Loading...
HomeMy WebLinkAbout2011-00554 - addn/remode/repair CITY OF ORONO PERMIT NO.: 2011-00554 • �' 2750 KELLEY PARKWAY ORONO, MN 55356- DATE ISSUED: 07/OU2011 952 249-4600 FAX: 952 249-4616 ADDRESS : 3424 EASTLAKE ST P[N : OS-ll 7-23-13-0044 LEGAL DESC : BAYSIDE BEACH : LOT 003 BLOCK 001 PERMIT TYPE : ADDITION/REMODEL/REPAIR PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : ADDN/REMODEL/REPAIR ACTI V ITY : 434-RESI DENTIAL VALUATION : $ 30,000.00 NOTE: SEPERATE PERMITS REQUIRED: PLUMBING,MECHANICAL ADV. PLAN REVIEW PAID$303.39 ON PERMIT#2011-00553 ON 06/29/2011 APPLICANT pERMIT FEE SCHEDULE 466.75 RADKE, THOMAS&MARGARET 3424 EASTLAKE ST STATE SURCHARGE(VALUATION) 15.00 LONG LAKE, MN 55356- TOTAL 481.75 OWNER RADKE, THOMAS& MARGARET 3424 EASTLAKE ST LONG LAKE, MN 55356- AGREEMENT AND SWORN STATEMENT 'I�he work for which this permit is issued shall be perfonncd according to the approved plans and specifications,applicable City approvals,and the S[ate[3uilding Code. This permit is for only the work described and does not grant permission for additional or rela[ed work which requires separa[e permits. All provisions of laws and ordinances goveming this type of work shall be compied with whether or not specified herein.This permi[will exp�re and become null and void if construc[ion authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time afrer work has commenced. The applicant is responsible for assuring all required inspections are requested in c nformance with the State Building Code.This permit may be revo at a t� e for due cause. � G�l� �D / / l1 App icant Permitee ignature Date Iss 13y Signature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. t � BUILDING PERMIT ESCROW AGREEMENT �}�'� / Orono Land Use Application#11-3509 and Building Permit#'?�� � ' �V�'-�`1 AGREEMENT made this �� day of�u�� , 20 � � , by and between the CITY OF ORONO, a Minnesota municipal corporation ("City") and �� �cz �6¢��� ("Owners"). Recitals 1. A building permit application has been filed for located additions to the home at 3424 Eastlake Street the ("Subject Property"), legally described as Lot 3, Block 1, Bayside Beach, Hennepin County Minnesota. 2. Owners request the City to review this application. 3. The City will commence its review of the application and incur costs associated with said review only if the Owner establishes an escrow to ensure reimbursement to the City of its costs. NOW THEREFORE, THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owners shall deposit $2,500 with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of $500, or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be responsible for under a building permit application. The escrow will also guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work (including planning, en �ne ring, or legal consultant review) associated with Land Use Application #11-3509 and Building Permit # — �"r if compliance with the approved building permit is not accomplished. 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. tn the event that the Owners do not make payment to the City within the timeframe outlined in #3 above, shall issue a Stop Work Order unfil the Owners pay all expenses invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eligible expenses the City has incurred. 5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the Owners when the review has been completed and written notification is received from the Owners requesting the funds. 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn. Stat. §§ 415.01 and 366.012. CITY: TY ORONO OW ER: By: ���_� �tS: �^��`��2 'J�r�C�a� � ����C����1�'�� __ :�°OT�(,�����lIIl��f�'�` , �.