HomeMy WebLinkAbout2016-00385 - mechanical .�� CITY OF ORONO * 2 0 1 6 - 0 0 3 8 5 *
2750 KELLEY PARKWAY DATE ISSUED: 04/18/2016
ORONO,MN 55356-
(952) 249-4600 FAX: (952) 249-4616
ADDRESS : 755 DICKEY LAKE DR
PIN : 34-118-23-22-0009
LEGAL DESC : RINGERSWOOD
: LOT 005 BLOCK 002
PERMIT TYPE : MECHANICAL
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : MECHANICAL-MULTIPLE
VALUATION : $ 8,200.00
NOTE: REPLACE: 1 HEATING SYSTEM(RUUD)& 1 COOLING SYSTEM(RUUD)
APPLICANT MECHANICAL 102.50
STATE SURCHARGE MECH(VALUATION) 4.10
CENTERPOINT ENERGY MAIL-IN FEE 2.00
6161 GOLDEN VALLEY RD
BUILDING A TOTAL 108.60
GOLDEN VALLEY,MN 55422- Payment(s)
(763)512-2765 CHECK 20221 108.60
Minnesota State License#:mech-MB003503
O W NER
ESAU,TERRANCE&MARY
755 DICKEY LAKE DR
LONG LAKE,MN 55356-
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for only the work described and does
not grant permission for additional or related work which requires separate
permits. All provisions of laws and ordinances governing this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 1 SO days of the date of issuance,or if construction is
suspended for a period of 180 days at any time afrer work has commenced.
The applicant is responsible for assuring all required inspections are
requested in conformance with the State Building Code.This permit may be
revoked at any time for due cause.
�, . /��
�
'-'�.C�-i � � �� :�o � l'���-� �- y � r �� 1 �
i V �,.
Applicant Permitee Signature Date Issued By Signature Date
4
� FOR CITY USE ONLY
City of Orono
�O�O P.O.Box 66 Date Received: �/�� �lpPermit# z(?z(>�(c 3 ��j
2750 Kelley Parkway ��/� �
Crystal Bay,MN 55323 Approved By: "Y� Amount$:� U
Phone(952)249-4600 Fax(952)249-4616
� �
ti �
F �
t9k£SH���G CITY OF ORONO—MECHANICAL PERMIT
(All Commercial permits must be approved by the Building OfYicial or Inspector and/or Fire Marshall)
GENERAL 1NFORMATION
1. You may apply for mechanical permits by mail or in person at the City offices. Applications will
be reviewed and a permit will be issued within two working days.
2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT
VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE
PERMIT CARD IS POSTED ON THE JOB SITE.
3. Mechanical Desi�ns—Complete calculations,details and specifications are required for each
heating,ventilation,humidification-dehumidification,and air conditioning installation including
heat loss/heat gain calculation,design temperatures,equipment ratings and identification as to
type,manufacturer and model. Data shall be presented on form provided.
4. When any new construction or remodeling is involved,a separate building permit must be
obtained.
5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code
requirements.
6. All work must be inspected(rough-in and final). Call (952)249-4600.
(24-48 hour notice required)
7. House Heating Test Record must be submitted before final.
TYPE OF PERMIT
(Check All That A l )
x❑ Residential ❑ Commercial (Approval Required) [Backflow Device: ❑ AVB ❑ PVB]
❑ New ❑ Additional ❑ Repairs ❑ Replace
Job Site/Owner Information:
Site Address: �55 DICKEY LAKE DRIVE
Owner: TERRY ESAU Mailing Address: 755 DICKEY LAKE DR
Clty: ORONO Zjp; 55356
Home Phone: 952-457-4853 Alternate Phone: 952-457-4858
Contractor Information:
Contractor: CENTERPOINT ENERGY Contact Person: JOANN ZINKEN
Address: 6161 GOLDEN VALLEY RD, BLDG A State Bond #: MB003503
City: GOLDEN VALLEY Z�p; 55422 Expiration Date: osi2o�2o�s
Phone: 763-512-2765 Alternate Phone:
�X II1SUPaI1Ce—CUCC211t: Old Republic insurance Co.
yer i i i y
1 Policy#WLRCC48597075
Policy Period-01/01/2016-01/01/20�7
� .
MECHANICAL SYSTEMS BEING INSTALLED
Note: All Geothermal Systems will now require a Site Plan& Review by our Building Official.
IS THIS GEOTHERMAL? ❑ Yes � No
HEATING SYSTEMS
Quantity: 1
Make: Ruu�
MOde�: R95TA070-1317MSA
Fl1eI: NATURAL GAS
Flue Size:
Input BTUs: �o,000
�UtpUt BTUS: 66,500
CFM:
COOLING SYSTEMS
Quantity: �
Make: Ruu�
NfOde�: RA1630AJ1NB
7'Ol]S: 2 1/2
H.Power
FIREPLACES
❑ Gas Factory Fireplace Brand Name:
❑ Wood Burning Fireplace
❑ Wood Stove Model No.:
❑ Wood Stove with Flue/Masonry
VENTILATION
❑ No. Kitchen Exhaust duct recirculating cfm
❑ No. Bath Exhaust(must have duct outside) cfm
❑ No. Other Fans: Locations cfm
FUEL STORAGE (Must be approved by Fire Marshall if proposing to abandon tank in place.)
