HomeMy WebLinkAbout2015-00077 - new structure t � CITY OF ORONO * z 0 1 5 - 0 0 0 � � *
� 2750 KELLEY PARKWAY DATE ISSUED: 03/06/2015
ORONO, MN 55356-
(952 249-4600 FAX: 952 249-4616
ADDRESS : 790 BROWN RD N
PIN : 34-118-23-11-0003
LEGAL DESC : REG. LAND SURVEY NO. 1275
: LOT 000 BLOCK 000
PERMIT TYPE : NEW STRUCTURE
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : SINGLE FAMILY
ACTNITY : 101-SINGLE FAMILY HOUSES, DETACHED
VALUATIOI�1 : $ 483,665.04
NOTE: SEPARATE PERMITS REQiJ[RED:PLUMBING, MF,CI�IANICAL, F[REPLACE,GRADING, SEWER CONNFCTION, LAWN
IRRIGATION,LANDSCAPING,
WELL(STATE),ELECTRICAL(S"I'ATE)
NO'CE: PRIOR TO THE START OF FRAMING AN AS-BUILT FOU��$�T�SURVEY MUST BE SUE3MITTED AND APPROVED BY THE
CITY OR A STOP WORK ORDER WILL BE[SSUED: INITIAL: ,7 ��
NOTE: PRIOR"I'O ISSUANCE OF A OCCUPANCY AN AS-BUILT SURVEY IS REQUIRED TO BE SUBMITTED AND
APPROVED BY STAFF. INITIAL:
NOTF,: IN THE EVENT OF W[NTER COND[Z'[ONS OR OTHER UNFAVORABLE WEAT ER CONDITIONS(WHICH PREVENT THE
COMPLETION OF THE EXTERIOR IMPROVEMENTS AND/OR AN nS-BUIL"C SU ) ORARY CERTIFICATE OF OCCUPANCY
(TCO)MAY BE NECESSARY. A TCO REQUIRES A$1Q000 ESCROW. INITIAL:
NOTE: A MCWD APPROVED WETLAND DELINEATION AND AN EXECUTED MCWD WETLAND BUFPER DECLARATION ARE
APPLICANT PERMIT FEE SCHEDULE 3,528.79
PLAN REVIEW 466.83
GONYEA HOMES STATE SURCHARGE(VALUATION) 241.83
6102 OLSON MEMORIAL HIGHWAY
GOLDEN VALLEY, MN 55427- S.A.C. 2,485.00
(612)741-9069 TOTAL 6,722.45
Minnesota State License#: BUIL-2459 Payment(s)
CHECK 15287 4,237.45
CHECK 15289 2,485.00
OWNER
Gonyea Homes
6102 OLSON MEMOR[AL HWY
GOLDEN VALLEY, MN 55427-
AGREEMEIVT AND SWORN STATEMENT
The work for which[his permit is issued shall be performed according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for only the work described and does
not grant permission for additional or related work which requires separate
permits. AIl provisions of laws and ordinances goveming this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time afrer work has commenced.
The applican[is responsible for assuring all required inspections aze �n //�
requested in conformance with the State Building Code.This y bc �� �
revoked at any time for due cau
a--
� �/ � / l
A ca ermitee Signature Date Issued By Signa ure Date
r ,
City of Orono
Building Permit Application
for New Structures or Addi�ions
Mailing Address:
Q PO Box 66 Permit number: Z C'�� � ��'�- 7 7
� �Q Crystal Bay, MN 55323-0066 Date received: � � z� ��
StreetAddress:' __ Received b__y:_____ ���'lC
y� ,� 2750 Kelley Parkw �r�f � Plan review fee: / t� : �
c,` Orono, MN 55356 � � ��6� ��
`�'FESHO�� Main: 952-259-4600 Total Fee: � ��Z, �
Fax: 952-249-4616 w�n�w.c,i.orono.mn.us
This application form must be completed in full and all required information must be submitted.
Incomplete applications will be returned. (Please print)
GENERAL INFORMATION: ,� , ,,
Job Site Address: ('`(�'•% �>r'c�'��.' ,� ���t�'
Will this be a Parade of Homes, Remodelers Showcase Home or other Display Home? ❑ Yes ❑ No
If yes, a special event permit is required with Police Department and City Council approval 60 days prior to the event. Shuttle bus service will be
required unless applicant demonstrates sufficient on-site parking is available. Non-permitted events will not be allowed.
CONTRACTOR I APPLICANT INFORMATION:
Name: G C��-��t �F��v✓�t' S
State License # �2 l�j�� Expiration Date:
Phone: (cell) �, 1�.-7�(�- ���,�j (office)
Mailing Address: (c+/��-- �-}lSon �1�,.� . Yvy City: �i� �o�n I/' wyZIP:
Contact Person: �f��� � Applicant is: �rrtractor,� Homeowner (CircleOne)
Email and/or Fax: ��t1,�,,,,1�, q�,,,�u,�� {�;,,,,,t�-s : (vvn
PROPERTY OWNER I�FORMATION:
Name: �-'��1y�.c, �-��.M� l
Phone (day): �
Address: City: ZIP:
Email and/or Fax
ARCHITECT I ENGINEER INFORMATION:
Name:
Phone (day):
Address: City: ZIP:
Email and/or Fax:
PROJECT INFORMATION: Description of project:
1.Type of Project 2. Proposed Use 3. Structure Type 4. Sewage Disposal &
-� ter Supply
ew Construction Single Family with ❑ Accessory Bldg./Garage
❑Addition attached garage ❑ Deck Public Sewer
❑Accessory Building ❑ Single Family with ❑ Office/Commercial
❑ Relocation detached garage ❑ Residence ❑ P � ate Sewer
❑ Other: (specify) ❑ Multiple Family/Condo ❑ Retaining Wall(s)
❑ Public 4-feet or greater Public Water
**Any earth movement may require ❑ Commercial ❑ Storage
MCWD review 8�permits. ❑ Industrial ❑Warehouse ❑ Private Well
Minnehaha Creek Watershed District(MCWD) ❑ Other: (specify) ❑ Other(specify)
15320 Minnetonka Blvd
Minnetonka, MN 55345
Phone: 952-471-0590
Fax: 952-471-0682
www.minnehahacreek.or
�. 'Z��--
rstimated Construction Valuation (excluding land) $ ��- �C) G��� �
jcket Last Updated: January 2015
Page 20
h 1
STRUCTURE INFORMATION:
1. Structure Dimensions 1. Structure Dimensions(continued) 2. Type of Construction
a. Length (ft.)= �_��' � Number of bedrooms= -S ood/Frame
�
b.Width(ft.)= �� Number of garage stalls: ❑ Masonry
Areas in spuare feet Attached = � ❑ Metal
t ❑ Pole Bldg.
c. Basement= t �� Detached = ❑ ICF
d. 15t Story = �(� ❑ On-site Prefab
e. 2"d StOry= I�� ❑ Off-site Prefab
f. 'h Story = ❑ Other(please specify):
g.Total Area= � �
REQUIRED SUBMITTALS:
All of the information must be submitted in order for your application to be processed:
Not
Enclosed Applicable
❑ ❑ Buildin Permit Escrow A reement and Fees
�' ❑ Plan Review Fee
❑ Com leted A lication Form
�' ❑ Pro osed Buildin Plans—2 full size sets,to scale and 1 reduced 11 x 17 or 8 Yz x 11 set
C�/ ❑ Minnesota State Ener Code Calculations and Mechanical Code Re uirements
q/ ❑ Surve —2 full size,to scale meetin ALL surve requirements
F�' ❑ Hardcover Calculations
❑ Se tic S stem Certification
❑ ❑ Minnehaha Creek Watershed District(MCWD)Permit or
Documentation form MCWD statin no ermit is re uired
❑ �/ Landsca e Walls and/or Retainin Wall Plans
❑ ❑ Stormwater Pollution Prevention Plan SWPPP
❑ ❑ Access Permit
E�I' ❑ Data Privac Adviso Form
APPLICANT/OWNER ACKNOWLEDGEMENT:
. Agrees to provide all information required or requested by the Building Department;
• Agrees to pay the City of Orono for engineering consultant review costs in excess of$500;
• Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they
are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative
but to reject it until it is complete;
. Acknowledges the Escrow Agreement is completed and signed;
• Understands some or all of the information that you are asked to provide on this application is classified by State law as either
private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject
of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our
purpose and intended use of this information is to annually update our records and records of other governmental agencies
required by law. If you refuse to supply the information, the application may not be issued.
. Agrees that in the event that weather or other conditions prevent the completion of an as-built survey at the time the
Certificate of Occupancy is requested, a temporary Certificate of Occupancy may be issued upon receipt of a $10,000
escrow to ensure completion of the as-built survey and all site improvements.
ApplicanYs Signature: ^ � � Date: I � � �
�� :
�
Owner's Signature: `7'�- ^^ Date: � � � � S
Packet Last Updated: January 2015
Page 21
�
�� , . P��4[� I��VIEW �HECKLtST FO� ��V11 STREJCTURES / ADDITI�f��
� � �c� "�ro��- � � p�
�� Adciress: Permit hlo.: �C� 'ovt��7
�� Description of�neork: ' � � � � Date R ' � ' �.�
ec d: ��
�
Septic review by: V ' Date Approved:
Zoning review by: '�` � Date Approveci: 2• �cr'J ' �
��
Building review by: - :�, �a �:���F�c.�-. Date Approved: � � Z`�" - Z.ols
� Z.
Grading review by: - Date Approved: �/� �ff
�, Zonin District: �'(1�' Zonin File# f����`��� � f 1�^
� 9 g Reso#:�� � Reso Date:
Zoning: Lot Area: �o�r �/AC�'R� Width:��� Lot Coverage '����,� �'���,��_SF ����t� %
� ���`�';�`�
�ur-vey Submitted: �`Yes ❑ No Date of Survey: _ Revised date( )�
i; Proposed Setbacks: `��Y� �9� �{ �� ��
0' '
F�(Lake) �(Street� ( H S E V11� ( N S E F� Other Buildings Wetland
Side Side
_�
Defined Height: ����� ;�� Peak Height: FFE:�°'���� FFE minus 6 feet� ��'�r o� (Existing Contour
,e. �,-. �
Perimeter(linear feet) _ � � �� 50% = �� �°`�� � � ����� L.F. below grade #of Stories
�FOR A BUILDING WITH A BASENiENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATION:
� The distance between the lowest proposed The distance between the top of
START WITH floor(of the basement or crawt space)and START WITH slab and the highest point of the
�� � the highest point of the roof. roof.
If you have a... If you have a...
GABLE OR HIPPED ROOF
' / `,��� • GABLE OR HIPPED ROOF(no • (no windows): Subtract half
� �� windows): Subtract half the distance the distance between the
`, between the hi ghest point of the roof highest point of the roof to
to the low point of the corresponding
SUBTRACTION gable or hipped roof the low point of the
corresponding gabte or
�� (BASED ON . GABLE OR HIPPED ROOF(with SUBTRACTION hipped roof
ROOF TYPE) windows): Subtract half the distance (BASED ON . GABLE OR HIPPED ROOF
�j, between the top of the highest ROOF TYPE) (with windows): Subtract
window and the highest point of the half the distance between
roof the top of the highest
• ALL OTHER ROOF TYPES(flat, window and the highest
mansard,etc):No subtraction. point of the roof
�.l'� • ALL OTHER ROOF TYPES
�,���;'f: SUBTRACTION Subtract the distance between the (flat,mansard,etc):No
� (BASED ON basemenUcrawl space floor and the subtraction.
EXISTING highest existing grade adjacent to the ADDITION Add the distance between the top
GR,4DES) foundation OR 10 feet(whichever is less). (BASED ON of slab and the highest existing
EQUALS Defined building height EXISTING grade adjacent to the foundation.
2�E���� GRADES
EQUALS Defined building height
' y �� � ��` � e-�
Shorelanci District [NCWD Permit Avera�e �akeshore Setback g�uff
Met?
�Yes 0 No Permit Number: I .� ` � Yes � No � N/A 0 Yes �~J�No
� N/A—see attached ���G�. �' f " �=..� .;.='-�j Setback:
Stormwater Quality Proposed
Overla District Existing Hardcover
Y o Hardcaver Variance Required CUP Required
Tier circle one ��o and sfl %and s � �
1� 2 3 4 5 ���� �� ,' Yes Q No � Yes � No
� Type s: Type(s):
�°•!�� f;��',. - r f( ���; ,����, �
Updated: January 2015 �"�, � �� � � f�� _
z:\forms\plan review checklist 2015.docx � � , '�; � '"_
��".I�' .�_`i� �j`� ,
!- ' ��
i
;_
REICAARFCS (in-house):
Fees to be Char ed YES NO
Permit ✓
Plan Review �
State Surcharge �
Investigation Fee
SAC-Number of SAC Units �,
Other(specify)
S uare Foota e $ er Sc�uare Foota e
Basement pZ/ X �i�,l (o = $ I i °I I bb 2.`�
1S�Floor /`f i 10 X `?S�.I(o - $ ► 3`� ��`C.Sb
2"dFloo� 1Cf � 3 X ��.��0 - $ � ��� � �.2�
Garage j� X �, t�I - $ .3� �gZ•5 �
Estimated Construction Value: � 3� 6 6S�d`�
' Orono Inspections Required Work Requiring Separate Permits Required State �ermits
Q Site ,� Plumbing Q Grading / Filling ell
� Silt Fence/ Erosion Control � Mechanical � Fire Electrical
� Hardcover Removal � Septic 0 Water Connection
,� Footing �'Fireplace ,�Sewer Connection
�'Poured Wall � Masonry � awn Irrigation
�" Foundation Survey � Mfg. �andscaping
� Foundation Waterproofing ❑ Other(specify)
f �' Radon Rock Bed
� Framing
� lnsulation
� As-Built Survey
�'Final
0 Other(specify)
REMARKS (in-house):
Other f2eview: Revieweed by: Date Approved:
"� Access: Existing: ❑ YES ❑ NO New: 0 YES 0 NO
OFFICIAL REMARKS -TO BE NOTED ON PERNiIT �4,ND INITIALLED
� �- �C.�l� �@� 1�d�,�rt0� r�eO��iUI�� 4- C�c� i1�tC.W
� �o� a i , �tc� �, e �i�1 n�
i � n rr h i �C�� e� ��
� U,tt�'r�� �e� � ��is��! ._.-- ���fia/
� a�� �� �a C ;
Updated: January 2015 � { } ( fj �'f� P �
z:\forms\plan review checklist 2015.docx {S� , I(����^��°� ��'l�'t/L� � ���j'�/�,
f j�f�_ * ,
� rr
��L�� '�=� �(P�/'� t� E `� ,
�'
U ' r.
