Loading...
HomeMy WebLinkAboutResolution 2692 , . � i . � � ' `• � • e �° 1 • 1 u�y' �AA��� �� c�t o� oR,oNo ,�K;: �, . _ ��;g� . � :~.7{�_ ^:R .. . RESOLUTION OF THE CITY COUNCIL r,i�. ' 2692 -�4�,x�.• NO. • ' • • • '�°�������` , A R$SOLIITION APPROVING THE GENERAL CONCEPT STAGE OF A PDD REZONING APPLIGATION � TEAT INCLDDES A PRELIMINARY SDBDIVISION, VACATION AND COMMERCIAL SITS P7�AN REVIEW FII,$ NO. 1428 WHEREAS, Clifford Otten of Otten Brothers Nursery and Landscaping (hereinafter "the applicant") on June 23, 1989 filed a formal. Planned Unit Development • rezoning application with the City consisting of a two-lot commercial and residential lot line rearrangement subdivision, partial vacation of Pine Ridge Lane and drainage and utility easements within the Ringerswood plat, and a commercial site plan review for proposed Lot 1 of the commercial subdivision, of the properties legally described as Lots 1 and 2, Block 3, Ringerswood and Outlot A, Ringerswood, Hennepin County, Minnesota (hereinafter "the property"); and WHEREAS, after due published and mailed notice in accordance with Minnesota Statues 462.358 et. seq. and the City of Orono Zoning and Platting Codes , the Orono Planning � Commission held a public hearing on August 21, 1989 at which times all persons desiring to be heard concerning this comprehensive application were given the opportunity to speak thereon; and . WHSREAS, at their regular meeting held on September 11, 1989 the Orono City Council considered the application f or a Planned Unit Development rezoning consisting of a subdivision, vacation and commercial site plan review, noting the fol lowing f indings of f act: 1. The property is located within an area adjacent to Highway 12 that would be permitted special land use consider-ations per the directives of Comprehensive Plan Amendment No. 2 and under Sections 10.52 and 10.53 of the Municipal Zoning Code. 2. Per Section 10.52 entitled "Special Requirements for Rezoning in the Highway 12 Corridor Study Area" , the application has been f ound to satisfy the standards set forth as follows: A) The total area of the proposed commercial portion of the Planned Unit Development consists of approximately 13 acres. The rezoning standards would require a minimum of 5 acres for consideration. , Page 1 of 7 \ f � . f , � . ' i I� � � ' �, • � � . ti�` � .•, ������ Cit� o� ORONO , � � _ � � -.r � ������r ��, � RESOLUTION OF THE CITY COUNCIL � �. ..� ;�``�-: r:°,.:,. ,�� -���' � NO. 2692 �<: ,: . �._ . • �`�R-���-� �-`- The proposed plan satisfies the objectives of the Transportation Plan of Comprehensive Plan Amendment No. 2 as applicant has provided dedication of access for Highway 12 and a road outlot to serve as an east/west f rontage road. C) Municipal sanitary sewer and water has been ordered to serve the property. � D) Applicant has provided detention areas on the site and will provide more detailed drainage plans upon approval of the general concept stage and as a requirement of the final development stage of the PUD rezoning. ' E) The PUD zoning and format of �development is preferred within the Highway 12 Corridor. F) The exterior of commercial building proposed for Lot 1 of the commercial subdivision shall be of a • combination of tan and dark brown concrete blocks with . split-face stone finish with trim of dark brown and green to match annodized aluminum with clear glazing used through area where plant materials are maintained. AI1 accessory structures shall be of the same exterior finish and exterior colors. G) Applicant shall enter into a Development Agreement with the City to specify timing of all improvements associated with the development and developer' s financial commitments related to those improvements. 3. The residential portion of �the subdivision application involves - a lot line rearrangement of existing residential lots. Each of the newly rearranged lots satisfies the area and lot width standards finding that each lot can continue to be used for residential use and future construction without the need of further variances. � 4. The proposed vacation of Pine Ridge Lane is consistent with the directives of Comprehensive Plan Amendment No. 2 as the applicant has dedicated a road outlot through the commercial portion of the property for an east/west frontage road. ` Page 2 of 7 • , . , �� ; . � ,' � ::;;Y �����:;;���fi� � Cit� o� ORONO � ,,:: ��y � , • . �> -�.r ��,.