Loading...
HomeMy WebLinkAbout2007-P10797 - restoration due to fire damage t ' PERMIT CITY OF ORONO 2750 Kelley Parkway - PO Box 66 Permit Number: p1o797 Crystal Bay, Minnesota 55323 Pel'mlt Type: Addition/Remodel/Repair (952) 249-4600 Date Issued: 3/2/2007 SITE ADDRESS: 2470 Dunwoody Ave Unit# Wayzata,MN 55391 P��� 20-117-23-21-0005 DESCRIPTION: UBC Occupancy R3 Construction Type VN Proposed Use: Residential Census Code 434 Permit Class: Building Addition/Remodel/Re air Permit Sub-type(s): Addn/Remodel/Repair Permit Type: P DETAILS: Approved per resolution#: Separate permits required: Mechanical Electrical(state) NOTICES/REMARKS: Restoration Due To Fire Damage Per Scope Supplied FEE SUMMARY: Pernut Fee: $ 958.75 valuation: $ 95,000.00 State Surcharge Fee: $ 47.50 TOTAL FEE: $ 1,006.25 APPLICANT: Groom Construction OWNER: Glen Marklund 2818 Washington Ave N 2470 Dunwoody Ave Minneapolis,MN 55411 Wayzata,MN 55391 THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL]MPROVEMENTS SPECIFIED AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF MINNESOTA BUILDING CODE REQUIREMENTS. ) % /� � �'� � ��_� .� �,�7/��_. APPL[ T P ITEE SIGNATURE ISSUED BY SIGNATURE � r- �, Copies: 1-File(SignaturesRequired), 1-Applicant, 1-MonthlyReports, 1-Assessing,(IfSeptic, l-Septic) Page l 1 G�.� 3�Z- o � i�. a� Total Fee: $ Date Received: �"- �� �� � Entered By: B Permit#: � /O -7� � CITY OF ORONO - BUILDING PERMIT APPLICATION All information must be submitted in full before plan review will be started. (please print all information) ------------------------------------------------------------------------------------------------------------------------ THE APPLICANT IS: (circle one) OWNER OR CONTRACTOR JOB SITE ADDRESS: ���(� l����oc,c��f ZIP: ��3�1 I Will this be a Parade of Homes,Remodelers Showcase Home or other Display Home? ❑ YeS ��10 Ifyes, a special event permit is requi��ed with Police Department and City Council approval 60 davs prior to the event. Shuttle bus service will be reguired unless applicant demonsb�ates sufficient on-site parking is available. Non-permitted events will not be allowed. C�I�-� i NAME OF OWNER: �� �G,�'klvtn,� PHONE: (home)(p��-,�j`�j5"O��yp� (work) MAILING ADDRESS:a.�7C? �v��nk�c_,c��i �✓�.CITY: �lb t� � ZIP: �5`3� � CONTRACTOR: ��c;�v�n �0�-�S�vcT•�v� PHONE: ��a-a�7 -q � � � CONTACT PERSON: ��+� , _ u MOBILE/PAGER C�I a '9(v`a -�-I la�� MAILING ADDRESS: d'`�( � )'U CITY: �✓f � � ����ZIP: '���) � STATE LICENSE: # ;�� � `l�'��(� EXPIRATION DATE: �-3� - C�`� ARCHITECT/ENGINEER: PHONE: MAILING ADDRESS: CITY: ZIP: NAME: REGISTRATION: # TYPE OF WORK: New Home Addition Accessory Structure Move Home Remodel/Alteration (ie: Siding, Windows) Any earth movement may require MCWD review and permits! PROPOSED WORK(describe in detai�:_��,}�,�,n�,-}-�� _ �,r� -�-� ��d`2_ ��G�Mc����? C��C' G,�u . S v o� I�'� STORIES: SQ.FEET OF EACH FLOOR: NO. OF BEDROOMS: GARAGE STALLS: ATTACHED DETACHED ESTIMATED CONSTRUCTION VALUATION(excluding