� � �
Permit Application: Self-Checklist for Completeness
Please note, the applicant must initial in the boxes below to acknowledge the minimum required
information is included with the submittal. If not, the application will NOT be accepted. Call
952.249.4620 to schedule a meeting with staff if you have questions on application submittal
requirements.
`� ��= Completed Application
I:�_ Plan Review Fee Paid
t: +
� `_' Signed Escrow Agreement & Escrow Payment
i,�
Building Plans (to scale) x2
�_. �
, ; Certificate of Survey (to scale) showing the proposed project &
`%�`�" meeting all requirements x2
; 4_.. Hardcover Calculations (if applicable)
I am aware that Orono will not issue a building permit without a
copy of MCWD permits (or documentation from the MCWD stating
�' ' ' the proposed project does not trigger their permitting
i t _
� �"
requirements). I will contact the MCWD at 952-471-0590
regarding this project.
�, � � _____--_. ___
Signed by: l�
_�,
Address: 7 I� ��r. �� .1 1'�.:_ � c� � c��� ���: �� �-
Permit #:
1:1!-Yy:I�H:f'I�{�'��<�I�I�C�]:i��7:1a�N�N�s111PIrle��I�ZK�,L��/�t1��F.Y0�l�1R�11R�yXKll:llr'l��a\r�l.i�.'�'5�7�:i_G3:{7�1:�e1�{�\1�[.
j/�j �r�/r, i/,i _., .. �`� ��\ �:� o��\�; ii; r�.�i ,.,.. ;,._ , pS�\ \�� ����\\ ����: r'�o
/ , , ;., . �\ �\� :�\\\� i;< ' BRIDCaEWATER BANK - �� �°� �O� ��� �..; � �G O�
j � VONYEA NOMES��NC..� �\ \ \ ; ,;yyWW.BRIDGEWATERBANKMN:COM �\\\ \� \�;��
� 'ri%�i%%i ,i%;:6102 OLSON MEAA(�RIAL'Hl�H1,!��°Y�� �\�� i,%�; i//� jiiz '//j% i/�/,� �\. \\� ���
� o�������� ? GOLDEN VALCEY;`:MN. 55`42� \� \\O� //�� ,//i�,,;/, ,///i ..//,,/, ..o:, �,.�:.
3/5/209 5
%/:'�' /� /. �i�// �i"�//i �� \\\ \��\� �\ �\\\�.
j ,.,, ,.,.. ////. // /'� \ � \\���\ \ �\\ �
���PAY TO T,NE �jj j�/ /��� \�� c\� � \ � \�
� �� . // ,�% \��� �\ �� \� \\
% ORDER OF'°' ,i�1��(Of Of0Il0 ����� �� „�.� ���� '\��\\ $ +�*
4,237.45
*.*.**t**x**�.********««****.*�*�«..****.*******..**.**.*�**.***
Four Thousand Two Hundred Thirty Seven and 45/100 � DOLLARS
�/ � i/�� � � �
� ��/ /�� \ \
% %/� /� ^ �� �� ^�� ��� � \\:
"//� �i/� lv� Of Orono \����\ \ ��\�\ \\ �\ �\\ . .
� �'//',%/,% � \\� \\��\\ \ ��\�
� ��/%/ F�BOX 66 �� � �
Crystal Bay, MN 55323 I
jn�/� //��%%iis, ��� ��j/r% .� ;��� \,:... \\����\ \�..����\ou..: =�ptSENs�rm ..
� //// j/� j �/ i�,�� . :��`�\\ �
/ ��%� � � � �
�. �MU � j � / E
'� %r %���„i �i �
i, /�i,%
GONYEA HOMEs 15287
City Of Oroi 3/5/2015
Date Typ� � Due Discount Payment
3/5/2015 Bill �7.45 4,237.45
!— Check Amount 4,237.45
Receipt No: t.u31[1� Mar 6, 2015
Gonyea Homes
Previous Balance: .00
Permits
��" " 2015-00077 790 Brown Rd N 3,528.79 !
, Permits �
2015-00077 790 Brown Rd N 466.83 � ,
(Differ�ence) '
� Permits � �
� 2015-00077 790 Brown Rd N 241.83 � 4,237.�5
�� Permits �
2015-00077 790 Brown Rd N 2,485.00 �
Total: 6,722.45
---------------
Check
Check No: 15287 4,237.45
Check
Check No: 15289 2,485.00
---------------
Total Paid: 6,722.45
Total Applied: 6,722.45
--------------
Change Tendered: .00
---------------
Duplicate Copy '
03/06/2015 11:28AM
- - - - .- . - - .- .
�� ,i ?/�� � ,,,:,, � �� ' � // �� . _ _ �\\ �\` �
GONYEA 'HOMES INC \ �\ �WWW.gRI GCE A ERBANKMN.COM \�\ � �\\\\\ \������
� � � � 6T02 QL50N MEMQRIAL NIGHWAY � �\� //�', \��� \`.\ \ �� ���'
%%" ���i;°:;�� ��y, G(3LbEN VALLEY,`.MN. 55422 � \�. . �j ';;.:ii'�' ,;,✓ ' ;i'' �\�� \\\ � \�\\\
3/5/2015
/;, ;.;;,,. ��\ \�� \���\` �` ��� \
s i- PAY 70 THE �O \ \ \� \\`
ii% � � � � � � �
; ORDER OF CI Of Of0110 ��\� ���\ \ ���\ $ **
tY 11,250.00
x�***w+r****r**,r*,t+,t****,t*****,r****,t*rr**,t*,t r+r,r�*,+rr*,t,rv�,t,k�**,t**+r*r****r*+
Eleven Thousand Two Hundred Fifty and 00/100 J�" DOLLARS
,%' � � � � � ,�� �A` ������ ��� �������. �� �
/� � o ��� \ � \ � \�
/ \��� � �� \ � \�
„ Ciry 0f Orono ���, \�o ,:\� \ ���\�
P� Box 66 �,.;,� � ,\ ��
Crystal Bay, MN 55323
Pt SENS�r
/// (4 L ' ...
�% .,; ��\ ��• \� �\\. m
� " � , �i,:�i - �� .a��,... ..>a������ a�� .., ��.., A
%� M�lVICI. � , �
'%! /%;,; 790._ �%i
GONYEA HOMES
15289
City Of Oron ,,,,��,�
Date Type Discount Payment
3/5/2015 Bili` 11,250.00
:k Amount 11,250.00
5� ._ 2 �g5 � �
��--Pr�j�� �
g � t�5 �
�
�� ���
Bridgewater Bank 830 790 11,250.00
1 r
Orono Buildin Permit # 2015-00077 oRo
9 �O �
. OPr
RE. 790 Brown Road
Additional Minnehaha Creek Watershed District Permittinq
Stipulations: Project to be completed as described in plans submitted to
the MCWD office on )anuary 23rd, 2015 according to the stipulations of
this permit.
� Properly install and maintain all required erosion control measures
until the disturbed areas are re-stabilized
� Work only within erosion control measures noted on plan received
January 23rd, 2015.
��,� When the site is re-stabilized and the MCWD staff has performed a
final inspection, all silt fences must be removed
��J� Submit a wetland delineation report and Boundary/Type application
for wetlands on site by July 1�, 2015.
�� Submit updated plans with boundaries of all existing or proposed
bufFers that are determined in accordance with section 6 of the
Wetland Protection Rule. Plans should include locations of buffer
monument signs by August 1�, 2015.
��'� Submit declaration approved by the District and recorded in the office
of the county recorder for buffers established on site.
� Install permanent wetland buffer monuments at each lot line where it
crosses a wetland bufFer, and where needed to indicate the contour
of the buffer, with a maximum spacing of 100 feet.
Builder/Owner Acknowledgement:
ALL SANITARY SFWER AND MUNICIPAL WATER CONNECTION CHARGES (If not previously assessed or if an improvement project is not deemed to be required in
the sole discretion of the City. If an improvement is required,the connection charge may be in addition to any assessment.) .
The connection charge for properties wishing to connect to the sewer or water but which are located outside the delineated boundaries of the affected project area shall be charged
the connection fee for that area. Such connections are subject to City Council approval. —
SEWER PROJECTS
2004 SEWER
2004 North Long Lake East Extension $14,610.00 (1)
2004 West Farm/Homestead $ 8,765.00 �1)
2005 SEWER
2005-1 Webber Hills/S Brown Rd Ext $13,280.00 �1)
2005-1 Dickey Lake Dr N $15,940.00 (1)
2006 SEWER
2006-1 Jamestown Road $14,110.00 �1)
2007 SEWER
2007 Farview Lane Sewer $10,650.00 �1)
2010 SEWER J
2010 North Farm Road $8,820.00 (1) ,�p
d
CREDIT TO AREA: �
(1) 602-37691 Sewer Operating (6) 3U-37691 1997 Improvements �
(2) 406-37691 PIR Fund#7 LS&Forcemain (7) 313-37691 1998-1999 Sewer Improvements �
(3) 316-37691 1992 Improve Stubbs Bay (8) 314-37691 2000 Sewer Improvements
�
201 S Fee ScH-�a��le-Page 13 �
" O ❑ 81 ? � 7 `� �O m n ny
� � n o� c3 �1 m A
�.�3� `#�� �� � � `� ajD � � a�
8 � �z
� p ��Ao� �a � � �3. a v R '^ �
� �
��, �o' � � � � ��m m , ° m
a � � N � � O
���� ���� g �. � ��z a
�3� g � � � d � �
��o� ;7� � � � m m
Yigm }}3 � � cao ��
d o O
�� �.� � �
m�� �� ti � �_
�q� � � � �, � �
�,�u .`8.`" � m m p�j � 'o
��3. �� � � � � �o W
_ � �
� �
��m`�R � W � � "� �
=a� � � � z D � ; �
m N � co D �a a
'� � a
v
v � fD � CDi � � �
� ? � � �
� q �
� ` � � � O m�
6 O N O ��
c � m �, � �
v
D
� � � � �� � ; �
o ❑ � v�u � 6
�
� � � �� � �
cn �
� �O N �'i
� O O
X � W
� a'� �� �
7 O
7
g �$ ��
-�
�a �' oe
� ��
� o +m
�,Z N 01
� s� w�'
w
PDF created with pdfFactory trial version www.pdffactory.com
Page 2 of 3 Minnesota UnNMm Conveyandng Bienke Form 10 7 1
State of Minnesota,County of HENNEPIN
This instrument was aGmowledged before me on March 05,2015,by John D.Stavig and Phcebe M.Stavig,married to
each other.
(StamPl
(slgneture ofnoWriel o1flCe� n
HOTARYRlBl1C•M�Tff9pD1
W 0�� r TH1e(and Rank):
My eortxntssfon expires:
THIS INSTRUMENT WAS DRAFTED BY: TAX STATEMENTS FOR THE REAL PROPERTY DESCRISED IN
(!^'°R^°^x a^d°de2u) THIS INSTRUMENT SHOULD BE SENT TO:
SaraGe haR �r�rre9er�ea�,dRsraenr�roreus;neasadaessacremee�
P Gonyea Homes,inc.
TiUeSmart,Inc. 6102 Olson Memoriat Highway
3300 Edlnborough Way Sulte 205 Minneapolis,MN 55422
Ed'ma,MN 55435
E
0
U
O
I V
I �
�
' �
( C
O
� '�
N
>
fC
�
O
U
(0
L.L
w
�
a
t
�3
FAe No.32947 Page 2 of 3 �
N
c6
N
U
LL
�
d
Christine Mattson
From: Christine Mattson
Sent: Thursday, February 26, 2015 1:08 PM
To: 'Ethan Kindseth'
Cc: Melanie Curtis; Lyle Oman
Subject: CORRECTION -790 Brown Road North /#2015-00077
Attachments: 790 Brown Rd N.PDF
Ethan,
I inadvertently called the Sewer Project Connection Fee the SAC fee in my previous email. Both SAC and Sewer Project
Connection F2es are required totaling$11,250. Please see the attached and explanation below:
• Sewer Availability Charge (SAC). The 2015 SAC is$2,485. This fee is determined by the Metropolitan Council
Environmental Services(MCES), collected by the City and passed on to the MCES.
• Sewer Project Fee. The 2015 Sewer Project Fee is$8,765 for this property. This charge is due prior to the
issuance of the building permit. This fee is in addition to the connection permit fee and cost of the grinder
station needed to make the connection to this pressure sewer.
Christine"
From: Christine Mattson
Sent: Thursday, February 26, 2015 10:09 AM
To: 'Ethan Kindseth'
Cc: Melanie Curtis; Lyle Oman
Subject: 790 Brown Road North / #2015-00077
Ethan,
We are ready to issue the permit, but before we do so, we need:
• Proof of Ownership. According to Hennepin County, the Stavigs are owners of the property. Please provide
proof of ownership.
• Minnehaha Creek Watershed District(MCWD) Permit. We need a copy of the MCWDs approvals and permit
for erosion control.
• Escrow Agreement. We have a signed escrow agreement, but the $2,500 escrow fee needs to be paid.
• Sewer Availability Charge (SAC). The 2015 SAC is$8,765 for this property. This charge is due prior to the
issuance of the building permit. This fee is in addition to the connection permit fee and cost of the grinder
station needed to make the connection to this pressure sewer.
Melanie may have mentioned to you that a MCWD approved wetland delineation and an executed MCWD wetland
buffer declaration are required for this permit. We have consulted with the MCWD and are willing to issue the building
permit prior to receipt of these items due to site specific conditions and weather constraints. However please note, we
will not issue a Final Certificate of Occupancy until the MCWD has confirmed the above requirements have been
satisfied.
Please don't hesitate to contact us if you have any questions.
