HomeMy WebLinkAbout2006-P10018 - new structure CITY OF ORONO PERMIT
?;50 Kelley Parkway- PO Box 66 Permit Number: plool8
Crystal Bay, Minnesota 55323 Permit Type: New Structure
(952) 249-4600 Date Issued: 7/11/2006
SITE ADDRESS: 2445 Dunwoody Ave Unit#
Wayzata,MN 55391
P��� 20-117-23-22-0011
DESCRIPTION: UBC Occupancy R3
Construction Type VN
Proposed Use: Residential
Census Code 101
Permit Class: Building
Permit Type:
New Structure Permit Sub-type(s): New Home-Single Family
DETAILS:
Approved per resolution#: 3197
Separate permits required: Plumbing Mechanical Fireplace Water Connection Sewer Connection Irrigation Electrical
(state)
NOTICES/REMARKS: , �
��� � ��
����� �� ��
FEE SUMMARY: Permit Fee: $ 3,708.75 valuation: $ 600,000.00
Plan Review Fee: $ 2,410.69
State Surcharge Fee: $ 300.00
TOTAL FEE: $ 6,419.44
APPLICANT: Suncrest Builders,Inc. OWNER: Mark Schuehle
Grant&Julie Johnson 2445 Dunwoody Ave
6371 Bay Ridge Rd. Wayzata,MN 55391
Mound,MN 55364
THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED
AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF
MINNESOTA BUILDING CODE REQUIREMENTS.
c� -, ����
�` � ,�'��" ������'-�. �
l /� . .�_b�_i'iff s �/L ��-..,ti_\`,-..._ _
A LI ANT GR ITEE SIGNATURE ISSUED BY SIGNATURE
Copies: 1-File(Signatures Reguired), 1-Applicant, 1-Monthly Reports, 1-Assessing,(If Septic, 1-Septic) Page 1
�
Total Fee: $ � `1 ��� ����'� Date Received: �'Z���
�`
Entered By: Permit#: f�/O�y/8
CITY OF ORONO - BUILDING PERMIT APPLICATION
All information must be submitted in full before plan review will be started.
(please print all information)
------------------------------------------------------------------------------------------------------------------------
THE APPLICANT IS: (circle one) OWNER OR CONTRACTOR
JOB SITE ADDRESS: 2445 Dunwoody Ave.Orono,Nnv ZIP: 55391
Will this be a Parade of Homes,Remodelers Showcase Home or other Display Home?
❑ Yes Q✓ No If yes, a special event permit is required with Police Department and Ciry Council approval
60 days prior to the event. Shuttle bus service will be required unless applicant demonstrates
su�cient on-site parking is available. Non-permitted events will not be allowed.
NAME OF OWNER: Mark and Sandy Schuehle PHONE: (home) (952)470-9982
(work) (9s2>906-�s39
MAILING ADDRESS' 26745 Edgewood Rd. CI•I•Y, Shorewood,MN ZIP: 55331
CONTRACTOR: Suncrest Builders,Inc. PHONE• (6l2)209-5916
CONTACT PERSON: Grant or Julie Johnson MOBILE/PAGER (612)209-5916
MAILING ADDRESS: 6563 sartlett slvd. CITY: Mound,MN ZIp; 55364
STATE LICENSE: # 20312998 EXPIRATION DATE: 03/31/07
ARCHITECT/ENGINEER: D.F.P.Planning&Design PHONE: ��63)780-8004
MAILING ADDRESS: 9100 Baltimore St.NE Ste. l06 CITY: Blaine,l�t7v ZIP: 55a49
NAME: Jeff Johnson REGISTRATION: # NA
TYPE OF WORK: New Home ✓ Addition Accessory Structure
Move Home Remodel/Alteration (ie: Siding, Windows)
Any earth movement may require MCWD review and permits!
PROPOSED WORK(describe in detain: Construct a new single family home with an attached two car garage.
STORIES: 2 SQ.FEET OF EACH FLOOR: Bsmt. 1049, 1 st Flr. 1251,2nd Fir. 1698
NO. OF BEDROOMS: 4 GARAGE STALLS: ATTACHED ✓ DETACHED
ESTIMATED CONSTRUCTION VALUATION(excluding land): $ 600,000.00
[hereby apply for a building permit and I acknowledge that the information above is complete and accurate;
that the work will be in conformance with the ordinances and codes of the City and with the State Building
Code;that I understand this is not a permit and work is not to start without a permit;and that the work will be
in accordance with the approved plan. ?
� ,
APPLICANT'S SIGNATURE: r�►�--� DATE: � � ��
31
�
Sec.13.04 RIGHTS OF SUBJECTS OF DATA
Subd. 1. Type of data. The rights of individual on whom the data is stored or to be stored shall be as set forth in this section.
Subd.2. Information required to be given individual. An individual asked to supply private or confidential data conceming himselfshall be
informed of. (a)the purpose and intended use of the requested data within the collecting state agency,political subdivision,or statewide system;(b)
whether he may refuse or is Iegally required to supply the requested data;(c)any known consequence arising from his supplying or refusing to supply
private or confidential data;and(d)the identity of other persons or entities authorized by state or federal law to receive the data. This requirement shall
not apply when an individual is asked to supply investigative data,pursuant to section 13.82,subdivision 5,to a law enforcement officer.
The commissioner of revenue may place the notice required under this subdivision in the individual income tax or property tax refund
instructions instead of on those forms.
Subd.3. Access to data by individual. Upon request to a responsible authority,an individual shall be informed whether he is the subject of
stored data on individuals,and whether it is classified as public,private or confidential. Upon his further request,an individual who is the subject of
stored private or public data on individuals shall be shown the data without any charge to him and,ifhe desires,shall be informed ofthe content and
meaning of that data. After an individual has been shown the private data and informed of its meaning,the data need not be disclosed to him for six
months thereafter unless a dispute or action pursuant to this section is pending or additional data on the individual has been collected or created. The
responsible authority shall provide copies of the private or public data upon request by the individual subject of the data. The responsible authority
may require the requesting person to pay the actual costs of making,certifying,and compiling the copies.
The responsible authority shall comply immediately,ifpossible,with any request made pursuant to this subdivision,or within five days of
the date of the request,excluding Saturdays,Sundays and legal holidays,if immediate compl iance is not possible. If he cannot comply with the request
within that time,he shall so inform the individual,and may have an additional five days within which to comply with the request,excluding Saturdays,
Sundays and legal holidays.
Subd.4. Procedure when data is not accurate or complete. An individual may contest the accuracy or completeness of public or private data
conceming himself. To exercise this right,an individual shall notify in writing the responsible authority describingthe nature ofthe disagreement. T'he
responsible authority shall within 30 days either. (a)correct the data found to be inaccurate or incomplete and attempt to notify past recipients of
inaccurate or incomplete data,including recipients named by the individual;or(b)notify the individual that he believes the data to be correct. Data in
dispute shall be disclosed only if the individual's statement of disagreement is included with the disclosed data.
The determination of the responsible authority may be appealed pursuant to the provisions ofthe administrative prceedure act relating to
contested cases.
DATA PRIVACY ADVISORY
In accordance with M.S. 13.04,Subd.2,"Rights of subjects of data",we would like to inform you that your request
for a permit or license from the City of Orono or any of its departments may require you to furnish certain private or
confidential information.
You are notified that:
1. The information you furnish will be used to determine your qualification for the permit or license
requested.
2. You may refuse to supply data,but refusal may require that the City deny the permit or license.
3. The information may be shared with other local, state or federal agencies to the extent necessary to
process the permit or license.
4. If your requested permit or license requires Council action to approve,some information may become
public.
5. You have certain rights under M.S. 13.04(available upon request)to review private data on yourself.
6. Your full name is required to process this application or permit.
�- i
(����z�r�� �'r�,�� _ �1,hs v��
First Middle Last
�> S�.� ��ir7'�e�Tl ��vcl:
' Address
,�i�,�r�r�, �?/�,' S�3�y (�/Z� 2Uy - �Y��
City State Zip Phone
I und,rstand my rights as stated above.
, ,`Z
Signature
32
. CHECK OFF LIST FOR ISS UANCE OF PERMITS
FOR OFFICE USE ONLY
ADDRESS OR LEGAL: L � v►�<,voa
PID:
DESCRIPTION OF WORK
ZOMNG REVIEW BY.• W ~~ ���� DATEAPPROVED:W W �7 O
BUILDING REVIEW BY.• �..- DATEAPPROVED: �-�-o�
FEES TO BE CHARGED: Misc. Fees Calculated By:
PERMIT Yes � No
PLAN REVIEW Yes � No SEWER CONNECTION
STATE SURCHARGE Yes ,/ No WATER CONNECTION
INVESTIGATION FEE Yes No� PARK FEE
SAC Yes No SITEINSPECTION
Number of SAC Units G�-�o '.M,�� 2� � s-iz•�,c�}�C OTHER (spec�) �3 �
=--��--�----��- .��- �
Z O N I N G C H E C K L I S T Zvning Dis tric t: �R ' �C� � � P���
v�53�Y
Fire Department:�)CCP�Sl61� Post Office: �/l� School District: �����S�yj,�/a�
LotArea: Sq.ft.�2(pZ. Acres Width /pZ .,j Depth ��O � ��•�
Survey Submitted: Yes�� No Date of Survey: � �O
Proposed Setbacks: p �o✓��►
Front(Lake): 7 �/ Right Side: Iz'r'J�
. .S�f'h .
Rear(Street): /O�f. '�j 2 Left Side: ��
Adjacent Structures: �7/� Wetland: hp'
Building Height: Def. Hgt. Z / Peak Hgt. JQ� ,
Lot Coverage: ���5�r''' ���D
Grading: Staff Approval Date: �� ' � � By:I,I�- Council Approval Date:
Septic: Staff Approval Date: �l� By: W�
Zoning File: #�fo_�7� Resolution: #� Resolution Date: �Z2 (J�p
Shoreland District: ✓ MCWD Permit:
Avg. Setback: Bluff Setback: �'1!-� Lot Coverage:
Existing Proposed
Hardcover: 0-75' �, O
�s-2so� ���� � ���ancu.. q�<<...�5 3ZZF�
2so-soo'
soo-�ono� n����
Hardcover Yariance Reguired: Yes ✓ No � Date of Council Approval: .�Z ('�p
�
REMARKS(in house): �U� wiC��'l Az'�C�,�sl v/�ii/CWi�P�
33
B UILDING REVIEW CHECK LIST
UBC: R-3 CONSTRUCT/ON TYPE: �N
Sg Footage $Per Sq Ftg
Basement x =
Ist Floor x =
2nd Floor x =
Garage x =
x =
TOTAL
EstimatedConstructionValue: $ 60c�,OD�'`�
lnspections Required: Work Requiring Separate Permits:
Site pt Plumbing Fire
Hardcover Removal X Mechanical ( Water Connection
�L Footing Septic ( Sewer Connection
_(� Framing ic Fireplace _oC Lawn Irrigation
� /nsulation (Masonry) Other
� Wall Board _�(Mfg.) Well(State Permit)
�C Final Grading/Filling �Electrical(State Permit)
Other
REMARKS(INHOUSE):
REVIEW BY OTHERS: DATE:
Access: Ezisting __ New
Access Approval: Date By:
REMARKS(TO BE NOTED ON PERMIT):
34
` � 35 West Highway 36 • St. Paul, MN 55113 �R .�,.�., �q��q�- �'�'`
Bonestroo � -
Office: G51-G3G-4G00 • Fax: G51-G3G-1311 ✓
Rosene ��"�� ����
Anderlil<& www.bonestroo.com
Associ�tes
Engineers&Architects
May 8, 2006
Ms. Evelyn Turner
Planner
City of Orono
Post Office Box 66
Crystal Bay,MN 55323
Re: 2445 Dunwoody Lane
File No. 000139-06000-1
Plat No. 06-3197
Dear Evelyn:
We have reviewed the survey for the proposed home construction at 2445 Dunwoody Lane dated 4-18-06.
We have the fo(lowing preliminary comments with regards to engineering matters:
• The plans show a proposed retaining wall north of the home. It is not clear why the wall is
proposed and why the grading plan does not propose a wider side yard swale north of the
proposed home (recommended). If the wall is to remain it should be relocated so that the face of
the wall is at least 5-feet from the property line. The wall also will require an engineered design
submittal for review and approval.
• The plans should show the existing sanitary sewer on the lake side of the home. The city should
review whether or not an easement exists over the sewer. If no easement exists the applicant
should provide a 20-foot wide utility easement centered over the existing pipe.
• Final plans should include erosion and sediment control details.
Once this information is received we can perform a more detailed review of the proposed project. If you
have any questions,please call me at(651)604-4863.
Yours very truly,
BONESTROO, ROSENE, ANDERLIK& ASSOCIATES, INC.
✓
��� �
Tom Kellogg
St. Paul, St. Cloud, Rochester, MN • Milwaul<ee, WI • Chicago, IL
Affirmative Action/Equal Opportunity Employer and Employee Owned
t � T �t �f"� � ^. � `,h
i�� ����'� �r,�.��� �
�
AD VANCE S UR VE YING & ENGINEERING CO.
RECAP OF HARDCOVER AT 2445 DUNWOODY AVENUE, MARCH 15,2006
ZONE 0-75 75-250 250-500 500-1000 TOTAL
AREA IN ZONE SQUARE FEET 4741 10994 530 0.0001 16265.0001
ALLOWABLE HC 0 2749 159 0 2908
TOTAL HC EXISTING 104 5228 323 0 5655
TOTAL HC AFTER PROPOSAL 0 3206 82 0 3288
UNDER OR(OVER) _ 0
Attached are city worksheets for each zone, please review your survey
and these worksheets with the city to be sure they agree that the items
shown as hardcover are indeed hardcover under their interpretaion of
their ordinances.
I hereby certify that this report was prepared by me or under my direct
supervision and that I am a licensed Professional Surveyor and Professional
Enqineer under the laws of the State of Minnesota.
�cvrrt.�r�• ,� �aC�iv
�'
James H. Parker P.E. & P.S. No. 9235
.
,
SETBACK ZONE: (CIRCLE ONE) 0-75' 75-250' 250-500' S00-1000'
EXISTING HARDCOVER IN ZONE
A. House x = S.F.
Length Width
x = S.F.
x = S.F.
x = S.F.
B. Garage x = S.F.
C. Driveway x = S.F.
x = S.F.
D. Sidewalk STEPS x = 104 S.F.
x = S.F.
E. Patio/Deck x = S.F.
x = S.F.
F. Landscape x = S.F.
Underlain x = S.F.
By Plastic x = S.F.
G. Other x =
TOTAL HARDCOVER IN ZONE lO4 S.F. A
TOTAL PROPERTY AREA IN ZONE 4741 S.F. B
A 104 - s 4741 10 0 = 2.2 0
PROPOSED HARDCOVER IN ZONE
A. House x = S.F.
Lenqth Width
S.F.
S.F.
S.F.
B. Garage S.F.
C. Driveway S.F.
S.F.
D. Sidewalk S.F.
S.F.
E. Patio/Deck S.F.
S.F.
F. Landscape S.F.
Underlain S.F.
By Plastic S.F.
G. Other
TOTAL HARDCOVER IN ZONE O S.F. A
TOTAL PROPERTY AREA IN ZONE 0.01 S.F. B
A 0 - B 0.01 100 = 0.0 �
s
SETBACK ZONE: (CIRCLE ONE) 0-75' 75-250' 250-500' S00-1000'
EXISTING HARDCOVER IN ZONE
A. House x = 1249 S.F.
Lenqth Width
overhang x = 167 S.F.
x = S.F.
x = S.F.
B. Garage x = 415 S.F.
shed 317
C. Driveway gravel x = 3021 S.F.
x = S.F.
D. Sidewalk x = 25 S.F.
x = S.F.
E. Patio/Deck x = S.F.
x = S.F.