� _..,.,. . _.�,,� �.., '������7'eE,t��C ,,�.a�..�� _ ,.�..».�... ....,. y.._ ...,. .. �s.. __ . . , . , ' . : • . 1 - � , � emo To: Finance Department From: Christine Mattson, Planning Assistant QJ� CC: Street File t Date: 1/9/2013 G/L: 101-22205 Re: Building Permit Escrow Refund Building Permit #2011-00554 pertaining to 3424 Eastlake Street is complete. The Applicant, Thomas 8� Margaret Radke, have verbally requested a refund of their$2,500 escrow. The following is attached: • Original signed escrow agreement • Copy of cash register receipt showing escrow amount received Mail to: Thomas & Margaret Radke 3424 Eastlake Street Long Lake, MN 55356 w:\street files\eastfake street\3424\escrow refund memo 2011-00554.doc BUILDING PERMIT ESCROW AGREEMENT I /� �� / Orono Land Use Application#11-3509 and Building Permit#�.��� I ✓ U v�"�`7 AGREEMENT made this ����� day of����� , 20 l � , by and between the CITY OF ORONO, a Minnesota municipal corporation ("City") and �� ,/�6¢�c� ("Owners"). Recita Is 1. A building permit application has been filed for located additions to the home at 3424 Eastlake Street the ("Subject Property"), legally described as Lot 3, Block 1, Bayside Beach, Hennepin County Minnesota. 2. Owners request the City to review this application. 3. The City will commence its review of the application and incur costs associated with said review only if the Owner establishes an escrow to ensure reimbursement to the City of its costs. NOW THEREFORE, THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owners shall deposit $2,500 with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of $500, or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be responsible for under a building permit application. The escrow will also guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work (including planning, en ne nng, or legal consultant review) associated with Land Use Application #11-3509 and Building Permit #���(„�-�_if compliance with the approved building permit is not accomplished. 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the timeframe outlined in #3 above, shall issue a Stop Work Order until the Owners pay all expenses invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eligible expenses the City has incurred. 5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the Owners when the review has been completed and written notification is received from the Owners requesting the funds. 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn. Stat. §§415.01 and 366.012. CITY: �Y ORONO OWI�ER: � ` ) , ' By: � v / �.,. %���-� j, � � _ � �tS: /'�� �Jtit N i..�, 1 J �ri.._C.. G\`- Internal Use Only: �Original to Planning � Copy to Property Owner �Copy to Street File ' Date Incomplete Notice Sent: ' Copy of Application Sent to: y� �YT^j Engineer on IU+'� Co� � � ��-�--�"� ! DNRon MC ll������� _ � LMCD on 4 rt���� �U� �t,�'�-, �j� �, Date Property Owners Notified: Date Legal Notice Published: �l�'' "' " PC Meeting(s): `�;�� `�; C�� 'a-- ��1�'• �= '"���'�����av, � (�� ti�1�( l���,���'�'� Notice of PC Action: �� City Council Meeting(s): �.-�,b'(,4�I�1,�� `�i�G��/�! �-��� ;,� 5-��rv��� � - �a+� �e:.� c�"� ,;�t�,�'� Notice of Council Action: Resolution: ".iiu�s C�'i` �lt+_rY',1 :.� ..r..�r.., r. �!,�� ��:!.i.lu�' ts�C'lC�iii•.(. �if�: �r'C!y." ' CJt='.:'_:?+y""'....;.,, f't=2 ���:�fl�'iA> u,.i��...h.1� u.. ��, 7 �.:_t. ;.;.y.tni sr ^kr , ,.� rnt4 � _ �$ i�6"�: , �'r�1�vi, ��t:�;: .. •,= .1—.S.Gi$r� lt7u"� i";z+�ra� r�l.z�.�i`�e�ll ai'tF'� LQ�`i1i`i�.�, j .7c'.r^L#' � �:.�"�G G',aY tir�,i:� `�r`; ,—y.�.r_ �Jei�R,z�}•k',_ r�: _::�.`r-. ��j;;� 4T :i;-�'r�rh} _�t';� '.