Loading...
HomeMy WebLinkAbout2015-01360 - deck attached + CITY OF ORONO * Z � 1 5 - 0 1 3 6 0 * , 2750 KELLEY PARKWAY DATE [SSUED: 12/10/2015 ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS : 2740 DEER RUN TR E p«1 : 04-117-23-13-0010 LEGAL DESC : N/A : LOT 003 BLOCK 001 PERMIT TYPE : ADDIT[ON/REMODEL/REPAIR PROPERTY TYPE : RESIDENTIAL COI�ISTRUCTION TYPE : DECK ATTACHED ACTIVITY : 434-RESIDENTIAL VALUATION : $ 9,822.00 NOTE: SEPARATE PERM[TS REQUIRED: ELECTRICAL(STATE) 2-DECKS N TE: PRI TO RELEASE OF ESCROW MONEY,A FINAL INSPECTION MUST BE COMPLETED AND APPROVED. INIT[AL: APPLICANT PERMIT FEE SCHEDULE 201.32 STATE SURCHARGE(VALUATION) 4.91 LANDSTYLE DESIGN&CONSTRUCTION TOTAL 206.23 110 RAILWAY ST W Payment(s) LORETTO, MN 55357- CHECK 27781 206.23 (763)479-1200 Minnesota State License#: BUIL-BC20388024 OWNER CONSTANT, KAREN & PETER 2740 DEER RUN TR E LONG LAKE, MN 55356- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. AII provisions of laws and ordinances goveming this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commen d wit �n 180 days of the date of issuance,or if construction is suspend�for a iod of 180 days at any time after work has commenced. The appl cant is e onsible for assuring all required inspections are requesCe,�in con a e with the State Building Code.This permit may be /���,� revokeai�any � due c � � i. C-� �� �����-- a � � .�.J� � �� ( , Appi' ant ermitee Signature Date Issued By Signature � Date � ' .. � � � City of Orono Building Permit Application �____�_ for New Structures or Addition �S�� 2; 5co `c�. �o�� Mailing Address: , � QA�. PO Box 66 Permit number. 2�t 5- �' I 3(�� / � `�0� Crystal Bay, MN 55323-0066 Date received: �b��l I � S 1 � �, '/I Street Address:' -; --- Received by: � y�y� � ��i\ � 2750 Kelley Parkway "���j� 0�3�P� �� � Plan review fee: �_� � � ' � � Orono, MN 55356 ___.__ �"��r��`` Main: 952-249-4600 Total Fee: Fax: 952-249-4616 .ti,nr,v�.' orono.mn.us This application form must be completed in full and ail required information must be submitted. Incomplete applications will be returned. (Please print) GENERAL tNFORMATIO�V: , JobSiteAddress: - � �-�(� ` - ��,I " ��y_ L �,� �'� ���' Will this be a Parade of Homes, Remodelers Showcase Home or oth Display Home? Yes No If yes,a specia/event permit is required with Police Department and City Council approva/60 days prior to the event. Shuttle bus service wil/be required un/ess applicant demonstrates su�cient on-site parking is availab/e. Non-permitted events will not be allowed. CONTRACTOR/APPLICANT INFORMATION: Name: �. C�(t t� � C`p I�S'�, State License# Q Expiration Date: Phone: cell - - office Mailing Address: LkJ Ci : r� ZIP: S 7 Contact Person: Applicant is: ontractor / Homeowner (Circle One) Email and/or Fax: hl�l I D�TT(���C-�h.L .�oM PROPERTY OWNER INFORMATION: Name: �P.�CIr �- kUr{,i'2 �.�,Yl� Phone (daY)� �iSZ -�'1�v-�t'3`L- Address: 274C� �7EF�- Kut.l TP-A(L 'F- . City: �tip�p ZIP� 55�(� Email and/or Fax ARCHITECT!ENGINEER INFORMATION: � �� I Name: LAf�(�t-Yl��. i�S�lati1- � C°ot�ST�, yp �M �-���p.i-�G20�F�aD?1-�' Phone(day): �l/„�,-�'La-�Z,pO Address: �_(Q_�,l�q� ��. �,J� City:(�o�(Tv ZIP: ��5� Email and/or Fax: _ �m�n�d,�t t�_� fGr-(•�o� PROJECT INFORMATION: Descri tion of ro�ect: l�-�� ' ���' 1.Type of Project 2.Proposed Use 3.Structure Type 4.Sewage Disposal& Water Supply ew Construction '�Single Family with Accessory Bldg./Garage Addition attached garage �Deck �Public Sewer ❑Accessory Building ❑ Single Family with Office/Commercial ❑ Relocation detached garage ❑ Residence ❑Other: (specify) �� S ❑Multiple Family/Condo ❑Retaining Wall(s) ❑ Public 4-feet or greater j�Public Water "'Any earth movement may require ❑ Commercial ❑Storage MCWD review 8�permits. ❑ Industrial ❑Warehouse , Minnehaha Creek Watershed District(MCWD) ❑Othef: (SpeCify) ❑Othef(SpeCify) 15320 Minnetonka Blvd Minnetonka,MN 55345 Phone: 952-471-0590 Fax: 952-471-0882 wv,�v.minnehahacreek or Estimated Construction Valuation (excluding land) $ � �,v(�� Packet Last Updated.� August 2015 Page 21 � STRUCT�IRE INFORMATION: 1.,Structure Dimensions 1.Structure Dimensions(continued) 2.Type of Construction a. Length(ft.)= � � Number of bedrooms= �Wood/Frame b.Width(ft.)= Number of garage stalls: ❑ Masonry ���'_. ' h Areas in sauare feet , � ,�n Attached= ❑ Metal � ❑Pole Bldg. .. � c. Basement= � J Detached= ❑ ICF d. 15'Story = ❑On-site Prefab e. 2nd Story= ❑Off-site Prefab f. '/z Story = ❑Other(please specify): g.Total Area= � �� REQUIRED SUBMITTALS: ��ParS p �� All of the information must be submitted in order for our a plication to be processed: ��'�° �°��y Not Enclosed A licable ❑ ❑ Buildin Permit Escrow A reement and Fees ❑ ❑ Plan Review Fee ❑ ❑ Com leted A lication Form ❑ ❑ Pro osed Buildin Plans—2 full size sets,to scale and 1 reduced 11 x 17 or 8'/2 x 1 set ❑ ❑ Minnesota State Ener Code Calculations and Mechanical Code Re uirement ❑ ❑ Surve —2 full size,to scale meetin ALL surve re uirements ❑ ❑ Hardcover Calculations ❑ ❑ Se tic S stem Certification ❑ ❑ Minnehaha Creek Watershed District(MCWD)Permit or Documerrtation from MCWD statin no ermit is re uired ❑ ❑ Landsca e Walls and/or Retainin Wall Plans ❑ ❑ Stormwater Pollution Prevention Plan SWPPP 0 ❑ Access Permit ❑ ❑ Data Privac Adviso Form APPLICANT/OWNER ACKNOWLEDGEMENT: • Agrees to provide all information required or requested by the Building Department; • Agrees to pay the City of Orono for engineering consultant review costs in excess of$500; • Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so,the staff has no alternative but to reject it until it is complete; • Acknowledges the Escrow Agreement is completed and signed; • Understands some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subjed of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If you refuse to supply the information, the application may not be issued. • Agrees that in the event that weather or other conditiona prevent the completion of an as-built survey at the time the Certiflcate of Occupancy is requested,a temporary Certificate of Occupancy may be issued upon receipt of a 510,000 escrow to ensure c pletion of the as-built survey and all site improvements. Applicant's Signature: i 'C�� - Date: / � �"� � � Owner's Signature: Date: � � Packet Last Updafed: August 2015 Page 22 �� • PLAN REVIEIAI Cl��CKLIS� FOR IVEW STRUCTI�RES / �,�QiT101�S �` Address: �i� � �,�� �T1'�,�,� � Permit