F. Landscape x = 16 S.F.
x = S.F.
x = S.F.
G. Other shed x = 18
TOTAL HARDCOVER IN ZONE 5228 S.F. A
TOTAL PROPERTY AREA IN ZONE 10994 S.F. B
A 5228 = a 10994 100 = 47.6 °
PROPOSED HARDCOVER IN ZONE
A. House x = 1880 S.F.
Length Width
S.F.
S.F.
S.F.
B. Garage S.F.
C. Driveway 960 S.F.
S.F.
D. Sidewalk 115 S.F.
S.F.
E. Patio/Stair 197 S.F.
O S.F.
F. Landscape S.F.
Underlain S.F.
By Plastic S.F.
G. Other Retaining Waiis 54
TOTAL HARDCOVER IN ZONE 3206 S.F. A
TOTAL PROPERTY AREA IN ZONE 10994 S.F. B
A 3206 - B 10994 10 0 = 2 9.2 0
1
' SETBACK ZONE: (CIRCLE ONE) 0-75' 75-250' C50-500' 500-1000'
EXISTING HARDCOVER IN ZONE
A. House x = S.F.
Length Width
x = S.F.
x = S.F.
x = S.F.
B. Garage x = 169 S.F.
C. Driveway x = 154 S.F.
x = S.F.
D. Sidewalk x = S.F.
x = S.F.
E. Patio/Deck x = S.F.
x = S.F.
F. Landscape x = S.F.
Underlain x = S.F.
By Plastic x = S.F.
G. Other x =
TOTAL HARDCOVER IN ZONE 323 S.F. A
TOTAL PROPERTY AREA IN ZONE S3O S.F. B
A 323 = B 530 10 0 = 60.9 0
PROPOSED HARDCOVER IN ZONE
A. House x = S.F.
Length Width
x = S.F.
x = S.F.
x = S.F.
B. Garage x = S.F.
C. Driveway x = 82 S.F.
x = S.F.
D. Sidewalk x = S.F.
x = S.F.
E. Patio/Deck x = S.F.
x = S.F.
F. Landscape x = S.F.
Underlain x = S.F.
By Plastic x = S.F.
G. Other x =
TOTAL HARDCOVER IN ZONE 82 S.F. A
TOTAL PROPERTY AREA IN ZONE 530 S.F. B
A 82 = B 530 10 0 = 15.5 s
, �
SETBACK ZONE: (CIRCLE ONE) 0-75' 75-250' 500' 500-1000'
EXISTING HARDCOVER IN ZONE
A. House x = S.F.
L,ength Width
x = S.F.
x = S.F.
x = S.F.
B, Garage x = S.F.
C. Driveway x = S.F.
x = S.F.
D. Sidewalk x = S.F.
x = S.F.
E. Patio/Deck x = S.F.
x = S.F.
F. Landscape x = S.F.
Onderlain x = S.F.
By Plastic x = S.F.
G. Other x =
TOTAL HARDCOVER IN ZONE O S.F. A
TOTAL PROPERTY AREA IN ZONE O S.F. B
A 0 = B 0.0001 10 0 = 0.0 5
PROPOSED HARDCOVER IN ZONE
A. House x = S.F.
Length Wi.dth
S.F.
S.F.
S.F.
B. Garage S.F.
C. Driveway x = S.F.
x = S.F.
D. Sidewalk x = S.F.
x = S.F.
E. Patio/Deck x = S.F.
x = S.F.
F. Landscape x = S.F.
Underlain x = S.F.
By Plastic x = S.F.
G. Other x =
TOTAL HARDCOVER IN ZONE O S.F. A
TOTAL PROPERTY AREA IN ZONE 0.0001 S.F. B
A 0 = B 0.0001 10 0 = 0.0 0
•
' , . Permit#
{
,^� �.. .
_ Pertnit Date
REScheck Software Version 3.7.3
Compliance Certificate
Project Title: 206231
Report Date:O6/21/O6
Data fdename:P:1REScheck�2006�206231-MN.rdc
Energy Code: 2000 Minnesota Energy Code
Location: Hennepin County,Minnesota
Construction Type: Single Family
Glaang Area Percentage: 21%
Construction Site: OwneNAgent: Designer/Contractor:
2445 DUNWOODY AVENUE GRANT OR JULIE JOHNSON D.F.P. PALNNING 8 DESIGN, LLC
ORONO,MN SUNCREST BUILDERS 9100 BALTIMORE ST.N.E.,SUITE 106
6371 BAY RIDGE ROAD BLAINE,MN 55449
MOUND,MN 55364 763-780-8004
952-491-1999 dfpplanningdesign�visi.com
grant.johnsonQsuncrestbuilders.00m or
julie.johnson@suncrestbuilders.com
. . . . i� ..:
. . . . . �
� - . - . • . �..
Ceiling 1:Flat Ceiling or Scissor Truss: 1120 44.fl 0.0 30
Wall 1:Wood Frame, 16"o.c.: 3411 19.0 0.0 156
Window 1:Above-Grade:Vinyl Frame,double Pane with Low-E: 591 0.320 189
Door 2:Solid: 54 0.140 8
Door 3:Glass: 120 0.320 38
Basement Wall 1:Solid Concrete or Masonry: 630 5.0 0.0 49
Floor 1:All-Wood JasVTruss:Over Unconditioned Space: 432 30.0 0.0 14
Fumace 1:Forced Hot Air:90 AFUE
Compliance SYatement:The proposed building design descxibed here is consistent with the bulding plans,specfications,and other
calculations submitted with the permit application.The proposed building has been designed to meet the 2000 Minnesota Energy
Code requirements in REScheck Version 3.7.3 and to comply with the mandatory requirements listed in the REScheck Inspection
C�ist.
�
��� � S�,nL�s� ��;���r��' . 1"��. -, .�i ��;.
BuildeNDesig Company Name Date
Project Notes:
MODE�
206231 Page 1 of 1
- ���j`►�(��� 206231 4 SEAS FOUND
""�"''"'�"a'=`'�` 2 Pcs of 1 3/4" x 9 1/2" 2.OE Parallam� PSL
TJ-Beam�620 Serial Number.7004109786
User 1 6/1920061126:12 AM V
• d�, e���v��:s.2o.,s THIS PRODUCT MEETS 4R EXCEEDS THE SET DESlGN � �
CONTROLS FOR THE APPLICATION AND LOAD'� LISTED
�
� ?
�. .�i. .
P�odikt Qia[pam is ra�ceptual.
LOADS:
Anatysis is for a Drop Beam Member. Tributary Load Width:1'
Primary Load Group-Residential-Living Areas(ps�:40A Live at 100%duration,15.0 Dead
Verticai Loads:
Type Class Live Dead Location Application Comment
Uniform(pl� Floor(1.00) 210.0 79.0 0 To 11' Adds To
Point(Ibs) Floor(1.00) 0 1082 3" -
Point(Ibs) Floor(1.00) 0 5361 3" -
Point(ibs) Floor(1.00) 0 5361 10'9" -
SUPPORTS:
Input Bearing Vertical Reactions(Ibs) Detail Other
Width Length Live/DeadNplifUTotal
1 Wood column 5.50" 3.20" 1375/7017/0/8392 L5 None
2 Wood coiumn 5.50" 2.78" 1375/5935/0/7310 LS None
-See TJ SPECIFIER'S!BUILDERS GUIDE for detail(s):L5
DESIGN CONTROLS:
Maximum Design Cor�trol Control Location
Shear(Ibs) 1831 -1506 6428 Passed(23%) Rt end Span 1 under Floor loading
Moment(Ft-Lbs) 4730 4730 13057 Passed(36%) MID Span 1 under Flaor loading
Live Load Defl(in) 0.140 0.258 Passed(L/887) MID Span 1 under Floor toading
Total Load Defl(in) 0.198 0.258 Passed(V626) MID Span 1 under Floor loading
-Deffection Criteria:Specified(LL:U480,TL:V480).
-Bracing(Lu):All compression edges(top and bottom)must be braced at 9'2"dc unless detailed othenaise. Proper attachment and positioning of lateral
braang is required to achieve member stability.
ADDITIONAL NOTES:
-IMPORTANT! The analysis presenbed is output from software developed by Trus Jast(TJ). TJ warrants the s¢ing of its products by this software will be
accomplishad in accordance with TJ product design criberia and code accepted design values. The specific product ap�ication,input design loads,and
stated dimensions have been provided by the software user. This output has not been reviewed by a TJ Associate.
-Not atl products a►e readily available. Check with your supplier or TJ techniql r�epresentative for product availability.
-THIS ANALYSIS FOR TRUS JOIST PRODUCTS ONLY! PRO�UCT SUBSTITUTION VOIDS THIS ANALYSIS.
-Allowable Sfiess Design methodology was used for Building Code UBC analyzing the TJ Distribution product lisbed above.
-Note:See TJ SPECIFIER'S J BUILDER'S GUIDES for multiple ply connection.
PROJECT INFORMATION: OPERATOR INFORMATION:
Terry Mikkelson
dfp planning design
9100 baltimore st.ne
suite 106
blaine,MN 55449
Phone:763-780-8004
Fax :763-780-8015
dfpplanningdesign�visi.com
Copyriqht Cn 2005 by Trus Joist, a Weyerhaeuser Business
Parallamb is a registered trademark of Trus Joist.
- �� �J� /�� 206237 BSMT STAIR
TJ-Beam�6`20SerialNu"m��`���g"�` 2 Pcs of 1 3/4" x 9 1/2" 2.OE Parallam� PSL
�'g�, ���7015:�� THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN
' Pa�1 Engine Version:6.20.16
CONTROLS FOR THE APPLICATION AND LOADS LISTED
.
� �
�
a��•.��
P�ochkt[►iagr��is Conceptuai.
LOADS:
Analysis is for a Header(Fiush Beam)Member. Tributary Load Width: 1'
Primary Load Group-Residential-Living Areas(ps�:40.0 Live at 100�o duration,15.0 Dead
Verrtiical loads:
Type Class Live Dead Location Application Commerrt
Uniform(pl� Floor(1.00) 507.0 190.0 0 To 2'4" Adds To
Uniform(pt� Floor(1.00) 507.0 325.0 Q To 2'4" Adds To
Point(fbs) Floo�(1.00) 0 5480 2" -
Point(Ibs) Floor(1.00) 0 4757 2'2" -
SUPPORTS:
Input Bearing Vertical Reactions(Ibs) Detail Other
Width Length l.iveNeadNpllfUTota1
1 Steel column 3.50" 2.80" 1230!6110/0/7340 L5 None
2 Steet column 3.50" 2.52" 1230/5387/0/6617 l5 None
-See TJ SPECIFIER'S/BUILDERS GUIDE for detail(s):L5
DESIGN CONTROLS:
Maximum Desfgn CoMrol CoMrol Location
Shear(Ibs) 1594 -133 6428 Passed(2%) Rt end Span 1 under Floor toading
Moment(Ft-Lbs) 797 797 13057 Passed(6%) MID Span 1 under Floor loading
Live Load Defl(in) 0.003 0.050 Passed(U999+) MID Span 1 under Ftoor loading
Total Load Defl(in) 0.004 0.050 Passed(U999+) MID Span 1 under Floor loading
-0eflection Criteria:Specified(LL:UA80,TL:U480).
-Bracing(Lu):All compression edges(top and bottom)must be braced at 2'4"o/c unless detailed otherwise. Proper attachment and positioning of lateral
bracing is required to achieve member stability.
ADDfT10NAL NOTES:
-IMPORTANT! The analysis presented is output from soflware developed by Trus Joist(TJ). TJ warrants the sizing of its producfs hy this softw�are will be
acxomplished in accordance with TJ product design criteria and code accepted design values. The speaFc product application,input design loads,and
stated dimensions have been provided by the sofiwane user. This output has not been revieweci by a TJ Associate.
-Not all products are readity avaitable. Chedc with your supplier or TJ technical repre.sentative for product availability.
-THIS RNALYSIS FOR TRt1S JOIST PRODUCTS ONLY! PRODUCT SUBST17UT10N VOIDS THIS ANALYSIS.
-Allowable Stress Design methodology was used for Building Code UBC analyzing the TJ Distribution product listed above.
-Note:See TJ SPECIFtER'S/BUILDER'S GUIDES for mui6ple ply connection.
PROJECT INFORMATION: OPERATOR INFORMATION:
Terry Mikkelson
dfp planning design
9100 baltimore st.ne
suite 106
blaine,MN 55449
Phone:763-780-8004
Fax :763-780-8015
dfpplanningde.Sign@visi.com
Copyriqht c�i 2005 by Trus Soist, a Weyerhaeuser Huslness
Parallam6o is a reqistered [rademark of Trus Joist.
- ���j�� � 206231 BSMT BATH
TJ-Bearr�620SerialNu_�;������'�"�" 3 Pcs of 1 3/4" x 16" 2.OE Paraliam� PSL
- P�e; E����s�s THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN
CONTROLS FOR THE APPLICATION AND LOADS LISTED
1 � �I
�o :o
b -�3•�,•• j
P�otluct Qiacpam is Conceptuai.
LOADS:
Analysis is for a Header(Flush Beam)Member. Tributary Load Width:1'
Primary Load Group-Residen6al-Living Areas(ps�:40.0 Live at 100%duration, 15.0 Qead
Vertical Loads:
Type Class Live Dead LocaUon Application Comment
Uniform(pl� Floor(1.00) 500.0 188.0 0 To 13'6" Adds To
Uniform(pt� Floor(1.00) 530.0 334.0 0 To 4'4" Adds To
Uniform(pf� Floor(1.00) 530.0 334.0 10'10"To 13'6" Adds To
Point(ibs) Floor(1.00) 0 8936 3" -
Point(Ibs) Floor(1.00) 0 2780 4'4" -
Point(Ibs) Floor(1.00) 0 2780 10'10" -
Point(Ibs) Floor(1.00) 0 5488 13'3" -
SUPPORTS:
Input Bearing Vertical Reactions(Ibs) Detail Other
Width Length Live/Dead/Uplift/Total
1 Steel column 5.25" 5.02" 5647/14127/0/19775 L5 None
2 Plate on sbeel beam 7.63" 7.46" 5353/11289!0/16642 Ai:Blocking Custom B►ocking
-See TJ SPECIFIER'S/BUILDERS GUIDE for detail(s):L5,A1:Blodcing
DESIGN CONTROLS:
Maximum Design Control Co�ol Location
Shear(Ibs) 10328 7947 16240 Passed(49°�) LL end Span 1 under Floor loading
Moment(Ft-Lbs) 28953 28953 52432 Passed(55%) MID Span 1 under Floor loading
Live Load Defl(in) 0.131 0.317 Passed(L/999+) MID Span 1 under Floor loadi�g
Total Load Defl(in) 0.280 0.317 Passed(L/544) MID Span 1 under Floor loading
-Deflection Criteria:Specified(LL:U480,TL:U480).
-Bracing(Lu):All compression edges(top and bottom)must be braced at 10'6"o/c unless detailed othervvise. Proper attachment and positioning of lateral
bracing is required to achieve member stability.
PROJECT INFORMATION: OPERATOR INFORMATION:
Terry Mikkelson
dfp planning design
9100 baltimore st ne
suite 106
blaine,MN 55449
Phone:763-780-8004
Fau :763-780-8015
dfpplanningdesign@visi.00m
Copyright � 2005 by Trus Joist, a weyerhaeuser Business
PacallaprtV is a registered [rademark of Trus Joist.
- ���f���� 206231 BSMT BATH
TJ-Beam�16.20SerialNu"m�`���&�'"� 3 Pcs of 1 3/4" x 16" 2.OE Parailam� PSL
us�, �,�,o:o�:��
" Page2 e�;�v�KK,:s.zo.�s THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN
CONTROLS FOR THE APPLICATION AND LOADS LISTED
ADDITIONAL NOTES:
-IMPORTANT! The analys�presenbed is output from software devetoped by Trus Joist(TJ). TJ wamants the s¢ing of its products by this software wiN be
accanplished in accordance witli TJ product design criteria and code accepted design values. The specific product application,input design loads,and
stated dimensions have been provided by the software user. This output has nat been reviewed by a TJ Associate.
