - �� � �� `�`- � ��Q c�',. � . . . . ..u;�� '` 1�on' a . F -. / �/// � C��r� \��0� � _ �°9 ��e � - ng=' ��. � : \ ��c �a , � / �\ sp Q /.� � y3. d 4� } �r p sll�.p��� i� ' A � P � � � 7 ' \ �_ , ��Si f C� ` a : �Ci. - ��' ';�6� � u i �s'""'--r*s---t e�w.—�r— r . ' _—.� 6 � ,`t • �v'. - -cr� X,>�,�G,S" =b� li" k' j� � �Z� U`p . -'� -'r Ss¢'��� . Z/�4/ • _ - � � � . s , s ; � , � > � � ' l\':9 Q� U`, � f� ' zdr_._ .. ?. � - . . � . - �'€].rF ..:: . ' � � f '�` � -G ..� l�"" - - �i „ N'O C,.� . � — -.z�__ �, „� - - -- < _' `,` n��,o`�- ,. r.c�°q6 30'��25?.35 , \� . . , ;i � ___..- --____ _..___ _ ____ _ ------ ----- �- ' -._� � �� .. --- • ' / I�,t�oV_`�_ • . � �`�, , fU'�( ?� A°u`�srn / --Yc:�..__�' � "io rco►� . _....,,.____ -- - �_..��.. _ __ ;__ .. ...._.. .« .,,...- �..�._...._.._..._.....______�E 1Q�.._._.�_..�.. _..__`=� l.�QNa�'. ..,.....:.7A�.,.�t1;�.�-- ..�AtLS,f �.___............... . .'k<lCsl �- . . ` �'^' . `"� . * AM�il; dSE. ` ' , ~`'�,_ `ttdl$NA/�1�tf� __.�..\, , �'...��.�7k�. .�.. ��•�l��� M , '�' """,,.» N[ ' (� , f yF. a�-w�Lt ..._.,....n_.�L'.-`.Sst�tR__._......�....... ., ......._'�E.� �.. ,_... _ ,.,.. .. ......_._.......,_ .M._. . - `"`-.--.....�..,.......�-.t� ._ .-._.....w-.-..e...y,.'^.........e........�..._---.•--- �,"i.,�' .�_.r ,i, ,. 'r s� l ,._.. Ou��C++H'�Sr ►ttl �p _��--c�`._�'..—,--,-��—.. �F►iC �� ..,.....• ,K . 'r . -_...... � , la*ecY RK nsrcr sc t»�els so %_���', ;<,.�< ���C � �11+�x seue dwa,wr _eae oeaoR G.�:� i�=.�c� � ._ __...._ ��`'' r."'c St��L �C1RtN� �'L�I/A'i`lE�i�� ..�.�_,�_.. _. .__.. , MOUN11 iYS l f�h•1 l)I SlGN T}�.�� E�.. �.;.e. = 7N.��2 EL. ,. a�s'�i EYf��': ? l;f'd►oc��n,Aucrage pE�rcc:latival�ate _ ,' _ �T�QQ�`�K!� '�'t-j,*��(,;. -,' 9 � 8Ystem mu�!be: TH.�{E[.. f,9 9 u<,, - ; �a Kal/d.�y ._ >� sq_fi c�i�treatment�.�e� ?��-�� V10 fi_ �v�dtf� _: ft�. length nf t�ed are� Ti111�,;;;;;;'�'OitIPTOp@�'(le Ijp�� w*$EL. 1GY t, �.,•�'t�m w�e� al'�EL. • :Y;G.9 Sid��;I��pc i ur►=�: , to I x-:� lttighl =+�. h.x `.: ft. l awri arF�a. .. " ,l,it,."'frWt1 bWyl�. �' T�tst�tllllt�tro� �",����tPOtt1 k�te.,,,..'��i7� C:lean rock ��c�c�ed plu5 20H'� �� ru.yds_Caarse washed sanc :�� cu.Yds. Avera�;e 5ancf dc�pth ; '�'�����������y��(��q� ^ �O°�i'C?tl71N�� Sandy luani.i�% cu.yds., ToFnrril E, `r cu.yds. +zlus SO% U`,�� cu. Yds. ���r�y ��� Jt Niamb��r of t�nks;:r_ ,15`tank !nc ,gals.,?`�'iai�k !_ . g�1s.,Pump ct�a�nber capacity ;�: �_-' gals_ - P�tC1F��R7Y Cli�':,. -,t::.,:..�.. r• ,�t�: ;, �., ;. , €:ak.j10U{ineal fe�et of � � - „�,�,,,� , - ; x•,dia. Sup�ty pipe, finea!fieet r��crded,;.� � ' ;.; ` �� � . r , _ , ` r � ___._ __ _ • �..��,.tD. � R���)_'.c1 �.J { '_- ..�: .,...___��w.�....�..._.�.�:.J'...�..,.._,.......`...._...._.. Uistri�ution i�ipe r;___"dia_ �,,�. linca)k�et, di.a. Pertoratiom %? .---_ ..— � _____.._.___... _ __i__ -�" __"apart • ��)ck;!t�t at : '. . pals.,_ '�-; tirnet��r�r clay 1'unip curve /min. :-; feet head��ressi�re. , --- JetB:,�_I,�;J,,� �'h. 7b3•498-8774 Ru�ty t?!