No.: ��� - ��J��� Description of work: ���� Date Rec'd: I ���I' I�1 Septic review by: Date Approved: � a � . �� ,� � Zoning review by: n j �'"`� Date Approved: � Building review by: Date Approved: l� ,�/��J � Grading review by: N � Date Approved: �� Zoning District: - � Zoning File#: Reso#: Reso Date: Zoning: Lot area: SF/AC Width: Lot Coverage: SF % Survey Submitted: �es � No Date of Survey: ��• ��° �� Revised date(?): Landscape plan submitted? � Yes �No Landscaper: Proposed Setbacks: N�� `�'t' �""�' � �o � 3� Front(L e Rear(Str t) ( N S E W ) ( N �S�E W ) Other Buildings Wetland � Si� �ide Defined Height: Peak FEeight: FFE: FFE minus 6 feet = (Existing Contour; Perimeter(linear feet) = 50% = L.F. below grade Basement? � Yes 0 No, Stories FOR R,BUILDING WITH A BASEMENT OR CRA1nlL SPACE: FOR A BUILDING ON A SLAB FOUNDATION: , The distance between the lowest proposed Slab at or above grade— START WITH floor(of the basement or crawl space)and measure from hiphest existinq the highest point of the roof. rp ade to the highest point of the START WITH roof even if fill was bro ht in to elevate home. If you have a... SUBTRACTION • GABLE OR HIPPED ROOF(no Slab bel grade—measure (BASED ON windows): Sub t half the distance from ' est existing grade to the ROOF TYPE) between t ighest point of the roof hi st oint of the roof. to the point of the corresponding you have a... ga or hipped roof SUBTRACTION ' GABLE OR HIPPED ROOF ABLE OR HIPPED ROOF(with (BASED ON (no windows): Subtract half • � windows): Subtract half the distance ROOF TYP ) the distance between the between the top of the highest highest point of the roof to window and the highest point of the � the low point of the roof > corresponding gable or hipped roof � • ALL OTHER ROOF TYPES(flat, � • GABLE OR HIPPED ROOF f, mansard,etc):No subtraction. (with windows): Subtract TRACTION Subtract the distance between the half the distance between BASED ON basemenUcrawl space floor and the the top of the highest EXISTING highest existing grade adjacent to the window a�d the highest GRADES) foundation OR 10 feet(whichever is less). point of the roof • ALL OTHER ROOF TYPES (flat,mansard,etc):No E�UALS Defined building height subtraction. Defined building height E�UALS �o � � Updated: October 2015 z:\forms\plan review checklist 10-2015.docx 1`���°' ,,�c�' Shoreland District MCWD Permit � f � „ r�E* v Average Lakeshore Setback Bluff ,� Met? � / Permit Number: � Yes ❑ No N/A Q Yes 0 Yes jd No No / ❑ N/A- see attached Setback: `' Stormwater Quality Existing Preposed �' Overlay District Tier Hardcover Hardcover Variance Required CUP Required f circle one % and sf % and sf � Yes No 0 Yes No 1 2 3 4 5 .�.-�------��-- -� Type(s): Type(s): Fees to be Char ed YES NO Perm it 1/ Plan RevieHr State S�rcharge ' Investigation Fe� SAC-Nurrtber of SAG lJn6ts � Other(specify) ��` Square Foota e $ per Square Foota e Basement X - $ 1 S' Floor X = $ 2"d FIOo� X - $ e Garage X - $ �': � Z� ; Estimated Construction Value: � �r �--- Orono Inspections Required Work Requiring Separate Permits r: Footing ❑ Site ❑ Plumbing � Grading/Filling ❑ Poured Wall 0 Si►t Fence/Erasion Control ❑ Mechanical � Fire ❑ Foundation Survey ❑ Hardcover Removal 0 Septic ❑ Water Connection � 0 Foundation Waterproofing ❑ Other(specify) ❑ Fireplace ❑ Sewer Connection �$ �Framing � Masonry 0 Lawn Irrigation U Q Insulation � Mfg. ❑ Landscaping G;., � ❑ As-Built Survey 0 Other(specify) �` �Final �- 0 Lathe Required State Permits � Other(specify) � Well ❑ Electrical �, � � REMARKS (in-house): � � ,, � � a OFFICIAL REMARKS -TO BE NOTED ON PERMlT AND INITIALLED: �, ~'0..�eE�tter��ci�t�w�dgerr�ert#Fo►�� �� � t � ,�Pri�to release of escrow money ac�,a.srb�lt���a�d-hard6ou�a4�lat+e�s-m�s�-be-submi#ted-and a�proved. { F '��, -ef `�S„" R�+' f �E �•�'k���e���� � Ef�t` .k�l'*' �'�- ��t r�f€'ff ��,14" � f`— �A'��E,-�F;a kd�� a i t + Updated: October 2015 �•\fnrmc\nlan ravio�ni rharkliel 'I fl_9f11 F rinrv � Permit Application: Self-Checklist for Completeness Please note, the applicant must initial in the boxes below to acknowledge the minimum required information is included with the submittal. If not, the application will NOT be accepted. Call 952.249.4620 to schedule a meeting with staff if you have questions on application submittal requirements. � j� Completed Application � -% `�� C �j� Plan Revi w ee Paid . l� _,\ �i�� Signed E row Agreement & Escrow Payment� C��6�� �� k��� Building Plans (to scale) x2 �1�-�� 1�'� � � � �� Certificate of Survey (to scale) showing the proposed proje & � � meeting all requirements x2 ��� �� ';�� Hardcover Calculations (if applicable) I am aware that Orono will not issue a building permit without a ,� ) copy of MCWD permits (or documentation from the MCWD stating �� '�� the proposed project does not trigger their permitting requirements). I will contact the MCWD at 952-471-0590 regardin th' roject. Signed by: ��, r-��; Address: �� ���r �: �t� J1'��� f r. t� Permit #: ��1 5.- v � 3 l��� � Packet Last Updated: August 2015 Page 2 Roger Peitso From: Landstyle Design & Construction -Admin <admin@landstyledesign.com> Sent: Friday, December 11, 2015 1:25 PM To: Roger Peitso Cc: admin@landstyledesign.com Subject: Landstyle - Constant Project 2740 Deer Run Trail E. Roger, ZQ ��,�- G � � �P� V As per our conversation, you approved our use of diamond pier footings on hot tub deck and steps. Thank you for getting back to me. Bruce Wohlrabe Landstyle Design &Construction Ltd. 110 W. Railway St. Loretto, MN 55357 Ph: 763-479-1200 Fax: 763-479-6801 1 Christine Mattson From: Christine Mattson Sent: Thursday, November 05, 2015 4:19 PM To: 'admin@landstyledesign.com' Cc: 'Karen Constant'; Jeremy Barnhart Subject: 2740 Deer Run Trail E/#2015-01360 Attachments: letter.pdf; Ord 152.pdf; Survey Requirements-August 2015.pdf Ti m, Attached is a copy of the letter and enclosures being mailed tomorrow. If you have any questions, please don't hesitate to contact us. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway � Orono � MN � 55356 (physical address) PO Box 66 � Crystal Bay � MN � 55323-0066 (mailing addressJ S 952.249.4620 � 8 952.249.4616 � cmattson@ci.orono.mn.us : � www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm OUR OFFICE WILL BE CLOSED: Wednesday, November 11, 2015 1 �°�o CITY OF ORONO .1 a„ Street Address: Mailing Address: Telephone(952)249-4600 y�, Gti 2750 Kelley Parkway P.O.Box 66 Fax (952)249-4616 l,q F, Orono, MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us '�E S H O� November 5,2015 Tim Erickson Landstyle Design &Construction 110 Railway Street W Loretto, MN 55357 Re: Building Permit Application#2015-01360 2740 Deer Run Trail E Following up on October 30th letter, we recommend the following items be submitted or revised in order for your application to be considered complete and for the plan review to continue: 1. Certificate of Survey. Ordinance 152 (copy attached) allows projects that meet all of the items listed in 86- 68(b)(1)(a) to be exempted from submitting an initial survey; however, the 2003 survey submitted does not meet all of those exemption requirements,specifically item#2. In order to meet#2 the rear setback must be 75'from the property line. Please provide two copies of an updated,full size certificate of survey which meets all of the City's survey standards (enclosed) indicating the location of the proposed decks and stairs (and any proposed grading). 2. Landscape Plan. Will there be any changes to the landscaping with proposed project? If so, the City requires a landscape plan be submitted showing all the proposed exterior/landscaping improvements, i.e. patios, grading, sidewalks, retaining walls, etc. The plan should include the name of the individual perForming the work. 3. Wetlands. Based on our available information, it appears there is a wetland within the subject property. This wetland appears to be located within 150 feet of the proposed project. Because Orono City Code requires a 35-foot setback from any wetland for structures or hardcover,the location of the wetland must be indicated on the survey. Setbacks must be verified with wetland delineation information. Please have a wetland delineator perform a Leve11 delineation. A Level 1 delineation may be depicted via a map and/or aerial photo overlav onto the certificate of survey and does not require a site inspection. Please feel free to contact me at 952.249.4620 or by email at cmattson@ci.orono.mn.us if you have any questions on the above requirements. Sincerely, CITY OF ORONO C��hr� V�a�o�-- Christine Mattson Planning Assistant c Landstyle Design &Construction via email Karen Constant,via email Jeremy Barnhart, Community Development Director enclosures Christine Mattson From: Christine Mattson Sent: Friday, October 30, 2015 10:33 AM To: 'admin@landstyledesign.com' Subject: 2740 Deer Run Trail E/#2015-01360 Attachments: letter.pdf; 78-1605.pdf; Survey Requirements -August 2015.pdf; Ord 152.pdf Ti m, Attached is a copy of the letter and enclosures being mailed today. Please do not hesitate to contact us is you have any questions. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway � Orono � MN � 55356 (physical addressJ PO Box 66 � Crystal Bay � MN � 55323-0066 (mailing addressJ `l�' 952.249.4620 � 8 952.249.4616 !� cmattson@ci.orono.mn.us � www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm OUR OFFICE WILL BE CLOSED: Wednesday, November 11, 2015 1 �°�o � �� � w� 5 � � Street Addrf ,�1 (,N � 9-4600 y � 2750 Kelley ��� � � C.� 5 F � G Orono,MN ��� �;,, ' , is qKFSHo�� ��Iln � �,'�'Y i October 30, 2015 ���'V r ` �r��� �' rP n�I fiCI� �10Y�-1 � Tim Erickson � �` �� Landstyle Design &Construction � �� '` ��..• �-rJ- _ 110 Railway Street W Loretto, MN 55357 D�'��—• � ��� ,1� T ��.J Re: Building Permit Application#2015-01360 2740 Deer Run Trail East On October 21, 2015 the City received a building permit application for construction of two(2)decks. Staff conducted a preliminary review based on the information provided and recommends the following items be submitted or revised in order for your application to be considered complete and for the plan review to continue: 1. Wetlands. Based on our available information, it appears there is a wetland within the subject property. This wetland appears to be located within 150 feet of the proposed project and according to Orono City Code Section 78-1605(copy enclosed)a wetland delineation is required for projects within 150 feet of a wetland. A 35-foot setback is required from any delineated wetland edge for structures or hardcover. Contact a wetland delineator to conduct a wetland delineation. The delineation report must be submitted to the Minnehaha Creek Watershed District (MCWD) for their approval. Following the MCWD approval the location of the wetland edge and 35-foot setback must be shown on a survey. 2. Certificate of Survey. The copies of the survey submitted do not meet the City's survey requirements(see Ord. No 152, enclosed). Please provide two copies of an updated,full size certificate of survey which meets all of the City's survey standards (enclosed) indicating the location of the proposed decks;delineated wetland edge and 35-foot setback. Please note, our engineer has not reviewed the survey,so additional comments may be forthcoming. 3. Landscape Plan. Will there be any changes to the landscaping with the construction of the two decks? If so, the City requires a landscape plan be submitted showing all the proposed exterior/landscaping improvements, i.e. patios, grading, sidewalks, retaining walls, etc. The plan should include the name of the individual performing the work. The above information is required in order for the plan review to continue. Please feel free to contact me at 952.249.4620 or by email at cmottson@ci.orono.mn.us if you have any questions on the above requirements. Sincerely, CITY OF ORONO ��I�.J istine Mattson Planning Assistant c Tim Erickson via email Peter& Karen Constant; 2740 Deer Run Trail E; Long Lake, MN 55356 Roger Peitso, Building Official enclosures ' , t'T s' ..• ,, �__ _ ---- �I ' y _ ' -:. h , �` ,� r, } : � �� � I ,;a � � y.a � �' �� . z) �' c � � � � r�° 2� .... '�:-�. � �, .�� � � ,.� - �. � " . �r _ �q „� , � � ��, � a � i• ! A ' j ' _ . �� . N ,. >� . .. 1`�. , '♦O . �+ � �� o�: ,' ���� �r ���� �= ,;� � �►�';'�' . �� � �� .�;� ` ��� '� x�. A � � � " '"' s�^ �+1� � '� � . � a , '. � `«= t, ..;a" :° ';o�k s.� .,' � � " r � . . �..�. _ 'SF, G� . �� .s .:.:.. _ , ;�y;��� � �� '• � �kESHoc�� ,, �. -. :� � ' 4 � � .N,4' ��� v r,p �' � � . • . '•� :6 ��� � d � �•• y � � ., . �� ' .� by, � � +� b'l{' .��Y, �k ��1� M.L * �'�� 'Se-_ ;a�. � r �`�,� €. � ar Legend w Jt r ' � �' i. 3 ft J � �`. •�"" � "z "�' - ' �' � " M � � ' Railroad r* � ` ,� pi .'`+� � . .� . �4'# �.. `�.