-Not all produds ane readify available. Check with your supplier or TJ technicat representative for product availability.
-THIS ANALYSIS FOR TRUS JOIST PRODUCTS ONLYi PRODUCT SUBSTITUTtON VOIOS THIS ANALYSIS.
-Allowable Stress Design methodobgy was used for Building Code UBC analyzing the TJ Distribuaon product listed above.
-Note:See TJ SPECIFIER'S/BUILDER'S GUIDES for multiple ply connection.
PROJECT INFORMATION: OPERATOR INFORMATION:
Terry Mikkelson
dfp planning design
9100 bat�more st.ne
suite 106
blaine,MN 55449
Phone:763-780-8004
Fau :763-780-8015
dfpplanningdesign@visi.com
Copyright Ci 2005 by Trus Joist, a Weyerhaeuser Business
Paralla� is a regisfered trademark of Trus Joist.
- , .�,��f� � 206231 FOYER DR
�..v�
TJ-Bearr�6.20SerialNumber�4�86"�` 2 Pcs of 1 3/4" x 9 1/2" 2.OE Parallam� PSL
- P�1 E�����«:26�,6 THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN
CONTROLS FOR THE APPLICATION AND LOADS LISTED
��
�
6 7• 1
P�ockkt Qiag�am is ConceptuaL
LOADS:
Analysis is for a Drop Beam Member. Tributary Load Width:1'
Primary Load Group-Residential-Living Areas(ps�:40A Live at 100%duration,15.0 Dead
Vertical Loads:
Type Class Live Dead Location Application Comment
Uniform(pi� Floor(1.00) 530.0 199.0 0 To T Adds To
SUPPORTS:
Input Bearing Vertical Reactions(Ibs) Detail Other
1Kdth Length Live/DeadNplift/Total
1 Wood column 5.25" 1.50" 1995/785/0/2780 L5 None
2 Wood column 525" 1.50" 1995/785!0/278Q l5 None
-See TJ SPECIFIER'S/BUILDERS GUIDE for detail(s):L5
DESIGN CONTROLS:
Maximum Design CoMrol Corrtrol Location
Shear(Ibs) 2532 -1804 6428 Passed{28%) Rt end Span 1 under Floor loading
Moment(Ft-Lbs) 4036 4036 13057 Passed(31%) MID Span 1 under Ftoor loading
Live Load Defl(in) 0.052 0.159 Passed(U999+) MID Span 1 under Floor bading
Total Load Defl(in) 0.073 0.159 Passed(U999+) MID Span 1 under Floor loading
-Deflecfion Criteria:Specified(LL:L/480,TL:U480).
-Bracing(Lu):All compression edges(top and bottom)must be braced at 7'o/c unless detaited othervvise. Proper attachment and positioning of lateral bracing
is required to achieve member stability.
ADDITIONAL NOTES:
-IAAPORTANT! The analysis presented is output from software developed by Trus Joist(TJ). TJ warrants the sizing of its products by thi�software wiN be
accomptished in accordance with TJ product design criteria and code accepted design values. The spec�c product application,input design bads,and
stated dimensions have been provided by the software user. This output has not been reviewed by a TJ Associate.
-Not all products are reaciily available. Check with your supplier or TJ technical representative f�praluct availability.
-THIS ANALYSIS FOR TRUS JOIST PRODUCTS ONLY! PRODUCT SUBSTITUTION VOIDS THIS ANALYSIS.
AIlovvable Stress Design methodology was used for Building Code UBC anayzing the TJ Distribution product listed above.
-Note:See TJ SPECIFIER'S/BUILDER'S GUIDES for multiple ply connection.
PROJECT INFORMATION: OPERATOR INFORMATION:
Terry Mikkelson
dfp planning design
9100 baltimore st ne
suite 106
blaine,MN 55449
Phone:763-780-8004
F2x :763-780-8015
dfpplanningdesign�visi.com
c:opyright u LUUS by Trus Joist, a weyerhaeuser Business
Parallamca is a registeretl trademark of Tzus Joist.
'���� �j�" 206231 FRONT PORCH
vp�
TJ-BeamA6.20SeriafNumber�7i004109788 3 Pcs of 1 3/4" x 9 1i2" 2.OE Parallam� PSL
� "��' ���g��� THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN
Page 1 Engine Version:6.20.16
CONTROLS FOR THE APPLICATION AND LOADS LISTED
�vlen�v Slope:812 Roaf Slope012
. ��
� �
� r�.3� i
Ap dimensions.N e hotixontal. P�oduct Diag�.m�is f.w�ceptual.
LOADS:
Analysis is for a Drop Beam Member. Tributary load Width:1'
Primary Load Group-Roof(ps�:40A Live at 125°�dura6on,15.0 Dead
Vertical Loads:
Type Class Live Dead Locatian Application Comment
Uniform(pt� F{oor(1.00) 64.0 24.0 0 To 5'3" Adds To
Un'rform(plf) Roof(1.25) 100.0 38.0 0 To 5'3" Adds To
Point(Ibs) Roof(1.25) 0 11836 1'9" -
Point(Ibs) Roof{1.25) 0 1020 5'1" -
SUPPORTS:
Input Beariny Vertical Reactions(Ibs) Detail Other
wdth Length Live/DeadNplift/Total
1 Wood column 5.25" 227" 536!8400/0/8936 L5 None
2 Wood column 5.25" 1.50" 535/4942 J 0/5477 L5 None
-See TJ SPECIFIER'S/BUILDERS GUIDE for detail(s):L5
DESIGN CONTROLS:
Maximum Design CoMrol Corrtrol Location
Shear(Ibs) 8843 8286 8678 Passed(95%) Lt.end Span 1 under Dead loading
Moment(Ft-Lbs) 12405 11938 17627 Passed(68%) MID Span 1 under Dead loading
Live Load Defl(in) 0.004 0.154 Passed(U999+) MID Span 1 under Roof loading
Total Load Defl(in) 0.072 0.231 Passed(Ll768) MID Span 1 under Roof loading
-Deflection Criteria:Specified(LL:L/360,TL:U240).
-Bracing(Lu):All compression edges(top and bottom)must be braced at 5'3"dc unless detailed otherwise. Proper attachment and pasitioning of lateral
bracing is required to achieve member stability.
-Design assumes adequate continuous lateral support of the compression edge.
PROJECT INFORMATION: OPERATOR INFORMATION:
Terry Mikkelson
dfp planning design
9100 baldmore st.ne
suite 106
blaine,MN 55449
Phone:763-780-8004
Fax :763-780-8015
dfpplanningdesgn(a�visi.com
Copyright c� 2005 by Trus Joist, a Weyerhaeuser Business
Parallam�a is a registered trademark of Trus Joist.
-�� �j�� � 206231 FRONT PORCH
�.�v�
TJ-BeamlD620Seria�Numbe�r 7���'�'"� 3 Pcs of 1 3/4" x 9 1/2" 2.OE Parailam� PSL
- P�2 E�����:���6 THtS PRODUCT MEETS OR EXCEEDS THE SET DESIGN
CONTROLS FOR THE APPLICATIDN AND LOADS LISTED
ADDITIONAL NOTES:
-IMPORTANT! The analysis pr�sented is output from software developed by Trus Jaist(TJ). TJ warrants tl�e sizing of its products by this soRware will be
accomplished in ac�rdance with TJ product design criteria and code accepted design vafues. The specif'�c product application,input design loads,and
stated dimensions have been provided by the software user. This output has not been reviewed by a TJ Associate.
-Not all products are teadily available. Chedc with your su�lier or TJ technical representative for product avaitabiliry.
-THIS ANALYSIS FOR TRUS JOIST PRODUCTS ONLY! PRODUCT SUBSTITUTION VOIDS THIS ANALYSIS.
-Allowable Stress Design methodology was used for Build'mg Code UBC analyzing the TJ Distributior►product listed above.
-Note:See TJ SPECIFIER'S t BUILDER'S GUIDES for mui�pte ply oonnection.
PROJECT tNFORMATION: OPERATOR iNFORMAT10P1:
Tercy Miickelson
dfp ptanning design
9100 baltimore st ne
suite 106
blaine,MN 55449
Phone:763-780-8004
Fax :763-78Q-8015
dfpplanningdesign@visi.com
Copyriqht v 2005 by Trus Joist, a Weyerhaeuser Business
Parallam(� is a reqistered trademark of Tzus Joist.
-���� � 206231 FRONT PORCH
�q�
TJ-Bearr�6.ZOSerialNumb�70`'`o�a oo�7�"es� 3 PCS of 1 3/4" x 16" 2.OE Parallam� PS�
' P�; Engf�neVets'wn:'6.20.16 THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN
CONTROLS FOR THE APPLICATION AND LOADS LISTED
. , � �--�—�
a �
�— 13•6•• A
P�ock�ct Diag���is Co��ceptu.�l.
LOADS:
Analysis is for a Header{Flush Beam)Member. Tributary Load Width:1'
Primary Load Group-Residential-Living Areas(ps�:40.0 Live at 100%duration,15.0 Dead
Vertical Loads:
Type Class Live Dead Location ApplicaUon Commerrt
Un'rform(pl� Ftoor(1.00) 30.0 12.0 0 To 13'6" Adds To
Unifortn(pl� Roof(1.25) 70.0 26.0 0 To 13'6" Adds To
Unffomi(pl� Roof(1.25) 610.0 349.0 0 To 2'2" Adds To
Unifonn(pf� Roof(1.25) 260.0 218.0 2'2"To 8'4" Adds To
Uniform(pl� Roof(1.25} 260.0 218.0 11'To 13'6" Adds To
Pant(Ibs) Roof(1.25) 0 7367 2'2" -
Point(Ibs) Roof(1.25) 0 595 8'4" -
Pant(Ibs) Roof(1.25) 0 595 11' -
SUPPORTS:
Input Bearing Vertical Reactions(Ibs) Detail OtF�er
wdth Length LivelDeadNplift/Totai
1 Microllam LVL beam 3.50" 3.01" 3188!8648/0/11836 A1:Bloc:king 1 Pty 1 314"x 16"2.OE Parallarr�PSL
2 Wood column 5.25" 1.50" 2277/3624/0/59U1 L5 None
-See TJ SPEClFIER'S/BUILDERS GUIDE for detaii(s):A1:Blocking,LS
DESIGN CONTROLS:
Maximum Design Corrtroi Corrtrol Location
Shear(Ibs) 11640 7953 14616 Passed(54%} Lt end Span 1 under Dead loading
Moment(Ft-Lbs) 23557 23557 65540 Passed(36%) MID Span 1 under Roof loading
Live Load Defl(in) 0.075 0.326 Passed(U999+) MID Span 1 under Roof loading
Total Load Defl(in) 0.234 0.326 Passed(U669) MID Span 1 under Roof loading
-Deflection Criteria:Specified(LL:U480,T1:U480).
-Bracing(Lu}:All compression edges(top and bottom)must be braced at 10'6"dc unless detailed othenNise. Pr�er attachment and posi6oning of lateral
bracing is required to achieve member stabi{ity.
PROJECT INFORMATION: OPERATOR INFORMATION:
Terry Mikkelson
dfp planning design
9100 bamrrmre st ne
suite 106
blaine,MN 55449
Phone:763-780-8004
Fax :763-780-8015
dfpplanningdesign@visi.c�m
Copyrigh[ C: 2005 by Trus Joist, a Weyerhaeuser Business
Parallartea� and Flicrollam� are registered trademarks oP Trus Joist.
����� �j�' 206231 FRONT PORCH
�i�f�/
TJ-Bearr�6.20SerialNum"��''�''`�,��&�"� 3 Pcs of 1 3/4" x 16" 2.OE Parallam� PSL
us« , s�,s.zooss:zz:,,w�n
' P�z e��v��«,:szo.,s THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN
CONTROLS FOR THE APPLICATION AND LOADS LISTED
ADDITIOIiAL NOTES:
-IMPORTANT! The analysis presented is oulput from software developed by Trus Joist(TJ}. TJ warrants the s¢ing of its products by this software will be
accomplished in accordance with TJ product design criteria and code accepted design values. The specific praduct application,input design loads,and
stated dimensions have been provided by the soflware user. This output has not been reviewed by a TJ Associate.
-Not all products are readily available. Chedc with your supplier or TJ technical representative for praiuct availability.
-THIS ANALYSIS FOR TRUS JOIST PRODUCTS ONLY! PRODUCT SUBSTITUTlON VOIDS THIS ANALYSIS.
-Allowable Stress Design methodology was used for Building Code UBC analyzing the TJ Distribu6on product listed above.
-Note:See TJ SPECIFIER'S J BUILDER'S GUIDES for mul�ple ply connection.
PROJECT INFORMATION: OPERATOR INFORMATION:
Terry Mikkelson
dfp planning design
9100 baltimore st.ne
suite 106
blaine,MN 55449
Phone:763-78Q-8004
Fax :763-780-8015
dfpplannin�iesign@visi.com
Copyright (� 2005 by Trus Joist, a Weyerhaeuser Business
Parallam@ and HicrollamCq are registered trademarks of Trus Joist.
-�� �J� /� 206231 DIN WDW
TJ-Beart�6.20SerialNu"m��``'4`���T`"� 2 Pcs of 1 3/4" x 11 7/8" 2.OE Parallam� PSL
�s� , 6/16120064:07:OBPM THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN
' Page 2 Engine Version:6.20.16
CONTROLS FOR THE APPLlCATION AND LOADS LISTED
ADDITIOIdAL NOTES:
-IMPORTANT! The anatysis presented is output from software developed by Trus Jast(TJ). TJ warrants the s¢ing of its products by this software wiii be
acxAmplished in accardance with TJ product design criteria and code accepted design values. The specific product appfication,input design loads,and
stated dimensions have been provided by the software user. This output has not been reviewed by a TJ Associate.
-Not all products are readily available. Chedc with your supplier or TJ tecc:t►nical representative for product availabiliiy.
-THIS ANALYSIS FOR TRUS JOIST PRODUCTS ONLY! PRODUCT SUBSTITUTION VOIDS THIS ANALYS►S.
Allowable Stress Design methodology was used for Building Code UBC analyzing the TJ Distribu6on product listed above.
-Note:See TJ SPECIFIER'S/BUILDER'S GUIDES for muttiple ply connection.
PROJECT INFORMATf�N: OPERATOR INF�RMATION:
Terry Mikkelson
dfp planning design
9100 baltimore st.ne
suite 106
blaine,MN 55449
Phone:763-780-8004
Fax :763-780-8015
dfpplanningdesign@visi.com
Copyright e� 2005 by Trus 3oist, a Weyerhaeuser Business
Parallam°a is a registered trademark of Trus Joist.
- �� �l�f��� 206231 DIN WDW
TJ-BearrAJ6.20 Serial Nu"m��,�,��"� 2 Pcs of 1 3/4" x 11 7/8" 2.OE P I
ara lam� PSL
User.1 8l16/2008 4:07:08 PM
- P�2 E����;�,:s.�.,s THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN
CONTROLS FOR THE APPLICATION AND LOADS LISTED
ADDITfONAL NOTES:
-IMP�RTANT! The anatysis presented is vutput from software deveioped by Tn�s Jast(TJ}. TJ warrants the sizing of its products by this software will be
accomplished in accc�rrdance with TJ product design criteria and c�de accepted design values. The spec�c product application,input design loads,and
stated dimensions have been provided by the software user. This output has not been reviewed by a TJ Associate.
-Not all protlucts are readily available. Chedc with your supplier or TJ technical representative for product availability.