��`$��nd Ps�rcoiat#an'��stlr�� 2011 purplecode Mound Design www Sept�cResource com ivers 15.2j Property Owner: West Bay Homes Date: 6r27/2016 Site Address: 100 Bayside Trait PID: 0611723220026 Comments: instructions: � = enter data � = adjust if desired � = computer catculated - DO NOT CHANGE! �3 bedroom Type � Residential System _ 450 GPD design flow Yes Garbage disposal or pumped to septic 50% targer tank with multipte comp�tanks � 1500 Gal Septic tank �code minimum� 2000 Gal Septic tank (design size % LUG re�'d� Tank options: none 1•2 GPD/ft� mound sand loading rate contour toading rate of 12 req's a min 38 ft. long rockbed ��� 10.0 ft rockbed width 38.0 ft rockbed length � 3.0 ft laterat spacing 3.0 ft perforation spacing imaximum of 3 for both) end feed manifold connection � �3 taterals 36.0 feet tong 13.0 perfs / laterat 39 perfs total �1/2 a perf means the first perf starts at the middle feed manifold) t/4" inch perfs at �feet residual head gives 0.74 gpm f(ow rate per perforation for this perf size Ec spacing, �t pipe size on line ?2, max perfs/lateral = 25 . iine z8 must be iess --> i�,; 4.0 doses per day { 4 minimumi i i, 113 gatlons per dose {treatment volume► 2.00 5x �, 2.00 inch diameter laterals must be used to meet "4x pipe votume" requirement 2.00 3x 120 feet of 2.0 inch supply line leads to 20 gatlons of drainback volume ITip: "top feed" manifold to control the drainback� 133 galtons TOTAL pump out volume �treatment � drainbackj i� 8 feet verLical lift from pump to mound laterals, teads to a: i��. 29 GPM � 17 feet of head, Pump requirement �note: y50gpm may require an extra 3-6'of head) i, 500 gal Dose tank tcode minimum) 1000 gal Dose tank (design size ! LUG req'd) at 25.00 gpi leads to a i.� 5.3 inch swing on Demand itoat, or timed dosing of 4.6 min ON �confirm pump rate with drawdown (this delivers Average flow, =70%of Peak design flow►�hrs QFF test and adjust as necessary) ��� 12 inches from bottom of tank to "'Pump OFF"ftoat ,� 17 inches from bottom of tank to "Pump ON"float, or 12 inches to "Timer ON" float if time dosed _� 20 inches from bottom of tank to "Hi Level" ftoat, or 30 inches to"'Hi Level" float if time dosed __ 500 �allons reserve capacity iafter Hi;h Levet Alarm is activated� _ 0.60 gpd/ft` Absorption area Soil Loading Rate, which gives a mound ratio of 2 Iminimum) jthis must match the soil boring tog� desired mound ratio 2.0 _ �8 percent site stope (0-20� range► �8 (%downstope site slope, if different than upslopel _ 20 inches, or 1.7 ft. to Redox or other limiting condition (need at teast 12"to be a Type I) Treatment zone contains�0 inches of 0`� soit credit, and �inches of 50%soit credit. Giving a: ,r. 16 inch, or 1.3 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONS!!! _ . 20.0 ft.Totat ABSORPTION width �with sand beyond rockbed as follows:I 'r, 0.0 ft. upslope and sidestope 10.0 ft. Downslope tndividuat slope ratios give BERM widths Itopsoil beyond rockbed) of: _ 4:1 upslope ratio 10 ft. upstope berm ,� � 3:1 sidestope 12 ft. sideslope berms , 3:1 downslope 20 ft. downslope berm _ Overatl Dimensions: 10.0 ft. wide by 38.0 ft. long Rock bed 4Q ft. wide by 62 ft. long Mound footprint 4" inspection pipe 18" cover on top U sto e berm �� Dov��nsto e berm 20 ' 12" cover on sides '/ � r6"L7amy cap&G"topsoili "� 1.3 C(ear� Sar�d !��ft �'�'�.� __��. 