HomeMy WebLinkAbout2004-P07712 - mechanical CITY OF ORONO PERMIT
2750 Ke�ley Parkway - PO Box 66 Permit Number: po��i2
Crv�tal Bay, Minnesota 55323 Permit Type: Mechanical Permits
(952) 249-4600 Date Issued: ��isi2ooa
SITE ADDRESS: 65 Cygnet Pl
L.ong Lake,MN 55356
P I D: 04-117-23-22-0008
DESCRIPTION:
Proposed Use: Residential
Permit Class: General
Permit Type: Mechanical Permits permit Sub-rype(s): Mulriple Mechanical Items
DETAILS:
Approved per resolution#:
Separate pernuts required:
NOTICES/REMARKS:
FEE SUMMARY: Pernut Fee: $ 250.00 Valuation: $ 20,000.00
State Surcharge Fee: $ 10.00
Misc.Fee: $ 1.61
TOTAL FEE: $ 261.61
APPLICANT: Ditter Inc. &Ditter Properties OWNER: Kevin&Michelle Krokzyk
820 Tower Drive 65 Cygnet Pl
Medina,MN 55340 Long Lake,MN 55356
THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE TI-IE REAL IMPROVEMENTS SPECIFIED
AND AGREES TO DO ALL WORK IN SI'RICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND SI'ATE OF
MINNESOTA BUILDING CODE REQUIREMENTS.
~���� �., C7�rx'�t'�' _
APPL[CANT PERMITGE S[GNATURE SUED BY SIGNATURE
Copies: 1-File(Sienitures Required), 1-Applicant. 1-Monthlv Reports, 1-Assessine, 1-Finance Page 1
_: CI�"Y OF ORONO APPLICATION FOR MECHANICAL PERMIT Page 1 of'3
CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT
Box C5 (2750 Kelley Parkway)
Crystal Bay, MN 55323
GENERAL INFORMATION
1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be reviewed and a
permit will be issued within two working days.
2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID iJNTIL YOU
RECEIVE A PERNIIT. WORK MUST NOT BEG1N UNTIL THE PERMIT CARD IS POSTED ON THE JOB SITE.
3. Mechanical Designs -Complete calculations, details and specifications are required for each heating,ventilation,
humidification-dehumidification, and air conditioning installation including heat loss/heat gain calculation, design
temperatures, equipment ratings and identification as to type, manufacturer and model. Data shall be presented on form
provided. Identification of and specifications for water heating equipment shall also be provided.
4. When any new construction or remodeling is involved, a separate building permit must be obtained.
5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements.
6. All work must be inspected (rough-in and final). Call (952)249-4600. 24-hour notice required.
7. House Heating Test Record must be submitted before final.
Instructions
Complete all items on this application. Compute the permit fee. Sign and date the certification. INCOMPLETE
APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call (952) 249-4600.
Please check one: New Addition Repair Replace Residential Commercial
,
JOB SITE: t� � J � � �l�C� Zi : ��JJ�
Owner's Name: �Q � t'CI C•Z� �. Phone Number• �'C,S�p i.f-7j,� — -7
Mailing Address: Suyy� City: �V-r,�'1� Zip• 53��,�"ip
�II� .—�- /,, Q !,
Contractor's Name:��'�T'~� - Phone umber: ��/3 � ��J J z��
Mailin Address: 0 j U�'t'►� ,/�� City• �� ' Zip• S:S3`f C�
��,,� �1-�c�� C �v 1 « � �.��, �
� � . � �1�� ��
� �
�� �
SYSTEM DESCRIPTION
HEATING SYSTEMS `
Quantity: I
Make: Q f�(�l�
ModeL• ` Y1'1V1�1(X�'�''17��
Fuel:
Flue Size:
Input BTUs: �� V(/�
Output BTUs:
CFM:
file://C:�Documents%20and%20 Settings�nimi\Desktop\CITY%200F%200RON0%20APPLICA... 7/31/2003
l;l 1 Y Vt' UKV1V V HYYL1l,H 1 iV1V t'VK 1Vl�l;tiHlVlI;HL Y�KMI 1 Page 2.of 3
COOLING SYSTEMS
Quantity: '
Make:
Gl✓�1 ��/ '
ModeL• �Pf l r/JJ(/`�p,����
Tons:
H.Power
FIItEPLACES
Gas factory fireplace
Wood burning factory fireplace with flue
Wood Stove
Wood stove with flue
Brand Name Model No.