-THIS ANALYSIS FOR TRUS JOlST PRODUCTS ONLY! PRODUCT SUBSTITUTION VOIDS THIS ANALYSIS.
-Allowable Stress Design methodology was used f�Building Code UBC analyzing the TJ Distribution product listed above.
-Note:See TJ SPECIFIER'S/BUILDER'S Gt11DES for muttiple ply connection.
PROJECT INFQRMATION: OPERATOR INFORMATION:
Terry Mikkelson
dfp pianning design
9100 battimore st.ne
sui�e 106
blaine,MN 55449
Phone:763-780-8004
Fax :763-780-8015
dfpplanningdesign�visi.com
Copyright c9 2005 by Trus Joist, a Weyerhaeuser 8usiness
Parallamc� is a registered trademark of Trus Joist.
- ����a� 206231 GAR DR
TJ-Bearr�0820SerialNu"m��004109 86� 2 Pcs of 1 3/4" x 11 7/8" 2.OE Parallam� PSL
User.1 6/1612008 3:42:14 PM
- Pe�, EngineVeraion:620.76 THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN
CONTROLS FOR THE APPLICATION AND LOADS LISTED
�vlembe� Slo�>e:81?Roof Sio�>e812
i �
d •19'_ .
AU dm�ensions a�e ho�iza�tal. P�ock�ct Di�<r.un is Conceptual.
LOADS:
Analysis is for a Drop Beam Member. Tributary Load Width:1'
Primary Load Group-Roof(ps�:40.0 Live at 125%dura6on,15.0 Dead
Vertical Loads:
Type Class Live Dead Location Application Comment
Unrform(pf� Roof(1.25) 100.0 38.0 0 To 19' Adds To
SUPPORTS:
Input Bearing Vertical Reactio�(Ibs) Detail Other
Width Length LivelDeadNpiift/Total
1 Wood column 5.25" 1.50" 1330/627/0/1957 L1:Biocking 1 Ply 1 3/4"x 11 7/8"2.OE Parailarr�PSL
2 Wood column 5.25" 1.50" 1330(627!0/1957 11:Blocicing 1 Piy 1 3/4"x 11 7/8"2.OE Parallarr�PSL
See TJ SPECIFIER'S/BUfLDERS GUIDE for detail{s):L1:Biockjng
DESiGN CONTROLS:
Maximum Design Control Co►rtrol Location
Shear(Ibs) 1892 -1663 10044 Passed(17%) Rt end Span 1 under Roof loading
Moment(F4-Lbs) 8694 8694 24878 Passed(35%) MID Span 1 under Roof loading
Live Load Defl(in) 0.384 0.613 Passed(U574) MID Span 1 under Roof loading
Tetal Load Defl(in) 0.565 0.919 Passed(Ll390) MID Span 1 under Roof loading
-Deflection Criteria:Specified(LL:U360,TL:V240).
-Bracing(Lu):All compression edges(top and bottom)must be braced at 9'2"o%unless detailed othervvise. Proper attachment and pasitioning of lateral
bracing is required to achieve member stability.
-Design assumes adequate continuous lateral support of the compression edge.
ADDITIONAL NOTES:
-IMPORTANT! The analysis presented is output from soflware developed by Trus Joist(TJ). TJ wamants the sizing of its products by this software will be
accomplished in accordance with TJ product design cxiteria and code accepted design values. The spec�c product application,input design loads,and
stated dimensions have been provided by ihe sofiware user. This ou¢�ut has not been reviewed by a TJ Associate.
-Not all products are readily available. Check with your supplier or TJ technical representative for product availability.
-TIiIS ANALYSIS FOR TRUS JOIST PRODUCTS QNLYI PRODUCT SUBSTITUTION VOIDS THIS ANALYSIS.
-Allowabfe Stress Design methodology was used for Building Code UBC analyzing the TJ D�tribution product listed above.
-Note:See TJ SPECIFIER'S!BUILDER'S GUIDES for multiple ply connection.
PROJECT tNFORMATION: OPERATOR INFORMATION:
Terry Mikkelson
dfp planning design
9100 bal6more st.ne
suite 106
blaine,MN 554�t9
Pho�e:763-780-8004
Fax :763-780-8015
dfppianningdesign@visi.com
Copyright t� 2005 by Trus Joist, a Reyerhaeuser Business
Paralla�� is a reqistered trademark of Tzus Joist.
�,��j�. � 206231 GAR WDW
TJ-Bearn�6.20SerialNu"m��4��'as'"s` 2 Pcs of 9 3/4" x 9 1/2" 2.OE Parallam� PSL
User.1 fi116l2006 3:40:05 PA1
- P�, EngineYersion:6.24.16 THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN
CONTROLS FOR THE APPLICATION AND LOADS LiSTED
h+lembei Slo�>e:012 P.00f Slope6l?
n. .n
. , ,
�
6 7' 1
AB ciimensions.0 e ho�izwitaL P�ock�ct Diacp�in is Conceptual.
LOADS:
Analysis is for a Drop Beam Member. Tributary Load Width:1'
Primary Load Graup-Roof(ps�:40.Q Live at 125%duration,15.0 Dead
Vertical Loads:
Type Class Live Dead Lacation Application Comment
Uniform(pt� Roof(125) 580.0 218.0 0 To 1' Adds To
Un'rform(plfl Ftoor(1.00) 320.0 120.0 0 To 1' Adds To
Unifortn(pl� Floor(1.OQ) 180.0 68.0 1'To 6' Adds To
Uniform(plfl Roof(1.25} 580.0 218.0 6'To 7' Adds To
Unrfortn(plf� Floor(1.00) 320.0 120.0 6'To T Adds To
Pant(Ibs) Roof(1.25) 0 500a 1'3" -
Pant(Ibs) Roof(1.25) 0 5000 5'9" -
SUPPORTS:
Input Bearirrg Vertical Reactions(Ibs) Detai! Other
Vlydth Length Live/DeadNplifUTotal
1 Wood column 5.25" 2.70" 1490/5597/0!7087 L1:Blocking 1 Ply 1 3/4"x 9 1!2"2.OE Parallarn�7 PSL
2 Wood column 525" 2.70" 1490/5597!0/7087 L1:Blocking 1 Ply 1 3/4"x 91/2"2.OE Parallarr�PSL
-See TJ SPECIFIER'S!BUILDERS GUIDE for detail(s):L1:Btocking
DESIGN CONTROLS:
Maximum Design Control CoMrol Locatio�
Shear(Ibs) 6680 5212 5786 Passed(90%) Lt end Span 1 under Dead loading
Moment(Ft-lbs) 6514 6173 13057 Passed(47%) MID Span 1 under Floor loading
Live Load Defl(in) 0.024 0.213 Passed(U999+) MID Span 1 under Roof loading
Total Load Defl(in) 0.130 0.319 Passed(U589) MID Span 1 under Roof loading
-Deflection Criteria:Spec�ed(LL:U360,TL•U240).
-Bracing(Lu):All compression edges(top and bottan)must be braced at 7'o/c unless detailed otherwise. Proper attachment and positioning of lateral bracing
is required to achieve mernber stabifit�r.
-Qesign assumes adequate con6nuous lateral support of the canpression edge.
PROJECT INFORMATION: OPERATOR INFORMATION:
Terry Mikkelson
dfp planning design
9100 battimore st.ne
suite 106
blaine,MN 55449
Phone:763-780-8004
Fax :763-780-8015
dfpplanningdesignQvisi.com
Copyright c;� 2005 by Tru3 .7oist, a Weyerhaeuser Husiness
Parallamc� is a registered trademark of Trus Joist.
• ���J��� 206231 GAR WDW
TJ-Bearnm6.2QSerialNu"m���004109&88� 2 Pcs of 1 3/4" x 9 1i2" 2.OE Parallam� PSL
User.1 6/162006 3:40 05 PM
- P�2 E������«,:s.�o.,s THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN
CONTROLS FOR THE APPLICATlON AND LOADS LISTED
ADDITIONAL NOTES:
-IMPORTANT! The anatysis presented is oufput from softyvare developed by Tn.is Joist(TJ). TJ warrants the smng of its products by this sofiware will be
accomplished in accordance with TJ product desgn criteria and code acCepted design values. The specific product application,input design loads,and
stated dime�sions have been provided by the sofiware user. This ouq�ut has not been reviewed 6y a TJ Associate.
-Not all products are readiy avai�able. Chedc with your supplier or TJ technicaf representaave for product availability.
-THIS ANALYSIS FOR TRUS JOIST PRODUCTS ONLY! PRODUCT SUBSTITUTION VOIDS THIS ANALYSIS.
,Allowabfe Stress Oesign methodology was used for Building Code UBC analyzing the TJ Distribution product listed above.
-Note:See TJ SPECIFIER'S!BUILDER'S GUIDES for multiple ply connection.
PROJECT INFORMATION: OPERATOR I+NFORM¢TION:
Terry Mikkelson
dfp planning design
9100 bal6more st.ne
sufie 108
blaine,MN 55A49
Phone:763-780-8004
fax :763-780-8015
dfpplanningdesign@visi.com
Copyright c� 2005 Uy Tzus Joist, a Weyerhaeuser Business
PazallamG• is a registered tzademark of Trus Joist.
- ���l��� 206231 GAR WDW
TJ-Bearr�620SerialNu"m���;�8�"`� 2 Pcs of 1 3/4" x 9 1/2" 2.OE Paraliam� PSL
l�ser:1 6/1612006 338:03 PM
- P�, �;�v���,:fi.zo.,s THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN
CONTROLS FOR THE APPLICATION AND LOADS LISTED
Wlember Slope:0�12 Roof Sbpe4•12
n_— n
. � �. �. i
6 ]• 1
AII di�nensions are ho�ixa�taL P�ochict tl�acpam is Ca►cept��al.
LOADS:
Analysis is for a Drop Beam Member. Tributary Load Width:1'
Primary Load Group-Roof(ps�:40.0 Live at 125°k duration,15.0 Dead
Vertical Loads:
Type Class Live Dead Location Appllcation Commerrt
Uniform(pl� Roof(1.25) 580.0 218.0 0 To 1' Adds To
Uniform(pif) Floor(1.00) 320.0 120.0 0 To 1' Adds To
Uniform(pl� Floor(1.00) 40Q.0 150.0 1'To 6' Adds To
Uniform(pl� Roof{1.25) 580.0 218.0 6'To 7' Adds To
Unfform(plf) Floor(1.00) 320.0 120.0 6'To 7' Adds To
Point(tbs) Roof(1.25) 0 4674 1'3" -
Point(Ibs) Roof(125) 0 4674 5'9" -
SUPPORTS:
Input Bearing Vertical Reactions(Ibs) Detail Other
wdth Length LiveJDeadNplift/Tota1
1 Wood column 5.25" 2.86" 2040/5476/0!7516 L1:Blocking 1 Ply 1 3/4"x 9 1/2"2.OE Paraltarr�PSl
2 Wood column 5.25" 2.86" 2040/5476/0/7516 L1:Blocking 1 Ply 1 3/4"x 9 1/2"2.OE Paralfarr�l PSL
-See TJ SPECIFIER'S/BUILDERS GUlDE for detail(s):L1:Blocking
DESIGN CONTROLS:
Maximum Design CoMrol Corrtrol �ocatfon
Shear(Ibs) 7109 �981 6428 Passed(93%) Rt end Span 1 under Floor loading
Moment(Ft-Lbs) 7671 7330 13057 Passed(56%) MID Span 1 under Floor loading
Live Load Defl(in) 0.043 0.213 Passed(U999+) MID Span 1 under Roof loading
Total Load Defl(in) 0.150 0.319 Passed(U511) MID Span 1 under Roof loading
-Deflection Criteria:Specified(LL:L/360,TL:U240).
-Bracing{Lu):AA compression edges(top and bottan)must be braced at 7'o!c unless detailed otherwise. Proper attachment and posi6oning of lateral bracing
is required to achieve member stabilit�r.
-Design assumes adequate continuous lateral support of the compression edge.
PROJECT INFORMATION: OPERATOR INFORMATION:
Terry Mikkelson
dfp planning design
9100 baltimore st ne
suite 106
blaine,MN 55449
Phone:763-780-8004
Fax :763-780-8015
dfpplann ingdesign�visi.com
Copyright r9 2005 by Trus Joist, a Weyerhaeuser Business
ParallanKa is a registered trademark of Trus Joist.
_ ���J� �f 206231 GAR WDW
TJ-Beam�620SerialNu'm��'"`��4;�8's"`� Z Pcs of 1 3/4" x 9 1/2" 2.OE Parailam� PSL
- P�2 En'9i��Version.6.2016 Tli[S PRODUCT MEETS OR EXCEEDS THE SET DESIGN
CONTROLS FOR THE APPLICATlON AND LOADS LISTED
ADDiT1�P1AL NOTES:
-IMPORTANTI The analysis presented is output from sofMrare developed by Trus Joist(TJ). TJ warrants the s¢ing of its products by this software will be
accomplished in accordance with 7J product design criteria and code accepted design values. The spec�c product appfication,input design loads,and
stated dimensions have been provided by the software user. This output has not been reviewed by a TJ Associate.
-Not all protlucts are readily available. Chedc with your supplier or TJ technical repnesentative for product availability.
-THIS ANALYSIS FOR TRUS JOIST PRODUCTS ONLY! PRODUCT SUBSTITUTION VOIDS THIS ANALYSIS.
Allowable Stress Design methodology was used for Building Code UBC analyzing the TJ Distribution product listed above.
-Note:See TJ SPECIFIER'S/BUILDER'S GUIDES far multiple ply connection.
PROJECT INFORMATION: OPERATOR INFORMATION:
Terry Mikkelson
dfp planning design
9100 baltimore st ne
suite 106
blaine,MN 55449
Phone:763-780-8004
Fax :763-780-8015
dfpplanningdesign@visi.c4m
Copyriqht � 2005 by Trus Joist, a tVeyerhaeuser Business
Para11am5A is a registered trademark of Trus Joist.
- ���j� ♦� 206231 GAR
v.v�
^`�T`'""'�`� 2 pcs of 1 3I4" x 9 1/2" 2.OE Paraliam� PSL
TJ-8earr�6.20 Serial Number:7004109786
_ ��� ��3:�o-3�vr� THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN
Page t Engine Version 62(7.16
CONTROLS FOR THE APPLICATION AND LOADS LiSTED
I
�
�- 6•c~ A
Prod�kt Uiac�am is Conceptual.
LOADS:
Anatysis is for a Header(Fiush Beam)Merr�er. Tributary Load Width:1'
Primary Load Group-Resid�ntiai-Living Areas(ps�:40.0 Live at 100%duration,15.0 dead
Vefical Loads:
Type Cfass L"nre Dead Locatfon Appiication Comment
Uniform(plf) Roof(125) 200.0 113.0 0 To 6'6" Adds To
Unifom�(pl� Ffoor(1.00) 440.0 165_0 0 To 6'6" Adds To
SUPPORTS:
Input Bearing Vertical Reactions(tbs) Pty Depth Naifing Qetaii Other
� �rZrfC��t�'i LERf3ue il5icr�i��3i���IffROt'd� �C�1
1 Wood column 525" 1_50" 2168!967!0!3i 35 N/A N1A N/A L5 None
2 Mxxollam�VL beain SZ5" yargei 2253!?V05=v i JLJi 3��� >ii� �i�n u�:�=6'k=�cs��:::��Fai:y.=.� ._:�..'a
-See TJ SPECIrlcR'S i 6UiLQERS Gi.sit�E fer c�+a�i;s):=�,r 5:r=ace nRouni`rian�c
_-— =_ -, >�aen�ted
.:E2��?;^•E: 'l:^��� vtv�:c ��21s �'c'��tSE kt'i���at1�8 l4Qf�clCt�S �!!j!(�K?C��OOf1
� �"�:GaL'�fk7lli?i�?i:y.c' avi�=�u�5i•:i L:'= Jl h}fs1 Ui;t RliLz, t�,'E1_
i°3XtI7ltlflF vc5i9R CO(ftTO� Controi �QCat14I1
Mornesit(Ft-lbs; 4� 406�# io3'� �a�s�{�� , �I^�;:,Q:<i �:�:;es-=t===- �_. ,, _
_ ._ _- - ,-� —-- . - - =- ------- �
;�_`:„�`��"-;"s� ..��2 _ `' ---� �---� � • -� r"- �- ' ;
) _�:_.� +:%ici�(tY3.'J3L�117(3
.. L ,
-B:dCtA{.�tLt�l-L+_ii rLri{:a�cE rr=... _, . . ..�:�: . �- - � �_ .- . _- . _.. — .. -� --_ � ,_ _-_ - . - , _- _ _, _ _- _.