1 .,�f. �; 1J � . _ Absor tion Width zo.o Note: For 0 [0 1 o slopes, Absorption Wrdth is measured from the Bedequally in both directions. For slopes >1%, Absorption width is measured downhil! from the upslope edge of the Bed. � Rock Bed: 10.0 ft. by 38.0 ft. by �inches under pipe, plus 2046 gives 13 yd'or•1.4= 1g ton , Mound Sand: Inote: votume is based on 3:1�4:i slope from top�f rockbed, Exchange sand for toamy cap if desired) 16.5 up + 40.2 downstope - 10.9 ends * 24.4 under rock = 110 Yd'ar'1.4= � 155 ton plus 20% Loamy Cap: 36 ft. by 58 ft. 6"deep, plus 20� gives 47 yd'or*1.4= 66 ton , Topsoil: i 4G ft. by 62 ft. 6"deep, plus 204o gives 56 yd'or'1.4= 7g ton I hereby certify that I have completed this work in accordance with alt applicable ordinances, rutes and laws. ,� ,.,�'_.___ Rusty Otson's Soil & Perc. 81G 6�27/2016 ,,�signer Signature Company License# Date Installer Summary 2000 gatlon Septic tank �minimum) Tank options: none �u� �arger iann wi�n rnuiupie coniNi�anKs 1000 gallon Dose tank (minimum) at 25.00 gp� 29 GPM C� 17 ft. of head, Pump required � 5.3 inch swing on Demand float which translates to roughly 3.7 inches of ftoat tether length if time dosing is required --> 4.6 minutes ON time 8 �hours OFF time 17 inches from bottom of tank to "pump ON" ftoat, or 12 inches to "timer ON"ftoat 20 inches from bottom of tank to"Hi �evel Atarm" or 30 inches to "Hi tevel atarm" if time dosed 120 ft. of 2.0 inch supply line with end feed manifold connection ITip: "top feed" manifold to control drainback) 16 inch, or 1.3 ft. Sand Lift Mound 10.0 ft. wide by 38.0 ft. long Rock bed 3 taterals 2.00 inch diameter 36.0 ft. tong 3.0 ft. laterat spacing 1/4" inch perfs 3.0 ft. perforation spacing No Effluent filter fx alarm 3 clean out 8 valve box assemblies 20.0 ft.Total sand ABSORPTION width �minimum) 0.0 ft. upslope and sideslope �sand beyond rockbed, minimum) i 10.0 ft. Downslope �sard bevcnd rockbeti. �inim��,r-,,i Specific slope ratios give BERM widths (topsoil beyond rockbed) of: 4:t upslope ratio 10 ft. upslope berm 3:1 sideslope 12 ft. sideslope berms 3:1 downslope 20 ft. downslope berm 4" inspection pipe 18" cover on top U slo e berrn � �� \ Downslo e berm 2C' ,,. 12" cover on side5 '� ` i.6"loamy cap&6"tops�il) 1.3 Clean sar�d ,:f; ���`� ,..,`�_ i ,, , �,.. 1.7 ;� .� :; ,. - . .� Absor tion Width 20.0 Note: For 0 ta 1� slopes, Abso�ption Width is measured from the Bedequally in both direction5. For slopes 71%, Absarption Width is measured �iownhitl from the upslope edge of the Bed. Rock Bed: 13.0 yd3 or'1.4= 18 ton 6 inches under pipe Mound Sand: 110 ydJ o�"�•4= 155 ton calculation based on 3:1/4:1 stope from top of rockbe� Loamy Cap: 47 yd' or`1.4= 66 ton 6" deep Topsoil: 56 yd3 or"1.4= 7g ton 6"deep INSPECTOR CHECKLIST - mound �uu �aysioe i rait � �1! I.1. .�zh��cl,,: 20' to pressure tested sewer line �5 psi for 15 min) 50'to everything 100'to dispersat area with shaltow well I'ROPER i 1' i_1\f.ti ;rihack: 10'to everything Ruad,�cback: platted: 10' prop line. Metes � bounds: out of road easement, or outer ditch. 1.:�1:1-: Bl.l FF ;�chack: 20'for btuff. Lakes: GD_, RD_, NE _. Protected wetland _. f3uildinL seihuck:: 10' for everything, 20' for dispersal area. t1 1l 1 R I I\'I: under pre;sure;�10'to bed,tank Et sewer line. (etse sewer tine > 12" below► � Sewer line & baffte connection (no 90's, 3'between 45's, slope min 1" in 8', max 2" in 8'i (no depth req's, clean out every 100', Sch 40 pipe� � Septic tank and risers (water tight, insulated, proper depth, existing verified by pumping) mfg 2000 gallons none Riser over outlet, riser over inlet or center, and 6"; inspection pipe over any remaining