Christine Mattson
Planning Assistant
i
City of Orono '
2750 Kelley Parkway Orono MN 55356 (physical addressJ
PO Box 66 „ Crystal Bay ' MN 55323-0066 (mailing addressJ
� 952.249.4620 ' � 952.249.4616
� cmattson@ci.orono.mn.us � www.ci.orono.mn.us
Office Hours: Monday- Friday 8 am to 4:30 pm
OUR OFFICE WILL BE CLOSED: Monday, May 25, 2015
2
CONSTRUCTION PERMITS AND INSPECTION FEES(CONT)
Applicable
Permit Tvae Fee Code Section
MUNICIPAL CONNECTION PERMIT(together with area connection charges}
Sewer $ 50.00
SAC(Sewer AvaiEabitity Charge}-Determined by MCES $�,�85,��p _
Water $ SO.OQ
Water Meter&Horn Fees
5/8" (3/4"x7-1/2")meter with horn including sales tax $ 323.07 or current cost Res.#S101
3/4" (3/4"x9")meter with horn including sales tax $ 374.84 or current cost
1" meter with horn includi��g sales tax $ 493.21 or carrent cost
Larger meter Quote Basis
Horn inctuding sales tax Quote Basis
Mail-in postage& handling charge $ 2.00
(sewer and water permits only)
201 S Fee Schedule-Page 9
ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES{If not previously assessed or if an improvement project is not deemed to be required in
the sole discretion of the City. If an improvement is required,the co�ection charge may be in addition to any assessment.)
The connection charge for properties wishing to connect to the sewer or water but which are located outside the delineated boundaries of the affected project area shall be charged
the connection fee for that area. Such connections are subject to City Council approval. -
SEWER PROJECTS
2004 SEWER
2004 North Long Lake East Extension $14,610.00 �1�
2004 West Farm/Honnestead � 8,7G5.00 �1�
2005 SEWER
2005-1 Webber Hills/S Brown Rd Ext 513,280.00 �i�
2005-1 Dickey Lake Dr N �15,940.00 �1�
2006 SEWER
2006-1 Jamestown Road $14,110.00 �1�
2007 SEWER
2007 Farview Lane Sewer $10,650.00 ���
2010 SEWER
2010 North Farm Road $8,820.00 �1�
CREDIT TO AREA:
(1) 602-37691 Sewer Operating (6) 317-37691 1997 Improvements
(2) 406-37691 PIR Fund#7 LS&Forcemain (7) 313-37691 1998-1999 Sewer Improvements
(3) 316-37691 1992 Imprave Stubbs Bay (8} 314-37691 2000 Sewer Improvements
2015 Fee Schedule-Page 13
Christine Mattson
From: Christine Mattson
Sent: Thursday, February 26, 2015 10:09 AM
To: 'Ethan Kindseth'
Cc: Melanie Curtis; Lyle Oman
Subject: 790 Brown Road North /#2015-00077
Ethan,
We are ready to issue the permit, but before we do so, we need:
• Proof of Ownership. According to Hennepin County, the Stavigs are owners of the property. Please provide
proof of ownership.
• Minnehaha Creek Watershed District(MCWD) Permit. We need a copy of the MCWDs approvals and permit
for erosion control.
• Escrow Agreement. We have a signed escrow agreement, but the $2,500 escrow fee needs to be paid.
• Sewer Availability Charge (SAC). The 2015 SAC is$8,765 for this property. This charge is due prior to the
issuance of the building permit. This fee is in addition to the connection permit fee and cost of the grinder
station needed to make the connection to this pressure sewer.
Melanie may have mentioned to you that a MCWD approved wetland delineation and an executed MCWD wetland
buffer declaration are required for this permit. We have consulted with the MCWD and are willing to issue the building
permit prior to receipt of these items due to site specific conditions and weather constraints. However please note, we
will not issue a Final Certificate of Occupancy until the MCWD has confirmed the above requirements have been
satisfied.
Please don't hesitate to contact us if you have any questions.
Christine Mattson
Planning Assistant
City of Orono
2750 Kelley Parkway ' Orono MN `` 55356 (physical addressJ
PO Box 66 Crystal Bay ' MN 55323-0066 (mailing addressJ
�' 952.249.4620 ' L� 952.249.4616
� cmattson@ci.orono.mn.us ` � www.ci.orono.mn.us
Office Hours: Monday- Friday 8 am to 4:30 pm
OUR OFFICE WILL BE CLOSED: Monday, May 25, 2015
i
Melanie Curtis
From: Melanie Curtis
Sent: Friday, February 20, 2015 3:26 PM
To: 'Jon Connolly'
Cc: Ethan Kindseth
Subject: RE: 790 Brown Rd N - Permit 2015-00077
]on
I went through the plans Ethan dropped off this afternoon. I think everything looks good from a variance and zoning
compliance standpoint except one tiny thing... there is a diamond shaped window above the Master bathroom level, I
think, that pulls the height up too high. With the window counted as the"highest window"I calculate a height of 31.25'
(30' is allowed). Removal of the window changes the measurement to the top of the 2nd floor windows and results in a
27' height.
Is this just an attic/decorative window?
Can it be made with louvers and not glass??
Call me to discuss.
Melanie Curtis
�952.249.4627 '��mcurtis@ci.orono.mn.us
From: Jon Connolly [mailto:jon@gonyeacompanies.com]
Sent: Monday, February 16, 2015 3:12 PM
To: Melanie Curtis
Cc: Ethan Kindseth
Subject: 790 Brown Rd N - Permit 2015-00077
Melanie,
Here's the updated survey from Sathre with the added topography added to the plan. They mentioned that the
OHW still remained the same and I think there was an issue with that. So let me know if anything else is needed. We're
working on updating the plans for resubmittal.
Thanks,
Jon
,�on Connolly
ARCHITECTURAL DESIGN MANAGER
OFFICE: (763)432-4500
DIRECT: (763)432-4507
FAX: (763)432-4501
� �.J 1 V I 1.� .Fl. � 2412
tiL7lv�F.S& RkMC?�7t':t_t��'; ���+����r+�
��rrf`"
�
LIKE US ON FACEBOOK a GONYEA HOMES
VISIT OUR WEBSITE
1
Melanie Curtis
From: Amanda Bednar[abednar@minnehahacreek.org]
Sent: Monday, January 26, 2015 8:38 AM
To: Melanie Curtis
Subject: 790 Brown Road N
Hi Melanie,
We received an application for 790 Brown Road N- single family home erosion control. The site is on Long Lake and has a
lot of probable wetlands along the shore. I'm going to call the applicant- Gonyea Homes later today and send them an
incomplete letter. I just wanted to check in with you first and see if you had any other information before I reach out to
them.
Thanks,
Amanda Bednar
District Representative
15320 Minnetonka Blvd.
Minnetonka, MN 55345
952-641-4581
MINPlEF�AHA CREEK
WATERSHEE') DiSTRICt
1
Melanie Curtis
From: Courtney Hall [Chall@minnehahacreek.org]
Sent: Tuesday, February 03, 2015 5:23 PM
To: Melanie Curtis
Cc: Amanda Bednar; Thomas Dietrich; Lora Pohtilla
Subject: RE: 780 Brown Road N - Gonyea permit
Hi Melanie,
I believe that we can make the delineation and declaration a condition on the permit to allow work on the house this
winter.
Thanks,
Courtney Hall
Permitting Technician, Wet/and Delineator Certified#1248
Minnehaha Creek Watershed District
15320 Minnetonka Blvd
Minnetonka, MN 55345
Chall@minnehahacreek.or�
Direct line: 952-473-2855
�o.
MIN�iEHhNA CRE�K
WA'FER$MED D15FRI�F
From: Melanie Curtis [mailto:MCurtis@ci.orono.mn.us]
Sent: Monday, February 02, 2015 1:52 PM
To: Courtney Hall
Subject: 780 Brown Road N - Gonyea permit
Hi Courtney— Have you decided how to treat this permit? I can make the delineation and declaration compliance a part of
our Certificate of Occupancy review. I am ok either way, but want to let the applicant know what the status is.
Thanks,
Melanie
Melanie Curtis
Direct 952.249.4627
Planning & Zoning Office 952.249.4620
2750 Kelley Parkway, Orono, MN 55356
Email: mcurtis(a�ci.orono.mn.us
Website: www.ci.orono.mn.us
1
�
City of Orono
,-�°n;o,1 Hardcover Calculation Worksheet
;
i
`� Property Address: �90 l3�w,� ��
1?, t;i
'"'��5,��a`% Prepared by: Date:
-- �va-n+� - a�.a.r�.o��- t�c. �-A� I, zo,s-
Stormwater Quality Overlay District Tier: (Circle one) Tier 1 er Tier 3 Tier 4 Tier 5
Step 2: PROPOSED HARDCOVER
In the following table, identify all items of proposed hardcover on the property, keyed by letter to
Certificate of Survey (survey must accompany this form). Include all existing hardcover items that are
intended to remain, as well as all proposed hardcover items that will be added. Use as many lines as
necessary to accurately depict proposed hardcover status of the property. For Tier 1 properties, identify
any features by letter which are split at the 75' setback line and calculate hardcover square footage
separatel for each portion.� _
Key to Hardcover Item (Describe) Length x Width Total
Surve S uare Feet
Exam le Gara e 24'x 30' 720 S.F.
A C Zx Jb 92.0� S.F.
B a S.F.
C S.F.
D 2/Z S.F.
E S.F.
F S.F.
G S.F.
H S.F.
I S.F.
J S.F.
K S.F.
L S.F.
M S.F.
N S.F.
O S.F.
P S.F.
p S.F.
R S.F.
S S.F.
T S.F.
U S.F.
V S.F.
W S.F.
X S.F.
Y S.F.
Z S.F.
1�_ Total Proposed Hardcover � ____, _� _ _____ 99 S.F.
- -----
Excludable Hardcover See Ci Code Sec 78-1684 :
S.F.
S.F.
S.F.
S.F.
S.F.
2 Total Excludable Hardcover S.F.
3 Net Pro osed Hardcover Subtract line 2 from line 1 $9`� S.F.
4 Total Lot Area D 9 S.F.
Proposed Hardcover Percentage [(3)T(4)] y,3 %
This is an information packet regarding Hardcover. Every effort has been made to insure the accuracy of fhe informafion contained
herein;however,if any information is not consistent with provisions of the City Code,the Code provisions will prevail.
Page 9 of 9
,
City of Orono
,:=�:otio, Hardcover Calculation Worksheet
�
' � Property Address: ��o �w� -y��
',, �;
r L f
�°trelioai� Pre ared b : Date�
---_ P Y �T+k Q.E — F�ER�GQ,�lLT I NC. �AN �J 201 S
Stormwater Quality Overlay District Tier: (Circle one) Tier 1 '�i�r Tier 3 Tier 4 Tier 5
Step 1: EXISTING HARDCOVER
In the following table identify all items of existing hardcover on the property, keyed by letter to Certificate of
Survey (survey must accompany this form). Use as many lines as necessary to accurately depict existing
hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at the
75' setback line and calculate hardcover square footage separately for each portion.
Key to Hardcover Item (Describe) Length x Width Total
Surve S uare Feet
Exam !e Gara e 24'x 30' 720 S.F.
A 2 k 1 42..o S.F.
B S.F.
C S.F.
D S.F.
E S.F.
F S.F.
G S.F.
H S.F.
I S.F.
J S.F.
K S.F.
L S.F.
M S.F.
N S.F.
O S.F.
P S.F.
Q S.F.
R S.F.
S S.F.
T S.F.
U S.F.
V S.F.
W S.F.
X S.F.
Y S.F.
Z S.F.
1 TotalExistin�_Hardcover 9Z•v S.F.
F�ccludable Hardcover See CI Code Sec 78-1684 :
S.F.
S.F.
S.F.
S.F.
S.F.
2 Total Excludable Hardcover S.F.
3 Net Existin Hardcover Subtract line 2 from line 1 Z.O S.F.
4 Total Lot Area 90 S.F.
Proposed Hardcover Percentage [(3)T(4)] � Q,Z� %
(Proposed Hardcover next page)
This is an information packet regarding Hardcover. Every e/fort has been made to insure the accuracy of the information contained herein;
however,ii any informafion is not consistent with provisions of the City Code,the Code provisions wiH prevail.
Page 8 of 9
�Voigt & Associates, Inc.
' STR UCTURAL ENGINEERING SER VICES
4635 N[COLS RD. SUITE 204
EAGAN,MN 55122
� PH.(651)686-7727 FAX(651)686-8444
Michael Karn January 14,2015
Gonyea Homes
6102 Olson Memorial Highway
Golden Valley,MN 55422
763-432-4511
michacl@�onvcacompanics.com
RE: Ho�an Residence at 790 Brown Road North,Long Lake,MN 55356
Dear Mr. Karn:
Per your request,I examined the main level garage wall(left elevation)of the address above for compliance with the
Minnesota State Building Code(2006 IRC)bracing requirements. Your plan notes that you will be sheathing the entire
exterior of the building with OSB (method 3)permitting the use of R602.10.5 Continuous wood structural panel
sheathing. Please note IRC Figure R602.10.5 Typical Exterior Corner Nailing....Stud to Stud Nailing required for the
continuous method. The continuous method pern�its effective wall lengths as short as 27"for a 9' ceiling adjacent to a
window opening.
The attached sheet, BP 1,indicates the locations of braced wall segments for the front elevation of the garage on the main
level of this house and the location of por�al frames. See Detail S 1.
Additionally,per your request,I examined the stairwell wall on the plan you sent to me for the home at the above address.
See Detail Tl.
A basic assumption of IRC bracing is that the rest of the structure is properly constructed and connected per the appropriate
section of the code.
The information and opinions contained herein are based upon the limited investigation described at the beginning of this
repor�.No warranties are expressed or implied regarding the existence of other unknown conditions not specifically
addressed.Our work is in aecordance with generally accepted engineering standards and is not intended to be relied upon or
transferred to individuals other than the addressee. Should information or conditions become known which differ from the
discussion herein,they may alter the opinions or conclusions of the undersigned.
Please call if you have any questions.
Sincerely,
P�. � � .
�
I Hereby Certify That This Plan,Specification,Or Report Was Prepared
By Me Or Under My Direct Supervision And That I Am A Duly
Licensed Engineer Under The Laws Of The State Of Minnesota.