�5�'—'�nY';r.t"tG�"��°� r�f'.� E1:i'rli'1I"1G �::tC� ��l'711f1� .i-�..:�+?s:' �..._?`liiti :rk'��i r..a�s C, :�1..:�i?,� ._3�'.i'.• �!� 1�-r ;i'" '�..i,{:n..��..a��i;,�_ _.��•:;�k�'�tJ��> f~.1?;����;i��: � - .��4TJ.i,!;_: '�rU.Z. , � .'�:���i:� l.'iL"�:� i�C: ^�t�;�' :1�i.....:":+i e�=el`.lY; �,:."`�:a��r' �_�I�i C etLil�.� . �:,�:.,��;����.�3� ,�:.�;.:a ;o n�ta�G 3•�n�. .,.'�7T��tM.` �•�l�o_ '�: . .. II _ ;'r�r�:�;i� .i�i:JZ:'. � If i,l APPLICATION ESCROW AGREEMENT Zoning Appfication # 1� - ?.� ` AGREEMENT made this�day of� , 20 ( � , by and between the CITY OF ORONO, a Minnesota municipal corporation (°City") and �1 � � .C' [a corporation— optionalJ ("Appiicant"). Recitais 1. Applicant has filed Zoning Application # S � - �formally requesting the City to review plans for V��(�(�1'1i,� located at �1 Z� �CtSi- Li1,K-C S tl Q��' the "Subject Property")as more fully shown and described on Exhibit"A" attached hereto. 2. Applicant requests the City to review said plans which requires City approval including 3. The City is willing to commence its review of the application and incur costs associated with said review only if the Applicant establishes an escrow to ensure reimbursement to the City of its costs. NOW THEREFORE, THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNQS. Contemporaneously with the execution of this Escrow Agreement, the Applicant shall deposit $ Z���C�C� with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all out-of-pocket costs the City has incurred (including planning, engineering, or legal consultant review) or will incur in meeting with the Applicant, reviewing the plans, and preparing agenda packet material for City Council review of application #�) _ - '� =� Eligible expenses shall be consistent with expenses the Applicant would be responsible for under a zoning and subdivision application. 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send a bill to the Applicant. Applicant shall be responsible for payment to the City within 30 days of the ApplicanYs receipt of bill. 4. DlSBURSEMENT FROM ESCROW ACCOUNT. In the event that the Applicant does not make payment to the City within the timeframe outlined in #3 above, the City may draw from the escrow account without further approval of the Appiicant to reimburse the City for eligible expenses the City has incurred. The City shall notify the Applicant of such draw and the nature of the expense for which the reimbursement is being made. If the Escrow amount falis below 75% of the original escrow amount the Applicant shall deposit additional sums as directed by the City, or the City shall discontinue all review. 5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the Applicant when the review has been completed. 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Applicant, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn. Stat. §§415.01 and 366.012. CITY: � O O - - APPLI ANT/OW�I.�R: � �i) l� ` �/ � r, '�-� !/ By: � � , / B � " � ��'f�C,�w� F�� Its: (� -;r / ���C��CE�' Its: �'� �- ��`'- �PO(_ L i,� , , ,'" �'�` � s �ETY C�F ��C)�J j ; ; i ; ?`�r,� � ,,,r� t�� �!Y'1,1t� ^`�' �'+�liF s- I�t`rn�� a .�'�,c�r'�fdddt. i� �st� U::v�i=. ' . I � �'.. , r 'te��:at 1<<r.a - ; `''` =��`L6f;;? ��.?tt,�::7� �+•;, :i .i.r3r.r'_' ;'�� Pct7r'i,� + /C -` � �''.1CS�IIi� �. I P .r•,�7f1 3{'h'� LOf�*,� j-,J �;� �}�� iit�. . _�yr ���'"'�Yr•'_ .`;n (� G'ay � lr(--;Gk,t �"':(1ei � ='�Y:G' i1�,F?-����;'ii.ilr� ��':,317Y'tsN - �•-j,i�E, ;:,. `-..;�r�:ru �:3�..���]� !!J �'{?=: ,I� '� � •�_ r�r " , � d�i. .P�' C.a_i�iitV �4w,.�r;.�F.t � , . t i r,�... e.f':�K; r;��, r[-'r,�r�ri , it�;�-tlE ? �'idti.. 4.