VENTILATION
No. Kitchen Exhaust duct recalculating cfm
No. Bath Exhaust(must have duct outside) cfm
No. Other Fans: Locations cfm
FUEL STORAGE(MUST BE APPROVED BY FIRE MARSHAL)
Installation or Removal
Fuel oil: gallons underground inside outside
LP Gas: gallons
Other Gas opening
PERMIT FEE CALCULATION(S)
2002 State Statute Yes This Section Applies
The replacement of a Residential fixture or appliance that meets all three of the following requirements:
1) Does not require modification to electrical or gas service.
2) Has a total cost of$500.00 or less;excluding the cost of the fixture�r appliance:
and
3) Is improved, installed or replaced by the homeowner or licensed contractor.
Skip next section; Cost of Permit $ 15.00 __
State Surcharge $ .50
-
Mail-In Fee $ 1.50
�ve oes not app y, o ow gu—i�e�nes e ow:
1. Contract Price* is .0125% of job with a Minimum Fee of($35.00)
--- � ----- �---- �� 11
X .oi2s $ 7i
(contract price) (minimum$35.00)
2. State Surcharge. ** Add the State Building Code Division aMinimum Fee of($ .50)
_ ___ __--- - ---- .
Z-�� �`�C��! �X .000s $ j0 ,D o
file://C:\Documents%20and%20Settings�rriimi\Desktop\CITY%200F%200RON0%20APPLICA... 7/31/2003
a� CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT Page 3 of'3
(contract price) (minimum$.50)
3. Postage and Handling(Only mail-in applications) $ 1.50 ___
4. TOTAL PERMIT FEE(Add lines 1-3 above) $ _��/' � /
*CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted work including materials,labor,profit,
and other fixed costs.It is the amount to be charged to the customer for the work done.If any material,equipment,labor,or installation is furnished
by the owner,tenant or any other party the reasonable market value of such items must be added to the estimated cost or contract price for permit fee
purposes.In the event that there is a dispute on the amount of the job cost,the City may request the submission of a signed copy of the actual
contract.
**The STATE SURCHARGE is.0005 of the contract price under$1,000,000 or$.50-whichever is greater.For valuations over$1,000,000 call the
Department of Inspectional Services for the price.
The undersigned hereby applies to the C'ty for issuance of a Mechanical Permit,agrees to do all work in strict accordance with the ordinances of the
City and the regulations of the Minneso State Building Code,and certifies that all statements made on this application are complete,true and
correct. /�
Applicant's Signature: ��_�_ � __ _Date: �✓ /� /v __ __
- — — �-------- Date:
Approved By: _ _ _
file://C:�Documents%20and%20Settings�nimi\Desktop\CITY%200F%200RON0%20APPLICA... 7/31/2003
. �
�
�' KROLCZYK '
HVAC LOAD ANALYSIS
for
_ _ _ _ _ _ _ ___ ,
KROLCZYK RESIDENCE
65 CYGNET PLACE
ORONO, MN
�I
_ _ -- - _ . - �
�
III m�� �,,u,.. �
�
i R�i�t�Q���A�
� ��"'�����. I��IA�LQAt��
�
�
�
�
� �
; I
Prepared By: '
I
Doug Bjork
Ditter Cooling and Heating
I 820 Tower Drive
Medina, MN. 55340
(763)-478-8558
05-12-2004
. _ _ _ -- __ _ _
RHVAC-Residential&Light Commercial HVAC Loads Program � Elite Software Development,Inc.
` Ditter,inc. KROLCZYK ,
Hamel,MN 55340-9691 05-12-2004 Page 2
- ---- _ -
�otal Building Summary Loads
_ _ -
----------
Component Area Sen. Lat. Sen. Total
Description Quan Loss Gain Gain Gain
3E Window Double Pane Low Emit TIM Frame 525 19,271 0 23,311 23,311
8M Glass Door pouble Clear Glass Wood Frame 224 11,355 0 9,404 9,404
, 11 B Door Metal Fiberglass Core & Storm 21 709 0 205 205 I
I 12H Wall R-19 + 1/2" Gypsum Board(R-0.5) 2,823 15,583 0 4,506 4,506 '
161 Ceiling R-44 Insulation 2,464 5,214 0 2,664 2,664
21A Basemt Floor 2' or More Below Grade 2,464 5,441 0 0 0 ,
-_ _ _ _
-- - _ _ _ _
Subtotals for structure: 8,521 57,573 0 40,090 40,090 '
Active People: 9' 0 2,070 2,700 4,770
Inactive People: 0 0 0 0 0 '
Appliances: 0 0 0 1,200 1,200
Lighting: 0 0 0
Ductwork: 0 0 0 0 0
Infiltration: Winter CFM: 230.0, Summer CFM: 115.0 770 22,580 3,222 2,823 6,045
Ventilation: Winter CFM: 25.0, Summer CFM: 0.0 0 2,455 0 0 0
- - --
Sensible Gain Total: 46,813
Temperature Swing Multiplier. X1.00
_ _ __ _- _ -
Building Load Totals: 82,608 5,292 46,813 52,105
Check Figures -- -
.