Paul W.Voigt Date l/14/15 License Number 20705
UPPER LEVEL FRAMING
ABOVE NOT SHONN FOR _
cuwn
DWBLE TOP PUTE
TYPICAL wALL fAANINC
(CRIPPLE SNDS)AND
SHEA7HING ABO�E MEADER.
FASTEN SHEATHINC TO
HEAOER 1NTH 8d COMMON
NNLS IN 3'CPoD PAT7ERN 2 PLY- 1 3/4'X 11 7/8'MINIMUII HEADER - SEE PLAN
AS SHOMN ANO 3'O.C.IN
ALL FliANING(SNOS AND ��
9LL5)(TYP.)
FAS7EN PIAlE TO HEAOER
M1TH TNCI ROWS OF 16D 1000 LB.HEADER-TO-JAp(-SND
4NKER NNLS O 3'OC, STRAP ON BOTH SIOES OF OPENING_
np (TYP.) (INSTALL ON BAq($IDE
9MPSON LS7A24,LSTA30,LSTAJ6 OR MIN. (2)1RIMMERS �i
EWIVALENT) 8(2)KING SNO rc <
MIN. (2�2�%6�(TYP.J- VERIFY x �
w/wui nnGwE55 16' MIN. i6' MIN. io �� �
9'-0' +/— (FlNISHED WID1H — VERIFY) F Q� N
FULL HEICHT SiUD ON ENO. � p g
w
PANEL SPUCES IF REWIRED = ~
0
SHALL HAVE PANEL mGES x
BLOCKEO ANO OCCUR NITHIN �
2t'OF MIDDLE OF WALL MIN 4200 LB SiRAP TYPE TIE-OOWN FRMAING IS 7HE
HEIGHT SANE AS OTHER
(EMBEDDED INTO CONGRETE AND 4DE
7/18'MIN. THICHNE55 WO00 NAllEO INTO FRAMING,INSTALLm
SIRUCNRAL PANEL SHEATHING PER MANUFACNERm,SIMPSON
S1DF11L Oft EWIVALENT IS
MIN 2�%2'X3/8�PLATE WASIER RECOMMENEDEDj
FA57EN ALL PUTES 70 SHEATHING
W/8d NAILS O 3�O.C. Typ 5/8�DIA ANCHOR BOLTS W/
7'MIN EMBEDMENT AT 1/3 PqNTS
C.I.P.FWNDAiION WALL
OU751DE ELEVAl10N
I hereby cerfify that this plan, speciftcatlon or
MAIN LEVEL GARAGE ELEVATION report was prepared by me or under my direct
� no scue supervision and that I am a duly licensed
Professional Engtneer under the laws of the
State of Minnesata.
� �' � •
Signature PAUL W. VOIGT
1/14/2015 20705
Date Registration Number
�Voigt & Associates, Inc. HOGAN RESIDENCE /GONYEA HOMES �1
� STRUCTURAG ENGLNG'ERING SERVICES
4635 N[COLS RD. SUITG 204 790 BROWN ROAD NORTII,LONG LAKE,MN 55356 i �� 1
GAGAN,MN 55122 PROJ.#: 2015.xxx RGVISIONS:
� PH. (651)686-7727 FAX.(651)686-8444 � DATE: 1/1,4/20 9 5
DRAWI� BY: RNS
ROOF TRUSSES
�ABOVE
N07E: TALL WALL
� �I HAS NOT BEEN
DESIGNED TO
ACCO�AODATE GIRDER
TRUSS BEARING
`o v o in
� N� 1��
2
O �`V � NZ
U U �� N �
Q .0 O 7� O
W d C� p O
N N � v� H
U' N
� � � o �j o
no o-o �
E � 3
�N — 7 �
Tt `
� � O J
O�+t- � � Q
L � � p a
� �-���y
Tnc c m
H '� o O W C
� � a C N
� o c a �
Ct N O C
II a; �0 0 N
N O `
J m t m b O � �
J C N
< L d 7 L C O' � O
3 � Hdin r`n c
�
0
x
�"-, HEADER - SEE
= PLAN
(3) 2X6 KING STUDS AS
I�ULLIONS BETWEEN
UPPER WINDOWS
(1) 2x6 TRIMMER
OUGH OPENING = 2
2X6 STUDS � 12" OC
(2) 2x6 SILLS
r- � SI�IPSON A35
FRAMING ANGLES
c=.� AS SHOWN
a
w INFILL STUDS
u`"i SHOWN TO DEPICT
DESIGN CONCEPT
ONLY. NUMBER �AAY
� � VARY.
TA�L WALL AT STAIRWELL
1 NO SCALE
�Voigt & Associates, Inc. HOGAN RESIDENCE/GONYEA Ti
� STRUCTURAL ENGINEERING SERY'/CES � �
4635 N[COLS RD. SU[TE 204 790 BROWN ROAD NORTFI,LONG LAKE,MN y OF 1
- EAGAN,MI�55122 PROJ.#: 2015.xxx REV[SIONS:
PH.(651)636-7727 EAX.(651)686-8444 DRAWN BY: RNS DATE: i/14/15
�
� �„��" '�1� ,
� ,��
r.Nh �Q�O
� , �' '�,, ���
� � � '.+e� � � k�.
' .�. + ? � �� i
a
. � �
�, >
:
� . �� ,.� �fi yF�q �c,
.. �` ��1 l � � 'tfSHOQ-
:. . � j.J
� ' ' `�� -
Legend
�� /�� `,' / l� �
E" '�, , n .- Railroad
�V vv `�"��� � I � City Limits
�1,�.�� /���h�r(� ❑ Parcels(11-1-2014)
«� �����.�����
ll ,_•.' ,^`Lt �/� Wetlands
..:z. .-_� — c' ,� '1 C 1 � Y/� C Y lT ! PI 1 ��; Preserve-50'
n" V � � Jla �,/µ�1 lV� v�
�.J\/�
�t _ f ' � Manage 1-35'
F '�� _.� ,�i� !'�{ry��A y1n y J/{N'� � Manage 2-25'
� ��W r� ��� � Manage 3-16b'
� y�/ ' i Q���� �� ^ ��Ot, I � Unclassified
� �%
- �jQJ�I C� �f Y1 YL4.C,T`fh� �I'VI t� � : l..�x
� _ ; 5hav� � i �.
No �ur�c� � # v�
_ ��� ���� { �
. {
�- �, a — w � ���ty�, �
� � .���z� �� �
� } :� . �
�. �r�= i
�:Bro wn �� ���;, �
,� � �k ,�� �T �
�Y "'� �i�hJl�J l� �-�':�,� ,~�; � _ � , _. �
� ., ,
�::
� �� ¢
�� t � vt,pt � � +
a :.� �� � � �t i� ( o��
�
" �,"r �� G • �• 'i
���� I
� ;
�t - . '
°� �,� -t 790 Brown Road
.� �
N
��:�, r �
� ,
a°� !. \ oi:da�me�:
---- __ . _ - . . . __ --- -- - �
This drawing is neither a legally re orded map nor a
rvey and is not inrended to be used as one.Thls
drawing is a mmpilation of rewrds,information,and data
0 83 Feet e bcated in various ciry,county,and state offces,and
other sources affecting the area shown,and is to be used
for reference purposes only.7he City of Orano is not
�O Bolton&Menk,Inc-Web GIS 1/30/2015 8:42 AM rrcnnnsihlr fnr anv inarcu�arias harwin rnntainrd.
' '' ` � » � ,.
New Construction Ener Code Com liance Certificate ���
9Y P �����
Per N 1 I O I.A Building Cenificate.A building certificate shall be posted in a permunendy visible location inside Date CertiRcate PosteJ
the building. The certiticate shall be completed by the builder and shal]list infonnation and values of
com onents listed in Table N I 101.8. PIQC@ yOUr
Dlailing Address of the Dwelling ar Dwelling Unil
790 Brown Rd N Lon Lake �ogo here
Name of Residential Contraclor DIV License Number
Gon ea Homes 2459
Communitv Plan ID
THERMAL ENVELOPE RADON SYSTEM
Type:Check All That Apply X Passive(h'o Fa�a)
�o a,
� � �, Active(With fan and naona�ieter or�
_ � >, o�her si stem monitoring device)
a � � — 'D a v
� � � — o b �
� a � U a� � a� �
- < CC C7 a�i U � �o =
CS . . � � � U
� O z N �r. G � L y O
Insulation Location � `� " v 0 � �' �
cs o � � � £ v �o �
� � � � °�' m cc �
F° � z � p u°, � � c'C �c� Othcr Please Describe Here
BeloH Entire Slab X
Foundation��'all R-�J X exterior
Perimeter of Slab on Grade X
Rim Joist(Foundation) R-10 X intenor
Rim Joist(1'�Floor+) R-�� X Interior
wal� R-19 X
Ceiling,flat R-44 X
Ccilin�,vaulted R-30 X
Ba���'indoHs or cantilevered arcas R-30 X
Bonus room o�cr�arage R-38 X
Describe other insulated areas
Windows 8 Doors Heating or Cooling Ducts Outside Condi�ioned Spaces
n��erage U-Factor(excludes skrlrghts and one door)U: 27-.31 Not applicablc,all ducts located in conditioned space
Solar Heat Gain Coefficient(SI IGC): 25-29 R8 R-value
MECHANICAL SYSTEMS Make-up Air Select a Tipe
Applianees Heating System Domestic Water Heater Cooling System x Not required per mech.code
Fue1 Type NAT GAS ELECTRIC R-410A Passi�e
Alanufacturcr BRYANT Rheem BRYANT Powered
Interlocked with exhaust device.
�1ode1 912SB66100S21 82V80-2 113ANA048 Describe:
Input in 100000 Capacity in 80 Output in 4 tOn Other,describe:
Ratin�or Size E3TUS: Gallons: Tons:
Hea�Loss: 89,893 Hea� 38,462 Location of duct or system:
Structure's Calculated Gain:
AFUEor 92 SEER: �3
HSPF90
Catculated 4J770
Efficiencv coolin=load: Cfm's
"round duct OR
Mechanical Venfilafion System "metal duct
Describe any additional or combined heating or cooling systems if installed:(e.g.two fumaces or air Combustion Air Select n Type
source heat pump with gas back-up furnace):Master to get lo-sone 80 cfm Broan fan for intermittent X Not required per mech.code
Select Tjpe Passive
X Heat Recover Ventilator(HRV) Capacity in cfins: Low: High: 130 Other,describe:
Energy Recover Ventilator(ERV)Capacity in cfins: Low: High: Location ofduct or system:
Continuous exhausting fan(s)rated capacity in cfms: fUf118C@ f001'Tl
Localion of fan(s),describe: Cfm's
Capacit}continuous ventilation rate in cfms: 103 "round duct OR
Total ventilation(intennittent+continuous)rate in cfms: 205 "metal duet
790 Brown Rd Long Lake
HVAC Load Calculations
for
Gonyea Homes
Golden Valley, MN
Prepared By:
Todd Boyum
Sabre Plumbing&Heating
15535 Medina Rd
Plymouth, MN 55447
763-473-2267
Tuesday,January 13, 2015
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition,Version 2, and ACCA Manual D.
� � ,
Rhvac-Residential 8�Light Commercial HVAC Loads Elite Software Development,Inc.
Sabre Plumbinq&Heatinq � 790 Brown Rd Lonq Lake
PI mouth MN 55447 ___ �-1� Page 2
— _ -- __. ---- - - -- -- - - - --- -------—
Project Report �
General Pro'ect Information
Project Title: 790 Brown Rd Long Lake
Designed By: Todd Boyum
Project Date: 1-13-15
Client Name: Gonyea Homes
Client City: Golden Valley, MN
Company Name: Sabre Plumbing& Heating
Company Representative: Todd Boyum
Company Address: 15535 Medina Rd
Company City: Plymouth, MN 55447
Company Phone: 763-473-2267
Company Fax: 763-473-8565
Desi n Data
Reference City: Minneapolis, Minnesota
Building Orientation: Front door faces North
Daily Temperature Range: Medium
Latitude: 44 Degrees
Elevation: 834 ft.
Altitude Factor: 0.970
Outdoor Outdoor Outdoor Indoor Indoor Grains
� Bulb Wet Bulb �m B�1,J�.m � Bulb Difference
Winter: -15 -12.38 n/a n/a 70 n/a
Summer: 88 73 50% 50% 72 42
Check Fi ures
Total Building Supply CFM: 1,757 CFM Per Square ft.: 0.368
Square ft. of Room Area: 4,773 Square ft. Per Ton: 1,251
Volume(ft') of Cond. Space: 41,031
Buildin Loads
Total Heating Required Including Ventilation Air: 89,893 Btuh 89.893 MBH
Total Sensible Gain: 38,462 Btuh 84 %
Total Latent Gain: 7,308 Btuh 16 %
Total Cooling Required Including Ventilation Air: 45,770 Btuh 3.81 Tons(Based On Sensible+ Latent)
Notes
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition,Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
C:\...\Gonyea 790 Brown Rd Long Lake.rh9 Tuesday, January 13, 2015, 8:36 AM
T �� i
Rhvac-Residentiai&Light Commercial HVAC Loads Elite Software Development,inc.
Sabre Plumbinq&Heatinq � 790 Brown Rd Lonq Lake
PI mouth MN 55447 �1� Pa e 3
Load Preview Report -�
, �
� , �
� Net� ft�� Senl Lat; Net� Senj Hts CIS Act Duct
Scope Ton. ITon; Area j Gain i Gain( Gain� Loss I 9 9 Size
_ � i i_� _ CFM CFM CFM
Building 3.81 1,251 4,773 38,462 7,308 45,770 89,893 1,135 1,757 1,757
System 1 3 81 1,251 4,773 38,462 7,308 45,770 89,893 1,135 1,757 1.757 18x18
Ventilation 956 3,847 4,803 5,080
Duct Latent 1,578 1,578
Zone 1 -Clg 24°/.Htg:32% 1,425 10,325 0 10,325 26,967 361 484 484 9x11
1-Basement 1,425 10,325 0 10,325 26,967 361 484 484 5--6
Zone 2-Clg:41%,Htg:31% 1,425 17,891 683 18,574 26,378 353 838 838 10x16
2-Main floor 1,425 17,891 683 18,574 26,378 353 838 838 8--6
Zone 3-Cig 35%,Htg,37% 1,923 15,184 1,200 16,384 31,468 421 711 711 10x14
3-2nd floor&Bonus 1,923 15,184 1,200 16,384 31,468 421 711 711 7--6
Sum of room airtlows may be greater than system airtlow because
s stem has multi le zones.