land): $__q�, bu c� 1 hereby apply for a building permit and I acknowledge that the information above is complete and accurate; that the work will be in conformance with the ardinances and codes of the City and with the State Building Code;that I understand this is not a per ' and ar is not to start without a permit;and that the work will be in accordance with the approved plan. APPLICANT'S SIGNATURE: �`• DATE: Z.' Z Cc " � � 1 31 \ �'�. . �KEC� Cl�`k' i,TST FOR ISSUAI�iCE �F �'E�.�Z'� FOR OFFICE USE ONLY p,,pDRE�S ORLEGAL: z'�1l o ��rvwc���v ��2 - — - Pl�: ` JDESCFtIPTI�N OF�FVORK: �,2�c ,���<< �2-EAA�2 - Z4Y�i IG REVTEtiV BY: ----hJ��-____�_ J�E�T`� A1'P�OVED: � _ �;UTZDII�G REYIEtiV BY: . DATE APPROVED: 3-�- �� --- �`EES TO BE CHARGED: Misc, Fees Calculated By: _____ PERMI.T Yes ✓ No PLAI�T REVIE�V � Yes No _�___/� SEti�TE,R CONNECTION _------__ STATE SU�RCHARGE Yes �/ No GVA'I�RCONNECTION INVESTTGATZON FEE Yes No PARK FEE SAC Yes No SITEINSFECT'ION Number of SAC�Units OTHER (specify) -------------------- ZONI�IG CHE.CK LIST Zaning District: t�fU CNA�C�Is. FLre Department: Post Of:ice: School Di�trict; � .__ 1..,oc Area: 5q.ft. Acres Wid�h Depch ________ Survey Submitted: Yes No Date of Survey: Proposed 5etbacks: Froa:{Lake): Right Side: Fte3[' �jiicctj: L�ft Side: �djaceat Stn:ctures: Vettand' auil�lin�Hei�t: Det. Hgt, Pe�Hgt. ,. Lot Covera�e: C�rading: S�aEf F�pprovai Dz�e: B;: Cottecil Approval Date: Szpt;c: Staf� App;o��:1 Dace: _ �`.�: Zo�ng F�Iz R Resolution: „`' Pesoluticn Da'e: �;-,��zi�-�d Distr:ct: �,�Se�back: i_r��Coverae: -------.__ __ A.vQ. Setb2ck; B�'� ` , E�isti�o ?;oros=u H�dcever: �J-75' 75-2�0' 2�0-5C`t`' — �CO-1���' - _. - �� �� -. _.. ,- , ..,.._� c�,-� �-�� , , .. — �- - —_ , ___---_ --- ;�'__., ... , �._..�_ ., .... . _ �.�.�L'�F.��i� �L:r.o�Lej: --------- - BULLDING T:ttEVIEtiY CHECK LIST ��: �-3 � covs•rxr�crc�o�v�E: �N Sq Footage $ Per Sq Fto Basemenc � X _ . Ist Fioor x _ . 2nd Floor x _ . GdCBa� x _ z — TOTAL Estimated Construction Value; $_ c1 S,OU O � Insgections Required: Work Requiring Separate Pecmits: 5 ite �umbing Fire Hardcover Removal Mechacucal Water Con.aectioa Footing � 5eptic Sewer Connectioa � �_ Fram;ng Fireplace Lawn Irrigation �_Insuiatioa (Masonry) Other ��Va11 Board (Mfg.) �il (Scate Permit) F�� Grading/Filiin� Eiectricai (State Permit) Other REMA.RKS (]I\HOUSE): ~ ----------------------------------------------------------------------------------------- REV��V BY OTHERS: DAZTE: Access: Existing NeFy Access Approval: Date gy: ----------------------------------------------------------------------------------------------- REI�TAFth'S ('I'O 13F N��n nv p�R� .y y • G U ' MINNESOTA DEPT. OF LABOR & INDUSTRY Construction Codes and Licensing Division , 443 Lafayette Road N. St. Paul, NIN 55155-4344 MA� � 5 2Q06 ZACTLY SOLUTIONS INC y GROOM CONSTRUCTION INC 7600 W 27TH ST #210 ST LOUIS PARK, MN 65426 �n;F�o Construction Codes and Licensing Division ,-�,� .,�,��, State of Minnesota _ �- ,� �� c�, Tele hone: 651 284-5065 ,� Department of Labor and Industry P ( ) :d: �•� � E-mail address:dli.contractor�state.mn.us �.