� ��} ` �� u RESOLUTION OF THE CITY COUNCIL �'t ,,., a ';`,'' • .� NO. 2692 ��' +:i�, � �.� • . ' ' `'Y'�r4 ��-� proposed vacation of existing drainage and utility easements within existing Lots 1 and 2, Block 3, Ringerswood is acceptable as new drainage and utility easements will be dedicated along newly created lot lines of the residential lots. ' 6. The commercial site plan for proposed Lot 1 of the commercial portion of the subdivision has been found to satisfy all pertinent standards of the underlying B-6 zoning district. Per the directives of Comprehensive Plan Amendment No. 2, B-6 zoning standards shall be applicable for all commercial development within the Highway 12 Corridor. NOW, TH$REFOR$ BE IT R$SOI.VED� that based upon either one or more of the findings noted above, the City Council of the City of Orono hereby approves the general concept stage of the Comprehensive Planned Unit Development rezoning application for Clifford Otten of Otten Brothers Nursery and Landscaping per the survey entitled "Preliminary Plat", dated June 23, 1989 by . McCombs Frank Roos Associates Inc., subject to the following conditions: 1. Outlot C shall be realigned along the southern border of Lot 1 to straighten out the curving of the roadway. 2. Final adjustment of lot line rearrangement of Lots 1 and 2, Block 3, Ringerswood to be finalized subject to the approval of the zoning staff of the City of Orono. 3. The final plan must locate the eastern portion of east/west frontage road (Outlot D, Sugars Wood) to confirm alignment with Outlot C of current subdivision. 4. Submit new legal descriptions for commercial portion of property to be rezoned to PUD with underlying B-6 zoning and redefined southern boundary of RR-1B residential zoning district - subject to review and approval by Orono. 5. If temporary (ingress only) access is approved off of Highway 12, applicant is to submit written permit f rom MnDot. In addition, applicant's commercial site plan is to be amended to confirm location of curb cut approved by MnDot. Page 3 of 7 • . � . �i� � � ' , � . -,s�+i '�{. :�:I!..'�� �y ����- c�t� o� oR,oNO . 4 ` �:{.�,... � ,�� }, - . �-��s 3 i y4... . ., RESOLUTION OF THE CITY COUNCI�L ���"'"'�� 2 6 9 2 .�;�.��.� . ,,�.� • .,� NO. _.• -.• .• •'"���.:F�i.�r approval by Minnehaha Creek Watershed District of all grading and drainage plans for the PUD development. Applicant shall prepare for formal application to the MCWD providing design storm sewer calculations for ponding areas, grading. and drainage and soil erosion plans. Applicant shall provide all information prepared for the MCWD to the City offices as soon as these plans and specifications are complete for the City's review. 7. Septic testing for residential lots is required as original test sites have been negated with the rearrangement of lot lines. Final a roval of lat and develo ment sta e shall be delayed until septic testing can confirm t ere is a�c equate area within the newly rearranged �lots to satisfy septic code. 8. 25' of Pine Ridge Lane that abutts north lot line of Lot 1, Block 3, Ringerswood shall not be approved for vacation by City, but shall remain as an access corridor to Lot 2, Block 3, Ringerswood via Dickey Lake Drive. All access to . residential lots via Highway 12 shall be discontinued with the approval of this subdivision and PUD rezoning. 9. The City to approve vacation of drainage easements within Outlot A, Ringerswood and to extinguish original Conservation and Flowage Easement over said wetland area. In exchange for the redesignation of drainage easements over newly defined detention areas within the commercial portion of the subdivision. The City to acquire drainage easements over said detention ponds and drainageways within the subdivision. Detention ponds are to be defined as drainage easements on the plat. The width of drainage easements shall be established by the City Engineer prior to final plat approval. 10. The commercial site plan must reflect the following changes: A) All private driveways must be of a 30' minimum width where lane also serves as a fire lane. B) Landscaping plan - location, type and size of plantings. C) Detailed lighting plan - type and location. � Page 4 of 7 � • J • � � . 1� . • � . .��'�Y... . �1 •f. ��t Cit o� ORONO �R �.��. y �:: � . • �..''�SIi;J�x:��,:N, ..�..