C:\...\Gonyea 790 Brown Rd Long Lake.rh9 Tuesday, January 13, 2015, 8:36 AM
� f� �
Rhvac-Residential&Light Commercial HVAC Loads �'"� Elite Software Development,Inc.
Sabre Plumbinq&Heatinq 7� 790 Brown Rd Lonq Lake
PI mouth MN 55447 �1�� _ ____ Pa e 4
---- -.. _ _ - -- - --
System 1 Summary Loads _
Component Area Sen Lat Sen Total
Description Quan Loss Gain Gain Gain
LOW EE: Glazing-Builder Grade Low E Windows& 932.5 24,584 0 21,100 21,100
Sliding Door.33 U value .33 SHGC, u-value 0.31,
SHGC 0.29
11J: Door-Metal- Fiberglass Core 41.8 2,131 0 677 677
12E-Osw: Wall-Frame, R-19 insulation in 2 x 6 stud 3687.9 21,316 0 4,615 4,615
cavity, no board insulation, siding finish,wood studs
15B0-Ssf-4: Wall-Basement, , R-5 board exterior 70 536 0 0 0
insulation to footing, no interior finish, 4'floor depth
.1560-5sf-8: Wall-Basement, , R-5 board exterior 765 7,657 0 587 587
insulation to footing, no interior finish, 8'floor depth
RJ 10 Spray Foam: Wall-Frame, Custom, Closed Cell 738.2 6,275 0 1,855 1,855
R10 Spray Foam
166-44: Roof/Ceiling-Under Attic with Insulation on Attic 1922.6 3,595 0 2,157 2,157
Floor(also use for Knee Walls and Partition
Ceilings),Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-44 insulation
21A-20: Floor-Basement, Concrete slab, any thickness, 2 1425 3,270 0 0 0
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 20'wide
20P-38: Floor-Over open crawl space or garage, Passive, 498.5 1,271 0 164 164
R-38_blanket insulatio_nLany cover_ _ _ _ __ _ _
_ _ _ _ __ _ __
Subtotals for structure: 70,635 0 31,155 31,155
People: 6 1,200 1,380 2,580
Equipment: 683 3,430 4,113
Lighting: 0 0 0
Ductwork: 5,393 1,578 1,541 3,118
Infiltration:Winter CFM: 97, Summer CFM: 0 8,785 0 0 0
Ventilation: Winter CFM: 140�_Summer CFM; 140 _ __ ___ _ 5,080 _ 3 847 . ___ 956_ _ 4,803_
System 1 Load Totals: 89,893 7,308 38,462 45,770
Check Fi ures
Supply CFM: 1,757 CFM Per Square ft.: 0.368
Square ft. of Room Area: 4,773 Square ft. Per Ton: 1,251
Volume (ft') of Cond. Space: 41,031
S stem Loads
Total Heating Required Including Ventilation Air: 89,893 Btuh 89.893 MBH
Total Sensible Gain: 38,462 Btuh 84 %
Total Latent Gain: 7,308 Btuh 16 %
Total Cooling Required Including Ventilation Air: 45,770 Btuh 3.81 Tons (Based On Sensible+ Latent)
Notes
Rhvac is an ACCA approved Manuai J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition,Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
C:\...\Gonyea 790 Brown Rd Long Lake.rh9 Tuesday, January 13, 2015, 8:36 AM
� '' � / F� ����t�� �TifR��
�.�_ . �
� 4 �� Td'$. ,....
_� �_��.._e....�.r_...���..�...__........_...e_...�..�__�-.-. ____ __ -...�.e_._.....a...��'�'e_. ..___..,.�.. I'
....-._..�� ... � � V �
�.____--_. ;�_—_--------- �"`-0� ----- '� � ,".6 ��•.� _ ..v._ _._ ,�-0 ::A� ,-.�- -� �i L �� �
�, � ..j_ .�.�
, ;
� '�� .___._... __ Y OF ORONO ' �
� � ' � � " \ �~,
4 ______rr---- � �
� � � �ONUS RDOk TRUSSES j � ` � ���
I I I �� ABQVE I ��+ ` `
�.-1. I I I � r-�. . -.__.v.._.�...
\ _.._.�___—.._.........
+ � � a� � � , A►� � �- ��5
; , , �, � ��
4 � i i `�i i � H�MES
n_DINING ROOM ARCH �' ! � � �� ' �j CI F ORONO 6,n�o�S�Nh��MOH�A�t�WY.
, ,.
C.fSCALE: 1!4"=1'-0" � � � m� � �i BN asa4 GOLCEN 4M.LEY,MN 55A??
I I 1 I . — -^--.--�----�. OFFI(:E:/63�31�4500
- ---� 1 1 I � 1 FAX:763+i32�7501
j � � � � � B'1Y HEAp Mi. ;
I � � ___, ` ` ��� � ' BUILDEhLICLN5EN2a59
11
---
tr- i � i
�I � ��i i i i
I i f j ' ___ �F__ i j � , ON REC
N � REVISI dRD
I � � F� � � , � � � �
� � � W.-r i i.�..����a� , , � i i F� 3 �r-0•.�o�� 1 12-5 14--
� , � ,
�'--+ � i a q i ��"-_,, ��1� j �j � � j j� � ; OFFICE z i 2 � �2-11 14
� � � � Sh I 1 i� I 1 � � 9'-1 t1B�'CL G�HGt. � � � � i
3 12-12 14 �
l .�o� � � i w i �i a�-o a GE i i i � ; si�:s+a� � 4 _12-22 14 ' -
L 1
� � � ��..�. � � � UFwERSJ o o �' l.�_J huCRO - .-�_____ _
, �
_.:.
_y I . i
� I OI , . : i y cc__==c==c d�v ! .__.._- 17-fi'�+T.p...__� ^ ` \ �
�1 I ml ( � I i� �� � Jrr L_
2 GREAT ROUM ARCH ; ; ;; � ,. � ��, � �� ; §
3 SCALE: 114'=1'-0" I -'*---`' _. . '" , �' mrai� AT ortoenat �_ ..` 1 g-�,��`Oci�c Nct. �' �iQ ` ` ` � ` 3•s ra• t r.
� � oa sEa�+ �" � -
� �.4------, . -_.. stt. RI �y ti�' � �`� ' —7-� '3 JGiBPtCt �PICT 3458PICT
� -_--_-I I I � j�'`' � � 1 70tSAW?NpPT.70t8AWN 7.�3�16AWNOP*.1„
i i �i - -i-- � i c-s•K6�a^ f � j � � r•H�+o - �
I � � i �i 4 3 + MUD ROOM .��, _� i i i � � �
� � 3`�� �- �.E - j , �� , , �
a § � ------- � .,�� �;� � ��� �0; � � '� n� _
� I I C11 STaY'JMDLU aE STFPS ���;`1 �J f � � �� �+^
t? g, § m � � : I I �I TREATEOW LOM1t�- eENCHWl �.: -� � i � 'O
� � � � I I KI BONUSRCXU�TRU3SE9 I I- ______ HUOKS . !� I�i � I � , `5�^, `
I I .1 ABOVE I I 1 —Y 1
0`-4` J� . j I I °iI I I B'A'x4.�. ���1 7-8' TJ'-0' � i � �b 1J'�Ci'.17b' � �� § ��
I 1 I � � (�ci r I �t pINING ROOM Q� r.�
� i i i i � i§ P�Y *� �Y j �" t �� �Y ,,+;coo �< �
I � I 1 I'
�
�
6 ______�!-_"_� . I I� � � � �-�1�8 CIC.NGT. �� 12'-0'r 10�' .
3 FOYER ARCH �FOYER ARCH Q ' ' � �►` ++ ' ' SSH. �6�R�. ---�- —' � � ��- � GRILLDECK '
I � p�ry "1 i� I I CEDAR GECK
3 SCALE: 1!4"=1'-0" 3 SCALE: 1/d"=P-0" sr+zawa �.,�,R 5.-0. c aecess� 1� � i '�
�� MATGN 1.'AIN LEVEL 1 1 �C,� � T G
� W�YpON.'HEIGHTS � � POWDER v� __R65N__-_ i i }� W
� I ':.,% r � w000 Y _---- ------------------- T
� '1-G `rp N O Q�VAN_ " "__ _.___" "_'" � .1�
� �,.' _
.� � -
J r � � -1
..."r' ,," • � § . ._ •.d'�n �,ro i i��i o�ssi.naa�� � � �T•iiF'9Ti nRC}r--
� �,�., r.+nNUFsroNe- � � �i � � t � � --- -- � LL
i t m Y i i
c ((�
5'-0' l�J 8'-10' 10" 7'-1U' Y�t ' � N'S "`i
�,.\ � '�.�., ue , 1 t O �
r7 �,9 ! � �
' � � � �. 8..�nTg � � � a
§ / ,L FOYER i im I I� �uJ' ,#- �� Q � M�/�
� 1 .1D' BUILOING J ` WOOD � � I I ;,( ��' Q 41/
9'•'1+E'GLG.HGT. I�c' =i O � � 1 h
3'•0' i S[TEA:KS � � ���
`�� tl'�7"HEAD HT? I� Ev
\ + I;,, a 7B'-0'n 19-0' F �
5 FOYER ARCH s GREAT ROOM ARCH � I! �' GREATROOM � � �� o W �
� � SM 3056-: �
b CARPET �p C
7•1 va'CLG.HGT. �� � � G
`ay �'OVEREDPQRCH • � `^ �P*.t'+� �
3 SCALE: t!4"=1'-0" 3 SCALE: 1Iq"=1'-0" `,\ _ q �n i � �
covc.
♦ ALUF,!1`iR:.C G. � � ,°p
� '�
� ' =��a� &•b• s�e� �� � t� z � Y
c � N4NUPSTOtiE ��e
�. �VF�CEOFCANCPORCN 4'- '.C' i ��R W � O �
�
REFA6RICATED�\ y NG 6 ENV7 ' � � � � �
OLUNNS
� § , h - �„8FP � p C.� U m (�
w ,., a r.cq�n- s�75o • '-0'nenfl nt
R �.\ SUAGF 5TCN:E � __ _ . . _ _ _ _ _
-����a�cr_ _ - - - - - - - - -msancr - � - - - - - - - - - - - - = O Q Z
3' " 23E' T-0' -.. 9d' - ` ' -�._. - �9.1 I J 3C16A1'�N 18A' JOiBAY.N ?J O
- � MP,IN LEVEL PLAI�i � h��s��,NT�Ra�T:� d = � � O
HEADERS TL?BE:.2n70 �
nDINING ROOM WINDOWS 8 KITCHEN ARCH sc�e: ,�4•=,�_o" U�+1E550TeERVA5EN0T[D }
3 SCALE: 114"=1'-0" 3 SCALE: 1/4"=1'-0" �� -r+: `�` ._ '"� � z.)srawn+E.a�cuT � PROJECT
r
gy'�/�G.��'���f �„� � SH01'�N g 10'•13�a'MAX R;S_�
- O fOUNDATtON �42S;
— —� �.�.u:�v.c:Ee�v.Ut5AN5' FINISHEDSQ PT.
� ���� � �y \ UNLE554THERNISENOTED ,'n1 ___._._._.�.__i
,� f'� `�J t.IALLEXTfWGR v BASEL.ENT
ORdEtiSiONS'O �
oursiceovsN�r�inc d' FIRST 1425 j
j ' ;���, SECOND �923�
� � 9 ( f' S.IMA{NAhbUPPEHWINDpWS � -
rvt �0 UND � � � ��6'-70'MGT,(L7i.�SOUS AEOV[1 3RD LEVEL '�
UNLE550THERR95E NO1E� �
� 6.)cn�uGE:axua6 (v 5POftTCOURT -I
I
� m. i ! U9N A � O � ', 7.1 O�E IFVS'ZER6SPACINGOF STS.Ea T�TAI 4562
°rnu��Es � PROJ. NO.
9 GREAT ROOM FP ,o GREAT ROOM WINDOWS 8.1a'2'RETURnSONALL000R5 GH0516
UNlE55�THFHVJISE NOTED
�� �-- �
9.)RIX]M DINE�SICNS FOR FhISHED
3 SCAIE: 114"=1'-0" 3 SCALE: 114"=1'-0" � Foa�cr�ri;.�ri�ni�Ezac� ShIE ET `�
FOUf.1711.IE\�ION 1^.1�.�VARY. /'1
�,� oF 6
�
� � ... .
D
r
oi—---- 12,0�" -------�---------___- --- - --�- ----- --__1�4�"---._.__.___------�IL- � �!
m 9-2"O.C.� SPACING----» LEFT END OF TRU55 13'-0-0" 4-6-0"
� UPPER LEVEL FLOOR PLAN NOTES
�
°' 1. 18"4X2 FLOOR TRUSSES i i
a
m 2. 1/2"SHEATHING DEDUCT �'', I I _
`D 3. TRUSS IDENTIFICATION LABEL LOCATED ON END i, I �'
� OF TRUSS I _
� i �
0 4. LEFT END OF TRUSS IS PAINTED. THE(X)TICK MARK ON � I I �
� LAYOUT INDICATES LEFT END OF TRUSS AS SHOWN ON ' i ;
CITY OF�C3Fi�;�yJ
� LEFT SIDE OF TRUSS DRAWING. �! I I
�. � LEFT END OF TRUSS
� 5. ALL DIMENSIONS ARE IN FEET-INCHES-16THS � �( � I �
� � � i
co 6. HOLD RIBBON FLUSH WITH TOP OF TRUSS. NOTCH IS
`D MADE LARGER FOR VARYING LUMBER THICKNESS I, � �j I I I i
� o
� �: � �
'D 7. ALTER TRUSS SPACING UP TO 3 1/2" FOR PLUMBING I� I I I �� o
� AND MECHANICAL LOCATIONS. TOILET SYMBOL DOES NOT I: ' I ; �
i � ; I
REPRESENT EXACT LOCATION. I; I i� , i
� i i i �i_ I ��
0 8. D O N O T M O D I F Y,C U T,O R R E P A I R A N Y P O R T I O N O F T H E I I '� I I i j i
n TRUSSES WITHOUT WRITTEN APPROVAL FROMABC TRUSS. _ i I I I � ' ;
a WARRANTY WILL BE VOIDED WITHOUT OFFICIAL i; �� i i i�
o° DOCUMENTATION. �� ; �I � I ' I �
� �I I i I i�
a 9. THE INTENT OF THIS DOCUMENT IS TO SHOW TRUSS � � � j �� i � � ( � �; �� I
PLACEMENT ONLY. THE CONTRACTOR WILL BE ' I I I I '
� RESPONSIBLE FOR VERIFING ALL DIMENSIONS AND WALL � I `I I � � '
� HEIGHTS WITH THE BLUEPRINT PRIOR TO SETTING TRUSSES. I I i ' I I j i I
I ' I
o � � -
— -- ------- ----- - ---- -
T ,I � i ' I , i
i I �j i �
� �I I i �� I i II � -
o - ' ! �: I!