�.., i',�'„Yn: �A� �,J�" i .�� ;�+ ' :.i���� '•'ei;t�it.�si�jfr� � �.!7��`�; �� .....�.. -. -... ' � +5L3; 1��!a'> ,- .�„ �` r � � ��. . „ ��74.:�Yis yJ . f CJI�{ t� -'�t � . W... C�n�. -. �irt:� , ..�.%!�;. . . . ,I ' "`iiF� ,•n�n ;�f* , `�.J�:(1: J, __ i „�Ji �� f K;l: .'1 1 d(,�:J�::'t!°? --- .....,, � �r � �, 1 � � I�. .. . k�a � . � . . . - � . -� � , . � ^� ������CEJ� ���` 3 (� �'�i t ^��` ar= 4�C)�1� . �O1 Vo C ITY OF O�RONO � Street Address: Maifing Address: Telephone(952)249-4600 � � �r ' �� 2750 Kelley Parkway P.O. Box 66 Fax (952)249-4616 F` � Orono, MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us "�kFSH o� January 4, 2013 Thomas & Margaret Radke 3424 Eastlake Street Long Lake, MN 55356 RE: Building Permit#2011-00554 3424 Eastlake Street While closing out files I discovered that the final inspection has not been performed for the second story additions at 3424 Eastlake Street. Please call 952-249-4600 to schedule a final inspection. After the inspection has been completed and approved, we can refund the $2,500 building permit escrow associated with this project. Please don't hesitate to contact me at 925-249-4620 or at cmattson(a�ci.orono.mn.us if you have any questions. Sincerely, CITY OF ORONO ��"� Christine Nlattson Planning Assistant . � _... ��s� � ___._ __ ___ ______ �_ _._.__�__.______._, ____._ _ ------ � , `Q � � ' � � � i _ _ - _ _ t I_� � � ; � a: _ , - _' � � � � � ��� r i z .. of• ^^---. _. . . d � �— � �� _ —1�1 � � a� .___ � � � � 5 C '� S� � � d �� � — Q '.�� � � ,,° r � o m .� o `- � � � � �' v n e ' � a� ' � � `� � � Y �p C {i�' �1 �. G ' V� cO C y T� � v�� � '� � ' M [� 0- . � '��. . � � W � � : . � � � C e- N n' � ra � � � C � c ' a Q � _ .� , � - � � C � I ad y C ��-� � . �' � � Q � � 0 ' � � '4 '— C�(1 :.�:.[V� � 'Li � U � a '� I �k � ` L�Ji-� � O � ' r� E +�F' C 9) v� W C � C C ' � d5 � �- i t? Ll � G�. O�. C7 - w ,� w ' c� n, v ; � � : �_ � DATE TIME V CITY OF ORONO CALLED IN �_ 7_� �� �,�., INSPECTIO����C�Q��, ( SCHEDULED _� PERMIT NO. `"f COMPLETED ADDRESS�7a� �Q-C��L� S� OWNERTD�'�'1 �� K�-- TELEPHONE NO.���' " ��L ��5 / CONTRACTOR �: DESCRIPTION �l �� � l� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING � ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS y Q ❑ FRAMING ❑ MECHANICAL FINAL � TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP ? ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAI ❑ FOUNDATION/REMOVAL � OWNER/CONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W a � � O >. � O � W � Q � Z W � W � � GW ❑WORK SATISFACTORY:PROCEED �ROJECT COMPLEfE � ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN INSPECTOR WILL REfURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (g52) 249-4600 OwnerlContractor o site: Inspector.�/�� / � White Copyllnspector's File Canary CopylSite Notice � .i�:! � � DATE TIME CITY OF ORONO CALLED IN � IN�PECTION NOTICE SCHEDULED l0�Zl0�I� ��,� PE►�MIT NO. COMPLETED ADC�RESS �"'Z-�' �C'��� t�-1� SI ri� OWNER TELEPHONE NO. CONTFiACTOR � DESCRIPTION �' \ � � ,J '� � W ❑ FOOTING ❑ DEMO-FINAL SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL J ❑ DEM ❑�TIC INSTALL ❑ FOUNDATION/REMOVAL 2 OWN O RACTOFi T MEET Y�OU: YES_NO ti COM ENTS: � a �l i o �'` �� r . .rz � i �l '' G�' t�tJGr a� 0 � W � �/`�.(,t � C� i Q 2 �2b i�� �"����(Q�1.