baffles. No effluent filter £� alarm Dose tank risers and piping �water tight, insutated, proper depth, drainback� mfg t0p0 gallons � dose pump 29 gpm 17 head VERIFY PUMP CURVE 4.6 min ON 9 hr OFF � ftoat setting drop 5.3 inches at 25.0 gpi "DESIGNED" 3.7 inches approx float tether length 133.0 gal dose divided by gpi "INSTALLED" = inches float drop (field corrected LABEL pump requirements and drawdown on riser or panel Cam lock reachable from grade - 30" max. J•hook weep hole. Supply line access (no hard 90's) 2.0 inch supply pipe: Sch40, sloped 1/8"+, supported by 4" sch40 sleeve or compacted, and buried 6'"+. splice box / control panel / etectrical connections flow measurement: CT, ETM, time dosed, home water meter mound absorption area rough up mound rock dimensions 10.0 X 38.0 Sand lift depth 16 inches. (Jar test : 2" sand leaves < i i8" silt after 30 min} � Absorption Sand beyond rock 0.0 upstope 10.0 downslope � Bermed topsoil beyond rockbed 10 upslope t 2 sidestope 2u downstope cover depth of 12•18"� YERIFY 3 laterals �1-2'from edge of rock) 2.00 inch pipe size (Sch40 pipe & fittingsl 3.0 ft tateral spacing 8 1/4" inch perforations 3.0 ft perforation spacing Air inlet at end of laterals, and at top feed manifold if necessary. VERIFY ctean outs �no hard 90's{ 4" inspection pipe to bottom of rock, anchored VERIFY Abandon existing system - if necessary �Re-use existing tank certification monitoring plan and type well abandonment form - if necessary � 1 . .., . .6. � . a . System Elevations t Y.!•Y{_?::M�.a�vla�•slA, } � � � —, ' ^ benchmark ' � r , ' ' T SN`ri i Mound � (Grade elevations are existing. tf a loamy cap different final grade is desired it should lateral be shown and described here.� bottom rack grade (at up�lop��oc k tTcd) $H�'1iT (at up,lupt��o�k Ix�d) 1 1 1 1 �� •J •J J J •l ..J / / . � r � I � � r r 1' 1 1' Sewer pipe exiting house Septic Tank Septic Tank (��,�����i��.�c,i��� Pump Tank urade vrade urade Grade Pipe inlet inlet mlet Tank boltam Tank bottom Tank bottom Loqs of Soii Bor�nqs License #810 LocatiQn or Project: Proposeci fot i Borings made by: Rusty Oison's 5oi! and Perc testing 1/7/2013 C{assification System: AASHO ; USDS USDS-5CS X ; Unified ; Other Auger used (check two): Hand _X�, or Power_, Flight, Bucket or Probe_X_ Bonng Number_1_Surface elevation_965.9� Mattled Soil at_1.7_feet �r"-14" Dark brown loam 10yr3I2 N20 present at X 14"-20" Brown loam �Oyr4J3 20"-30" Rusty brown loam 10yr414 B���ng Number_2_Surface elevation_965.9_ Mottled Soil at�1.7,feet 0"-14" Dark brown loam 10yr3/2 N20 present at X 14"-20" Brown loam 10yr4f3 20"-30" Rusiy brown Ioar1� 10yr4i4 Boring Number_3_Surface Elevation�969.9 Mottled Soil at 2.3 feet Q"-20" Dark brown loam 10yr3/2 H20 present at_X_ 20"-28" Brown loam 10yr414 28"-36" Rusty brown loam to clay laam 1�yr5,'3 Boring Number_4_ Surface elevation_969.9_ Mcttled Soil at_2.3_feet Q"-22" Dark brown loam 10yr3/2 H20 �resent at X 22"-28" Brown loam 10yr4/4 28"-36" Rusty brown clay ioam 10yr4i4 Boring Number_5_Surface elevatian_964.6` Mottled Soil at 1.5 f2et Q-14" Dark brown loam 10yr3l2 H20 present at'X_ 14"-18" Brown loam 10yr413 18"'-24" Rusty brown loam 10yr4/4 Boring Number_6_Surface elevation�966 9_ Mottled Soil at 2.3 feet 0"-20" Dark brown loam 10yr3/1 H20 present at_X_ 20"-28" Brown loam 1�yr4/4 28"-36" Rusty brown loam to clay loam 10yr4/4 Percolation Test Data Sheet Lic.