�:. " �y . a �. • } � � �� .r . ..<.r . �s �'� �� , ,- , ;, . '.;� �.� ,: � � � � � ��,� �, � ��� City Limits t r � �;, ` � � , , � �� �.�., `' �`, �► � � Parcels(6-1-2015) :.� 4� �- : ,�t'-. �. �� ti . '� ," � � ��`.�� '� �� .��`�� � .,,, ��5; �°+� Wetlands _ , . r , .�. �„� _ . ,� , � � , r `��„, a ' ' P so . ,�* - � ° reserve- ' . .f . �. - ��, � a ee -. * ,r * �`; ,: , i-t ____, . . , � �'' ''..", - ,w =�r'"� t" '��'�,� �a,� 3�.. � °�� �, � Manage 1-35' r�" ` � :.. __ � �`: �� � �, ` ���, ,�� * " ���' ,��s.;'�• � �:.s[ � �,,.� �� $-0'� �� r� . �:. . -� b . � Manage2-25' g _ � . ' :� 'C'.. ��L ±". ' _ � *��- ► .,� ��* � -.�� Mo,� � � Manage 3-16.5' , � .. .� � � * �� ,����,k'�.����`,. ' .� ❑ Unclassified � .e �� �� `'' '���- r°�• -;,,, � � .t� ��� � ,�� �,;�M ,Y� -��, ��,°� �' �„ ��, .,�+�,. Lakes&Ponds r ,_ . � '- •. ; � � � �,_" x � . �'4 w t n ' � - . .* " � �"� °`' Stormwater Quality Overlay C � . s 'S�� '�g .^, -i. „��y ' a, "rtl+7,.� � �;,,� �,� � .m,�.: � " �� .t a� . �'r.. � . Tie�1-25% � J� - rs ,w v�- ` �,�t { � �,� � a'�', e � �� ,� ���':��oP _ '"�� f .�� af d. . `�' #� "�� ,�kx�."�' m ,�y'" q� . '" � � ' ,1.'- � Tier2-30% 'lT —�.�� s il s �C "£- "��_ � ,�ti'��'�raa � , A , . � Y_ �, / 3�' af� .... .� �.�n�a ! s},�$ M _� +�� ;��£N '�ti�� ��1 Y��. � '� a��� � Tief3-35% � ' � ` �r�.. � � � '� �*-'� � 5.i, � . r g..,�µ � "� a„ . Tier 4-50% , � '��`�r ti�' -m� ��� � ��i��� s�.� . J��x ; � . Tier 5-85% +., ��..� � . ��� � �. � . ! y� 9 { �.. ib�'�! ; w -��,. � ,s�'� � .- "�"�,'� a �� � �!'°.y � Exempt �¢ �a� a,�, ; - �,aR� A,.�,.� 4+�,:���6 _ � � * � �,��i ��` ",'`���f ..y`�F Y� "^a.;. �# �`�3�'.. � �n �'�4'�' ah'' �� , � � � � �'�' fi °N� �'� � �,�,� S�' \ FL�''' � #�'� s. .`�y � .. ; �: � +�' er'�' < i ., . ,, +� �� . � < . r� , y� �s; �� . � r -,. # �.0 t,'a , ��s�"".'� � '."�` '.�.�as� ��. . «s �, � �"'� �te +- - .. e � , , ;: ��'~,` �� '- .� ,t� +:k+ zr fx � ��.. s�$ t z � �� ��,� � ' '"� >�� ��s`'n` ��}� �a � � � '�� ,� O� � ', ,� �.•�%�Gi - _ �; �",. �� ,. +„ `#,.........�..� � �. :� . � 4. �� ' '� � `Tf' Ak.a..'. �Ak , Pj,������'. .. . �. � , � Ji � �*-"� 4-;b :�� � .�! -��.�#�. ,y� �� 4� J'_ � .,_ . ,..• . '{ § .Q ti i.... 4 �7. 'S�� , , � � �� � ;� , � ,. r . ����' �: ,E , *� � . . � � � ; } .�� �^� � :ar F � •� � _�", Y ,� �� �,� �,�Y „� � � � , �. ,� 3 'Y � Y ��y b:^ ,5 y+��w � .. .,41.xi'J` �� �-��n,.?-"�'. � ' 4�� 1 $� +�^ •+(z:.- �� � ��, ' �� #� � : 2740 Deer Run AIn � � R� � Trail E ��� �.4 r i `.-.<, a,� +y*''. �� � {� � , '� �i r�, ' � w_ ��'.. � �; I Y � � �.i�} � «p dYy��..��p�y� �Fi..��.`^k. n�.. . �Z•��' DISC�dI111El: . .i�',.- . . ,. . -s . a n� .. _.__.__.. .. . _.. ._.—_ ' � - � This drawing is neither a legally recorded ma —.__. _ . . .._..._. .. . .. .__.. ._.� pnora urvey and is not intended ro be used as one.This drawing is a wmpilation of remrds,information,and data 0 132 Fe2t e lo urced in various ciry,county,and state offces,and other s affecting the area shown,and is m be used for �O Bolton&Menk,Inc-Web GIS 10/28/2015 11:52 AM fP`^n e purp�S�eV o�i f'rne ary of�o�o�o�s oot ndhla fnr r�hrr' nntainP�i �'`1'�M��i►'/�11'r'��.`*�- ,d:,�� "�:� s� � „�',�,: w� e � k '��� �o �.2f wac— 'sk �w ���rpr - n. l�Iyq. `._ ,�l. � a hm '� ���.�� �� '�3�� �' �#y � �v'��`� py.��g;� tv � t. ' ,i� �" E w ��� w � ,� � �'4 �3 , � - ' ..%r�.' ��• ��� :f .� ,.�'�. � . � ,. �°,''�. � � � f ��� � � . .�._. ..�_ .^��:� � �wd. �y'� .�., f�r,° � � '}�� 4°�yM`�., ' R,,-, �, '.�� ..ax"�' � ,_��X���76`f.ry"sa?�,�,. �„v�'`_,,wj � �- ., �., . . � ,. �,�4. �a�-� �� '�...w ' �� � ' � � _ �,.:�� .., h. . , , � ,� �.rf - . �_,��� , r'� �i:.� "y-� �td 'an �`a F� ;w �� �� ,��.� �Y�� �-. i�� _ '�9 �1 'F.• �`����� ♦ .z� . �. . .. y " � _-,�' .4..�r-' .� �� Wt 'f - ��. � ._ �A�q:. .. �JL i� , y w � f N.�r F{�. ��r � '�: .�A. �::�� �•^R , S .,.� . •' � i.e�. • _�—•_ '. .�+",�� � �� �� �� � � �,,�',�,�, — ,�, .�r�` +�+, I �f` ��e} �� ._�* , _ x: : . /'�` �x ' ., `� ����u � ��� � a _ � e �����.r, � ��` ,,.: C n`��r- � ; � s' , _ t � ''� `,;:�- J�� !�, $ �• r} �"� �' r' ; .;. . ° �.. , j ; i;; � i �� r �-i. -�. � �. , • � ,. � , � � _",�`;:r , ;� � - �„ �Y�i �: � Q 9 a ��� - ;� 4, C� .. . }�� ir:�Y d -� � ,+• . C . �I���� 'S' � "�� �. � _ e�'WW."n'Y.%� L �y,y`.� ^,. T~ � ". _ � L?y;.. N � ,�R� ��$Y �g� . .� - � ° � ,�. Ul �r .'$a „`ed„r' # �:. �,�- dl� � �p' p� $ y, �' (� . � � �s� t; °� , �'* � -. " � �t.5. , � � � � r , , - . � K � r� i _ . t � �-ti,"i� . . ` �-. '"" �' �7 r` ' " � . � -..� "�_ _ .- �§'�:,.�P . t_ , i _� � .� �+,�� � � ,f `Ff �' .;r�', rr � , . iw.Af, -. .+ . . � , � u. .. . �,�.�` �� -�:. _�rr: . v w � � ti , _ . . - . . ° #��'f�.�,., ' �: � . .4_ . ; „t. 2�+ � O � � , � � � ' ., . � � :� y :;.�:� „ �•�� �� , � W � `� � � � + r� •�' .y, ,,�` ,. . , •�_` �i!`�'_,. � L 8'',`` . " s*��a,� ms -=�--��� , ' � >� � �! - . *� ,.�,. y���; � � . �� � �'��''��: � �` *�''� LL t�_.: � �r �, _ � f C� ,�t� i � � _ ,'�i � `1 'f! '�1 i a°�i � � , ��, . � �: `� .'.- •� � , .� ..�:: .i �,� .. . � • � .. . . ,. ,., � • «. N � � � 3 w � � a z � � m � �5 c = i �o � j� � a � a E g ��n ,e o m � � W� Q � U � � � N � m '� N W� � t � a m M^ • � � O Q � � C Q� � � o ^ I� � + ,Q � � � ~ � 'v4i ii q e � d c � � � � �o m � �, � � � � 7 C � YO � i �zj 9q . ��77 y � Y 0 � .. .. U S � YI � V � " � � � C � � ` LL = 3 � i� � � 5 � a i Q � w � � � $ � '�'� `'�,$ � � ' ► • ; Orono, MN Code of Ordinances Page 1 of 2 Sec.78-1605.-Wetland buffer areas and setbacks. (a) This subsection establishes authority for wetland buffer areas around protected wetlands. Buffer areas are necessary and beneficial to maintain the health of wetlands. Buffer areas protect the edge of wetlands from erosion while filtering sediment,chemicals and other nutrients from runoff that drains into wetlands. Buffer areas can improve the biological diversity and health of a wetland environment while reducing the adverse impacts of human activities. (b) All wetlands within the City of Orono are within the Minnehaha Creek Watershed District(MCWD),which has rules and regulations for the establishment and maintenance of wetland buffers. In an effort to avoid overlapping or conflicting regulations,the city defers jurisdiction for the establishment and maintenance of wetland buffers to the Minnehaha Creek Watershed District. If application of MCWD buffer regulations is in conflict with city regulations,the more restrictive requirements shall apply. (c) In order to