�,, 4:- �' � 443 Lafayette Road N. � � Website address: www.doli.state.mn.us °�3:._����-�.:� �> St. Paul, MN 56155-4344 >.��._.. _. �isssf� , _ _..._ � � � Residential Building Contractor License� Legal Name: ZACTLY SOLUTIONS INC Business Structure: DBA: GROOM CONSTRUCTION INC / CORPO�ATION Address: 7600 W 27TH ST #210 ST LOUIS PARK, MN 55426 License Identification Number: 20398386 Qualifying Person: GREGORI� LEWIS GROOM Licerise Expiration Date: 3/31/2007 Continuing Education:7 hours due by 3/31/2007 - �; � � . - � � �'j����9 M�� � ��� ���� .� � � ��� } � 1 Groom Construction Inc. 7600 West 27th Street,Suite 210 St.Louis Park,MN 55426 p:(952)929-4778 f:(952)929-4779 Lic#20398386 Client: Glen Marklund Home: (612)385-2742 Home: 2470 Dunwoody Ave. Orono,MI�r Operator Info: Operator: GREGC Estimator: Greg C. Reference: Business: (612)919-1115 Company: Service Master Type of Estimate: Fire Dates: Date Entered: O1/30(2007 Price List: MNMN4S7A Restoratioi�/Service/Remodel Estimate: MARKL,LJND-GI,EN Groom Construction Inc. 7600 West 27th Street, Suite 210 St.Louis Park, MN 55426 p:(952)929-4778 f:(952)929-4779 Lic#20398386 MARI:LLTND-GLEl� Room: Living Room LxVVxH 20'9"x 13'0" x 8'0" Missing Wall: 1 - 10'0" X 4'4" Opens into E Goes to neither Floor/Ceilinb Missing Wall: 1- 6'8" �5'0" Opens into E Goes tu Floor DESCRIPTION QNTY UNIT COST TOTAL R&R St�id wall-2"x 4"- 16"oc 104.00 SF ci 1.85= 192.40 R&R Top plate-2"x 4" 13.00 LF @ 1.69= 21.97 R&R Batt iusulation- 4"-R15 104.00 SF @ 1.25= 130.00 Visqueen vapor barrier 104.00 SF C� 0.29= 30.16 R8:R Acoustic plaster over metal lath 238.88 SF @ 7.41 = 1,770.10 Sea]underlayment for odor control 269J5 SF @ 0.36= 97.11 Seal stud wall for odor control ]04.00 SF @ 0.49= 50.96 Seal floor or ceiling joist system 269.75 SF @, 0.60= 161.85 Mask and prep for paint-plastic,paper,tape(per LF) 67.50 LF @ 0.80= 54.00 Texhire drywall-macl�ine 269.7� SF @ 0.2£= 75.53 R&R Two coat plaster over metal lath 135.00 SF @ 5.8] = 78435 race track PC in living � Seallprime the ceiling-one coat 269.75 SF @ 0.33= 89.02 Seal then paint the walls(2 coats) 463.33 SF @ 0.58= 268.73 R&R Casins-2 1/4" stain grade 47.00 LF C 2.72= 127.84 Stain&finish casing 47.00 LF @ 0.90= 4230 R&R Baseboard-2 1/4"stain grade 60.83 LF @ 2.87= 174.58 R&R Base shoe-hardwood 60.83 LF C? 1.79= 108.89 Stain&finish baseboard w/cap&/or shoe 60.83 LF @ 1.08= 65.70 R&R Oak floorin�-#1 common-no finish 269.75 SF�; 10.24= 2,762.24 Vapor bamer- 15#felt 269.75 SF cv 0.24= 64.74 Sand&finish wood floor(natural finish) 269.75 SF @ 3.38= . 