. .. . . . ,. . . . ..- .
:._. , ..... _
i r,-....-� -�..�y�.�:.r.a-. - ---.,_ ,..: .-�._'. _ . . :.�� . ... -.
r,r?y`it?s�i�;�quired}o achieve rs�mber stabil�{y.
' ' - _ - _ :r1_ : _ _ .'_��__-,._'_'__-
TEfTj/ 11$!!Sk@iSCN�
-; _. . ...._-.,.
...�.,�:_.....:::�_:s:y,�
.'�.�.n.v tJn�IRk7(2 S�[18
JuilG i vt!
�SIt28,�?*1 u5��
;,r.:-:t�: ;J.>-:Oti-GiIU4
Fax :753-78D-8015
dfpptannirfgtiesign o�viSi.C�
Copyriqht ea 20U5 by Trus JoisL, a weyerhaeuser Business
?:;ra!laa��� ard!!icro!la.^.sJ are registereC tradema:ks c. _n:s Joist.
- �� �j� � 206231 GAR
...v�
TJ-BeamO6,2(TSerialNum�o`,�&�"� 2 Pcs of 1 3/4" x 9 1/2" 2.OE Parallam� PSL
- P�Z E���6�6 THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN
CONTROLS FOR THE APPLICATION AND LOADS LISTED
ADDITIONAL NOTES:
-IMP�RTANP. The�rsis presenbed is out�wt from software devebped by Trus Jast(TJ). TJ warran4s the s¢ing of iLs produds by this soflware will be
acoompfished�accordance wifh TJ product design cri6e�ia and code acoepted design values_ The specific produd a�pplication,input design loads,and
shd�ed d'Kneresions have been provided by ihe sofMrar�e user_ This output tras not been reviewec3 by a TJ Associahe_
-Not all produds are readity available. Chedc wilh your suppfier or TJ�echnical representative for prafud ava�Tdy.
-TtiiS A�NALY�IS F^,R TftUS JQ1ST PROi1UCTS ONLY! PRODUCT SUBST17UT10N VOIDS TF!!S ANALYSIS.
:�-;��able S!*�s Des±g�mefiho�y��sEsf ior Suilding Cc�de USC analyzing tl�e TJ Disfi�wtion praduct listed above.
-No�e=See TJ SPECIFfER'S/BllILDER'S GUIDES for mult�[e pfy c�nection.
PROJECT INFORMATION: OPERATOR INFORMATlON:
Terty M�ckelson
�R P�nning design
9100 baltimore st ne
suite 106
btaine,MN 55449
Phone:763-780-6004
Fax :763-780-8015
dfpplanningdesign@visi.com
Copyright C9 2005 by Trus Joist, a iieyerhaeuser Business
Parallam[J and HicrollamV� are registered tzademarks of Trus Joist.
- ���j���� 206231 4 SEAS PORCH
� '"'�`h�`&'v"`u 2 Pcs of 1 3/4" x 11 7/8" 2AE Parallam� PSL
TJ-BeamO 6.20 Serial Number:7004109786
Wser 1 6l1fi/10063:04:15 PM
- P�, EngineVersion:620.16 THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN
CONTROLS FOR THE APPLICATlON AND LOADS LISTED
� ?
� i�. �
Ptoduct Dia�am is Ca�cept�wi.
LOADS:
Anaiysis is for a Drop Beam Member. Tributary Load V1/'�dU►:1'
Primary Load Group-Residential-Living Meas(ps�:40.0 Live at 100°k duration,15.0 Dead
Vertical Loads:
Type Ciass Live Dead Location Appiication Comment
Unifomi(plf) Floor(1.00) 64.0 24.0 0 To 11' Adds To
Unifortn(pl� Roof(1.25) 320.0 210.0 0 To 11' Adds To
Point(ibs) Floor(1.00) 0 1588 3" -
Point(Ibs) Roof(125) 0 4947 10'9" -
SUPPORTS:
Input Bearing Verticaf Reactions(Ibs) Detaii Other
Width Length Live/DeadNplifflTotal
1 Wood column 5.25" 2_04" 2332/3029/0!5361 L5 None
2 Wood cdumn 525" 3_3Y 2332/6388/0/8720 L5 None
-See TJ SPECIFIER'S/BUILDERS GUIDE for dehait(s):L5
DESIGN CONTROLS:
Maximum D�ign Controi Corrtro! Location
Shear(ibs) 3559 -2794 10044 Passed(2896) Rt end Span 1 under Roof loading
Moment(Ft-L6�s} 9230 9230 24878 Passed(379'0) MID Span 1 under Roof bading
Live l.oad Defl(m) 0.129 0259 Passed(U965) MID Span 1 under Roof laadu�g
Totai Load Defl(in) 0.209 0.259 Passed(U597j MID Span 1 under Roof i�ling
LL:L1.13V�C�eria:Spec�fied(LLU480,TLU480)_
-8r2ci�g{!u):A?t�cxr�ression edges{top and boHom)rrwst be braced at 9'2"dc unless detailed otherwise_ Proper aftachment and positioning of taDeral
bracing is rec}uired to achieve member stzbiCdy.
h�,�•;�:•-•�AL NOTES:
_";rv�cTRNT! s�e analysis presented is oui�t from soRware developed by Trus Joist(TJ)_ TJ waRants the seng of its products by this softwa�will be
.- - •. � . . .
15!t£'L!F?2CtYJ!:33t?C�tY�fr :,j-,r;:::::-•:-�:r�:�R-,�+�.<<�t , _ - - -
. . �
�� r----=---�-•-- ���,-- 1.:::_ - .._..__ - - T ---� - - _
-- :. :. ,-<<
--�----------�-- --�- --- -
stated dimertsions have L�en^�o•,��•,j�*�=�-�=r-��_�� -f'r._: �:�:...:;:_-� ._ _____� �
i- ... _
�. � ,..�....-,..........,..... _,,..r....._..........................� , _ .
. . .. . . .- -...�D�f-'' ��- � __ .. ... ,-_ -,�T 1�_"..,^a;rc�+�ocan�4:_:0, �����\�al�lrl�/
_ . - :-.-.�•-,. c.-%,ni , rnrnrm
� , - —" _"__"'...,.J__.�__rl....,� ,.. . _t.�__. .. .r..�. _
,. , _ , e.�,,,• ,�.r t t:._'.i'�lii�S:i vitiiY' T r:iiiC:t.i Siiii.iy i i i v i itii+i`v'a���$�}�{.S r��Y.S�.S'.
.-.._. , �.. ,. _ .,.,v`
-��04S...s.�..cs...,...n..,.:...,...�.e,...e,. _' - ..c!°...a ..:.... •:�. - -- - __ -
6UtG vuG��..s.. _ .r�....,...- u� " " `"'. .. � -. ., . :+ .
-Nt*fe_��r„�?�_.. _.. _ _� _ � __ � - - - - : . - _ __
___- ________,__":�:�1 ii.J�PI: _-,;_=== -` ::,�r._�Fc3ree�e EON:
! ;:} �...,y�:,�r,m
dfP Qlanning�igr
9�00 baltimnrn et ne
Su1e�O6
btaine,MN 55449
Phone:763-78�-SQ�4
Faz -763-78(1�3(11.5
�f�pianningdesign(�visi.com
Copyrignt �n 2005 by Trus Joist, a weyernaeusez susiness
ParallamW is a reaistered trademark of Trus Joist_
-�� �j� ��' 206231 REAR ENTRY W.I.C.
�..v��
TJ-Bearnt�6.20SerialNum��'"7���� 2 Pcs of 1 3/4" x 9 1/2" 2.OE Paraliam� PSL
_ `�, �,�z�:��PM THIS PR4DUCT MEETS OR EXCEEDS THE SET DESIGN
Paye 1 Engine Version:6.20_16
CONTROLS FOR THE APPLICATION AND LOADS LISTED
� �
y — �
� r x. A
Prochkt Dias�am is Ca►ceptual.
LOADS:
Anatysis is for a Header(Flush Beam)Member. Tributary Load Width:1'
Primary Load Group-Residential-living Areas(ps�:40A Live at 100%duration,15.0 Dead
Vertica{Loads:
Type Ciass Live Dead Location Application Commerrt
Unifomi(plf) Fbor(1.00) 64.0 24.0 0 To T 4" Adds To
Pant(Ibs} Ffoor(1.00j 0 2684 2'8" -
SUPPORTS:
Inp�rt Bearing Vertical Reactions(tbs) Detail Other
Y1fMU� Length Live/DeadNplifw/Total
1 Wood column 5.25" 1.50" 381/1923/0/2305 L1:Bbcking 1 Ply 1 3/4"x 9 12"2.OE Parallarr�PSL
2 Wood cdurrx� 5.25" 1.50" 381/1123/0/1504 L1:Bbcking 1 Ply 1 3/4'x 9112"2.QE Par�l�r�PSL
�ee TJ SPECIFIER'S!BUILDERS GUIDE for de#ail(s):L1:Blodcing
DESlGN CONTROLS:
Maximum Design Co�rtrol Corrtrol Location
Shear(�s) 2257 2116 6428 Passed(33%) Lt ertd Span 1 under Floor load�ng
Moment(Ft-L.b6) 4887 4887 13057 Passed(37%) MID Spen 1 under Floor bad�ng
l'r,re L�Defl(ai) 0.012 O.i&S P�sed(L/999+) MID Span 1 urxier Floor loadmg
Total Load De#1(m) 0.080 0.168 Passed(L/999+) M1D Span 1 under Fbor loading
-Deflecfion Criteria:Spec's5e;i�L:L'r.80.TL:t148C}.
-Brac:in9(Lu):AN�sion edg�s(toF and bot�rrt)[nust be br�at T 4"ofc unless deta�othen�ise. Prc�per�eameni e�d perssitoR��g�€�raf
bracing is required to achiave member s1�iGty_
ADDITIONAL i+lOTE�:
-IMPORTANT! The anaEysis pr�enf�is ouf�t from soflware devefoped by Trus k�f(T.!j. TJ r:amn�+he sizing�i's;,��u��j L':s s���a r???�e
' - _ .- r SL__�+r; - !=__-r'ir j r'u,=�i�Y�JQS_ TY3£C�i7.�'�Ni?C�UCt 3�Q��lSNI,lII;?ll�i�E$l�Fl�S,�
..._._� _ , _ .. , �.._._ _=:i."...;.�,.�j'`���rc�::v-��:�:�s�r .....;_�.�f*-.-::":_�..�t�n r2�iwk�by a TJ Rssociate_
-�fTf aii rvnrf��r£�:rc ray�n.,a:ra?:�`-.: '_'- ._ , . ., _ -�' . . = . .. .. . .-, ' _ _.. . . � .
._� � _ . . :,_, ..L_�
.e. i..:---�.. .r.�v- , � --- ^ .-...,. ._.,..,:-�:
.�..'..............�....w....i �_�"_... '""".j.."' ..�E.,.' . � --. • _
.� ..�.....-�.....-...�r-'c cr.e r' ': '
-THtS�;i1 SiS FCS� f I[i�J.Jlli.7 i r l'atix�`t)t.r.:,_ _. ' ' '
_ r. ' . . ... ... .:, '�..... . ��. . _ .— '.
[`� .-••_.,- ....__ ._� _ .
,....,�a. 1. .�� .�_.�.-�ih��I...r�.e.......' ..(�'r�l��fC� .�..�H.r��'i f1 �..'i�..i:w. U4��I� GiJUYG�
.a�a..inev evn. i��
....-.. - .�.. . -.:�a.�..u�� � ":'� �.-:, _::t s. . ��i�.i���� ti�y� .. - . v.1tJi�l�J .147 �
__'_ __' ' _' __ _ �. .,�.�..:� .,�.- ��.�_� �. .,.:"r'�rx .s.;io yi`.lfl'
PROJEC�'.�:«a���-?-' O#�E�?�_�� —=��—= _ ---=
Terry NEi�iR�u=:
��ri._--:,-�;4�ci�
?�1{:?r,�;Etimnr�±st na
suite i06
blaine.Mhi 55+t49
Ph��7fi3-78U-8004
Fax •7fi3-7Rf)-R015
dfpplanningdesign�visicxxn
Copyright � 2005 by Trus JoiSt, a ileyerhaeuser business
Parallam� is a reaistered tratlemazk of Trus Joist.
_ ���j�����' 206231 BED 2/SITTING
'A"�'°`''�'�`&`�'� 3 Pcs of 1 3/4" x 11 7/8" 2.OE Parallam� PSL
TJ-BeamO 620 Serial Num6er:7004109786
u� � ����1=��PM THIS PR�DUCT MEETS OR EXCEEDS THE SET DESIGN
" Page 1 Ergine Versian:620.16
CONTROLS FOR THE APPLICATION AND LOADS LISTED
�lemVer Sbpe:s i2 Roof Slope8�12
�
>
d 1.�. i
AB dimensions a�e horizo�il. ProchKt Diacpam is Co�xept�wl.
LOADS:
Analysis is for a Drop Beam Merr�ber. Tnbutary Load Width:1'
Primary Lo�i Group-Roof(psfl:40.0 Live at 125%duration,15.0 Dead
Vertical Loads:
Type Class Live Dead Location Application Commerrt
Uniform(pif� Roof(1.25) 600.0 225.0 0 To 11' Adds To
SUPPORTS-
Input Bearing Vertical Reactions(Ibsy Detail Other
wdth Leru�th LivelDead/Up!'�ft/Total
1 Wood column 5.25" 1.50" 3520/1427/0/4947 L1:Blodci�g 1 Pty 1 3/4"x 11 7B"2.OE Parallarn�l PS!
2 Wood odurrx� 5Z5" 1.50' 3520!1427/0/4947 L1:Blodcing 1 Ply 1 3/4"x 11 7/8"2.OE ParaNarr�PSL
-See TJ SPECIFIER'S!BUILDERS GUIDE for detail(s):L1:Blodcing
DESIGN CONTROLS:
Maximum Design Corrtrol Corrtrol Location
Shear(fl�s) 4666 -3663 15066 Passed(24%) Rt end Spar►1 under Roof loading
Morr�ent(Ft-lbs} 12103 12103 37317 Passed(32%) MID Span 1 under Roof bad'mg
Live Load Defl(m} 0.130 0_346 Passed(LnJ59) MtD Span 1 under RaoF badag
Total Load Defl�n) 0.182 0.519 Passed(U683) MID Span 1 under Roo#loading
-0eflection Cci�esia:Specsfied(LL:1./3f0,TL:L/240).
-Brac�ng(Lu):AN compression edges(top and bottom)must be braced at 10'6'dc unless delailed othervvise. Prnper attachment�►d positioning of IaDeral
brac�g is►equired tfl achieve rnember stab�Tty-
-0esign assumes adequate continuous!aleral support aF the compressic�t e�e.
��.�.*iTil3E+iR�NOTES'
-iMPOR7RlVT! The anafyrsis presenbed is ouiput hom sa�tardre developed by Tnis Jast(TJ). TJ warrdnfs ihe s¢irig of iLs producfs by this sotNvare vvri�be
" ' " .- 1.r.d A.-..-' ....5... - ^ .....