❑ Installation ❑ Removal
Fuel Oil: gallons ❑ Underground ❑ Inside ❑ Outside
LP Gas: gallons
Other:
GAS LINE ONLY
❑ Outdoor Grill ❑ Other/List What&Where:
2
PERMIT FEE CALCULATIONS
1. CONTRACT PRICE * is 1.25%of contract price with a(Minimum Fee of$50.00)
8200.00 x.0125 $ 102.50
(contract price) (minimum�50.00)
2. STATE SURCHARGE
8200.00 x .0005 $ 4.10
(contract price)
3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 2.00
4. T'OTAL PERMIT FEE(Add Lines 1-3 Above) $ 108.60
■ * CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the
permitted work including materials, labor, profit, and other fixed costs. It is the amount to be charged
to the customer for the work done. If any material,equipment,labor or installations are furnished by the
owner, tenant or any other party, the reasonable market value of such items must be added to the
estimated cost or contract price for permit fee purposes. In the event that there is a dispute on the amount
of the job cost, the City may request the submission of a signed copy of the actual contract.
MECHANICAL PERMIT APPLICATION AGREEMENT
The undersigned hereby applies to the City for issuance of a Mechanical Permit, agrees to do all
work in strict accordance with the ordinances of the City and the regulations of the State of
Minnesota, and certifies that all statements made on this application are complete,true and correct.
Applicant's Signature: �d,cQ�L�L �����e¢yL Date: 04/11/2016
3
��� 5e-�
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED ��c
PERMIT NO. �l%'lLn`(�2 3�� COMPLETED
ADDRESS � � � � i C IC.� �I � iL � �
OWNER TELEPHONE NO. ��'-3_S/Z��Z7�
CONTRACTOR C e n�C-r �f �C':�a"q "
� � � � �� J
� DESCRIPTION � I �a I � �� ��Q ��
l� ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SkAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q �FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
_ ❑ AS �IL -SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL
J MO- ITE ❑ S PTIC INSTALL
2 NERf�6NTFiACTOR TO M�U:�YES_NO
y MMENTS:
� �- .
a 1�U✓Yl � �' I• ' � `� ` �
o - ��C�� Vsrc� " ,de� vY�4rta •c���f�s -
� �'�rn Lj�t �'�i.s�., 4�r b r�li I 6Os/9
O
�
W
Q ��r� - �l�r«� r��r��a��—
�
z
� u/c�lL Co v����-�c -
� � ,�x r��� �t��
, -
W ❑WORK SATISFACTORY:PROCEED �[iOJECT COMPLEfE
� ❑COHRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
w
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑pHOTOTAKEN
INSPECTOR WILL REfURN
❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑INSPECTION REQUIRED_CALL TO ARRANGE ACCESS_
Cail for the next inspection 24 hours in advance. (g52) 249-46��
OwnerlContractor on site:
Inspector: �
White Copylinspector's Ffle Canary CopylSite Notice
. � CenterPoint,
Holicc� h��tln� tc�t rec���c� - � ; E'�'l3 Ener
gy
� �J �� ,,_ _ ,�_ _ � � . � � � ���6
�� �� � �:]Ty�F �I
Owner � �Cp Controls �{ (N, OR�C3�ersion
`� �
Address �S ,� � , Apt rhermostat.�� Neatplug UentSize p2 ��
City /' Ua/ve � � • Kind of liner/size �—
Heat loss Date htg. inst Y—�Y"l� Limit '�x Draft hood �'�.1 p Regulator
Soldbv CenterPoint Energy Limitsetting � Filters:Size/�2�c YNumber �
Installed bv CenterPoint Energy Fan setting l��.( Chimney loca[ions: (�l� �Outside
Electrical workbv CenterPoint Energy Pilottype ��iC✓� Chimneyconstruction �!� �
Heat type FA Q Space heater Piloi make --� Wiring .� Test tag �
Gas line by � Pilot model —_ Lighting InsT �6ate tested �(— ��'��
�_
Unitheater Other �_ Pilot timing CompanV testin Ce rPoint Ener
Gas design Pressure:Hi fire/Lo-fire � S Tester's name �,� �/�--��,�Z��
Make �N�� Model �g S��/7d Percent CO2 . �
Input CFH �� Percent 02 !�� �
Serial no.li(/.� 3 � S� 9� � 7 `_
� � ao, � _ � ��5
Input 70 �G d Stack temp�� Percent CO �p��
�
CNP 235(11-2008)