� �; � '; ' ,;
I ,i �; :, li
� _ � ; ; ;; ,; � �i i
o �. , � ,� j' (, ;
3 ' , �: �
m I � I I I� I , I I i
� I � i �. ' � i I; I� Ii �'
� ; ,
� il , i
_,j . _
; - , ,' - 1
_
' , �i {_ '1 � , a �
ii
� 1
� � ,
i'' � i ; � � I � ! � I.
� ,; -, , - ! i I:
Y � + � I,
I i I
�
.i I � I �j � � �I I
� � i
° � �- I -I �-_ -_-� ' � �
� � � �
'�, i � o
� a
o � ; j �,
� ,
� � i i i,
;
= Ij ;i, '
_ i � ;�
' ' , � !;
- I�
I ' ',; II '' !
! `� ;, -
W��� .�-- ��----�I�- —--�I`--- 9�-4-Q�� �--- ---------�I' o
+ `�' 8'-8-0„ �$,_6_�„
� ...f.�. , .�-- -- - ------- --- ----- 43�_6_0„- ---------------------_---- -- x'
CERTIFtED
Automated Building Components, Inc HOGAN sz�LEs REP : zz,c wo# : Tsi_osoF
1111 8th Street DUE Dz-��rE : ol/i9/is scz�LE : 1��=6 � -0-0^
Chetek, W154728 LYL�IAN CHAN DSGNR/CHKR: JLB / Date _ 1/19/2015 11 : 17
�7 9 O BROWN ROAD NORTH TC Live 40 . 00 psf DurFac-Lbr _ 1 _ 00
Phone 800-524-9990
1'/roi:e 7I5-924-4867 LONG LAKE MN 'rc neact lo _ oo psf n,�rFac-Pit . i _ o0
Fc�� 7I.S-924-2585
BC Live 0 . 00 psf O . C _ Spacing : 1- 7- 3
BC Deacl 5 _ 00 psf Design Spec : IRC-2006
"SETTING THE STANDARDS FOR QUALITY AND SERVICE" T o t a i s s _ o o x,s f #T r/#c f g : o / o
!..- ,
. 12�_Q_��� � --- t �q�_�_��� --_--- ---+-_ ----__+
' 13'-0-0" 4'-6-0"
MAW LEVEL FLOOR PLAN NOTES 19.2"O.C.SPACING----» LEFT END OF TRUSS
1. 20"4X2 FLOOR TRUSSES �
2. 1/2"SHEATHING DEDUCT
3. TRUSS IDENTIFICATION LABEL LOCATED ON END �; 'I ' i;;<,
�`p'..
OF TRUSS. � _ ,
i
4. LEFT END OF TRUSS IS PAINTED. THE(X)TICK MARK ON � I
LAYOUT INDICATES LEFT END OF TRUSS AS SHOWN ON C!�L�" C�FCUPV�
LEFT SIDE OF TRUSS DRAWING. - � ��
5. ALL DIMENSIONS ARE IN FEET-INCHES-16THS LEFT END OF TRUSS
6. HOLD RIBBON FLUSH WITH TOP OF TRUSS. NOTCH IS i `�i '.
MADE LARGER FOR VARYING LUMBER THICKNESS. i '' I
j :i i
7. ALTER TRUSS SPACING UP TO 3 1/2" FOR PLUMBING � � i', j ; ' ,o
AND MECHANICAL LOCATIONS. TOILET SYMBOI DOES NOT � i I I I lo
I r
REPRESENT EXACT LOCATION. ! ! _ � +� ,f � i I
8. DO NOT MODIFY,CUT,OR REPAIR ANY PORTION OF THE � �� � � i i� � ( j �
TRUSSES WITHOUT WRITTEN APPROVAL FROM ABC TRUSS. - (
WARRANTY WILL BE VOIDED WITHOUT OFFICIAL I � ' i , i( 'i I (. �
DOCUMENTATION. - � I � � I
I; '
i � i � i � ' �� � �
9. THE INTENT OF THIS DOCUMENT IS TO SHOW TRUSS I � I j I I I � � i, �i
P L A C E M E N T O N L Y. T H E C O N T R A C T O R W I L L B E � �,, ' i '� i i I I •; � ' I
RESPONSIBLE FOR VERIFING ALL DIMENSIONS AND WALL ; , � ;
HEIGHTS WITH THE BLUEPRINT PRIOR TO SETTING TRUSSES. I i i i I 'i i i � I '
- - ; � � I: �
� '
� ;� j i � i� I, i i'I ij _
' i i
�
I �� I
II�i
� I � i� I _ i -
- II ( � I I i� I �
_ i' I � � i � � I � I
I , li
, � I i ;i I i 'I
�' i� �I I ' i I
I i
il
ii i� I�
i I �) ( ! I � I
I
��~ lx * � �� � �� �I
I I �� �: �
� i � � j
'' I i�
i i' ' I
4'�-0" I I 12'-��0 ,I - - —
�;�
o I � �'' i
� I
( �i
�
I '.I �� �� � �
�i
I
:, - =t -#--�_- � t I � I' (' I i
�; i i
, I i i o
'i
i I i I j !; o
o i I �, ', I o�
� � I � � I i I
� . i I �, i ' : .j
I il I � � �i
Ii ; ;
_ !� i I
I% I ii
� � �� ' I
i ''
' � �
' �, I
�
�� �
�''' �� -
� _ o
,._o_o��
, � _ -
— 9 4 0 � --#
� -� --
w � 8'-8-0" 18'-6-0"
a-rubi',`�
CERT(F(ED r --- ---- -------- -— -__ _ - �-�------- �
Automated Building Components, Inc Ho GAN sAz,Es RF P : Lzc wo# : T s i o s o F
1111 8th Street DUE nz��rE : ol/i9/is scAZE : 1 ��=6 � -0-0^
Chetek, Wl 54728 LYMAN CHAN Ds�ivR/cxxFz : JL,B / nate : Z/19/2ols ll : l�
7 9 � BROWN ROAD NORTH TC Live 40 _ 00 psf DurFac-Lbr 1 _ 00
Plror�e 800-524-9990 "
TC Dead 10 _ 00 psf DurFac-P1t _ 1 _ 00
1'/ro�ie 7I5-924-4867 LONG LAKE MN
Fc,�r 715-924-2_58_S Bc Live o . 00 psf o. c . spa�ing : i- �- 3
BC D�ad S _ 00 psf Design Spec _ SRC-2006
#Tr/#Cf O / O
"SETTING THE STANDARDS FOR QUALlTY AND SERVICE" T o t a i s s . o o p S f g `
��� �� DATE TIME �
��av" '�E�IN �
CIN�F�R�N•
INSPECTION NOTICE SCHEDULED � � na��I�
PERMIT NO.�'�/S-D�ZT7� COMPLETED
ADDRESS /Q r �Z�x�
OWNER TELEP NE NO. �Z �l0�
CONTRACTOR —
� DESCRIPTION ' � � �"y/ �
�
ll! �E.00TING ❑ DEMO-FIN L ❑ SEPTIC FINAL
Qv❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS
� ❑ INSULATION ❑ WOOD BURNER/F�REPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
_ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL
J ❑ DEMO-SITE ❑ SEPTIC INSTALL ❑ FOUNDATION/REMOVAL
� OWNERICONTFiACTOR TO MEET YOU:_YES_NO
� COMMENTS: ��3�� " �bs n��o l� �K
W �jp�-
a c�`���i ` ��
� �� � n
J� �3� /� � I'Gt �"�'�'`r1,� 3��j$ . �
�. .. � ,. V? � �? ��G-<1 �' �L�j —
� .
O
�
W
Q _ Sd ,-C . ��.P _ G14�, �
�
2 �C - .
� Uin,S�C. Scz�t -�s ���5 �° ��t���'
W
� rc� o f� -
a
W ❑WORKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE
��C6RRECT WORK&PROCEED C ISSUE CERTIFICATE OF OCCUPANCY
w
� ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL REfURN
❑STOP ORDER POSTED.CALL INSPECTOR !�CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
C 'nspection 24 hours in advance. (952) 249-4600
Own rfContractor q�site: � '�
Inspector. �-'
White Copy/lnspector's Ffle Canary CopylSite Notice
r
� � �J{�� DATE TIM V
CITY OF ORONO CALLED IN /j/rl _ J�����'1
INSPECTION NOTICE SCHEDULED��
PERMIT NO. a�'S�DD77 OMPLETED
ADDRESS /�v ��j �✓
OWNER T PHONE N(�"�-���- -S -S
CONTRACTOR �- �- — -e
� DESCRIPTION �� � L��
ly ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
O ❑ FOUNDATION WATERPROOF ❑ PLUMBING F�NAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
i ❑ AS BUILT-SURVEY ❑ SE ER HOOK-UP ❑ HARD COVER REMOVAL
J ❑ DEMO-SITE ❑ TIC INSTALL ❑ FOUNDATION/REMOVAL
� OWNERICONTRACTOR�U: YES._NO r
� COMMENTS:
�
W
a
�
J
O `�
�
O
�
W
�
Q
2 �
W
�
W
�
j
O
W WORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLEfE
� ❑C RECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
W
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN
INSPECTOR WILL REfURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 ho in a . ( 2) 249-4600
OwnerlContractor on site:
Inspector.
White Copyllnspector's File Canary CopylSite Notiee
�� � DATE TIME �
CITY OF ORONO CALLED IN
INSPECTION I �/ ��SCHEDULED __�! ' ' �•
PERMIT NO. `� COMP ETED �
ADDRESS �
OWNER TELEPHONE NO. � �����'
CONTRACTOR �, (��l'1 ���.�-�
� DESCRIPTION ���C��� � � '
ll� ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL I•
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
� ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
_ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL
v ❑ DEMO-SITE ❑ S IC INSTALL ❑ FOUNDATION/REMOVAL
2 OWNERfCONTRACTOR TO MEET YOU: YES_NO
� COMMENTS:
a� r /� . � ^ .
I�Ourt�laf`/tC� ►'�. W�tte✓�/c�� �Y l�t�,�.o�.-
J QK `
O �" _ . . —
� � �2/�OL�'t T�C�K��f%ro r�. 1�'G�LGl ��1 <�✓[c�
O
�
� ^ fo4 n�a��r�n �rc�ri, ,6 �% - o,�
Q .
� lJ Prv t,��o� I^�!� -� �'�Ehr�, �✓ G�ra.n�c l e
� � �- •� �'- k�c�<l s � Sv�/f �QGJ.t —
�—�
� C6 r✓�L'C�" 5 �� '� Cd��
�
d
W ❑WORKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE
� `�CGAREGT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
W
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE CWERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. ❑ PHOTOTAKEN
INSPECTOR WILL REfURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (J52� Z49-4600
OwnerlContractor on site:
Inspector_
White Copyllnspector's File Canary CopylSite Notice
�/� � DATE T�
�` CITY OF ORONO CALLED IN
INSPECTION N TICE SCHEDULED �,T(/ �j h� /(�
PERMIT NO. � �c'C� �� COMPLETED
ADDRESS �I �O �r�. � i� �'l ��,
OWNER TELEPHONE NO�IZ-�I(� '"5�Z�'I
CONTRACTOR C � � "�
� DESCRIPTION ��� � '
ll� ❑ FOOTING ❑ DE -FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
Q ❑ OUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z�.$�4DON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL
J ❑ DEMO-SITE
❑ S TIC INSTALL ❑ FOUNDATION/REMOVAL
� OW NER/CONTRACTOR TO MEET YOU:�YES_NO
� COMMENTS:
� n
a F�6�4 (f_� ��� �c�
�
0 " �L( ��e4wt S -� /��it.o�/l.��ic.� rc� t�� -
�.. �-�
�
� � � CQUQ �
W
�
Q
�
2
W
�
W
�
J
d
�J/�'�$i�6K.SATiSFACTORY:PROCEED ❑ PROJECT COMPLETE
❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTO TAKEN
INSPECTOR WILL REfURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Ca11 for the next inspection 24 hours in advance. (g52) 249-4600
OwrterlConVactor on site:
Inspector.
�/^-- �
White Copyllnspector's File Canary CopylSite Notice
�
. J%
G�� DATE TIME
CITY OF ORONO CALLED IN
INSPECTION N, �S ^ �^��CHEDULED ��� ��
PERMIT NO. �� OMPLETED
ADDRESS ���d ��`(�n ��
OWNER TE�.EPHONE NO�� Z �tU ���1
CONTRACTOR �' � -
� DESCRIPTION ��C k- �
W �OOTING ❑ DEMO-FINAG ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
y ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
_ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL
v ❑ DEMO-SITE ❑ SEPTIC INSTALL ❑ FOUNDATION/REMOVAL
2 OWNERfCONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
a .3 ` ✓�1 •• �� �e�.� ��s- 4�/�
oS6�r� ��. ��s - .� 6 D Y -� ����, -
�' ,� +,
�
� � �wtd%e c_T�� /'j9CLc� '} �Q�sS� ��G �'�'d..�(
W '
Q ��"6� 6�' �S . � ,(�/t� �o�G v+�l �G ✓
�' CtD,//'Gu�� ,n��it Dv�o � � /�6.,.:�, .-Lz '
z
W
�
� � r r�G�-� � �- .d6cc � -
�
O
W ❑WORKSATISFACTORY:PROCEED ❑ PROJECT COMPIEfE
��BRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
O C�CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECWERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN
INSPECTOR WILL REfURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑INSPECTION REQUIRED_CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (g52) 249-46��
OwnerlContractor on site: �a'�G—
Inspector. �� �r---- �
White Copyllnspector's File Cenary CopylSite Notice
C�/ DATE TIME �
% l�ITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED � �-
PERMIT NO. ��U���T��� COMPLEfED
ADDRESS �
OWNER TELEPHONE o. 12 7��-9c�9
CONTRACTOR � D/1 a ��h'1S
� DESCRIPTION / �
tu ❑ FOOTING ❑ DEMO-FINAL ❑ S IC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
_ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL
J ❑ DEMO-SITE �PTIC INSTALL ❑ FOUNDATION/REMOVAL
� OWNERfCONTRACTOR TO MEET YOU: YES_NO
v�i COMMENTS:
� -
a ��..2�+- - fa��� �e� ��D lr t-�s/�
oC„�sw�,O�cE�� bK � ' l!� � � �> c���-.- �r
a
�
� ��Q'G��C+^ G..✓� FjJ�I ,�ji� C w47 .ds9�t�
W
�
Q
�
2
W
�
W
�
j
��PO�FiK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
� ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. O PHOTO TAKEN
INSPECTOR WFLL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR O CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Ca11 for the next inspection 24 hours in advance. (g52 j 249-4600
OwnerlContractor on site:
Inspector.