��T '.l+'`; �: <;� R ,. RESOLUTION OF THE CITY COUNCIL �''�' 2692 a�r��,��� NO. . �� - • • . '�� y =�'�� Total signage plan. E) Loading berth - size and location. Conditions noted above and the following list of final submittals must be submitted as part of the final development stage of the PUD rezoning application and must be submitted to the Zoning Administratvr 30 days prior to a regularly scheduled Council meeting held on the second and f ourth Mondays of each month: � A. RECORD PLAT drawings in the form of two (2) mylar copies and one (1) copy reduced to 1"=200'. Drawing to include: a) Lot lines platted per survey by McCombs Frank Roos Associates, Inc. and if amended revised plan must be approved by City staff final to surveyor preparing final plan. b) . Dedication of "drainage and utility easements" 10' • wide along all perimeter property lines and 5' each side of internal property lines. c) Designation and dedication of drainage easements over all drainage ways and detention ponds within the plat. d) Define open space/buffer area to residential property, east/west frontage road and property to be deeded to City to house municipal well as outlots. e) Show a 1 i gnment with Out 1 ot D of Sugar Wood s a 1 ong east side of plat. f) Dedicate additional right-of-ways for adjacent public roadways as follows: i. 7' additional right-of-way for Willow Drive; ii. 10 ' additional right-of-way for Highway 12. g) Name of subdivision. Page 5 of 7 • �� � ' � • � i� ,� . , ; ..�;r �°1 4� ��;; � ���_��� Clt� o� OR�NO . ��� • � � �:�� :.:t:. �.�F RESOLUTION OF THE CITY COUNCIL 4 . :::����.:� .`.., • NO. 2692 �-;:�� • - •.. .• . %'"',�L�"� ` DOCUMENTS required: a) Title opinion addressed to the City. All owners, mortgage holders or others with property interest indicated therein shall sign the plat and all other documents affected by such interest. b) The applicant must provide certified copies of all recorded easements currently affecting the property: c) Signed and executed drainage easements over detention areas and drainageways within the plat (see sample enclosed). d) Executed road and utility easement over east/west frontage road, Outlot C (see easement enclosed). e) Executed' Development Agreement by applicant and City. Development Agreement shall identify timing of all of the required improvements associated with the • development and developer'.s financial commitment related to these improvements. A final development plan shall be attached to this agreement locating all structures, driveways, landscaping, define use of each area within proposed structure, areas devoted to open space def ined in square f ootage, parking area, def ine area to be used within Lot 2 for temporary use by landscape operation. No signage shall be allowed on Lot 2, only on Lot 1 where the principal use is defined. A Letter of Credit shall be submitted with the Developer's Agreement for all improvements not completed by final approval of the development stage of the PUD. The Letter of Credit shall be made out to the amount of 150$ of the cost of the improvements yet to � be completed. C. DETAILED SITE PLAN suitable for recording showing the physical layout of easements, rights-of-way, utility lines and facilities, lots, blocks, public and common open space, general landscaping plan, and structure. D. SOIL EROSION CONTROL PLAN as approved by the Minnehaha � Creek Watershed District and the Orono City Engineer. � Page 6 of 7 • . . � > � - . A' n�A L�• . ♦ � ��� 1 '!� �n: ��E.R��Y 'k�4 � ��:_ ��� Cit� o� ORONO . • ` �:.� }:,���a �!;y ' ;�;,: RESOWTION OF THE CITY C.OUNCIL ��. ��:e�� NO. 2692 .a '�• �'• • �'^}`��'"� S TO BE PAID: Total Due $6,050.00 a) Park dedication fee per current schedule: $500 per acre = $6,500.00 b) Final plat fee = $150.00 c) Legal review and filing fees of $300. 00 (Total due $6,950.00 less overpayment of $900.00 paid with original application fees for road) . Adopted by the Ci:ty Counci 1 of the City of Orono, � Minnesota at a regular meeting held this llth day of September, 1989. i James � . Grabek, Ma �. ' ATT ST: � � • Dorothy . allin, City Clerk STATE OF NNESOTA ) ) ss. COUNTY OF HENNEPIN ) The foregoing instrument was acknowledged before me on this llth day of September, 1989, by James R. Grabek & Dorothy M. � Hallin, Mayor & City Clerk of the City of Orono, a Minnesota municipal corporation and said instrument was executed on behalf of the City. N ry Pu 1 ' ^"^^' �•'"`4"� L IE K. SCH�FFLER ,���� NOTARti PUBLIC-MINNESOU 3_, •+ `"` � �'� HENNEPIN COUNTY �; ' � �; ��� My commisaion expires6-8-93. -�;+�•. My Commissi Page 7 of 7 •