911.76 R&R Storm door assembly-High grade 1.00 EA�a; 298.7b= 298.76 R&R Exterior door-metal-insulated-flush or panel style 1.00 EA @ 254.68= 254.68 R&R Door lockset-exterior 1.00 EA� 55.03= 55.03 R&R Ceramic tile-Hign grade 39.40 SF na, �3,aa- 5?4.1� Room: Dining Room LxWxH 17'0" x 9'9" x S'0" Missing Wall: 1 - 6'8"X 6'0" Opens into E Goes to Floor DESCRIPTION QNTY UNIT COST TOTAL R&R Oak flooring-#1 conunon-no finish 165.7� SF�a� 10.24= 1,697.28 Vapor barrier- 15#felt 165.7� SF @ 0.24= 39.78 Sand& f:r.ish wood floar(nararal finish) 165.75 SF(a; 338= 560.24 R&R Batt insulation- 4" -R13 194.00 SF cu 0.90= 174.60 MARKLLJND-GLEN 02/26/2007 Page: 2 Groom Construction Inc. 7600 West 27th Street, Suite 210 St.Louis Park,M1`'S5426 p:(9�2)929-4778 f:(952)929-4779 Lic#20398386 CO\TINUED-Dining Room DESCRIPTION QNTY UNIT COST TOTAL Visqueen vapor barrier 194.00 SF @ 0.29= 56.26 R&R Batt insulation- 6" -R19 ]65.75 SF @ 1.06= 175J0 R&R Acoustic plaster over metal lath 243.75 SF @ 7.41 = 1,806.19 Seal underiayment for odor control l 65.75 SF @ 0.36= 59.67 Seal stud wall for odoi•control 388.00 SF @ 0.49= 190.12 Seal floor or ceiling joist system 165.75 SF @ 0.60= 99.45 Mask and prep for paint-plastic,paper,tape(per LF) 53.50 LF @ 0.80= 42.80 Texture drywall-machine 165.75 SF @. 0.28= 46.41 Seal/prime the ceiling-one coat 165.7� SF cc- 0.33= 54.70 Sea]then paint the walls(2 coats) 388.00 SF @ 0.58= 225.04 R&R Baseboard-2 1/4"stain grade 46.83 LF a% 2.87= 134.40 R&R Base shoe-hardwood 46.83 LF @ 1.79= 83.8� R&R 6-0 6-8 wood sliding patio door-wlexterior cladding 1.00 EA @ 1,46�.85= 1,463.85 Stain&finish wood patio door(per side) I.00 EA @ 58.04= 58.04 Stain&finish baseboard wicap&/or shoe 46.83 LF @ 1.08= 50.58 R&R Wood window-picture(tixed), 12-22 sf,High grade 1.00 EA @ 510.44= S 10.44 1 of the 6 windows broken fi•om fire department Room: Kitchen LxVVxH 13'6"x il'4"x 8'0" Missing Wall: 1 - 11'4" X 8'0" Opens into E Goes to Floor/Ceiling DESCRIPTiON QNTI' UNIT COST TOTAL Seal/prime the walls and ceiling-one coat 459.67 SF ci 0.33= 151.69 Paint the walls and ceiling-two coats 459.67 SF @ 0.59= 271.21 Mask and prep for paint-plastic,paper.tape(per LF) 38.33 LF C� 0.80= 30.66 Room: Hall�i�ay L�VViH 19'S" x 3'0" x 8'0" Subroom 1: closetl LxWxH 3'0" �:2'0" x 8'0" Subroom 2: closet2 LsWxH 3'0"x 2'0" x 8'0" DESCRRPTI01� QNTY UNIT COST TOTAL R&R Oak floorine-#1 common-no finish 7U.2� SF a- 10.24= 719.36 MARKLUND-GLEN 0?!26/2007 Page:.3 Groom Construction Inc. 7600 West 27th Street,Suite 210 St. Louis Park,MN 55426 p:(952)929-4778 f:(952)929-4779 Lic#20398386 CONTINUED-Hallwav DESCRIPTIOI� QNTY UNIT COST TOTAL Vapor barrier- 15#felt 70.2� SF @ 0.24= 16.86 Sand&finish wood floor(natural finish) 70.25 SF @ 3.38= 237.45 R&R Baseboard-2 1/4"stain grade 64.83 LF�u, 2.87= 186A6 R&R Base shoe-stain grade 64.83 LF cL 1.21 = 78.45 Paint the walls and ceiling-two coats 588.92 SF @ 0.59= 347.46 Seal/prime the walls avd ceiling-one coat 58892 SF a� 0.33= 194.34 Mask and prep for paint-plastic,paper,tape(per LF) � 64.8� LF�; 0.80= 51.86 Stain&finish baseboard w/cap&/or shoe 64.83 LF a� 1.08= 70.02 Room: Bathroom LxWxH 7'8" x 5'0" x 8'0" DESCRIPTi01� QNTY UNIT COST TOTAL Seal then paint the ceiling(2 coats) 38.33 SF @ 0.58= 22.23 Mask and cover light fixture 1.00 EA @ 8.46= 8.46 Mask and prep for paint-paper and tape(per LF) 25.33 LF @ 0.44= 11.15 Room: Office LxWxH 11'4"x 10'0"x 8'0" Subroom 1: offset LxWxH 3'0"x 2'S" s 8'0" Missing Wa1L• 1 - 3'0" ?