!� S,'t'+P1 �.)�x'rrFa��t��n r{,1at,a�n��rx_{a�EC_�� ��:�.`_c���. �.._._ _ .e,.:-_«�~ . �- -_-'" __ -, -
.. . :.... • .
- �--_ -.- --_- - ' '� - s•-••
shabed dimensiorts have b�een prcRvvided by the sefl��re u�. '�F!is e;st�,�+���ot�R{�r�e�*�-.���v�y = - --:- -.-
.t .," �;�- ..:,: . .:',�)? t`hark wiih J^'::Si.ti)I3�Lf L3t'7}ca�h�!r�,r��.o.^.t3.'Y8 fM�Cfl(1uf:t 2v2i�sTity
- _. _ .•_,. _ .:!� ,-_.,. ..�._.�.:i:._= . .�C:i�l;t;s:i CJtditr' YttC3i)i;t:7 5I7�3ST1TlITtON V�ii3S 7NtS Ai�fALYStS.
�SUFTJ v .....a:....l..L...— a..,•-1 f:.:�s:N'e. f'.... _. _ . _ �'. .. _...,..., . -�.�......... ........-.
G3it�f e iG iRa � '. v .
-N�:See TJ SPEi.(�i=R'S f�LF�s�s�cr•��:,��e:��Fi..-:�:i::�;�;��; :.v..-_�...._.-.
TFS J.sTL.i iiMrl/�A6Q�C��� +�!'i?s[t t1F!K!�'�M����•
�Q.tfS) �.3'1�iJNl
)
dfp ptanning design
9100 bat�re st ne
suite 106
Waitte,MN 55449
Phone=763-780-8004
Fax :763-780-8015
dfpplannir�sign�visi.com
Copyright o 2005 by Trus Joist, a nieyezhaeuser Business
Parallam� is a registered trademark of Trus Joist.
" Multi-Loaded Beam(AISC 9th Ed ASD 1 Ver: 6.00.81
By: TERRY MIKKELSON , DFP PLANNING&NDESIGN, LLC on: 06-19-2006: 11:08:38 AM
Project: MECH- Location: 206231
- ' Summarv:
A36 W 12x35 x 22.84 FT(7.7+ 15.2)
Section Adepuate By: 13.3% Controlling Factor: Moment
Left Span Deflections:
" Dead Load: DLD-Left= -0.03 IN
Live Load: LLD-Left= -0.01 IN= U7989
Total Load: TLD-Left= -0.04 IN = U2192
Center span Deflections:
" Dead Load: DLD-Center= 0.17 fN
Live Load: LLD-Center= 0.07 IN=U2510
Total Load: TLD-Center= 0.24 IN= L/750
Left End Reactions(Support A):
Live Load: LL-Rxn-A= 0 LB
Dead Load: DL-Rxn-A= -2388 LB
Total Load: TL-Rxn-A= -2388 LB
Desiqn For Ualift Loads(Includes Ualift Factor of Safetv) Rxn-A-min= �291 LB
Bearinq Lenqth Required(Beam only, support capacity not checked): BL-A= 0.00 IN
Center span Left End Reactions(Support B):
Live Load: LL-Rxn-B= 7508 LB
Dead Load: DL-Rxn-B= 33381 LB
Total Load: TL-Rxn-B= 40890 LB
Bearinq Lenqth Required(Beam only, support capacity not checked): BL-B= 1.64 IN
Center span Riqht End Reactions(Support C):
Live Load: LL-Rxn-C= 5906 LB
Dead Load: DL-Rxn-C= 15273 LB
Total Load: TL-Rxn-C= 21179 LB
Bearinq Lenqth Required(Beam only, support capacity not checked): BL-C= 0.92 IN
Dead �oad Uplift F.S.: FS= 1.5
Beam Data:
Left Span Lenqth: L1= 7.67 FT
Left Span Unbraced Lenqth-Top of Beam: Lu1-Top= 7.67 FT
Left Span Unbraced Length-Bottom of Beam: Lu1-6ottom= 7.67 FT
Center span Lenqth: L2= 15.17 FT
Center span Unbraced Lenqth-Top of Beam: Lu2-Top= 15.97 FT
Center span Unbraced Length-Bottom of Beam: Lu2-Bottom= 15.17 FT
Live Load Deflect. Criteria: L/ 360
Total Load Deflect. Criteria: U 240
Left Span Loading:
Uniform Load:
Live Load: wL-1= 0 PLF
Dead Load: wD-1= 240 PLF
Beam Self Weight: BSW= 35 PLF
Total Load: wT-1= 275 PLF
Point Load 1
Live Load: PL1-1= 0 LB
Dead Load: PD1-1= 3135 LB
Location tFrom left end of span): X1-1= 1.5 FT
Center span Loading:
Uniform Load:
Live Load: wL-2= 140 PLF
Dead Load: wD-2= 53 PLF
Beam Self Weight: BSW= 35 PLF
Total Load: wT-2= 228 PLF
Point Load 1
Live�oad: PL1-2= 0 LB
Dead Load: PD1-2= 13340 LB
Location(From left end of span): X1-2= 1.75 FT
Point Load 2
Live Load: PL2-2= 0 LB
Dead Load: PD2-2= 3319 LB
Location(From left end of span): X2-2= 2.17 FT
Point Load 3
Live Load: PL3-2= 0 LB
Dead Load: PD3-2= 5210 LB
Location (From left end of span): X3-2= 5.83 FT
Point Load 4
Live Load: PL4-2= 0 LB
Dead Load: PD4-2= 2697 LB
Location (From teft end of span): X42= 9.08 FT
Point Load 5
Live Load: PL5-2= 0 LB
Dead Load: PD5-2= 8578 L6
Location(From left end of span): X5-2= 14.17 FT
, Paqe: 2
Muiti-Loaded Beam(AISC 9th Ed ASD 1 Ver:6.00.81
, By:TERRY MIKKELSON , DFP PLANNING &NDESIGN, LLC on: 06-19-2006: 11:08:38 AM
� Proiect: MECH-Location:206231
Trapezoidal Load 1
Left Live Load: TRL-Left-1-2= 140 PLF
_ Left Dead Load: TRD-Left-1-2= 188 PLF
Riqht Live Load: TRL-Riqht-1-2= 140 PLF
Riqht Dead Load: TRD-Right-1-2= 188 PLF
Load Start: A-1-2= 2.17 FT
- Load End: B-1-2= 15.17 FT
Load Lenqth: C-1-2= 13.0 FT
Trapezoidal �oad 2
Left Live Load: TRL-Left-2-2= 720 PLF
Left Dead Load: TRD-Left-2-2= 390 PLF
Riqht Live Load: TRL-Ri.qht-2-2= 720 PLF
Riqht Dead Load: TRD-Right-2-2= 390 PLF
Load Start: A-2-2= 1.83 FT
Load End: B-2-2= 3.17 FT
Load Lenqth: C-2-2= 1.34 FT
Trapezoidal Load 3
Left Live Load: TRL-Leit-3-2= 720 PLF
Left Dead Load: TRD-Left-3-2= 390 PLF
Riqht Live Load: TRL-Riqht-3-2= 720 PLF
Riqht Dead Load: TRD-Right-3-2= 390 PLF
Load Start: A-3-2= 6.0 FT
Load End: B-3-2= 15.17 FT
Load Lenqth: C-3-2= 9.17 FT
Properties for: W 12x35/A36
Yield Stress: Fy= 36 KSI
Modulus of Elasticity: E= 29000 KSI
Depth: d= 12.50 IN
Web Thickness: tw= 0.30 IN
Flanqe Width: bf= 6.56 IN
Flanqe Thickness: tf= 0.52 IN
Distance to Web Toe of Fiflet: k= 0.82 IN
Moment of Inertia About X-X Axis: Ix= 285.00 IN4
Section Modulus About X-X Axis: Sx= 45.60 IN3
Radius of Gyration of Compression Ftanqe+ 1/3 of Web: rt= 1.74 IN
Design Properties per AISC Steel Construction Manual:
Flanqe Bucktinq Ratio: FBR= 6.31
Allowable Flanqe Buckling Ratio: AFBR= 10.83
Web Bucklinq Ratio: WBR= 41.67
Allowable Web Bucklinp Ratio: AWBR= 106.67
Controllinq Unbraced Lenqth: Lb= 15.17 FT
Limitinq Unbraced Lenqth for Fb=.66*Fv: Lc= 6.92 FT
Limitinq Unbraced Lenqth for Fb=.6'Fy wJ Cb: Lu= 12.63 FT
Moment Gradient Bendinq Coefficient: Cb= 1.0
Allowable fb per ASD Eqn F1-6: F1-6= 44.73 KSI
Allowable fb per ASD Eqn F1-7: F1-7= 15.53 KSi
Allowable fb per ASD Eqn F1-8: F1-8= 17.99 KSI
Elastic Limit of ASD Eqn F1-6: EL1-6= 17.26 FT
Allowable Bendinp Stress: Fb= 17.99 KSI
Web Heiqht to Thickness Ratio: h/tw- 3g,2
Limitinq Web Heiqht to Thickness Ratio for Fv=.4'Fy: h/tw-Limit= 63.33
Alfowable Shear Stress: Fv= 14.4 KSI
Design Requirements Comparison:
Controllinq Moment: M= -60345 FT-LB
Over left support of span 2(Center Span)
Critical moment created by combining all dead loads and live loads on span(s) 1, 2
Nominal Moment Strength: Mr- 68359 FT-LB
Controllinq Shear: V= 31354 LB
At left support of span 3(Riqht Span)
Critical shear created by combining all dead loads and live loads on span(s) 1, 2
Nominal Shear Strenqth: Vr= 54000 LB
Moment of Inertia{Deflection): Ireq= 91.16 IN4
1= 285.00 IN4
� Multi-Loaded Beam[AISC 9th Ed ASD J Ver: 6.00.81
, By: TERRY MIKKELSON. DFP PLANNING&NDESIGN. LLC on: Q6-19-2006
Project: MECH-Location: 206231
Summary:
A36 W12x35 x 22.84 FT{7.7+ 15.2)
� Section Adequate By: 13.3% Controlling Factor: Moment
LOADING DIAGRAM
P
1-2 P3 P4 P5
P1
a B c
Left Span =7.67 ft Center span = 15.17 ft
Reactions
Live Load Dead Load Total Load Uniift Load
A 0 Lb -2388 Lb -2388 Lb -4291 Lb
B 7508 Lb 33381 Lb 40890 Lb 0 Lb
C 5906 Lb 15273 Lb 21179 Lb 0 Lb
Left Saan
Uniform Loading
Live Load Dead Load Self WeiQht Total Load
W 0 Plf 240 Plf 35 Plf 275 Plf
Point Loading
Live Load Dead Load Location
P1 0 Lb 3135 Lb 1.5 Ft
Center saan
Uniform Loading
Live Load Dead Load Self Weiqht Total Load
W 140 Ptf 53 Plf 35 Plf 228 Plf
Trapezoidal Loading
Left LL Left DL RiQht LL Right DL Load Start Load End
TR1 140 Plf 188 Plf 140 Plf 188 Plf 2.2 Ft 15.2 Ft
TR2 720 Plf 390 Plf 720 Plf 390 Plf 1.8 Ft 3.2 Ft
TR3 720 Plf 390 Plf 720 Plf 390 Plf 6 Ft 152 Ft
Point Loading
Live Load Dead Load Location
P1 0 Lb 13340 Lb 1.8 Ft
P2 0 Lb 3319 Lb 2.2 Ft
P3 0 Lb 5210 Lb 5.8 Ft
P4 0 Lb 2697 Lb 9.1 Ft
P5 0 Lb 8578 Lb 14.2 Ft
Multi-Loaded Beam[AISC 9th Ed ASD�Ver: 6.00.81
_ � By: TERRY MIKKE�SON , DFP PLANNING&NDESIGN, LLC on: 06-19-2006
Project: MECH-Location: 206231
Summary:
A36 W 12x35 x 22.84 FT(7.7+ 15.2)
Section Adequate By: 13.3% Controlling Factor: Moment
SHEAR, MOMENT,AND DEFLECTION DIAGRAMS
Load combination shown: Controllin Shear/MomenUDeflection Dia rams
- 40000 31354 Ibs @ 8 ft
20000
Shear
(Ibs) 0
-20000
-40000 -211791bs� 23 ft
70000 54376 ft-Ibs @ 17 ft �'i
�
35Q00 '
i
Moment '
(ft-Ib) 0 �
�
-35p00 �
�
�
-70000 -60345 ft-Ibs @ 8 ft i
-0.3 i�-OA42 in 4.5 ft i
i �
i i
-0.15 ' '
� ,
Deflection ' '
i
(��1 � � �
� �
� �
Q.15 � �
� �
i �
0.3 � 0.243in@ 15.9ft�
Left Span =7.67 ft Ce�ter span = 15.17 ft
Controflina Load Cases:
Shear: Critical shear created by combining all dead loads and live loads on span(s) 1, 2
Moment: Critical moment created by combining all dead loads and live loads on span(s) 1, 2
Deflection: Critical deflection created by combining all dead loads and live loads on span(s) 1, 2
" Multi-Loaded Beam(AISC 9th Ed ASD 1 Ver: 6.00.81
BV: TERRY MIKKELSON , DFP PLANNING &NDESiGN, LLC on: 06-19-2006: 10:42:26 AM
Project: 206231 -Location: BSMT BATH/STAIR
- � Summary:
A36 W 10x15 x 5.0 FT
Section Adequate By: 6.8% Controliing Factor: Shear
Center Span Deflections:
- Dead Load: DLD-Center- 0.03 IN
Live Load: LLD-Center= 0.01 IN = U8145
Total Load: TLD-Center= 0.04 IN=U1478
Center Span Left End Reactions(Support A):
- Live Load: LL-Rxn-A= 2407 LB
Dead Load: DL-Rxn-A= 28560 LB
Total Load: TL-Rxn-A= 30967 LB
Bearinp Lenqth Required(Beam only, support capacity not checked): BL-A= 6.98 IN
Center Span Riqht End Reactions(Support B):
Live Load: LL-Rxn-B= 2655 LB
Dead Load: DL-Rxn-B= 6368 LB
total Load: TL-Rxn-6= 9023 LB
Bearing Length Required (Beam only, support capacity not checked): BL-B= 0.57 IN
Beam Data:
Center Span Lenpth: L2= 5.0 FT
Center Span Unbraced Lenqth-Top of Beam: Lu2-Top= 5.0 FT
Center Span Unbraced Length-Bottom of Beam: Lu2-Bottom= 5.0 FT
Live Load Deflect. Criteria: U 360
Total Load Deflect. Criteria: U 240
Center Span Loading:
Uniform Load:
Live Load: wL-2= 743 PLF
Dead Load: wD-2= 419 PLF
Beam Self Weight: BSW= 15 PLF
Total Load: wT-2= 1177 PLF
Point Load 1
Live Load: PL1-2= 0 LB
Dead Load: PD1-2= 16642 LB
Location(From left end of span): X1-2= 0.25 FT
Point Load 2
Live Load: PL2-2= 0 LB
Dead Load: PD2-2= 8975 LB
Location (From left end of span): X2-2= 0.92 FT
Point Load 3
Live Load: PL3-2= 0 LB
Dead Load: PD3-2= 5901 LB
Location (From left end of span}: X3-2= 1.75 FT
Trapezoidal Load 1
Left Live Load: TRL-Left-1-2= 330 PLF
Left Dead Load: TRD-Left-1-2= 304 PLF
Riqht Live Load: TRL-Riqht-1-2= 330 PLF
Riqht Dead Load: TRD-Right-1-2= 304 PLF
Load Start: A-1-2= 0.92 FT
Load End: B-1-2= 5.0 FT
Load Lenqth: C-1-2= 4.08 FT
Properties for:W 10x15/A36
Yield Stress: Fy= 36 KSI
Modulus of Elasticity: E= 29000 KSI
Depth: d= 9.99 IN
Web Thickness: tw= 0.23 IN
Flanqe Width: bf= 4.00 IN
Flanqe Thickness: tf= 0.27 IN
Distance to Web Toe of Fillet: k= 0.57 IN
Moment of Inertia About X-X Axis: Ix= 68.90 IN4
Section Modulus About X-X Axis: Sx= 13.80 IN3
Radius of Gvration of Compression Flanqe+ 1/3 of Web: rt= 0.99 IN
Design Properties per AISC Steel Construction Manual:
FlanQe Buck�inq Ratio: FBR= 7.41
Allowable Flanqe Buckling Ratio: AFBR= 10.83
Web BucklinQ Ratio: WBR= 43.43
Allowable Web Bucklinq Ratio: AWBR= 106.67
Controllinq Unbraced Lenqth: Lb= 5.0 FT
Limitinp Unbraced Lenqth for Fb=.66'FV: Lc= 4.22 FT
Limitinq Unbraced Lenqth for Fb=.6*Fy w/Cb: Lu= 5.01 FT
Moment Gradient Bendinq Coefficient: Cb= 1.0