#810 Percolating test readings made by: Rusty Olson's Perc. starting at 1�39 P.M. On 1108i13 �ocaiion: Proposed loi 1 Hole number. 1 Date hofe was prepared: 1i07/13 Depth of hole bottom_12"_inches, Diameter of hoie_6"_ inches. Soif data from iest hole: �epth. ir�ches So+i texture 0-12" Dark Brown Loam 10yr3/2 Method of scratching side wall: Knife �epth of gravel in bottom of hole 2 inches: �ate nf initial water fiiling 1/07J13 depth of initiai wate�filiing 12 inches above the hole bottom Melhod used to maintain at ieast 12 inches of water depth in hole #or at least 4 hours Automatic Siphon Maximum water dspth above hole botiom during tests 6 inches Time Time Depth Drop in H20 Perc Rate 1:59 2:29 6" 4.5 6.7 2:32 3:03 6" 4.4 6.8 3:03 3:33 6" 4.3 7.0 AVERAGE PERC. RATE 6.8 MPI Per'colaUan Test Dat� ShEet Lic.#810 Percolating test readings made by: Rusty Olson's Perc. starting at 1:39 P.M. On 1/08l13 Location: Proposed lot 1 Hole number: 2 Date hoie was prepared: 1J07/13 Deptn af hole bottom_12"�inches, Diameter of hole_6"_ inches. Soil data from test hote: �epth, inches Soil texture 0-12" Dark Brawn l.oam 10yr3/Z Method of scratching side wall: Knife Jepth of gravel in bottom of hole 2 inches: �ate of+nitial water fifling 1/07l13 depth of initial water filiing 12 inches above the hole bottom Method used ta maintain at least 12 inches of water depth in hole for at least 4 hours Automatic Siphon ^J"axirnurn water aepth �bove hofe bottom during tests 6 inches Time Time Depth Drop in H20 Perc Rate 2.00 2:30 6" 5.2 5.7 2:31 3:01 6" 5.0 6.4 3:04 3:34 6" 4.8 6.2 AVERAGE PERC RATE 6.0 MPI Percalat�on Test Daia Sheet Lic.#810 Percolating test readings made by: Rusty Olson's Perc. starting at 9:30 A_M. O� 1/09l13 Location� Proposed lot 1 No1e number: 3 Date hole was prepared: 1f08113 Depth of hole bottom_12"_ inches, Diameter of hole_6"_ inches. Soil data from test hole: Depth. inches Soii texture 0-12" Dark 8rav+rn Loam 10yr3/2 Meth�d of scratchiny side waii: Knife Depth of gravel in bottom of hafe 2 inches: Jate of initial water filling 1/08/13 depth of initial water filling 12 inches above the hole bottom Ulethod used to maintain at ieast 12 inches of water depth in hole far at least 4 hours Automatic Siphon Maximum wa#er d�pth above hol� hottGm dunng tests 6 inches Time Time Depth Drop in H20 Perc Rate 9:44 9:59 6" 4_1 3.S 10:02 10:17 6" 4.0 3.7 14:18 10�33 6" 3.9 3.8 AVERAGE PERC RATE 3.7 MPi . , PercolaUon Test Data Shee? Lic.#810 Percolating test readings made by: Rusty Olson's Pe�c. starting at 9:30 A.M. On 1/09/13 l.ocation: Proposed lot 1 Hole number: 4 Date hole was prepared� 1f08113 �epth of hole bottom^12"_ inches, Diameter of hole_6"! inches. Soii data from test hole: �epth. inches Soii texture f�-12" Dark Brown �oam 10yr3/2 Method of scratching side wail Knife �epth of gravel in bottom of hole 2 inct�es: �ate of initial water fiiling 1/08/13 depth of initiai water filling 12 inches above the hole bottom 'Ulethod used to maintain at least 12 inches of water depth in hole for at least 4 haurs Automatic Siphon `�/laximurr; water depth above hole bottom during tests 6 inches Time Time �epth Drop in H2Q Perc Rate 9:45 10:00 6" 5.5 2.7 10:01 10:16 6" 5.5 2.7 10:19 10:34 6" 5.5 2.7 AVERAGE PERC. RATE 2.7 MPI