�8'0" Opens into 0 Goes to Fioor/Ceiling Subroom 2: closet LxWxH 6'0"x 2'0" x S'0" DESCRIPTION Q?�TY iTNIT COST TOTAL Sand, staiu,and finish wood floor 132.�8 SF @ 4.11 = 544.90 Paint the walls and ceiling-two coats 640.58 SF a� 0.59= 377.94 Seal/prime the walls and ceiling-oue coat 640.�8 SF @, 0.33 = 211.39 Mask and prep for paint-plastic,paper,tape(per LF) 63.50 LF @ 0.8U= 50.80 Ruum: FED 1 LxV1'sH 13'4"x 10'0" x 8'0" Subroom 1: closet LxWxH 7'0" x 2'0" x 8'0" MARF�L.UND-GLEN 0?r26'2007 Page: 4 Groom Construction Inc. 7600 West 27th Street,Suite 210 St. Louis Park,MN 55426 p:(952)929-4778 f:(952)929-4779 Lic#20398386 Missing Wall: 1 - 7'0"X 6'8" Opens into 0 Goes to Floor DESCRIPTIOI� QNTY UNIT COST TOTAL Sand,stain,and finish wood floor 147.33 SF @ 4.l] = 605.53 Paint the walls and ceiling-two coats 571..i3 SF @ 0.59= 337.08 Seal/ptime the walls and ceiling-one coat 571.33 SF @ 0.33= 188.54 Mask and prep for paint-plastic,paper,tape(per LF) 64.67 LF @ 0.80= 51.74 Room: BED 2 LxWxH 12'0" z 11'10" x 8'0" Subroom 1: closet LxWxH 6'6" x 2'0" x 8'0" Missing Wall: l - 6'6" X 6'S" Opens into 0 Goes to Floor DESCRIPTION QNTY UNIT COST TOTAL Sand,stain,and finish wood floor 155.00 SF C 4.11 = 637.05 Paint the walls and ceiling-nvo coats 585.67 SF @ 0.59= 345.55 Seal/ptime the walls and ceiling-one coat 585.67 SF @ 0.33= 193.27 Mask aud prep for paint-plastic,paper,tape(per LF) 64.67� LF @, 0.80= 51.74 Room: Stairwa�� LxWxH 10'8" x 2'6" x 8'0" D�SCRIPTION QNTI' UNIT CQST TOTAL Seal/prime the walls and ceiling-one coat 23733 SF(a; 0.33 = 78.32 Paint the walls and ceiling-two coats 23733 SF @ 0.59= 140.02 Mask and prep for paint-plastic,paper,tape(per LF) 26.33 LF @ 0.80= 21.06 Room: Exterior DESCRIPTION QNTY UNIT COST TOTAL R&R Builder board- 1 r'2" (composition or fiberboard sheathing) 67.00 SF @ 1.11 = 74.37 R&R House wrap(air/moisture barrier) 67.00 SF a` 0.30= 20.10 R&R Siding-hardboard-lap pattern-6"or 8" 67.00 SF @ 4.24= 284.08 R&R Siding trim- 1"x 6" fiber ceinent trim board 23.00 LF C 5.48= 126.04 Exterior-paint two coats 67.00 SF C 0.74= 49.�8 R&R Gutter/downspout-aluminum-6" 72.00 LF @ 7.93= 570.96 R&R Soffit&fascia-metal-3'overhang 27.00 LF C 11.92= 321.84 R&R Siding trim- 1"x 4" fiber cement trim board 27.00 LF�; 4.51 = �1?1.77 MARKLLTND-GLEN 02/26;2007 Page: 5 Groom Construction Inc. 7600 West 27th Street,Suite 210 St.Louis Park,MN 55426 p:(952)929-4778 f:(952)929-4779 Lic#20398386 CONTINUED-Exterior DESCRIPTION QNT1' UNIT COST TOTAL Seal&paint trim 27.00 LF @ 0.85= 22.95 Room: Roof DESCRIPTION QNTY UNIT COST TOTAL Rernove 3 tab-25 yr. -composition shinale roofing- incl. felt 17.00 SQ @, 48.15= 818.55 Ice&water shield 830.00 SF @ 1.17= 971.10 3 tab-25 yr.-composition shinele roofing-incl. felt ]8.