White Copyllnspector's File Canary CopylSite Notice
� � �i� DATE TIME\/
CITY OF ORONO CALLED IN �� �
INSPECTION OTICEO�-7-� SCHEDULED -1�y�(C_`{�-- —�Y►
PERMIT NO. COMPLETED
ADDRESS � � � �� �7�=✓1 /� �
OWNER TELEPHONE NO. � � a �y� 7U1��
CONTRACTOR �-=� r�l/�/-�`u�'l�S j
� DESCRIPTION � r " �
ll� ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
i ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL
v ❑ DEMO-SITE ❑ PTIC INSTALL ❑ FOUNDATION/REMOVAL
2 OWNERICONTRACTOR TO MEET YOU�YES_NO
� COMMENTS: �_L r.r �'?n�G77�i�'I � � /��Zl
a ��� �5/����
o �� P�w°,a c, 7-,�,.�« � .` f.-kss G �d�- r��� b�dc�.
'' � P�o��n� /4C��y ,�� w�*� ` bio
� n�a� .•.� rt t4s
� t(`�b/�w C✓ ��t�a.
W .
Q �I� I �/ setf � o�iy/� g..��.� �r�ss�,s�
� s�ecs rv✓•�G u- J / 7•� ��' �-'4Ss-K Y
� Ir�t. � r n - 'h�!
� r �cc t3 � .: �..i l�„�r. y� ..� r.r+c k.. � pwr�'kr�
. f,o
� ` • � p^���e��o�
� i+�l.ca r�'� l - .
d Gow� .4 fj,�?� �.Cg�.�
W ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLEfE
� �f86RRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
W
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING � PERMANENT
❑ CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTO TAKEN
INSPECTOR WFLL REfURN
❑ STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
r t inspection 24 hours in advance. (952) 249-46�0
Ow fContractor on si :
Inspector. /r^�
White Copyllnspector's File Canary CopylSite Notice
-
�� -�j� � � DATE TIME �
CITY OF ORONO �m% CALLED IN
INSPECTION NOTI�E �� SCHEDULED /S �
PERMIT NO. �D COMP�ETED
ADDRESS �O ,���i I o�/J �ZC� /Il
OWNER TELEPHONE N �0�2"�y�`9D�
CONTRACTOR �
�; DESCRIPTION ���-l� �� d� !��
11� ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FI�
O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
W ❑ AS BUILT-SURVEY ❑ S WER HOOK-UP ❑ HARD COVER REMOVAL
J ❑ DEMO-SITE ❑ PTIC INSTALL ❑ FOUNDATION/REMOVAL
� OWNERiCONTRACTOR TO MEET YOU: ES_NO
� C MENTS: �
a � � � �G( � '�' CI� .SG�'t'l
o /r �e l �H �e�e.�c,�� ,�
'` �� f' / u c.y
�
° P�''!cG vt i G -�Y'�► v✓'�C� l�v!
W
�
Q
2 c� CoU e Y�
W
�
W
�
j
d
W ❑WORK SATISFACTORY:PROCEED ❑PROJECT COMPLEfE
� CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
❑ RRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. ❑ pHOTOTAKEN
INSPECTOR WIIL REfURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUEO
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call forthe next inspection 24 hours in advance. (952) 249-46��
OwnerlContra on site:
Inspector.
White Copyllnspector's File Canary CopylSite Notice
� I� �Q �
- ��C'V ' �
Q ^ D T � TIME
CI7Y OF ORONO � CALLED�N 0 �'�.'
INSPECTION NO ICE S HEDULED � ��
PERMIT NO. � � OMPLETED
ADDRESS
OWNER TEL P ONE NO. �o?" � -G�9
CONTRACTOA �
� DESCRIPTION �
W ❑ FOOTING ❑ DEMO- INAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
J �FINAL ❑ WATER HOOK-UP
❑ FOLLOW-UP
_ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL
v ❑ DEMO-SITE ❑ SEPTIC INSTALL
Q OWNERICONTRACTOR TO MEET YOU:_YES_NO
° COMMENTS: ��eG • -r�Kt,L ' �d "02�f- /5�
�
W
a
O /� �� CpYvsc��i�Gn S �r0✓��q �
>.
�
� 1 �/( k�0 r K C°o w�-�/�Z�� —
Q �P�ov.d�. cs-/�a. l.0 Sc.�r.� 1
2 �- PP!'yy�Q, �'c..to(�� �.e� K��/io�4� b F
� 4s -64. �c SY/✓�y -
W
�
j
W ❑1NORK SATISFACTORY:PROCEED �ROJECT COMPLEfE
� ❑CORRECT V1fORK 3 PROCEED �ISSUE CERTIFICATE OF OCCUPANCY
W
O ❑CORRECT WORK,CALL FOR REtNSPECTION TEMPORARY
V BEFOREC0IIERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS_ ❑ PHOTO TAKEN
INSPECTOR Wlll RETURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (g52) 249-46��
OwnerlContractor on site:
Inspector_ �/�-- 7C�
White Copyllnspector's File Cenary CopylSite Notice
�� ��;, /
�,7C�� DATE �a v� TIME"-�•�
CITY OF ORONO CALLED IN ��
INSPECTION NOTICE �,--� SCHEDULED `' �_{� �n-,
PERMIT NO. ���_ COMPLETED "
ADDRESS '� �_- 'i'�tl.l�rl �V
OWNER TELEPHONE NO. (I1 (Z- 7�1-QLY�
CONTRACTOR ���7/���eL� 7�f�'V��
��
� DESCRIPTION "� D � \.�'%'
W ❑ FOOTWG ❑ DEMO-FINAL f,� ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL
_
J ❑ DEMO-SITE ❑ S PTIC INSTALL
2 OWNERICONTRACTOR TO MEET YOU:�YES_NO
� COMMENTS: �'_(�EL,IL- ��}--�-1'i l5 l,l�
� � In�C"}--�("�
�
�
o / .
a� - -J /�`S 1 n 5/�°�i�0.� /'d„�c,O�G��� O Z
° .� -//• i� �y (�,.,�.,
W
�
Q
�' �on�✓s��r �s5 LG�IGY,d /�S/J-
� sl� -
w
�
j
d
W� �iNdRKSATISFACTORY:PROCEED ❑ PROJECT COMPLEfE
� ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFOREC0IIERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR W{LL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Cail for the next inspection 2a hours in advance. (g52) 249-46��
OwnerlContractor on site:
Inspector. �r"''��
White Copyllnspector's Ffle Canary CopylSite Notice
�
� //
��
�,/ ' DATE .�� TIME� �
CITY OF ORONO CALLED IN t
PERMIT NO. , E sCHEDULED _ r I��1A�
INSPECTION NOTI�I 5���.� -
�� _ - -
COMPLETED
ADDRESS � �� ������� �
OWNER TELEPHONE NO. ���' -���
CONTRACTOR � -� ��A� �'1�5
� DESCRIPTION �� , �� _���--
ll� ❑ FOOTING ❑ DEMO-FINAL " ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
_ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL
v ❑ DEMO-SITE ❑ EPTIC INSTALL
2 OWNERICONTRACTOR TO MEET YOU:�YES_NO
� COMMENTS: �-Q��-C� � `=�G1�S
�
a �� �� `'��1 � i
�
J
O �r-/
� ,/`?•S /�'►v/�o�ro.� Co�,��� D n
� L/- /S� " /5 ��6.�.� �l ��- /'��D• .-
W
�
Q
2 �O �L��¢l.�d�" � [/G�l�t'� l�,��- �rd �
W
�
w
�
j
W�RKSATISFACTORY:PROCEED ❑ PROJECTCOMPLEfE
� �CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
W
� ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE CWERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. p pHOTO TAKEN
INSPECTOR WILL REfURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
O INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Ca11 for the next inspection 2a ho 'n advance. (952) 249-4600
OwnerlContractor on site:
Inspector.
White Copyllnspector's Flle Canary CopylSite Notice
�-- �
a
�� � � DATE
CITY OF ORONO '�CALLED IN �
INSPECTION�TICE r.�SCHEDULED _����
PERMIT NO. �d 5 "(`Y`�� gCOMPLETED
ADDRESS � � � �►�l.-��� 1 T�r� I��
OWNER TELEPHONE NO.
CONTRACTOR '�� Ol'� l�s ..Po.o� �'vY�c-
� DESCRIPTION �� �V� V `� f'�.�i �;-� ��I�
ly ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL�,�
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
W ❑ AS BUILT-SURVEY ❑ EWER HOOK-UP ❑ FOUNDATION/REMOVAL
_
J ❑ DEMO-SITE ❑ TIC INSTALL
2 OWNER/CONTRACTOR TO MEET YOU: ' YES_NO '
� COMMENTS: � PrOv i�j s c/e�•k4L �,�iaG
W /'Cl•v�w/! ��. s�v a� vs w� �S
a
� /'bG/a� 9• n �....
�
� 5 c�a,! 4 � c�3
�
� • > �
� fb� Drovr,d� ��u. �, " ✓ /GS�i 1�SG r d K �e�.k,
� � �5
Q •
�
W
� Co''''��� �'s�� �� / /'�s n-s,�e�a :�
W
�
�
J
d
W ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
� ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
W
� ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
� BEFORECWERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pH0�0 TAKEN
INSPECTOR WILL REfURN
❑ST P ORDER POSTED.CALL INSPECTOR O CITATION ISSUED
INSP N REQUIRED.CALL TO ARRANGE ACCESS.
Ca11 for the next inspection 2a hours in advance. (g52) 249-46��
OwnerlContractor on site: ��fi.r�
Inspector.
White Copy nspector's Ffle Canary CopylSite Notice
J '
� ► � �
1 �
emo
To: Finance Department
From: Chnstine Mattson, Planning Assistant �J� ' '
CC: Street File
Date: June 21, 2016
G/L: 101-22205
Re: Escrow Refund
Building Permit #2015-00077 pertaining to 790 Brown Road N is complete. Please refund
$10,000 to the applicant, Gonyea Homes.
The following is attached:
• Original signed escrow agreement
• Copy of cash register receipt showing escrow amount received
Mail to: Gonyea Homes
1000 Boone Ave#400
Golden Valley, MN 55427
w:�street files�brown road n\790\escrow refund 2015-00077.docx
� . � ' V
TEMPORARY CERTIFICATE OF OCCUPANCY
ESCROW AGREEMENT
Orono Building Permit#2015-00077
• AGREEMENT made this �d day of , 20�, by and between the CITY OF
ORONO, a Minnesota municipal corporation ("City") a Gonyea Homes ("Owners").
Recitals
1. Construction of the new residence located at 790 Brown Road North the ("Subject
Property"), legally described as in Orono, Hennepin County
Minnesota, is the subject of building permit application number 2015-00077 has been
completed.
2. Winter conditions currently prohibit completion of exterior improvernents, final grading, and
vegetation establishment. An as-built survey cannot be accurately conducted at this time.
3. Owners request the City issue a temporary certificate of occupancy ("TCO")to the Owners
so that the Owners may occupy the new residence.
4. The City will issue a TCO only if the Owners establish an escrow to ensure completion of
exterior improvements, continuation of erosion control and submittal of an as-built survey
to the City.
NOW THEREFORE, THE PARTIES AGREE AS FOLLOWS:
1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow
Agreement, the Owners shall deposit$10,000 with the City. All accrued interest, if any, shall be paid to the
City to reimburse the City for its cost in administering the escrow account.
2. PURPOSE OF ESCROW. The purpose of the escrow is to assure completion of any
exterior improvements, final grading, establishment of vegetation as well as guarantee reimbursement to
the City for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of$500,
or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with
expenses the Owners would be responsible for under a building permit application. The escrow will also
guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work
is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City
Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions
associated with the work and to repair any damage to public property or infrastructure that is caused by the
work (including planning, engineering, or legal consultant review) associated with building permit#2015-
00077 if compliance with the approved building permit is not accomplished.
3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will
in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the
Owners' receipt of bill.
4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make
payment to the City within the timeframe outlined in #3 above, shall issue a Stop Work Order until the Owners
pay all expenses invoiced pursuant to#3. The City may draw from the escrow account without further approval
of the Owners to reimburse the City for eligible expenses the City has incurred.
5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to
the Owners when all requirements related to the project are complete. City Staff shall review the terms of
this escrow agreement two times per year to determine whether the requirements of the project have been
successfully completed and whether it is appropriate to return the funds. Owner may also request the
release of the funds, and such funds shall be released upon City Staff receiving the appropriate verification
that all requirements of the project have been successfully completed.
155441
6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligibie
expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the
unpaid balance to the subject property pursuant to Minn. Stat. §§415.01 and 366_012.
' 7. ACCESS TO SUBJECT PROPERTY. The Owners hereby grant to the City, its agents,
employees, officers and contractors, the right to enter upon the subject property for the specific purpose of
inspecting and completing any exterior improvements, final grading, establishment of vegetation and the
restoration of the subject property should the Owners not complete the work by the specified dates.