-f i !il (i �_ W � � �� � ��9�� � �� � d W ❑WORK SATISFACTORY:PROCEED G PROJECT COMPLEfE � ❑CORRECT VYORK 8 PROCEED C ISSUE CERTIFICATE OF OCCUPANCY W � ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY � BEFORECdVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN iNSPECTOR WFLL REfURN STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Ca11 tor the next inspection 2a hours in advance. (952� 249-460� Owner on site: Inspect . White Copyllnspecto�'s File Canary CopylSite Notice t City of Orono Building Permit Application for New Structures or Additions _— -_, Mailing Address: p�0/( —Dfj55'cf � %"��,�j�� PO Box 66 Permit number: /r � �i0 , Crystal Bay, MN 55323-0066 Date received: 6`Z�—�� ��` /�,� ' �� Received b �iC�J� �I � ���a ��"��� .�� ,.;� Street Address' Y� �����,, ���,�y�,����� 2750 Kelley Parkway Plan review fee: 303. 39 �6�� �RgEsi�o�`'j Orono, MN 55356 ������0 c�3 b�yl��( — � Total Fee: Main: 952-249-4600 Fax: 952-249-4616 www.ci.orono.mn.us ��J This application form must be completed in full and all required information must be submitted. Incomplete applications will be returned. (Please print) -, GENERAL INFORMATION: -�-�--5 -�� Job Site Address: �� � � �,�r"� � �� ��,c�(r ,'_ r-¢jrC /'-��! Will this be a Parade of Homes, Remodelers Showcase Home or other Display Home? ❑ Yes No If yes, a special event permit is required with Police Department and City Council approval 60 days prior to the event. Shuttle bus service will be required unless applicant demonstrates sufficient on-site parking is available. Non-permitted events will not be allowed. CONTRACTOR/APPLI ANT INFORMATION: Name: �� � aq pK� State License# ����- Phone: �� 4i/�(o 2-Z cl � (office) �S� ���= ; `t�� �,1� �G-L (cell) Mailing Address: ; z � r�,1 L � s-T Cit :L. a <,- L�9- r ZIP: .s�.s-�_s— Contact Person: �_.� f'v�y�K F Applicant is: Contractor / omeowner �c�r�ie one� Email and/or Fax: T�� n�r;�F � TC c TF�� S-/j��-f- c c� PROPERTY OWNER INFORMATION: Name: �l��l'K� /�I v4-,�� G—�-,f`r T J�141�Kt' Phone (day): �S�2 9 z s� 3 �'?�; Address: � y 2 c� ���,- j ���- � T City: L �,�,r( L�q.n�ZlP:s���� Email and/or Fax �'��.� ,���������-��-��E��s-���1- C� �, ARCHITECT/ ENGINEER INFORMATION: Name: ��-/9��f� <�- i1'�S c�l /°� �i�= r Phone (day): ��� - �l7 s� -�� v � - w'� Address: 1� � o N'� ,('Ty ��2r�..,,.,,C z,� S-� City: S'��i�/L Fy ZIP:�� �� Email and/or Fax: _ � S� za 7S- g'z �� PROJECT INFORMATION: 1.Type of Project 2. Proposed Use 3. Structure Type 4. Sewage Disposal 8� Water Supply ❑ New Construction �Single Family with Residence �Addition attached garage �] Garage/Accessory Bldg. �Public Sewer ❑Accessory Building ❑ Single Family with ❑ Deck ❑ Relocation detached garage ❑ Office/Commercial ❑ Private Sewer ❑ Other: (specify) ❑ Multiple Family/Condo ❑Warehouse ❑ Public ❑ Storage ❑ Public Water *"Any earth movement may require ❑ Commercial ❑ Other(specify) MCWD review&permits. ❑ Industrial [�'Private Well Minnehaha Creek Watershed District(MCWD) ❑ Other: (speCify) 18202 Minnetonka Blvd Deephaven, MN 55391 Phone: 952-471-0590 Fax: 952-471-0682 Nni✓w.minnehahacreek.or Estimated Construction Valuation (excluding land) $ �c�� � c o ,. �, L _ � STRUCTURE INFORMATION: 1. Structure Dimensions 1.Structure Dimensions(continued) 2. Type of Construction a. Length (ft.)= Number of bedrooms=� �.Wood/Frame ❑�Vlasonry b.Width (ft.)= Number of garage stalls: ❑ Metal Attached= 2 ❑ Pole Bldg. Areas in sauare feet Detached = ❑ ICF � ❑ On-site Prefab c. Basement= �,�" ❑ Off-site Prefab d. 1S`Story = ❑ Other(please specify): e. 2nd Story= f. '/2 Story = g. Total Area= REQUIRED SUBMITTALS: All of the information must be submitted in order for your application to be processed: Not Enclosed A licable ,� ❑ Permit A lication ❑ Pro osed Buiidin Plans ❑ ❑ MN State Ener Code Calculations and Mechanical Code Re uirements Form �� ❑ Surve meetin all re uirements ❑ .� Stormwater Pollution Prevention Plan ❑ Hardcover Calculation s ❑ Se tic S stem Site Evaluation Re ort ❑ .