�0 SQ c�i 128.98= 2,386.13 Ridge cap-composition shingles 157.00 LF @ 2.75= 431.75 Valley metal 20.00 LF @ 3.41 = 68.20 Roof vent-turtle type 5.00 EA @ 33.05= 165.25 Flashine-pipe jacl< 3.00 EA @. 21.51 = 64.53 Furnace vent-rain cap and storm collar,6" 1.00 EA @ 41.13= 41.13 R&R Chimney flashing-]arge(32"x 60") 1.00 EA @ 317.99= 317.99 R&R Flashing, 14"wide 36A0 LF @ 3A6= 11U.16 Digital satellite system-Detach&resct I.00 EA @ 250.71 = 250.71 R&R Truss-4/12 slope 446.00 LF @ 6.00= 2,676.00 R&R Hip or roof intersection 6/12 slope(hip/valley lengthj 44.00 LF L b1.82= 2,72G.08 Remove 1"x 8" lumber(.667 BF per LF) 842.00 LF @ 0.82= 690.44 R&R Sheathing-plywood- 1/2" CDX 842.00 SF�; 1.53 = 1,288.26 Blown-in insulation- l4"depth-R38 1,685.00 SF @ 1.07= 1,802.95 Remove Blown-in insulation-Machine removal 1,655.00 SF a� 1.34= 2,257.90 Soda blasting 1,264.00 SF rL� 1.49= 1,88336 Room: GEl\T DESCRIPTION QNTY UNIT COST TOTAL ELECTRICAL 1.0�J E.A C 8,405.00= R,405.00 FLOOR COVERING-WOOD 1.00 EA C OPEN HEAT, VENT&AIR CONDITIONING 1.00 EA a� 438.00= 438.00 See sub bid-«'ater leaked into to furnace. Consider replacement of funiace. MARKLLJND-GLEN 02/?6/2007 Page: 6 Groom Construction Inc. 7600 West 27th Street, Suite 2l0 St. Louis Park,MN 55426 p:(952)929-4778 f:(952)929-4779 Lic#20398386 CONTINUED-GEN DESCRIPTION QNTI' UNIT COST TOTAL Taxes,insurance,permits&fees(Bid item) 1.00 EA C OPEN Dumpster load-Approx.40 yards,7-8 tons of debris 3.00 EA @ 521.04= 1,563.12 MASONRY-Per Paine Masonry 1.00 EA @ 23,780.00= 23,780.00 Adjustments fot•Base Service Charges Adjustment TilelCultured Marble Installer 181.00 Total Adjustments for Base Sei-��ice Charges: 181.00 Line Item Totals: MARICLUND-GLEN 77,781.73 Grand Total Areas: 3,452.67 SF Walls 1,153.67 SF Ceiling 4,611.33 SF VValls and Ceiling 1,1�8.67 SF Floor 128.74 SY Flooring 428.33 LF Floor Perimeter 1,233.33 SF Long Wall 710.67 SF Short Wall 468.67 LF Ceil.Perimeter 0.00 Floor Area 0.00 Total Area 0.00 Interior Wall Area 0.00 Exterior Wall Area 0.00 Exterior Perimeter of Walls 0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length 0.00 Total Ridge Length 0.00 Total Hip Len�th MARKLLTND-GLEN 02;'26i2007 Paee: 7 Groom Construction Inc. 7600 West 27th Street,Suite 210 St. Louis Park,MN �5426 p:(952)929-4778 f:(952)929-4779 Lic#20398386 Summary for Fire Line lteul Total 77,600.73 Total Adjustments for Base Service Charges 181.00 Matl Sales Tax Reimb C, 6.500% x 26,998.13 17�4.88 Subtotal 79,�36.61 Overhead @ 10.0% x 79,536.61 7,953.66 Profit @ 10.0% x 79,536.61 7,953.66 Cleaning Sales Tax @ 6.500% x 2,260.03 146.90 Replacement Cost Value 95,�90.83 Net Claim 95,590.83 Greg C. MARKLLTND-GLEN 0?;'26�2007 PaQe: S Groom Construction Inc. 7600 West 27th Street,5uite 210 St. Louis Park, MN �5426 p:(952)929-4778 f:(952)929-4779 Lic#20398386 Recap by Room Estimate: MARKLUVD-GLEN Living Room 9,116.86 11.72% Dining Room 7,529.38 9.68% Kitchen 453.56 0.58% Hallwar' 1,901.86 2.45% Bathroom 41.84 0.05% Oftice 1,185.03 1.52% BED 1 