provide for a minimum level of wetland protection where Minnehaha Creek Watershed District buffer rules do not provide for adequate separation between wetlands and buildings or other structures or surfaces,the city shall require setbacks from the delineated edge of a protected wetland as follows: Minimum distance setback from delineated edge of wetland to any building(principal or accessory)or other structure, hardcover, septic systems or wells: Where no formal buffer exists and where MCWD 35 feet does not require a buffer Where a formal buffer exists or where MCWD 35 feet or established buffer width plus 10 feet, buffer is required whichever is greater Areas within the required setback area subject to filling,grading or excavation as part of a construction project shall be revegetated immediately upon completion of such earthwork.Setbacks must be verified with wetland delineation information.The determination of whether a Level 1 delineation or Level 2 delineation is required shall be at the discretion of the planning director. Level 2 delineation information shall be provided on a certified certificate of survey.The requirement for delineation shall be applied in cases where the wetland exists within 150 feet of the proposed project. (d) The City of Orono has established wetland protection strategies in the Orono Surface Water Management Plan(SWMP) Qanuary 2011).A protection classification has been assigned to each wetland in Orono based on the stormwater susceptibiliry and functional assessment for each wetland.The city has also established additional protection requirements for each classification.The four protection classifications are described as follows: I Protection Susceptibility Description Additional Protection Classification Rating Requirements (B = Bounce = Change in water level due to runoff event) (P = Phosphorus) "Preserve" Highly Highly susceptible to both B: Maintain bounce at or below Susceptible quantity and quality impacts from existing conditions runoff; have the highest degree P: Limit loadings to of protection predevelopment loading(0.14 Lbs/Ac/Yr) about:blank Orono, MN Code of Ordinances Page 2 of 2 "Manage 1" Moderately Moderately susceptible to B: Maintain bounce at or below Susceptible quantity and quality impacts; existing conditions plus 0.5 foot protection is less stringent than ' P: Limit loadings to Preserve, provides protection to predevelopment loadings times 2 maintain their characteristics (0.28 Lbs/Ac/Yr) "Manage 2" Slightly Less stringent protection than B: Maintain bounce at or below Susceptible Manage 1 wetlands; maintenance existing conditions plus 1.0 foot of characteristics is desirable P: Limit concentration to predevelopment concentrations (200 ppb) "Manage 3" Least Wetlands are significantly B: No quantity requirement Susceptible degraded (e.g., cultivated or P: Limit concentration to 225 ppb canary grass monotype) or lack of wetland characteristics; not typically impacted by runoff; no quantity and only limited quality treatment of runoff is required The protection classification for each wetland will be found on the"Wetland Management Classification Map&List" which is hereby adopted by reference,a copy of which shall be kept on file in the office of the city clerk and shall be available for public review during all normal office hours.The Minnehaha Creek Watershed District required buffer area widths are based on the four protection classifications. (Ord. No. 28 3rd series, § 1,8-22-2005; Ord. No. 103 3rd series,§2,5-28-2013) about:blank � RECEIVED ' nC� 2 � 2015 City of Orono �o�o Hardcover Calculation Workshee�iN oF oRorvo ��� _ Property Address: �I l / �%" � '���U �-���' �C c:c� ��i�-,�,�( r z.�s� �°''Lu �GC� l�l�. '�-,�����`�` Prepared by: � � Date���;�, 5 l�,'� �%�t��, �s l/l Stormwater Quality Overlay District Tier: (Circle one) Tier 1 Tier 2 Tier 3 Tier Tier Step 1: EXISTING HARDCOVER In the following table identify all items of existing hardcover on the property, keyed by letter to Certificate of Survey (survey must accompany this form). Use as many lines as necessary to accu�ately depict existing hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at the 75' setback line and calculate hardcover square footage separately for each portion. Key to Hardcover Item (Describe) Length x Width Total Surve S uare Feet (Example (Garage) (24'x 30') (720 S.F.) A �'.; r;,� , `f.3 c. S.F. B j�l�.. C� �3 � S.F. C - - �-v, 7c � S.F. D S.F. E S.F. F S.F. G S.F. H S.F. I S.F. J S.F. K S.F. L S.F. M S.F. N S.F. O S.F. P S.F. Q S.F. R S.F. � S.F. T S.F. � S.F. V S.F. W S.F. X S.F. Y S.F. Z S.F. 1 Total Existin Hardcover !3 � i. S.F. Excludable Hardcover See Ci Code Sec 78-1684 : S.F. S.F. S.F. S.F. S.F. 2 Total Excludable Hardcover S.F. 3 Net Existin Hardcover Subtract line 2 from line 1 S.F. 4 Total Lot Area v I ��� S.F. Existi�g Hardcover Percentage [(3)=(4)] �,� , �� �: % (Proposed Hardcover ne�page) Packet Last Updated: January 2015 This is an information packet regarding Hardcover. Every effort has been made to ensure the accuracy of the information contained herein;however,if any information is not consistent with provisions of the City Code,the Code provisions will prevail. Page 16 • � � ���EIVED ' City of Orono � �otio Hardcover Calculation Worksheet ��'� 2 � 2015 ' l\� Property Address: � -� �' � - � � �Y �F,�O ` ,� �� l�` -p.- ��� ; yu, r ,�� ti, � � �,. NO ,'4`;�;�,�� Prepared by: ��.�, �{ ���. �i Date: �� ' � i� n Stormwater Quality Overlay District Tier: (Circle one) Tier 1 Tier 2 Tier 3 Tier 4 Tier 5 Step 2: PRCIPOSED HARDCOVER In the following table, identify all items of proposed hardcover on the property, keyed by letter to Certificate of Survey (survey must,accompany this form). Include all existing hardcover items that are intended to remain, as well as all proposed harcicover items that will be added. Use as many lines as necessary to accurately depict proposed hardcover status of the F�roperty. For Tier 1 properties, identify any features by letter which are split at the 75' setback line and calculate haracover s uare foota e se aratel for each ortion. Key to Hardcover Item (Describe) Length x Width Total Surve S uare Feet F�cam le Gara e 24'x 30' 720 S.F. q �� i' � � S.F. B : -,. �. ` S.F. C S.F. D S.F. E S.F. F S.F. G S.F. H S.F. I S.F. J S.F. K S.F. � S.F. M S.F. N S.F. O S.F. P S.F. Q S.F. R S.F. S S.F. T S.F. � S.F. U S.F. W S.F. X S.F. Y S.F. Z S.F. 1 Total Proposed Hardcover ' yC S.F. Excludable Hardcover See Ci Code Sec 78-1684 : S.F. S.F. S.F. S.F. S.F. 2 Total Excl�adable Hardcover S.F. 3 Net Pro osed Hardcover Subtract line 2 from line 1 ' � �., S.F. 4 Total Lot E�rea � i h�� S.F. Proposed Hardcover Percentage [(3)i(4)] (�q ��'-, % Packet Last Upc�ated: January 2015 This is an information packet regarding Hardcove� Every effort has been made to ensure the accuracy of the information contained herein;however,if any information is not consistent with provisions of the City Code,the Code provisions wil!prevail. Page 17 � -^' � _ , ��� �...