Allowable Bendinq St�ess: Fb= 21.6 KSI
Web Heiqht to Thickness Ratio: h/tw= 41.09
Limitinq Web Heiqht to Thickness Ratio for Fv=.4'Fy: h/tw-Limit= 63.33
Allowable Shear Stress: Fv= 14.4 KSI
PaAe: 2
' Multi-Loaded Beam(AISC 9th Ed ASD 1 Ver: 6.00.81
, BY: TERRY MIKKELSON , DFP PLANNING &NDESIGN, LLC on: 06-19-2006: 10:42:26 AM
- Proiect: 206231 -Location: BSMT BATHISTAIR
Design Requirements Comparison:
Controllinq Moment: M= 19759 FT-LB
1.75 Ft from left support of span 2 tCenter Span)
Critical moment created by combining all dead loads and live loads on span(s)2
Nominal Moment SUength: Mr- 24840 FT-L8
Controllinq Shear: V= 30967 LB
. At left supRort of span 3(Riqht Span)
Critical shear created by combining all dead loads and live loads on span(s)2
Nominal Shear Strenqth: Vr- 33087 LB
Moment of Inertia(Deflection): Ireq= 11.19 IN4
1= 68.90 IN4
� Multi-Loaded 8eam[AISC 9th Ed ASD)Ver: 6.00.81
, By: TERRY MIKKELSON . DFP PLANNING&NDESIGN. LLC on: 06-19-2006
Project: 206231 -Location: BSMT BATH/STAIR
Summary:
A36 W 10x15 x 5.0 FT
- Section Adequate By: 6.8% Controlling Factor: Shear
LOADING DIAGFtAM
P1 P2 P3
A g
Center Span =5 ft
Reactions
Live Load Dead Load Total Load Ualift Load
A 2407 Lb 28560 Lb 30967 Lb 0 Lb
B 2655 Lb 6368 Lb 9023 Lb 0 Lb
Center Saan
Uniform Loading
Live Load Dead Load Self Weipht Total Load
W 743 Plf 419 Plf 15 Plf 1177 Pif
Trapezoidal Loading
Left LL Left DL Riqht LL Riqht DL Load Start Load End
TR1 330 Plf 304 Plf 330 Ptf 304 Plf 0.9 Ft 5 Ft
Point Loading
Live Load Dead Load Location
P1 0 Lb 16642 Lb 0.2 Ft
P2 0 Lb 8975 Lb 0.9 Ft
P3 0 Lb 5901 Lb 1.8 Ft
� Multi-Loaded Beam[AISC 9th Ed ASD J Ver: 6.00.81
, By: TERRY MIKKELSON , DFP PLANNING&NDESfGN, LLC on: 06-19-2006
Project: 206231 -Location: BSMT BATH/STAIR
Summary:
A36 W 10x15 x 5.0 FT
- Section Adequate By: 6.8% Controlling Factor: Shear
SHEAR, MOMENT,AND DEFLECTION DIAGRAMS
Load combination shown: Controllin Shear/MomenUDeflection Dia rams
•40000 30967 Ibs Q 0 ft
20000
Shear
(Ibs) 0
-20000
-40000 -9023 Ibs @ 5 ft
20000 � 9 ft-Ibs @ 2 ft
�
�
10000 i
Moment '
(ft-Ib) 0 �
-10000 �
�
i
-20000 i
-0.05 i
�
�
-0.025 i
Deflection '
(in) 0 �
i
0.025 i
i
0.05 r� 0.041 in @ 2.3 ft
Center Span =5 ft
Controllinq Load Cases:
Shear: Critical shear created by combining all dead loads and live loads on span(s)2
Moment: Critical moment created by combining all dead loads and live loads on span(s)2
Deflection: Critical deflection created by combining all dead loads and live loads on span(s)2
� Multi-Loadec!Beam(AISC 9th Ed ASD 1 Ver: 6.00.81
' By: TERRY MIKKELSON , DFP PLANNING &NDESIGN, LLC on: 06-19-2006: 10:30:25 AM
Prolect: 206231 -Location: MECH
- Summary:
A36 W8x40 x 16.Q FT
Section Adequate 8y: 7.7% Controliing Factor: Moment
Center Span Deflections:
- Dead Load: DLD-Center- 0.34 IN
Live�oad: LLD-Center= 0.31 IN=U623
Total Load: TLD-Center- 0.65 IN = U295
Center SRan Left End Reactions(Support A):
Live Load: LL-Rxn-A= 7944 LB
Dead Load: DL-Rxn-A= 10393 LB
Total Load: TL-Rxn-A= 18337 LB
Bearinq Lenqth Required (Beam only, support capacity not checked): BL-A= 0.95 IN
Center Span Riqht End Reactions(Support B):
Live Load: LL-Rxn-B= 7618 LB
Dead Load: DL-Rxn-B= 7924 LB
Total Load: TL-Rxn-B= 15542 LB
Bearing Length Required(Beam only, support capacity not checked): BL-B= 0.95 IN
Beam Data:
Center Span Lenqth: L2= 16.0 FT
Center Span Unbraced Lenqth-Top of Beam: Lu2-Top= 16.0 FT
Center Span Unbraced Length-Bottom of Beam: Lu2-Bottom= 16.0 FT
Live Load Deflect. Criteria: U 360
Total Load Deflect. Criteria: U 240
Center Span Loading:
Uniform Load:
Live Load: wL-2= 600 PLF
Dead Load: wD-2= 225 PLF
Beam Self Weight: BSW= 40 PLF
Total Load: wT-2= 865 PLF
Point Load 1
Live Load: P1.1-2= 0 LB
Dead �oad: PD1-2= 2144 LB
Location (From left end of span): X1-2= 0.25 FT
Point Load 2
Live Load: PL2-2= 0 LB
Dead Load: PD2-2= 2305 LB
Location (From left end of span): X2-2= 2.42 FT
Point Load 3
Live Load: PL3-2= 0 . LB
Dead Load: PD3-2= 2681 LB
Location (From left end of span): X3-2= 6.42 FT
Point Load 4
Live Load: PL4-2= 0 L8
Dead Load: PD4-2= 2681 LB
Location (From left end of span): X4-2= 12.08 FT
Point Load 5
Live Load: PL5-2= 0 LB
Dead Load: PD5-2= 633 LB
Location (From left end of span): X5-2= 15.83 FT
Trapezoidal Load 1
Left Live Load: TRL-Left-1-2= 500 PLF
Left Dead Load: TRD-Left-1-2= 323 PLF
Riqht Live Load: TRL-Riqht-l-2= 500 PLF
Riqht Dead Load: TRD-Right-1-2= 323 PLF
Load Start: A-1-2= 0.0 FT
Load End: B-1-2= 2.42 FT
Load Lenqth: C-1-2= 2.42 FT
Trapezoidal Load 2
Left Live Load: TRL-Left-2-2= 600 PLF
Left Dead Load: TRD-Left-2-2= 360 PLF
Riqht Live Load: TRL-Riqht-2-2= 600 PLF
Ripht Dead Load: TRD-Right-2-2= 360 PLF
Load Start: A-2-2= 2.42 FT
Load End: 8-2-2= 6.42 FT
Load Lenqth: C-2-2= 4.0 FT
Trapezoidal Load 3
Left Live Load: TRL-Left-3-2= 600 PLF
Left Dead Load: TRD-Left-3-2= 360 PLF
Riqht Live Load: TRL-Riqht-3-2= 600 PLF
Riqht Dead Load: TRD-Right-3-2= 360 PLF
Load Start: A-3-2= 12.08 FT
Load End: B-3-2= 16.0 FT
Load Length: C-3-2= 3.92 FT
" Paqe:2
- ' Multi-Loaded Beam�AISC 9th Ed ASD 1 Ver: 6.00.81
, By: TERRY MIKKELSON , DFP PLANNING &NDESfGN, LLC on: 06-19-2006: 10:30:25 AM
� Prolect: 206231 -Location: MECH
Properties for: W8x40/A36
Yield Stress: Fy= 36 KSI
Modulus of Elasticity: E= 29000 KSI
' DeRth: d= 8.25 I N
Web Thickness: tw= 0.36 IN
Flanqe Width: bf= 8.07 IN
, Flanqe Thickness: tf= 0.56 IN
Distance to Web Toe of Fillet: k= 0.95 IN
Moment of Inertia About X-X Axis: Ix= 146.00 IN4
Section Modulus About X-X Axis: Sx= 35.50 IN3
Radius of Gyration of Compression Flanqe+ 1/3 of Web: rt= 2.21 IN
Design Properties per AISC Steel Construction Manual:
Flanpe Bucklinq Ratio: FBR= 721
Allowable Flanqe Buckling Ratio: AFBR= 10.83
Web Bucklinq Ratio: WBR= 22.92
Allowable Web Bucklinq Ratio: AWBR= 106.67
Controllinq Unbraced Lenqth: Lb= 16.0 FT
Limitinq Unbraced Lenqth for Fb=.66'FY: Lc= 8.52 FT
Limitinq Unbraced Lenqth for Fb=.6*Fy w/Cb: Lu= 25.36 FT
Moment Gradient Bendinq Coefficient: Cb= 1.0
Allowable Bendin�Stress: Fb= 21.6 KSI
Web Heiqht to Thickness Ratio: h/tw= 19.81
LimitinQ Web Heiqht to Thickness Ratio for Fv=.4'Fy: h/tw-Limit= 63.33
Allowable Shear Stress: Fv= 14.4 KSI
Design Requirements Comparison:
Controllinq Moment: M= 59350 FT-LB
6.56 Ft from left support of span 2(Center Span)
Critical moment created by combining all dead loads and live loads on span(s}2
Nominal Moment Strength: Mr= 63900 FT-LB
Controllinq Shear: V= 18337 LB
At left support of span 3(Riqht Span)
Critical shear created by combining all dead loads and live loads on span(s)2
Nominal Shear Strenqth: Vr= 42768 LB
Moment of Inertia (Deflection): Irep= 118.82 IN4
1= 146.00 IN4
Multi-Loaded Beam[AISC 9th Ed ASD]Ver: 6.00.81
By: TERRY MIKKELSON . DFP PLANNING&NDESIGN, L�C on: 06-19-2006
Project: 2Q6231 -Location: MECH
Summary:
A36 W8x40 x 16.0 FT
Section Adequate By: 7.7% Controllinq Factor: Moment
LOADING DIAGRAM
P1 P2 P3 P4 P5
A B
Center Span = 16 ft
Reactions
Live Load Dead Load Total Load Uplift Load
A 7944 Lb 10393 Lb 18337 Lb 0 Lb
B 7618 Lb 7924 Lb 15542 Lb 0 Lb
Center Saan
Uniform Loading
Live Load Dead Load Self Weiqht Total Load
W 600 Pif 225 Pif 40 Plf 865 Plf
Trapezoidal Loading
Left LL Left DL Riqht LL Riqht DL Load Start Load End
TR1 500 Plf 323 Plf 500 Plf 323 Plf 0 Ft 2.4 Ft
TR2 600 Plf 360 Plf 600 Plf 360 Plf 2.4 Ft 6.4 Ft
TR3 600 Plf 360 Plf 600 Plf 360 Pif 12.1 Ft 16 Ft
Point Loading
live Load Dead Load Location
P1 0 Lb 2144 Lb 0.2 Ft
P2 0 Lb 2305 Lb 2.4 Ft
P3 0 Lb 2681 Lb 6.4 Ft
P4 0 Lb 2681 Lb 12.1 Ft
P5 0 Lb 633 Lb 15.8 Ft
Multi-Loaded Beam�AISC 9th Ed ASD 1 Ver: 6.00.81
� ' By: TERRY MIKKELSON , DFP PLANNING &NDESIGN, LLC on: 06-16-2006 : 3:56:38 PM
Project: 206231 - Location: GRT RM WDW
Summary:
A36 W8x21 x 15.0 FT
- Section Adepuate By: 7.2°/a Controlling Factor: Moment
Center Span Deflections:
Dead Load: DLD-Center= 0.28 IN
Live Load: LLD-Center= 0.34 �N= U526
' Total Load: TLD-Center= 0.62 fN=U289
Center Span Left End Reactions(Support A):
Live Load: L�-Rxn-A= 4713 LB
Dead Load: DL-Rxn-A= 3109 LB
Total Load: TL-Rxn-A= 7822 �B
Beannq Lenqth Required (Beam only, support capacity not checked): BL-A= 0.70 IN
Center Span Riqht End Reactions(Support B):
Live Load: LL-Rxn-B= 4567 LB
Dead Load: DL-Rxn-B= 4046 LB
Total Load: TL-Rxn-B= 8613 LB
Bearing Length Required(Beam only, support capacity not checked): BL-6= 0.70 IN
Beam Data:
Center Span Lenqth: L2= 15.0 FT
Center Span Unbraced Lenqth-Top of Beam: Lu2-Top= 0.0 FT
Center Span Unbraced Length-Bottom of Beam: Lu2-Bottom= 15.0 FT
Live Load Deflect. Criteria: U 360
Total Load Deflect. Criteria: U 240
Cenfer Span Loading:
Uniform Load:
Live Load: wL-2= 0 PLF
Dead Load: wD-2= 0 PLF
Beam Self Weight: BSW= 21 PLF
Total Load: wT-2= 21 PLF
Point Load 1
Live Load: PL.1-2= 0 LB
Dead Load: PD1-2= 2237 L8
Location (From left end of span): X1-2= 10.83 FT
Trapezoidaf Load 1
Left Live Load: TRL-Left-1-2= 500 PL,F
Left Dead Load: TRD-Left-1-2= 188 PlF
Riqht Live Load: TRL-Riqht-1-2= 500 PLF
Riqht Dead Load: TRD-Right-1-2= 188 PLF
Load Start: A-1-2= 0.0 FT
Load End: B-1-2= 11.0 FT
Load Lenq#h: C-1-2= 11.0 F7
Trapezoidal Load 2
Left Live Load: TRL-Left-2-2= 450 PLF
Left Dead Load: TRD-Left-2-2= 169 PLF
Riqht Live Load: TRL-Riqht-2-2= 450 PLF
RiQht Dead Load: TRD-Right-2-2= 169 PLF
Load Start: A-2-2= 11.0 FT
Load End: B-2-2= 15.0 FT
Load Lenqth: C-2-2= 4.0 FT
Trapezoidal Load 3
Left Live Load: TRL-Left-3-2= 180 PLF
Left Dead Load: TRD-Left-3-2= 68 PLF
Riqht Live Load: TRL-Riqht-3-2= 180 PLF
Riqht Dead Load: TRD-Right-3-2= 68 PLF
Load Start: A-3-2= 2.0 FT
Load End: B-3-2= 13.0 FT
Load Lenqth: C-3-2= 11.0 FT
Trapezoidal Load 4
Left Live Load: TRL-Left-4-2= 0 PLF
Left Dead Load: TRD-Left-4-2= 101 PLF
Riqht Live Load: TRL-Riqht-4-2= 0 PLF
Riqht Dead Load: TRD-Right-4-2= 101 PLF
Load Start: A-4-2= 2.0 FT
Load End: B-4-2= 13.0 FT
Load Lenqth: C-4-2= 11.0 FT
Properties for:W8x21/A36
Yield Stress: FV= 36 KSI
Modulus of Elasticity: E= 29000 KSI
Depth: d= 828 IN
Web Thickness: tw= 0.25 IN
Flanqe Width: bf= 5.27 IN
Flanqe Thickness: tf= 0.40 IN
Distance to Web Toe of Fi{let: k= 0.70 IN
` Paqe: 2
_ ' Multi-Loaded Beam(AISC 9th Ed ASD 1 Ver:6.00.81
, By: TERRY MIKKELSON , DFP PLANNING 8�NDESIGN, LLC on: 06-16-2006: 3:56:38 PM
- Project: 206231 -Location: GRT RM WDW
Moment of Inertia About X-X Axis: Ix= 75.30 IN4
Section Modulus About X-X Axis: Sx= 18.20 IN3
Radius of Gyration of Compression Flanqe+ 1/3 of Web: rt= 1.41 IN
Design Properties per AISC Steel Construction Manual:
Flanpe Bucklinq Ratio: FBR= 6.59
_ Allowable Flanqe Buckling Ratio: AFBR= 10.83
Web Bucklinq Ratio: WBR= 33.12
' Allowable Web Bucklinq Ratio: AWBR= 106.67
Controllinq Unbraced Lenqth: Lb= 0.0 FT
Limitinq Unbraced Lenqth for Fb=.66'Fy: Lc= 5.56 FT
Allowable Bendinq Stress: Fb= 23.76 KSI
Web Heiqht to Thickness Ratio: h/tw= 29.92
Limitinq Web Heiqht to Thickness Ratio for Fv=.4*Fy: h/tw-Limit= 63.33
Allowable Shear Stress: Fw- 14.4 KSI
Design Requirements Comparison:
Controllinq Moment: M= 33607 FT-LB
8.1 Ft from left support of span 2(Center Span)
Critical moment created by combining all dead loads and live loads on span(s)2
Nominat Moment Strength: Mr= 36036 FT-LB
Controllinq Shear: V= 8613 LB
15.0 Ft ftom feft support of span 3(Riqht Span?
Critical shear created by combining a11 dead loads and live loads on span(s)2
Nominal Shear Strenqth: Vr- 29808 LB
Moment of Inertia (Deflection): Ireq= 62.63 IN4
1= 75.30 IN4
- � Mufti-Loaded Beam[AISC 9th Ed ASD]Ver: 6.00.81
, , By: TERRY MIKKELSON . DFP PLANNING&NDESIGN. LLC on: 06-16-2006
Project: 206231 -Location: GRT RM WDW
Summary:
A36 WS�CZ1 x 15.0 FT
• Section Adequate Bv: 72% Controllinq Factor: Moment
LOADiNG DiAGRAM
P1
A 6
Center Span = 15 ft
Reactions
Live Load Dead Load Tota! Load Uplift Load
A 4713 Lb 3109 l.b 7822 Lb 0 Lb
B 4567 Lb 4046 Lb 8613 Lb 0 Lb
Center SDan
Uniform Loading
Live Load Dead Load Self WeiQht Total Load
W 0 Plf 0 Plf 21 Plf 21 Plf
Trapezoidal Loading
Left LL left DL Riqht LL RiQht DL Load Start Load End
TR1 500 Plf 188 Plf 500 Plf 188 Plf 0 Ft 11 Ft
TR2 450 Plf 169 Plf 450 Plf 169 Plf 11 Ft 15 Ft
TR3 180 Plf 68 Plf 180 Ptf 68 Plf 2 Ft 13 Ft
TR4 0 Plf 101 Plf 0 Plf 101 Plf 2 Ft 13 Ft
Point Loading
Live Load Dead Load Location
P1 0 Lb 2237 Lb 10.8 Ft
4
- Multi-Loaded Beam[AISC 9th Ed ASD J Ver: 6.00.81
. � By: TERRY MIKKELSON , DFP PLANNING&NDESIGN, LLC on: 06-16-2006
Project: 206231 -Location: GRT RM WDW
Summary:
A36 W8x21 x 15.0 FT
i Section Adequate By: 72°k Controlling Factor: Moment
' SHEAR, MOMENT,AND DEFLECTION DiAGRAMS
� Load combination shown: Controllin Shear/MomentJDeflection Dia rams
' 90�0 7822 Ibs Q 0 ft
4500
Shear
(Ibs) 0
-4500
�
-9�� -8613 Ibs @ 15
40000 33607 ft-Ibs @ 8 ft �i
�
20000 ;
Moment '
(ft-Ib) 0 �
i
-20000 i
i
i
-40000 i
-0.7 ; �
�
-0.35 ;
Deflection ;
(in) 0 �
�
0.35 � �--
0.7 0.624in@7.6ft �
Center Span = 15 ft
Controllinq Load Cases:
Shear: Critical shear created by combining all dead loads and live loads on span(s)2
Moment: Critical moment created by combining all dead loads and live loads on span(s)2
Deflection: Critical deflection created by combining all dead loads and live loads on span(s)2
�G��✓J f�F�fl� TIME
CITY OF ORONO CALLED IN �
INSPECTION N E �� SCHEDULED `�� --�
PERMIT NO. COMPLETED
ADDRESS a-
OWNER CONTR.
TELEPHONE N0. (f��2' ��D `� b �f
� DESCRIPTION �
l� 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
� 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
�
O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
� 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
= 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
� OWNERICONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
a 's� �
�
�
O
>.
�
O
�
W
�
Q
�
Z
W
�
W
�
�
d
W ORKSATISFACTORY:PROCEED fl PROJECTCOMPLETE
� ❑ CORRECT WORK 8 PROCEED C ISSUE CERTIFICATE OF OCCUPANCY
W
O ❑ CORRECT WOFK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECTUNSAFECONDIT�ONWITHIN HOURS. ❑ PHOTOTAKEN
INSPECTOR WILL RETURN
�i CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑ INSPECTION REQUIRED.CALI TO ARRANGE ACCESS.
Call for the ne inspection 24 hours in advance. (952� 249-4600
OwnerlContract te:
Inspector.
White Copyllnspector's 'le Canary CopylSite Notice
GI � �I DATE TIME �/
b - V
CITY OF ORONO CALLED IN �
INSPECTION NO CE p SCHEDULED !O?�0-�'�(� �2_'B17
PERMIT NO. � �� �o COMPLETED
ADDRESS ��
OWNER CONTR. �
TELEPHONE NO. 7�� �� I �.31�
� DESCRIPTION � n�U�.C��B-Y\
l� 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
� 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
�
Q 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
� 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FO�LOW-UP
= 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU:_YES_NO
� COMMEN S:
a $ C/ �
�
�
o �
� � v� ('� vl� GP rP�r
0
�
`� e�-� r � a �
�
Q
�
z
w
�
W
�
j
d
W ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
� ❑ CORRECT WORK 8 PROCEED C ISSUE CERTIFICATE OF OCCUPANCY
W
OYCORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V ��EFORECOVERING PERMANENT
❑CORRECTUNSAFECONDITtONWITHIN HOURS. CPHOTOTAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR �-�CITATION ISSUED
❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. �952� 24Q-46QQ
OwnerlContrac site:
Inspector.
White Copyllnspector's File Canary CopylSite Notice
, ` /
� �� �
2 r ODATF��� TIME V
CITY OF ORONO J� CALLED IN �
INSPECTION NO SCHEDULED �-�_ /�s�
PERMIT NO. COMPLETED
ADDRESS n �
OWN ER CONTR. ����
TELEPHONE N0. (��� c�� �' O��
� DESCRIPTION
l� 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
� 02 FR G 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
J 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
= 09 PLUMBING Rt 23 SEPTIC FINAL 35 HARD COVER REMOVAL
J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
� OWNERICONTHACTOR TO MEET YOU:_YES_NO
� COMMENTS:
� �
� S .5 C,1,�
�
�
O
�
�
O
�
W
�
Q
ti
Z
W
�
W
�
�
d
W�RK SATISFACTORY:PROCEED I I PROJECT COMPLETE
� CORRECT WORK 8 PROCEED '- ISSUE CERTIFICATE OF OCCUPANCY
W
� G CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
�CORRECT UNSAFE CONDITION WITHIN HOURS. ;_ PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR � CITATION ISSUED
C INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Ca11 for the next inspection 2a hours in advance. (952� 249-46��
OwnerlCont \on site:
Inspector.
White Copyllnspector's File Canary CopylSite Notice
C'�� S� DATE TIME �/
CITY OF ORONO CALLED IN �"�•pl�
INSPECTION I E SCHEDULED '��O•hl� '��►'�
PERMIT NO. COMPLETED
ADDRESS
OWNER CONT . I� Ir �
TELEPHONE NO. ��1)�� )�I � D
— Cnr�cr�,. :3 0
� DESCRIPTION � — !�e)es no-�-�inisl�ud��� ��°sh
W�9y FOOTING 11 MECHANICAL R 18 EXCAV/GRADING/FILLING
� 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
�
O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
� 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
? 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
� OWNERICONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
w
a
�
J
0
a
�
0
�
W
�
Q
�
z
W
�
W
�
�
d
W WORKSATISFACTORY:PROCEED Ci PROJECTCOMPLETE
� ❑CORRECT WORK&PROCEED C ISSUE CERTIFICATE OF OCCUPANCY
W
O ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONOITION WITHIN HOURS. v pH0T0 TAKEN
INSPECTOR WILL RETUFiN _� CITATION ISSUED
�STOP ORDER POSTED.CALI INSPECTOR
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next i spection 24 hours in advance. (952� 249-460�
OwnerlContractor
Inspector.
White Copylinspector's Fil Canary CopylSite Notice
DATE TIME �
CITY OF ORONO CALLED IN
INSPECTION NO I��O l SCHEDULED
PERMIT NO. COMPLETED — �
ADDRESS ��"I �� �Cr�l CJfr�� �I t-lvf�
OWNER /]/�o��"I�- �SG1�kI� CONTR.
TELEPHONE NO.
� DESCRIPTION
� ❑ FOOTING � MECHANICAL RI ❑ EXCAV/GRADING/FILLING
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ LAKESHORE/WETLANDS
y ❑ INSULATION ❑ WOOD BURNER/FIREPLACE
❑ TREE REMOVAL
Z ❑ WAIL BD. ❑ WATER HOOK-UP ❑ SITE INSPECTION
Q ❑ FINAL ❑ SEWER HOOK-UP ❑ PROGRESS
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ COMPLAINT
J ❑ DEMO-FINAL ❑ SEPTIC INSTALL. ❑ FOLLOW-UP
_ ❑ PLUMBtNG RI ❑ SEPTIC FINAL ❑ HARD COVER REMOVAL
J ❑ PLUMBING FINAL ❑ FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
W
a
o � (C� !� �n � S.S'� Q �.� ,�tJ,� I
'' l _ �� ,
�
0
�
W
�
Q
�
z
w
�
W
�
j
d
W ❑WORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLETE
� ❑CORRECT WORK&PROCEED �ISSUE CERTIFICATE OF OCCUPANCY
W
� ❑CORRECT WORK,CALL FOR REINSPECTION TE PORARY �(�
V BEFORECOVERING PERMANENT ��7Z�G1rJ
❑ CORRECT UNSAFE CONDITION WITHIN HOURS. � pH0T0 TAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALI INSPECTOR
G INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Ca11 for the next inspection 24 hours in advance. (952� 249-46�0
Owner/Contractor on site:
Inspector. ��.t�/+�, �
White Copyllnspector's File Canary CopylSite Notice
�° ,�� ✓
D�CT l�,/,.,. T I M E
G CITY OF ORONO CALLED IN � � � �-/11/
INSPECTION NOT .� ��j SCHEDULED �iE% ..�•�
PERMITNO. �L��-�U COMPLET
ADDRESS �-
OWNER CONTR. E�.t-d'1 C:�-`� �r�
,
TELEPHONE NO. ��t/ / �� �/ ���
� DESCRIPTION � �� �� -
� 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILL NG
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
� 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
= 09 PLUMBING RI 23 SEPTIC FIMAL 35 HARD COVER REMOVAL
J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
� OWNERICONTRACTOR TO MEET YOU: YES_NO
� COMMENTS:
�
W
a
�
J
O
a
�
O
�
ti
�
Q
�
Z
W
�
W
�
�
d
W WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
� ❑CORRECT WORK 8 PROCEED C ISSUE CERTIFICATE OF OCCUPANCY
W
� ❑CORRECT WORK,CAIL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
�CORRECTUNSAFECONDITIONWITHIN HOURS. ,� PHOTOTAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
C INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next.'nspection 24 hours in advance. �95Z� Z49-46��
OwnerlContrac e:
Inspector.
White Copyllnspector' File Canary CopylSite Notice
���� � � ATE I'� TIME V
CITY OF ORONO CALLED IN v�
INSPECTION NO CE SCHEDULED /��
PERMIT NO. %�C COMPLETED
ADDRESS � ��� �'�-'�./'i l.��O�'�'� �d�-�.
OWNER CONTR.��t f� ��L.� �
TELEPHONE NO. � �a - a�o- b� � �
� DESCRIPTION �`�'�-�1 a—� �c��l�D - " �.-��� C By�
� 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
� 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Z
Q OS FINAL 14 SEWER HOOK-UP 06 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
� 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
? 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
Z OWNER/CONTRACTOR TO MEET YOU:_YES_NO
� COMMENT :
¢
�� l�. S mrS
o — �' ` e�r
�. �
�—
o t 4 � � �}�. - �Sr,Ja e ��►�
W ,
� s� s
Q
�
z
W
�
W
�
�
d
W ❑WORK SATISFACTORY:PROCEED f l PROJECT COMPLETE
� ❑CORRECT WORK 8 PROCEED � ISSUE CERTIFICATE OF OCCUPANCY
W
� �CORRECT WORK,CALI FOR REINSPECTION TEMPORARY
� BEFORE COVERING
PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. L, pHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR n CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. �952� 249-46QQ
OwnerlContr r site:
Inspector.
White Copyllnspector s File Canary CopylSite Notice
�" ✓
l^D E TIME
CITY OF ORONO CALLED IN
INSPECTION N TI E SCHEDULED ��
PERMIT NO. ��l COMPLETED
ADDRESS �� �
OWNER CONTR. S
TELEPHONE NO.d��i l�l a-af0^D��f
� DESCRIPTION �� "' ��"4/1�"�`='�
lL 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
� 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
�
O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAfNT
J 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
? 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU:_YES_NO
� COM ENTS:
� • l ���
�
�
�
o < -
� � ��
0
�
� .�— Gi� C.ti � �- � � � �
Q
� ,
z
W
�
W
�
�
d
W WORK SATISFACTORY:PROCEED � P OJECT COMPLETE
W `❑CORRECT WORK&PROCEED � ISSU CERTIFICATE OF OCCUPANCY
O ❑CORRECT WORK,CALL FOR REINSPECTION �TEMPORARY ����►�,
V BEFORECOVERING �_pERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. .� PHOTO TAKEN
INSPECTOR WILL RETURN
7 CITATION ISSUED
❑STOP OROER POSTED.CALL INSPECTOR
C INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the n t inspection 24 hours in advance. (J52� 249-46��
OwnerlContr ite:
Inspector. <
White Copyllnspector's File Canary Copy/Site Notice