CITY: CITY OF ORONO OWNERS:
By: � __
�ts: �{�h� ' l�
internal Use Only: Qriginai to Finance Department �Copy to Street Fiie
155441
� e• -e � � � •- �
� ' /,/�e%�j '�!/ % ���,. �� �� \�
� � . � j� �/%/�� \..,, ��\�\\'\ \ �\\�.. \. ..�_ �% .�,,;,ii�. . ijiTr��//%%ii. . . �' \\\ \����•� . \
� V� �f3' , %� �
� �� �� ��, ;YEA��?��E.\��y�� \�\ �� �. j / ��� O� � �
�� � �� / O�+l M F�.. ����AL' �� \ �� //O/R{ .:' �����// r flM � � \� \ \ �
�bEial VALC��MN����� \\\\ O \� � /// � �%/�'� �� � \o�\\\ \ \ \O,�\`��.
/���� r/� � ���� \ \�
� �
j ,��%%�,. � %o�� `� ��° �o ` -
� o, �% �� �� � � \� \ a��$�2���
� � � ,�� � :�`� . . . . :. -
;,� % �j� �, ����� � .��� - - � - -
G'��Orono . .s ** ..
7,5Q0.00
�/,� , jfl����J� �iVQ \\�\,`r��� \� �irw�\*\orr,r**�-�r�s**�f�-r,r****,�-�s�r,rx��xn.+r****.r*+�kx,�*,k,tk��*#*�r�.*+r,t*x DOlLi4R$
� / % � �� '����. \���� , �� _
���� , , o � �_ � _
��i��/�r�,� .���Y���:��no \� ����� � \���
PO Box 66
Grys#a18ay,MN���23 SENa '`
� '�/%/. %/. � /%� \��. �� �\\\ � � ='��t �r��,
/,//� �//� % /!� '�\..�\ ��\\ � � \���\ _ _�
' "���� i .�a�j �,� \ >_,,��,�, �� � >._ ._..._ _ .
// NArur�
- City of Drono � ' I
2750 Kelley Parkway
Orono MN 55356 952-249-4600
Receipt No: 3.014109 Aug 28, 2015
Gonyea Homes Inc.
Previous Balance:
Permits .00
2015-01098 790 Brown Rd N 7,500.00
101-22205
Deferred Rev-Developer Deposit
Total: 7,5p0,00
Check
_______________
Check No: 16454 7,500.00
Payor:
Gonyea Homes Inc.
Total Applied: 7>500,00
-----�-------oo-
Change Ter�dered:
_______________
08/2S/2015 11:3GAM
' ` CITY OF ORONO ��
' ' - * z 0 1 5 - 0 1 0 9 8 *
2750 KELLEY PARKWAY DATE ISSUED: 08/28/2015
ORONO, MN 55356-
(952) 249-4600 FAX: (952) 249-4616
ADDRESS : 790 BROWN RD N
PIN : 34-118-23-11-0003
LEGAL DESC : REG.LAND SURVEY NO. 1275
: LOT 000 BLOCK 000
PERMIT TYPE : ESCROW FEE-TIED TO BUILDING PERMIT
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : ESCROW FEE-TIED TO BUILDING PERMIT
NOTE: ESCROW FOR NEW HOME PERMIT#20 1 5-00077-PD BY GONYEA HOMES CK#16454-$7,500.00
APPLICANT ESCROW FEE-BUILDING 7,500.00
TOTAL 7,500.00
GONYEA HOMES Payment(s)
6102 OLSON MEMORIAL HIGHWAY CHECK 16454 7,500.00
GOLDEN VALLEY, MN 55427-
(612)741-9069
Minnesota State License#: BUIL-2459
OWNER
Gonyea Homes
6102 OLSON MEMORIAL HWY
GOLDEN VALLEY, MN 55427-
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be perfortned according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for only the work described and does
not grant permission for additional or related work which requires separate
permits. All provisions of laws and ordinances governing this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has commenced.
The applicant is responsible for assuring all required inspections are
requested in conformance with the State Building Code.This permit may be 1 i rn
revoked at any time for due cause. !W�
�� �C��� ���� I Sc� � � �� �
< Applic t rtee ' ure Date Issued By Signature Date
�� . � BUILDWG PERMIT ESCROW AGREEMENT
Orono Building Permit# 2C? f S - (]�;��
A�+REEMENT made this � � day of ,�Gi�� 20 �.5` by and between the CITY OF ORONO, a
Mirt iesota nunicipal corporation ("City") and �a c���i I{o�n,e� ("Owners").
Recitals
1. A building permit ap lication has been filed for �.�zi,�.' �a✓'�1C located at
(� v'� � the (°Subject Prop�rty" , legall described as
t2 t,g o. / Z�S �-rCc � v�¢ �-1/�.1
2. Owners request the City to review this application which requires City approval and may require
consultant legal and/or engineering review.
3. The City will commence its review of the application and incur costs associated with said review only if
the Owner establishes an escrow to ensure reimbursement to the City of its costs.
NOW THEREFORE, THE PARTIES AGREE AS FOLLOWS:
1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement,
the Owners shall deposit $2,500 with the City. All accrued interest, if any, shall be paid to the City to reimburse the
City for its cost in administering the escrow account.
2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all
out-of-pocket costs the City has incurred (including planning, engineering, in excess of $500, or legal consultant
review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be
responsible for under a building permit application. The escrow will also guarantee reimbursement to the City for all
out-of-pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater
Pollution Prevention Plan and the provisions of Orono City Code Chapter 79. The financial security may also be used
by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property
or infrastructure that is caused by the work (including planning, engineering, or legal consultant review) associated with
building permit#������k���7�1 if compliance with the approved building permit is not accomplished.
3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send
a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill.
4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the
City within the timeframe outlined in #3 above, shall issue a Stop Work Order until the Owners pay all expenses invoiced
pursuant to#3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for
eligible expenses the City has incurred.
5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the Owners
when all requirements related to the project are complete. City Staff shall review the terms of this escrow agreement
two times per year to determine whether the requirements of the project have been successfully completed and
whether it is appropriate to return the funds. Owner may also request the release of the funds, and such funds shall be
released upon City Staff receiving the appropriate verification that all requirements of the project have been
successfully completed.
6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible
expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance
to the subject property pursuant to Minn. Stat. §§ 415.01 and 366.012.
CITY• C T OF O O OWNER:
�
By: .'i
�ts: � ,�
lnternal Use Only: � Original to Finance Department �Copy to Street File
Packet Last Updated: January 2015
Page 22
yi,, � /i i2, .�� \ �. .
�j:� ' � ti��i � �\��\����\�- � � ��� �%i
, ,
��, , � ,, , � � ��� �� �i "SRID6EWi9�ER BANi( � � \�\ ����`�� \�? �`
q%� � „GONYEa �or�E���1��\ �,:�� � �� \ ��° ��� �� ��
� � F��H�; , , , ,� � ��\ ,` �,�\ .\ � � .� p
'� ��-,; � � �\ �� ��%.VJWW�RRI4GEMlA��RB/�NK,NIN.COM � � \ \ , �....
vY � � �� � .�\ � �� ��C7
��i��//%%%�. ��a�r2,QL�ON MEM(�R1AL�1\ �1,,�` \ ��; �//�`_ iR/�i/' /�y- �i'i%,.::' �� � � �� ��������°.
�� �� GOLDEN VALLEY`MN.5�`�"� \ \� �/��,i/i,� ii.,y�/ ,,>,c, , �/ \\ \.�\� � �\\
�!j ,%%�/,��, �i i�;�j'%%%� `\ \� . \\��\ �� �� `� 3/5/�03 5
�������� � � %� \��� ����� \ \,�e
i; ORb ..< i� , . '� � , \ \ \\\��`'
i �!:� ,,,����%�'�f ana\ ��\\\\� �` �\� - __ � *�
2,500:00
Two�housand Fave Hundred ��d OQ1�00+�*'*#'�,k"F'�*'`*'�**'***'`**'�*****w***�**,r,r***,r*r�rrwr }**r********,�**+*r*t+.rr*r*«*,rrr*,r,rr* DOL•LARS
�j�'/%� �� jj/j�� \�\\ \\\ �\\\'\ \ \\ \\
"%„ // Ct�;+�',���rio \�, ;\� \ � � �
r, i/ / , � ����\ \ \\\
�t� �b��s ,
Crystal 8ay, MN 55323 PSSENS,T ,
j ��j���% j��� �i/�%� \�\ ���\\� \�\\� \ �� \� _� m
� j%/ � % � �� �� ��\ � �\\ ,
�� % � % ��\� � �� � �\� �:
� � � ��� �� ��� AUTHORIZED SIGNATURE
.//�� %/i /%; 9/% %%,/,%j ,\\\� \\:��\\ �\�:�\�\ "RF,�� , •
GONYEA HOMES INC
City Of Orono 3/5/2015 15288
Date Type Reference Originai Amt. Balance Due Discount Payment
3/5/2015 Bill 790 Escrow 2,500.00 2,500.00 2,500.00
—�
Check Amount 2,500.00
- ,, �
R,.,
a ,
. .. ...:,
_��.�... �k=.. _. ... _.__. __ _
� : �
Bridgewater 8ar�k$30 790 2,5aD.00
City of Orono � '
2750 Kelley.�Jrkway
Oron� MN 55356 952-249-4600
Receipt No: 3.012913 Mar 6, 2015
Gonyea Homes
Previous Balance: .00
Permits
1015222053 790 Brown Rd N 2.500.00
Deferred Rev-Developer Deposit
Total:
2.500.00
Check =____=`_______
Check No: 15288 2,500.00
Payor:
Gonyea Homes
Total Applied: 2,500.00
-----------.00
Change Tendered:
_______________
03/06/2015 11:24AM
, � � CITY OF ORONO * z p� 1 5 - 0 0 z 7�
, 2750 KELLEY PARKWAY DATE ISSUED: 03/06/2015
ORONO, MN 55356-
(952 249-4600 FAX: 952 249-4616
ADDRESS : 790 BROWN RD N
PIN : 34-118-23-11-0003
LEGAL DESC : REG.LAND SURVEY NO. 1275
: LOT 000 BLOCK 000
PERMIT TYPE : ESCROW FEE-APPLICANT
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : ESCROW FEE-APPLICANT
NOTE: ESCROW FOR NEW HOME PERMIT#2015-00077-PD BY GONYEA HOMES CK#15288-$2,500.00
APPLICANT ESCROW FEE-APPLICANT 2,500.00
TOTAL 2,500.00
GONYEA HOMES Payment(s)
6102 OLSON MEMORIAL HIGHWAY CHECK 15288 2,500.00
GOLDEN VALLEY, MN 55427-
(612)741-9069
Minnesota State License#: BUIL-2459
OWNER
Gonyea Homes
6102 OLSON MEMORIAL HWY
GOLDEN VALLEY, MN 55427-
AGREEMENT AND SWORN STATEMENT
The work ror which this permit is issued shall be performed according to
the approved plans and specifications,app►icable City approvals,and the
State Building Code. This permit is for only the work described and does
not grant permission for additional or related work which requires sepazate
permits. All provisions of laws and ordinances governing this type of work
sha(i be compied with whether or not specified herein.This permit wi11
expire and become nu11 and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has co d.
The applicant is responsible for assuring all required inspec' s aze
requested in conformance with the State Building Code is permit may be /�� „
revoked at any time for due cause. ���
Y �
� / G
Applicant Permitee S' ature Date Issued By Signature Date
DATE TIME
C"I OF aRONO CALLED IN
INSPECTION NOTICE SCHEDULED
PERMIT NO. IS ..fit I l COMPLETED �7 I I-
ADDRESS �
OWNER TELEPHONE NO.
CONTRACTOR j
DESCRIPTION Ll 1'CIA,- ( �
W ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
QElFOUNDATION WATERPROOF ❑ PLUMBING FINAL ElTREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS
❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
_ ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL
J ❑ DEMO-SITE ❑ SEPTIC INSTALL ❑ FOUNDATION/REMOVAL
OWNERICONTRACTOR TO MEET YOU:_YES_NO
C) COMMENTS:
cc
W
a
a
d
W
cc
Q
2
W
Z
W
QC
j
d
W ❑WORK SATISFACTORY:PROCEED Li PROJECT COMPLETE
cc ❑CORRECT WORK&PROCEED Lj ISSUE CERTIFICATE OF OCCUPANCY
W
QC) ElCORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN
❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
Owner/Contractor on site:
Inspector. �UlC i r h � moo-�
White CopylInspector's File Canary Copy/Site Notice
DATE TIME
CITY OF ORONO CALLED IN
fNSPECTION NOTICE SCHEDULED
PERMIT NO. LIQ G QD�1 COMPLETED / /
ADDRESS 7'?0dw� 0o
OWNER TELEPHONE NO.
CONTRACTOR L l
DESCRIPTION
tA
❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
Cc
❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z SLAB
El ❑ MECHANICAL RI SITE INSPECTION
Q ❑ FRAMING MECHANICALFINAL ❑ PROGRESS
❑ INSULATION ❑ WOOD BURNER/FIREPLA E ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
W AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL
❑ DEMO-SITE ❑ SEPTIC INSTALL ❑ FOUNDATION/REMOVAL
OWNEWCONTRACTOR TO MEET YOU:_YES_NO
oy COMMENTS:
CC
601- r✓ 1'c lecf a ra di
0
I' m e— iNZ I_
Cc
LQ
D K
W
W
CC
J
d
W ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
44
W El WORK&PROCEED Ll ISSUE CERTIFICATE OF OCCUPANCY
OO 11CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
• CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
Owner/Contr r on site:
InspectorLIZ '7_
White Copylinspector's File Canary Copy/Site Notice
Christine Mattson
From: Adam Edwards
Sent: Thursday, October 29, 2015 1:49 PM
To: Jeremy Barnhart
Cc: Christine Mattson
Subject: 790 Brown Road N.
Jeremy,
I've completed review of the as built survey for the subject property and have no issues. City inspector
should inspect the site to ensure the survey accurately depicts current condition on the ground. In particular
the inspector double check the retaining wall height next to the paver patio on the east end of the home (the
elevations have changed between as-built submissions).
Adam
Adam T. Edwards, P.E.
Director of Public Works/ City Engineer
City of Orono
(952) 249-4661
aedwards@ci.orono.mn.us
i