� Access Permit ❑ Wetland Buffer Im rovement Plan ❑ En ineered Plans for Retainin Walls 4 feet or above � ❑ Plan Review Fee ❑ � Other APPLICANT ACKNOWLEDGEMENT: • Agrees to provide all information required or requested by the Building Department; • Agrees to pay the City of Orono for engineering consuitant review costs in excess of$500; • Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative but to reject it until it is complete; • Acknowledges the Escrow Agreement is completed and signed; • Understands some or all of the information that you are asked to provide on this appiication is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If you refuse to supply the information, the appiication may not be issued. • Agrees that in the event that weather or other conditions prevent the completion of an as-built survey at the time the Certificate of Occupancy is requested, a temporary Certificate of Occupancy may be issued upon receipt of a $10,000 escrow to ensure completion of the as-built survey and all site improvements. i� � / — _ Applicant's Signature: *-�—�—�� Date: C.� � C( l � � � . a�, . � �_�_ a . � .� - •� _ . . .� n_., . ,�. .. ,�.. _. , . . . . - _ f.,. Plan R�view Checkiist for New Structures / Additions Address / PID / Legal: � C�'"� � � Description of work: Septic review by: Date Approved: Zoning review by: Date Approved: � �I Buiiciing review by: � � -� � %( F Date Approved: ��� � �� � � ��� � «� � Grading review by: f� Date Approved: � " c,��; Zoning File#: � � � Resolution#: �/�� Resolution Date: Zonin District Fire Department Post Office School District � Zoning: Lot Are : SF/AC Width: Depth: Survey Submitted: Y s � No Date of Survey: Pro osed Setbacks: Front (Lake) Rear(Street) ( N S E W ) S E VI! ) Other Buildings Wetland Side Side � � Building Defined Height: Building Peak Height: �� #of Stories Ok?: ES FQR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATION: ' START WITH the distance between the basement floor/crawl START the distance between the slab and the highest ` space floor and the highest roof peak,the top of WITH roof peak,the top of the cornice of a flat roof, the cornice of a flat roof,the deck line of a the deck line of a mansard roof,or the mansard roof, or the uppermost point on a round uppermost point on a round or other arch-type or other arch-t e roof roof SUBTRACT half the distance between the highest window and SUBTRACT half the distance between the highest window hi hest roof eak of a itched roof and hi hest roof eak of a itched roof SUBTRACT the distance between the basement floor/crawl ADD the distance between the slab and the highest space floor and the highest existing grade within existin rade within the foundation the foundation or 10 feet, whichever is less. EQUALS Defined buildin hei ht EQUALS Defined buildin hei ht Lot Coverage: SF % A Shoreland District MCWD Permit Received Avera e �ak�shore Setback Bluff � Yes 0 No � N/A I7 Yes � No � Yes � No � Yes ❑ No 0 N/A Permit Number: Setback: Fiarc�cover Zone� Existin Proposec! �lariance Re uired CUP Re uired 0-75' Q Yes l7 No � Yes ❑ No 75-250' Type(s): Type(s): 250-500' 500-1000' '! rs C��� REMARKS (in-house)� � �':� i� � `t i ,. , � �.� -��� l '��f C� � '° ` Updated: 09/11�/2Q � .�-,'��`��� � z:\forms\plan review checklist.docx �,�` ���' . �, , . �.�. . , ,.�_. ..... .. ... . . ..,... : .. ..