Loading...
HomeMy WebLinkAboutltr re survey/permit Evelyn M. Turner From: Evelyn M. Turner Sent: Wednesday, August 18, 2010 2:09 PM To: 'a.smith@hp.com' Subject: Deck Permit for your house Mr. Smith: Before the building official reviews the your plans for compliance with the building code the Planning Department checks for compliance with the zoning code. It seems that the new deck will satisfy all the zoning code requirements. But because the survey you submitted dates from 1971 I had to look through old permits to determine what the hand drawn lines mean. (I did this only to ensure that the deck would probably satisfy the setback requirements before I asked for a survey.) After 39 years the survey needs to be updated. It needs to show: • The existing house and the proposed deck with distances to all four property lines from the closest point of the house and proposed deck. • The location of the Stubbs Bay Creek shoreland district boundary (300' from the creek) and hardcover calculations for any portion of the property with this shoreland district. To keep the process moving I will have the building official review the plans while you are obtaining the updated survey, but the survey is needed to issue the permit. If you will be excavating more than 50 cubic yards you need to obtain an erosion control permit from the Minnehaha Creek Watershed District (www.minnehahacreek.or�). If you don't need this permit erosion control measures but be shown on a second copy of the survey. If you have any questions feel free to contact me. Evelyn Turner City Planner City of Orono 952-249-4623 952-249-4616 (fax) 1