Pu�suant to Min�nesota Statutes Chapt�r 103D, and on the basis of statemenfis
and information contained in the permit applicativn, correspondence, plans,
The Minnehaha Creek maps, and all o4her supporting data submitted by the applicant, and made a part
hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant
Watershed Oistrictis named below fur use and development of land in the Minnehaha Creek
committed to a Watershed District.
leadership role in
protecting,improving �ssued to: Allike & Julie Whittinqton Permit No: 09-124
and managing the Location: 1981 Faaerness Point Rd, Orono
surface wacers ana Purpose: Ftule B� Erosion Control
affiliated groundwater .
Date of Issuance: 5/22/2009 Date of L=x iration: 5/22/2010
resources within rhe
District,includ;�g the�r By Order of the Board of Managers
relationships to the
ecosystems ofwhich ' Becky oudek
District Technician
theyare an integra!part.
wea�h�eveourm�s�o�� This permit is not transferable without District approval, ar�d is valid to the date of
expiration. No activity is authorized beyond the expiration date. If the permittee
through regulation, requires more time to complete the project, an application for renewal of the
capital projectc� Permit must be received by the District at least 30 days before expiration_
education,cooperative The applicant is responsible for compliance with all District Rules and for the
endeavors,and other action of their re:presentatives, contractors, and employees.
programsbasedon Conditions: Project to be completed as describ�d in plans submitted to the
ti�CWD office on May 19, 2009 according to the provisions of this
soundscience, _
permit.
innovativethinking,a� • Properly install and maintain all required MCWD Rule B,
erosion control measures until tl�e disturbed areas are ' '
informedandengaged restabilized
constituency,and the • When the site is restablilized and the MCWD staff has
performed a final inspection, all silt fences must be removed
cost effective use of
pu6Lic funds.
(Statement cor►cerning fees for inspections, violations, etc.., on following page)
TOTAL P.02
� MINNEHAHA CREEK WATERSHED DISTRICT
C�UALITY OF WATER QUALITY OF LIFE
EROSION CONTROL INSPECTION
DATE: December 3, 2009
TO: Dan Gallus, Michael Gallus Construction
Mike Gallus, Michael Gallus Construction
Christine Mattson, City of Orono
FROM: Tiffany Forner, MCWD
RE: Permit 09-124: 1981 Fagerness Point Road, OCono
The Minnehaha Creek Watershed District (MCWD) has inspected your site for compliance with the MCWD permit
requirements. Based on our inspection at the above mentioned location, the following violations were observed and
recorded on Decem ber 2, 2009:
Violation 1:
• Sediment tracking on Fagemess Point Road (Photo 1)
• Corrective Action: Sweep Fagerness Point Road of sediment by December 7. 2009
Photo 1
�`1 ' � �
- r`�u�,, 0�
. ,.•-�- . ,,
�`
�,.
�
����
Violation 2:
• Silt fence damaged and non-functional around site (Photo 2, 3)
• Corrective Action: Repair and re-install silt fence so it is effecti� by December 9. 2009
Photo 2 Photo 3
� \� ' ` - - .�v -
�h '���'�"' --`'�
x ,�t -�=
�� �, �s �- :�.�,. �..: -.
�« ��, `� ` � .. '���,��
yt� �� i� ,,�v �` _. �. ,,,t..."� .�
" '` �v���'h:r i i}�..,L.,7.j� . J -.:� ��4
�!{ *r� .,��� , . . .. � .. �':
� . .�'�% .'� ,.�� -. y�`-�3
Violation 3:
• Construction entrance/driveway needs crush rock installed to prevent sediment tracking
• Corrective Action: Install crushed rock by December 9. 2009
• MINNEHAHA CREEK WATERSHED DISTRICT
QUALITY OF WATER QUALITY OF LIFE
To avoid formal enforcement action from the Minnehaha Creek Watershed District, including the issuance of a Stop Work
Order and reimbursement of additional MCWD staff inspection time, please implement the above mentioned corrections
by the dates specified. Thank you for your immediate attention to this matter. If you have any questions, please call me
at (952)471-0590 x212 or by email at tforner@minnehahacreek.org.
Sincerely,
Tiffany Forner
District Representative
Enclosed: October 28, 2009 Inspection Letter
_.�:.
y ��ll�neha�a �i��el� -� '�� '��: ����atiershed Dlstrlct
IMPROVING QUALITY OF WATER, QUALITY OF LIFE
EROSION CONTROL INSPECTION FORM
1'he Minnehai,a Cree;< DATE: October 28, 2009
Watershed District i:- TO: Mike and Dan Gallus, Gallus Construction
committed to a Christine Mattson, City of Orono
teadership role in FROM: Luke Schwitzer, Minnehaha Creek Watershed District
protecting,improvinp �� RE: MCWD Permit#09-124: 1981 Fagerness Point Rd., Orono
and managing tne
, During routine inspections by the Minnehaha Creek Watershed District(MCWD) staff at the
surface waters anr• � above mentioned location, the following violations of permit#09-191 were observed and
recorded on October 28, 2009:
affiliated groundwate;
resources wr'thin the • Significant sediment vehicle tracking from the site
• Silt fence inadequately installed
Distrid,inctudingthei� • Gravel construction entrance missing
relationships to il��
• Soils and stockpiles lacking stabilization
ecosystemsofwhrcr. MCWD requests that the permit holder take the following action:
theyareanintegratpart. . Instali gravel construction entrance
• Sweep up all mud and tracked sediment on Fagerness Point Road
Weachieveourmission Re-install ALL silt fence on site. Silt fence needs to be trenched into the soil to function
tirrough regutation, • correctly, and it must be maintained and cleaned out when material accumulates to 1/3 of
its height.
capitat project< . Stabilize (either permanently or temporarily)the front yard
• Remove or stabilize the stockpile in the back yard of the lot—This stockpile is too large to
education,moperat;�: be adequately controlled by silt fence and will be a big concern in the Spring months if
endeavors,and���.��r attention isn't given to it now. Give me a call on this issue if there are questions.
programsbasedon To avoid formal enforcement action from the Minnehaha Creek Watershed District including the
issuance of a Stop Work Order and reimbursement of additional MCWD staff inspection time,
soundscienc please implement the above mentioned corrections by Monday, November 2, 2009. Thank you
innovative thinkin�, -.;, for your immediate attention to this matter. If you have any questions, please call me at(952)
� 471-0590 x214.
infermed and enr,�c��
� S�� erely, ,,
constituency,and the
�
cost effective���e.-= �
�„i��,.r�,�r�,- Luke Schwitzer
MCWD Compliance Offcer