�-...�r.��-���"'�--+� i � � �2� , �F`':. � ;t> ,�� � a�,tis�:� c � :� � � ?s� � r �,r.^ ,� E.%na�� „', �y .r "r4� r��,1 � r� An Af �/ �' � �� Ivlb�3. I f':����.J . r e 5�, �;}��,, y".� �� �k�`�t��`•��� 7 J/LP f�YIr;J'�. �c3JIL.l i f . �;,,53�_�itw V ` �`�� �';'�� ,�, 6, ��� n�,sN. FiL�ti)���J���a1 '�'{ � u \ i,.��`� . r -� � t c �!!;�r� �c ��._ dr�'g qT L�AST O�t��A��D�:-�I�F��_� . �c�Gs���a��` � GUI�,��R�il.O��id S�GES 36 �\e�gS\e o'P , ����.F! �c�,�r0`�`��� `LS ha�dca�is �Stairvy�..�--,--�� ��P�r'n�'�.�^�S c���p ot µPN�9«ph�h�-11�� �2 d�a• --- r:��t�a"� t��,�- us OP��' '`3 'cutv�c��n ;a.�P'�`'�v� Go � �38 � ^ t�wa�1 the oG�'n�n9 ,,�o� �� � d.3� �_1�2 t ' e��t Pa$5�''._---� CN closet�5�wail oc P°s ' 1 n„_.,--� � Ret�c�er' OP�t oc �ON 0 t Z�� � �� � � 2���--��3t�� . • . • . 1 • emo To: Finance Department From: Christine Mattson, Planning Assistant �` `(�. � CC: Street File Date: March 16, 2016 G/L: 101-22205 Re: Escrow Refund Building Permit#2015-01360 pertaining to 2740 Deer Run Trail E is complete. Please refund $2,500 to the property owners, Peter 8� Karen Constant. The following is attached: • Original signed escrow agreement • Copy of cash register receipt showing escrow amount received Mail to: Peter& Karen Constant 2740 Deer Run Trail E Long Lake, MN 55356 w:�street files\deer run tr e�2740\escrow refund 2015-01360.docx � � BUILDING PERMIT ESCRO A REEMENT , Orono Building Permit# ��s--� ��3�o AGREEMENT made this � day of v� , 20���by and between the CITY OF ORONO, a Minnesota municipal corporation ("City")and_�6���� r�.�����— ("Owners�). Recitals 1. A building permit application has been filed for ���" � �'1� located at the ("Subject Property"), legally described as -- �f c� ��. � 'l:. ro,�.� M�l S`�3� 2. Owners request the City to review this application which requires City approval and may require consultant legal and/or engineering review. 3. The City will commence its review of the application and incur costs associated with said review only if the Owner establishes an escrow to ensure reimbursement to the City of its costs. NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS: 1, DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owners shall deposit$2,500 with the City. All accrued interest, if any, shall be paid to the City to reimburse the Ciry for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of$500, or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be responsible for under a building permit application. The escrow will also guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono Ciry Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property vr infrastructure that is caused by the work (including planning, engineering, or legal consultant review) associated with building permit #Zc�t S-D�"3�o if compliance with the approved building permit is not accomplished. 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the timeframe outlined in #3 above, shall issue a Stop Work Order until the Owners pay all expenses invoiced pursuant to#3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eiigible expenses the City has incurred. 5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shail be returned to the Owners when all requirements related to the project are complete. City Staff shall review the terms of this escrow agreement two times per year to determine whether the requirements of the project have been successfully completed and whether it is appropriate to return the funds. Owner may also request the release of the funds, and such funds shall be released upon City Staff receiving the appropriate verification that all requirements of the project have been successfully completed. 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow,the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn. Stat §§415.01 and 366.012. CITY: OF ORONO OWNER: By; � � � its: � .��.� - ���� lnternal Use Onty: �riginat to Finance Departmerrt �Copy to Street File Packet Last Updated: Auqust 2015 Page 23 • , � , �� �, �. ,t ��t �..�.P_."„'' `� 4§ -- a� * u � "vreto=: y � . " �.�� ` d^' � - 'k ,t }.. ' l � ..� 1 i'.'! � � i _ -� {��' � ��}� � �sl�y�.�i7fi+R Vt���.�,�a. ��8/ bk ��. L �j�-+�"`�Y���y*a �s.i �'�� � �/ �� ,�� Y��f �i3/'�+✓'� � �� tl8 � z -,�q���A:�3�i� ws.����. �� � �: �� ��� l*��:.�, �- r � ����� ���� ��; b� ���� r �'40 D�ER Rt?N�E:�' w°.. .��. � ,r,. �`a+rP. �� `1�`�3AOh1O MN °i.5356-9�58 ,x�� ��,,,f {+' �" ' L � ��"^ir ..r,,� - ," ' ,�... f,y�-- _ r S.Yr. .� R�.� . �.,,. .."' —, _ ., . . � h�y to tne �� ���{� �a .� � � ' C$E�er of ' ' ��...,,..�A� �I #` c�a,r ' - �.,F'� �_ ,�f y _ _. , ii� � ���� °1 YNeYsf�goBahdc#A - . .�.... ._....-_ - . �� 7 �� . p "` �"+�ta'o`a`e � ,¢r� "�':, �'��:;,' fo� "'������� """-�.-"`/ ���� � '! � i, City of Urono 2750 Kelley Parkway Urono MN 55356 952-249-4600 Receipt No: 3.014499 Oct 21, 2015 Peter & Karen Constant ', Planning and Zoning �', 2015-�01359 2740 Deer Run 2,500.00 Tr E 101-22205 Deferred Rev-Developer Deposit Total: 2,500.00 ------------- --------------- Check Check No: 5004 2,5�0.00 Payor: . Peter & Karen Cunstant Total Applied: 2,500.00 --------------- Change Tendered: .00 10/21/2015 C1:36PM � CITY OF ORONO * z 0 1 5 - 0 1 3 5 9 * 2750 KELLEY PARKWAY DATE ISSUED: 10/2U2015 ORONO, MN 55356- 952) 249-4600 FAX: (952 249-4616 ADDRESS : 2740 DEER RUN TR E PIN : 04-117-23-13-0010 LEGAL DESC : N/A : LOT 003 BLOCK 001 PERMIT TYPE : ESCROW FEE-TIED TO BUILDING PERMIT PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : ESCROW FEE-TIED TO BUILDING PERMIT NOTE: ESCROW TIED TO DECK PERMIT#2015-01360-PAID BY:PETER&KAREN CONSTANT-CK#5004-$2,500.00 APPLICANT ESCROW FEE-BUILDING 2,500.00 CONSTANT,KAREN&PETER TOTAL 2,500.00 2740 DEER RUN TR E Payment(s) CHECK 5004 2,500.00 LONG LAKE,MN 55356- OWNER CONSTANT, KAREN&PETER 2740 DEER RUN TR E LONG LAKE,MN 55356- AGREEME1vT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires sepazate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections aze requested in conformance with the State Buiiding Code.This permit may be r�)�� revoked at any time for due cause. � � �� � '� � ���a 1�5 � � ���.