__ � , _._ ., ., . ._ . _. ... _...... . , t Fees to be Char ed YES NO Permit �'" Plan Rediew � �"� � State 5urcharge Investigation Fee SAC—Number of SAC Units Sewer Connection Water Connection Park Fee Site inspection Other(specify) Miscellaneous Fees Calculated By: S uare Foota e $ per Square Foota e Basement X = $ 15t Floor X = $ 2nd FIOo� X = $ Garage X = $ Estimated Construction Value: $ � � Orono Inspections Required Work Requiring Separate Permits Required State Permits � Site A Plumbing � Grading / Filling 0 Well � Hardcover Removal C7`"Mechanical � Fire � Electrical ❑ Footing 0 Septic 0 Water Connection � Poured Wall 0 Fireplace � Sewer Connection � Foundation Survey � Masonry � Lawn Irrigation 0 Radon Rock Bed 0 Mfg. � Framing � Other(specify) ` �¢` Insulation � As-Built Survey ,C�'Final � Other(specify) REMARKS (in-house): r Other Review: Reviewed by: Date Approved: Access:Existing: � YES 0 NO New: � YES � NO REMARKS (TO BE NOTED O(� PERMIT AND INITIALLED BY PERSON PULLING PERMIT) ;: Updated: 09/11/2009 z:\forms�plan review checklist.docx �> �_ �o�o C ITY OF ORONO ,� ,� Street Address: Mailing Address: Telephone(952)249-4600 '�y�, 1 2750 Kelley Parkway P.O. Box 66 Fax (952)249-4616 �,9 F,� Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us kFSHo� January 4, 2�13 Thomas 8� Margaret Radke 3424 Eastlake Street Long Lake, MN 55356 RE: Building Permit#2011-00554 3424 Eastlake Street While closing out files I discovered that the final inspection has not been perFormed for the second story additions at 3424 Eastlake Street. Please call 952-249-4600 to schedule a final inspection. After the inspection has been completed and approved, we can refund the $2,500 building permit escrow associated with this project. Please don't hesitate to contact me at 925-249-4620 or at cmattson(a�ci.orono.mn.us if you have any questions. Sincerely, CITY OF ORONO N�1� Christine Mattson Planning Assistant � �-^—��J 1 DATE r TIME ✓ C CITY OF ORONO �-� CALLED w C � �- l �� INSPECTION �I /�y— SCHEDULED ' � � PERMIT NO. c���! �—' �I.C�COMPLETED ADDRESS �J�-�-���--k � -t�c>T C L�..SZ S � OWNER `��YY� ���c�I I�TELEPHONE NO. �-( I� '`�l�%���o CONTRACTOR '�= ��� IC`��?,'���(j�?ufO�.fi � �: DESCRIPTION ���L� �C''�� � ��'1 t�-��'Y�C�'LQ ( I � � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADiNG/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI � LAKESHOREM/ETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W C � J o , V � � � � O � Q e �- �� � z W � W � j d W ❑WORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLEfE � ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W � ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY � BEFORE COVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN INSPECTOR WILL RETURN ❑ CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR O INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952� 249-4600 OwnerlContractor on site: Inspector. White Copyllnspector's File Canary CopylSite Notice � � C� DAT TIME � CITY OF ORONO CALLED IN � INSPECTION NOTICE SCHEDULED �� PERMIT NO.d�!�- c�TED � � �'1 ADDRESS � OWNER I U�YI (`� ��� TELEPHONE NO����Q `�7 �'� CONTRACTOR �c��C��1 �1it.� Oy/ �; ut�CRIPTION �-� ���� ��-'� � 111 ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING � ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS � O ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT J ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP ? ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W a � J O a � O � W � Q � Z W � W � � d �ORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLETE W ❑ CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY O ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN �NSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED C INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Ca11 for the next ins ection 24 hours in advance. (J52� 249-4600 OwnerlContra r o � . Inspector. White Copyllnspector's File Canary CopylSite Notice