HomeMy WebLinkAboutResolution 2608 ��..�{,�: .
���W c�t� o� oR,oNo
�i �N� .jy�"
i' Me 1N�.�A .
� � r�� �hl4y�.��,f.
� `� E w�+ �`; l�"� RESOLUTION OF THE CITY COUNCIL
•� .
$,
K.y r'
tryy�;�� L.,l:
'� NO. 2608
-. �.: ,;
.,..;.-.•. �..::.;,�
RSSOLDTION ORDERING STORM SEWL�R
FEASIBILITY REPORT FOR 3572 LIVINGSTON AVENQE
WHEREAS, the City of Orono has receivec3 a request from
the resident at 3572 Livingston Avenue to resolve a storm water
run off problem; and
W�RSAS, the City staff has reviewed the request and has
determined that further study of the area is necessary to
determine the extent of the storm water problem; and
WHSREAS, the City Council has reviewed the information
presented to them and received comments from the property owner
at 3572 Livingston Avenue, and
WHEREAS, the Orono Council feels that more information
� is needed to determine the extent of an existing storm water run
'off proBlem; and
WHEREAS, the most efficient manner in which to obtain
this information is to perform a feasibility study, which will
determine the extent of the problem, number of properties
included in the drainage area and the most efficient and cost
effective manner in which to proceed.
NOW, THEREFORE, BE IT RESOLV�, that the City Council of
the City of Orono direct the City Engineer to study and report to
the Council as to the feasibility and estimated cost to resol ve
the storm water run off problem for 3572 Livingston Avenue.
Adopted by the City Council of the City of Orono this
27th day of March, 1989.
�l ' ' r
ATT�S : James R. Grab k, Mayor
� �
Do thy M. llin, Cit� Clerk
•