�-�� �� , 2� , rs Ap licant Permitee Signature Date Issued By Signa re Date Date Time Inspector Inspection Type Stat H Permit# Address Permit Type Property Type Construction Type . ......_............_�' -- —__._..�. _v _.�__ ..m._.__ �. _ . .e_ _..__ _..._ _....... _. _ _ __ _..___. _ �_.._ __.._._ _ ____. . k :4 �.l.. 4P a�� a� • � .. a i 4 . �1 51.� • • a�. • �: •� ♦ . � ' ` . •�. �12�3012015 12 00 AM METJ Framing P Y 2015-01360 2740 Deer Run Tr E Adddion 1 Remodel 1 Repair Residential Deck Attached —— _... __� �2/26f2016 '12 OD AM METD Final P Y 2015 01360 2740 Deer Run Tr E Addition f Remodel/Repair Resident�al Deck Attached ' _.._. _ __ i Christine Mattson From: Karen Constant <kpconstant@aol.com> Sent: Wednesday, March 16, 2016 12:56 PM To: Christine Mattson Cc: Peter Constant Subject: Re: Permit# 2015-01360 for 2740 Deer Run Trail Follow up request to see if check was processed and when we should be expecting it. Karen Constant >On Feb 26, 2016, at 12:34 PM, K Constant<kpconstant@aol.com>wrote: > >Christine., > >We had the final inspection by Orono today on our project for the deck and it was approved and signed. Please start the process to refund the $2500 escrow deposit to us. > >Thank you, > > Karen Constant > > >952-476-0132 home > >612-237-5303 cell 1 s� � � DA TIME CITY OF ORONO CALLED IN l� INSPECTION N TICE SCHEDULED /.?-3C�-�� /0:30 PERMIT NO. S� D PLETED ADDRESS � 7 � OWNER _ LEPHONE NO.S��a�7'-�7'7� CONTRACTOR I�u C � DESCRIPTION 3 ' ,� ' _ 4� �OOTING ❑ DEMO-FIN L ❑ SEPTIC FI AL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/G ADIN /FILLING Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE RE Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q��G ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑� INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP _ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL J ❑ DEMO-SITE ❑ SEPTIC INSTALL � OWNERICONTRACTOR TO MEETS�OU:_YES_NO v�i COMMENTS: / O /e✓ . � I,�P 7� a �D� ��i�.P���vi - ,d P 5 0 ,�,�.-s �'ar t�k o ,S c ��.�� ��s - oK �. � ° ��'� Wl.���' �6, A'�l� Gb�` ��o�l. '�- /�d!� Q �li h ,J��a� �fw� wl �a��s — O� � � Fi��s� i�a/lr..,�T, a=st .�� — z /� � /c<�TQT�w/y D� � j d W ❑WORKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE � �ORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY w V � 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE CWERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pHOTO TAKEN �NSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Cau forthe�t inspection 24 hours in advance. (952� 249-46�0 Ow IContractor on s te• r�e Inspec White Copyflnspector's File Canary CopylSfte Notice �- `� j G� ATE TIME�, CITY OF ORONO CALLED IN " � ' INSPECTION NOTICE SCHEDULED o?- � /�� PERMIT NO. �/��S'b�J�� COMPLETED ADDRESS a 7� ��7� J� L OWNER TELEPHONE NO. 9Sa- �7G'D/3�— CONTRACTOR � DESCRIPTION � ��� ly ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS � ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL _ J ❑ DEMO-SITE ❑ SEPTIC INSTALL 2 OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W a � ` O �. � O W � Q � 2 � W � W � � J d � ❑WORKSATISFACTORY:PROCEED PROJECTCOMPLETE W ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CALL FOR REtNSPECTION - TEMPORARY V BEFORECdVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pHOTO TAKEN INSPECTOR WILL REfURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 ho rs in advance. ��5 �t�49-460� � ;� , OwnerfContractor on site: � ' Inspector. ' White Copyilnspector's Flle Canary CopylSite Notice vL.l \ ! il IV/"� 1 L V1; .�v� ♦ � +— � • •..• • • - A A L � } � 1 OF LOT 3, . BLOCK � , CF YSTAL BAY PRESERVE � ,�,� o� � . HENNEPIN C�UN- Y, MINNESOTA a �� y �� � S 89°01 ' �5" E ' 471.99 N��-�``���°'� ......_..---.....- i� .. ... . 317.23 �� } .76 -o --------- --- .�500 _`�_ ` - -o--- 90.0 ..... �` 1 � �� ` 't`--���------------------ •-------------------------- --__---4^_:o.._- (9��5,�-- ------- ----- - -; . Z� I � � :.� . � s � ��� � � ��� :-,,e.� , � � , ,� �oPos� � � �\ �j� =�9 � DPoVEWAY 1 � � , \ \\ i ��' '•.�� \ � ` � l wb� � 91�� � � �� � ` \`� ` � � /� 9,�cy,°j '1� ��s � 6� t•p ; � ` N\� ` ` \ \ \� �y L. � .T $�� S°j' ...».............��........»1....... �, � � 1� � + �• � N�` �"� !r h1 �`�� � � � ��:`� � $00 � 1 t�' O�l .•. (9��3 �91k' � (974.2) -O';O j � . \ � ` � �0 . � cv g'�- t N � � \ cP � O :�'1. �3 r�i ,�` �/ I � OQ >•�; t ��.�� �` ss� W ��� ��� • ` \��O ' Q� .� 1 2� o'}'�� 991 _ � i ,,-� `. �88 � �` , � �oo �6���� s�� ,PROPOSED o,3 ` . � �` � 2 p� r�j;:' � ,. > �/�I,r� � „ i � -� �/�i �� � O Cb' f 61 tP� �yy`s ���St3 �•j ��� 1 �� �>`� �:�G ` "s� �,�� HOUSE �� .,���� �� ��' ' � � �\ � `;� s �5e � . �.� .�J .�;,, ,�� �, , �� .� 2� � o Eso a�) �y.o s �(�, � 1— `� y ' y . •• k ' ����� � O _ . _�, \ �' �p` �q �\ S, �� � k� !g (971,8 O :� " l�� � � \ �L � � 6'�o t� S,�,j,� ��� � / :���� t \ � \ £ ( SEPTIC �. . - � � �'��`� . , � `� ► � ��f0/'J HArCN�ED A�CF.cS • ` �O �� � � ��.'. �, � � �.'•: �.�,,J 9' 9 gN � / t�' `� �` � BLffF�it ��t/itC'T � ' 20 .�' .� � \ •�,�, '1L�9��, � f•. . • ' ` . � .. �'' •125- ,�.r. --"'� r ..9+ , � - 82o tJa•�r: �.c�vfw.rr � �o � gg° E :---• -"" .- ------ s DRAINAGE AND.t::•-� , � �� �� �\ /Hl�tCr p`+ � '..��. ..�� -".�_._._r,-�','-,p'� io �\ �'SA4o U'f�ITY EASEMENTS�:: s �o � � �IOO�YiO.✓AL A4F�E�( A�E� \`I�i,r,r�'� , r :1-- � / �na� 3M � � \ �•pO � t=. � �� �� E1'MT. D f!i c.r7E0 OuTli� ' � .At tu.!c � � �J � ` � � ♦ � Ot'dE4uiRF� 20�� 29oot,j- � � • 6(}.0 l �__�.sv,_�ttcs.�c�'------------------------------- ----- - ---------__ �:c�- . � � . ,!, N � �+ � n J \`` ''�� ',�i � � T �o ' — � � .," ♦ �� i S 'F -w � /r. 1 \ :I � ��� �� _ / " �a�t /�\� � �A \ 1 �` '�� � � / ' � � \ � ` ` �' � � � O��G � � �� � � i . - � � �� �- � ``� � \�� �NON-ORONO� � � � � =PTIC `. - _ . � .�� � :'os�� . '�-�— � � �''•• � i ._. � � � ' � - , � •' ..::' i ' , � � L �''••-.,_ i 1 '� � —.-�'._ N 89°01' �5" W 28 i.35................�- ► � ............ � � �O , ``� J��P� ���• � � ,,,- o�� �, - `-�- CITY OF Q���O .