1,182.89 1.52% SED 2 1,227.61 1.58% Stairwa}� 239.40 0.31% Exterior 1,591.69 2,p5% Raaf 18,944.49 24.35% GEI� 34,786.12 43.9i% Subtotal of Areas 77,600.73 99.77% Base Service Charges 181.00 0.23% Total 77,781.73 100.00% MARKLiJND-GLEN � OZr26;2007 Page: 9 Groom Construction Inc. 7600 West 27th Street, Suite 210 St. Louis Park,MN 55426 p:(952)929-4778 F:(952)929-4779 Lic#20398386 Recap by Categor,y O&P Items Total Dollars % CLEANING 1,883.36 1.97% GENEIZAL DEMOLITION 9�384.91 9.82"/0 DOORS 521.27 0.55% DR1'WALL 121.94 0.13% ELECTRICAL 8,405.00 8.79% ELECTRICAL-SPECiAL SYSTEMS 250.71 0.26% FLOOR CO�'ERING-WOOD 7,80592 8.77% FINISH CARPENTRY/TRIMWORK 789.78 0.83% FINISH HARDWARE 44.57 0.05% FRAMING &ROUGH CARPENTRY S,142.33 5.38% HEAT, VENT&AIR CONDITiONING 479.13 0.50% INSULATION 2,250.94 2.3_5% MASONRY 23,780.00 24.88% INTERIOR LATH&PLASTER 3,656.54 3.83°/a PAINTING 4,889.13 5.11% ROOFING 4,476.92 4.68% SIDING 494.44 0.52% SOFFIT,FASCIA,&GUTTER 842.22 0.88% TILE 466.44 0.49% WINDOWS-SLIDING PATIO DOORS 1,433.05 1.50% V1'INDOWS-WOOD 482.13 0.50% Subtotal 77,600.73 81.18% Base Service Charges 181.00 0.19% Matl Sales Tax Reimb @ 6.500% 1,754.88 1.84% Overhead @ 10.00% 7,953.66 8.32% Profit @ ]0.00% 7,953.66 8.3?0�0 O&P Items Subtotal 95,443.93 99.85% Cleaning Sales Tax (a 6.500°/a 146.90 0.15°�0 Grand Total 9�,�90.83 MARKLUl`TD-GLEN o-2/26/2007 Page: 10 C/ D �� DAi+� TIME ✓ CITY OF ORONO CALLED IN �� INSPECTION TI E SCHEDULED � ��� PERMIT NO. 7 � COMPLETED ADDRESS ��70 ����%�►'LU>`D'� �i� OWNER CONTR. G d�'''� �-�� TELEPHONE N0. � � 9� - � DESCRIPTION ��G2'✓�E� i � 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/VJETLANDS � 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL � 04 WA�L BD. 12 WATER HOOK-UP 17 SITE INSPECTION Z Q OS FINAL 14 SEWER HOOK-UP O6 PROGRESS � 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT � 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP = 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL � OWNER/CONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W a � � O >. � O � W � Q � Z W � W � � d W �WORKSATISFACTORY:PROCEED C� PROJECTCOMPLETE � ❑CORRECT WORK&PROCEED - ISSUE CERTIFICATE OF OCCUPANCY W � ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY � BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. r pH0T0 TAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR C INSPECTION REOUIRED.CALL TO ARRANGE ACCESS. Call for the nex�t inspection 24 hours in advance. (952� 249-46�� OwnerlContr� o ite: Inspector. `'�� ~ F� 1 White Copyllnspector's File Canary CopylSite Notice �' DATE TIME / CITY OF ORONO CALLED IN 5-3 INSPECTION NO CE SCHEDULED .S-7 07 �-� PERMIT NO. �7� COMPLETED ADDRESS a`f 7D �I (�G�(�"�y �� OWNER CONTR. C'�. rD�yvL ��� TELEPHONE NO. 76� �6� ��l-3 �b� ��&� 1k3�,� � DESCRIPTION �/�S�(�(a'�G�� ly� 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING � 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS ti Q 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS � 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP = 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL � OWNERICONTRACTOH TO MEET YOU:_YES_NO � COMMENTS: � W � J V ��,��1 O a � O � W � Q � Z W � W � j d W WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE � ❑CORRECT WORK&PROCEED C ISSUE CERTIFICATE OF OCCUPANCY W O ❑Ct�RRECT WORK,CAII FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑ CORRECT UNSAFE CONDITION WITHIN HOURS. � pH0T0 TAKEN INSPECTOR W4LL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ��CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Ca11 for the next inspection 24 hours in advance. (952� 249-46�� OwnerlContr�cte; site: Inspector. White Copylinspector File Canary CopylSite Notice l�� ��� � �� DATE TIME � CITY OF ORONO CALLED IN (.Q�5"U� qsa am INSPECTION N TI F, SCHEDULED "�"b ` •O�1�M PERMIT NO. � COMPLETED ADDRESS �l� ��VV�V CTI�e OWNER CONTR. t'"Gu.L I TELEPHONE NO. C��Z ��� � !� � DESCRIPTION I� (� ' � � l.J�� L� 01 FOOTING 11 M CHANICAL RI 18 EXCAV/GRADING/FILLING � 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS � O 03 INSULATION 24/25 WOOD BURNER/FIREPIACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q OS FINAL 14 SEWER HOOK-UP 06 PROGRESS � 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT � 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP = 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W � J �, . � � w� O � � � .�-- � 1 (J� �.t. W � Q z Q� � � � �� � W � W � � � d W RKSATISFACTORY:PROCEED [� PROJECTCOMPLETE � ❑ CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W � ❑ CORRECT WORK,CALI FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. � pH0T0 TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ��CITATION ISSUED G INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Cali for the next i pection 24 hours in advance. (952� 249-4600 OwnerlContra Inspector. White Copyllnspector's File Canary CopyiSite Notice �,�i� �� TIME �� CITY OF ORONO CALLED IN INSPECTION NO IC SCHEDULED — O:d0 PERMIT NO. �7 COMPLETED ADDRESS OWNER CONTR. �/�,0797►'�,C�' TELEPHONE N0. �D� a ��O g �Cc� �' �.1'��C� � DESCRIPTION '��"�`L--- �� 1y� 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING � 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS � O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS � 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT � 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP � 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL � OWNER/CONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W � � J O . � � O � W � Q � Z W � W � � d W WORKSATISFACTORY:PROCEED Cl PROJECTCOMPLETE W ❑CORRECT WORK 8 PROCEED '� ISSUE CERTIFICATE OF OCCUPANCY � ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR '� CITATION ISSUED ❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Call for the ne t inspection 24 hours in advance. (J52� 249-4600 OwnerlContr o ite: Inspector. � ' White Copyllnspector's ile Canary CopylSite Notice