� S1TE �LAN � GRADING PLAN , ,•''� �o��'� ��; LEGAL DESCR 1 PT I ON OF PREM 1 SES : � ���,�;���r�, �w � �� -'"� Q�` ` ❑ Ai'r`r't��`J�� �1�'s��l R�Via{�NS `-�' �,� Lo t 3 , B i ock 1 , CRYSTAL BAY PRESERVE �o �� y�: ❑ ai�r'�u�'-. pc BY � � DATE� 3•25-03 �_____ a.�,, � _ o : denotes i ron marker �� `\' ' (gp8.3) : denotes ex i st i ng spot e 1 evat i on , mean sea I eve a um � b r ASSEMBLY D T kL SCAL Y 1/44 1'-fir- r l 2" X 6" SdS RAIL CAP 2" X 4" S4S HORIZ RAIL SPINDLE 2" X 4" 545 HORIZ. RAIL 5/4 PREMUM DECKING II �_ 1 ( 4"MAX. SPACING BETWEEN SPINDLES 4" MAX SPACING F BETWEEN DECK d t! I i i V X Ir FASCIA RAILING DETAIL (TYP.),N.T.S. LEDGER FLASHING 2" X 10" S.Y.P l • - JOIST ; • • ±. 2 - 318" . S' I, LAG BOLTS j WITH WASHERS K 16" O. C. .THANGERj LEDGER DETAIL (TYP.) N.T.S. r TI /r !4r code city of oro"o tance m r,` � gevtew I i I, � Four of these ner deck • .f Simpson DTT brackets Deck Tension Ties I -F i /_crx 611 17-1 IW Lateral -Load Connection no DECK CONSTRUCTION SPECIFICATIONS 12" x -Z, Frost Footings per Detail 6"x 6" Rough Sawn Cedar Posts on Metal Standoffs MAIN FRAME- Double Treated 2 x 10 S.Y.P. Rim on Complete Deck & Landings LEDGER BOARD- 2" x 10" Treated ledger attachment- ( 2 ) 3/8" x 5" Lag Bolts @ 16" O.C. attach and flash per detail HURRICANE CLIPS at all POST to RIM attachments JOISTS- 2." x 10" S.Y.P. Treated at 16" O.C. with Joist Hangers 5/4" x 6" Premium Cedar Decking to Main Frame and Stairs Closed Risers on Stairs with NO LARGER opening than 4" MAXIMUM FASCIA- 1" x 12" Rouqh Sawn Cedar to Main Frame and Stair Stringers RAILINGS- r 0� �l Grippable Handrail with FULL TURNBACKS Stairway Lighting Required 4 le� 12 i� _,w RECEIVED 0 oe-'14 OCT 212015 CITY OF ORONO Drawing Note: Although every attempt has been made to construct this drawing as true & accurate As possible, Some changes may be required during construction. Verify all Measurements on site. ;ISCLAIMER NOTICE Although every attempt shall be made to locate. and avoid ;t possible ;PRINKLER SYSTEMS and CABLE SYSTEMS, they are UNDETECTABLE to the naked eye. should they be UNCOVERED or DAMAGED during construction, the HOMEOWNER shall be responsible >r its REPAIR andlor its REPLACEMENT. A29)STYLEE Lao RAMWAY STREb-r wFST LORETCO, ALV S5357-oS61 OFFICE 763-479-r200 FAX 63-4;9-680} -NLN CONTILAL'rORS UC. • 2o388024 www.landsryledni�,c0m i ADDRESS: _ PHO,'NF„ nA7'E: lL-1�� PR>NTi • • SONO TUBE ~• OST CONCNETE 4a I ST VSTANDOFF •• CONC. GRADE •�, ANCHOR •a° r l 2" X 6" SdS RAIL CAP 2" X 4" S4S HORIZ RAIL SPINDLE 2" X 4" 545 HORIZ. RAIL 5/4 PREMUM DECKING II �_ 1 ( 4"MAX. SPACING BETWEEN SPINDLES 4" MAX SPACING F BETWEEN DECK d t! I i i V X Ir FASCIA RAILING DETAIL (TYP.),N.T.S. LEDGER FLASHING 2" X 10" S.Y.P l • - JOIST ; • • ±. 2 - 318" . S' I, LAG BOLTS j WITH WASHERS K 16" O. C. .THANGERj LEDGER DETAIL (TYP.) N.T.S. r TI /r !4r code city of oro"o tance m r,` � gevtew I i I, � Four of these ner deck • .f Simpson DTT brackets Deck Tension Ties I -F i /_crx 611 17-1 IW Lateral -Load Connection no DECK CONSTRUCTION SPECIFICATIONS 12" x -Z, Frost Footings per Detail 6"x 6" Rough Sawn Cedar Posts on Metal Standoffs MAIN FRAME- Double Treated 2 x 10 S.Y.P. Rim on Complete Deck & Landings LEDGER BOARD- 2" x 10" Treated ledger attachment- ( 2 ) 3/8" x 5" Lag Bolts @ 16" O.C. attach and flash per detail HURRICANE CLIPS at all POST to RIM attachments JOISTS- 2." x 10" S.Y.P. Treated at 16" O.C. with Joist Hangers 5/4" x 6" Premium Cedar Decking to Main Frame and Stairs Closed Risers on Stairs with NO LARGER opening than 4" MAXIMUM FASCIA- 1" x 12" Rouqh Sawn Cedar to Main Frame and Stair Stringers RAILINGS- r 0� �l Grippable Handrail with FULL TURNBACKS Stairway Lighting Required 4 le� 12 i� _,w RECEIVED 0 oe-'14 OCT 212015 CITY OF ORONO Drawing Note: Although every attempt has been made to construct this drawing as true & accurate As possible, Some changes may be required during construction. Verify all Measurements on site. ;ISCLAIMER NOTICE Although every attempt shall be made to locate. and avoid ;t possible ;PRINKLER SYSTEMS and CABLE SYSTEMS, they are UNDETECTABLE to the naked eye. should they be UNCOVERED or DAMAGED during construction, the HOMEOWNER shall be responsible >r its REPAIR andlor its REPLACEMENT. A29)STYLEE Lao RAMWAY STREb-r wFST LORETCO, ALV S5357-oS61 OFFICE 763-479-r200 FAX 63-4;9-680} -NLN CONTILAL'rORS UC. • 2o388024 www.landsryledni�,c0m i ADDRESS: _ PHO,'NF„ nA7'E: lL-1�� PR>NTi • • SONO TUBE ~• CONCNETE 4a I •• O• I FOOTING (TYP.) N.T.S. r l 2" X 6" SdS RAIL CAP 2" X 4" S4S HORIZ RAIL SPINDLE 2" X 4" 545 HORIZ. RAIL 5/4 PREMUM DECKING II �_ 1 ( 4"MAX. SPACING BETWEEN SPINDLES 4" MAX SPACING F BETWEEN DECK d t! I i i V X Ir FASCIA RAILING DETAIL (TYP.),N.T.S. LEDGER FLASHING 2" X 10" S.Y.P l • - JOIST ; • • ±. 2 - 318" . S' I, LAG BOLTS j WITH WASHERS K 16" O. C. .THANGERj LEDGER DETAIL (TYP.) N.T.S. r TI /r !4r code city of oro"o tance m r,` � gevtew I i I, � Four of these ner deck • .f Simpson DTT brackets Deck Tension Ties I -F i /_crx 611 17-1 IW Lateral -Load Connection no DECK CONSTRUCTION SPECIFICATIONS 12" x -Z, Frost Footings per Detail 6"x 6" Rough Sawn Cedar Posts on Metal Standoffs MAIN FRAME- Double Treated 2 x 10 S.Y.P. Rim on Complete Deck & Landings LEDGER BOARD- 2" x 10" Treated ledger attachment- ( 2 ) 3/8" x 5" Lag Bolts @ 16" O.C. attach and flash per detail HURRICANE CLIPS at all POST to RIM attachments JOISTS- 2." x 10" S.Y.P. Treated at 16" O.C. with Joist Hangers 5/4" x 6" Premium Cedar Decking to Main Frame and Stairs Closed Risers on Stairs with NO LARGER opening than 4" MAXIMUM FASCIA- 1" x 12" Rouqh Sawn Cedar to Main Frame and Stair Stringers RAILINGS- r 0� �l Grippable Handrail with FULL TURNBACKS Stairway Lighting Required 4 le� 12 i� _,w RECEIVED 0 oe-'14 OCT 212015 CITY OF ORONO Drawing Note: Although every attempt has been made to construct this drawing as true & accurate As possible, Some changes may be required during construction. Verify all Measurements on site. ;ISCLAIMER NOTICE Although every attempt shall be made to locate. and avoid ;t possible ;PRINKLER SYSTEMS and CABLE SYSTEMS, they are UNDETECTABLE to the naked eye. should they be UNCOVERED or DAMAGED during construction, the HOMEOWNER shall be responsible >r its REPAIR andlor its REPLACEMENT. A29)STYLEE Lao RAMWAY STREb-r wFST LORETCO, ALV S5357-oS61 OFFICE 763-479-r200 FAX 63-4;9-680} -NLN CONTILAL'rORS UC. • 2o388024 www.landsryledni�,c0m i ADDRESS: _ PHO,'NF„ nA7'E: lL-1�� PR>NTi