Total Building Supply CFM: 2193 CFM per square foot: 0.445
Square feet of room area: 4,928 Square feet per ton: 972.694
__ _ __ - _ _ _ _ __ _
_ _ __ __ _ _ _ _ -
Building Loads
_ _ _ _
_ _ _
Total heating required with outside air: 82,608 Btuh 82.608 MBH
Total sensible gain: 46,813 Btuh 90 % ,
I Total latent gain: 5,292 Btuh 10 %
'� Total cooling required with outside air. 52,105 Btuh 4.342 Tons (based on sensible+ latent)
5.066 Tons (based on 77% sensible capacity)
___
__-- _ _ ___ __
___ _ _ __ ___ _ -
Notes
Calculations are based on 7th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
Monday,May 17,2004
• --- - - ----- - _ -_ _ _ _ _ __- -_
RHVAC-Residential&Light Commercial HVAC Loads Program � Elite Software Development,Inc.
' Ditter,Inc. KROLCZYK '
Hamel,MN 55340-9691 05-12-2004 Page 3 ,
�ystem #1 Zone#1 Summary Loads
, Component Area Sen. Lat. Sen. Total '
Description Quan Loss Gain Gain Gain
, _ - _ _ __ __ _ - _
, 3E Window Double Pane Low Emit TIM Frame 458 16,812 0 20,798 20,798 '
8M Glass Door pouble Clear Glass Wood Frame 140 7,097 0 5,439 5,439
, 11 B Door Metal Fiberglass Core & Storm 21 709 0 205 205
12H Wall R-19 + 1/2" Gypsum Board(R-0.5) 1,592 8,788 0 2,541 2,541
161 Ceiling R-44 Insulation 2,464 5,214 0 2,664 2,664
- - - _
Subtotals for structure: 4,675 38,620 0 31,647 31,647
Active People: 6 0 1,380 1,800 3,180
Inactive People: 0 0 0 0 0
Appliances: 0 0 0 1,200 1,200
Lighting: 0 0 0
Ductwork: 0 0 0 0 0
Infiltration: Winter CFM: 184.9, Summer CFM: 92.4 619 18,152 2,590 2,269 4,859
Ventilation: Winter CFM: 17.7, Summer CFM: 0.0 0 n/a n/a n/a n/a
' Sensible Gain Total: 36,916
', Temperature Swing Multiplier: X1.00
Zone Load Totals: 56,772 3,970 36,916 40,886
Check Figures �,
_ _ . __
Supply CFM: 1,729 CFM per square foot: 0.702 ��
Square feet of room area: 2,464 Square feet per ton: 623.719 '�
Zone Loads _ _ __ _ _ _ _ _ '
_ _ _ _ _ _ _ _ _ . �
Total heating required with outside air: 56,772 Btuh 56.772 MBH
Total sensible gain: 36,916 Btuh 90 % ���
Total latent gain: 3,970 Btuh 10 % '
Total cooling required with outside air: 40,886 Btuh 3.407 Tons (based on sensible + latent) ',
3.950 Tons (based on 77% sensible capacity) '
� _ - -_ _ _ -_ _ ----__ _ ___ . _ _ -- -_ _ --
Monday,May 17,2004
.
� , RHVAC-Residential&Light Commercial HVAC Loads Program � Elite Software Development,Inc.
� Ditter,Inc. KROLCZYK j
Hamel,MN 55340-9691 05-12-2004 Page 4 '
• _ __ _ _ _ --_ _ _ -_—_ -- – — _ _ — �
' �ystem #1 Zone#2 Summary Loads �
_ _ _ _ _ I
! Component Area Sen. Lat. Sen. Total
Description Quan Loss Gain Gain Gain �
3E Window Double Pane Low Emit TIM Frame 67 2,459 0 2,513 2,513 '
� 8M Glass Door pouble Clear Glass Wood Frame 84 4,258 0 3,965 3,965 ,
i12H Wall R-19 + 1/2" Gypsum Board(R-0.5) 1,231 6,795 0 1,965 1,965
21A Basemt Floor 2' or More Below Grade 2,464 5,441 0 0 0
- - - - - - - -- - _ _ _ __ -
! Subtotals for structure: 3,846 18,953 0 8,443 8,443 ,
Active People: 3 0 690 900 1,590
Inactive People: 0 0 0 0 0 '�
Appliances: 0 0 0 0 0 i
Lighting: 0 0 0
Ductwork: 0 0 0 0 0 I
Infiltration: Winter CFM: 45.1, Summer CFM: 22.5 151 4,428 632 554 1,186
Ventilation: Winter CFM: 7.3, Summer CFM: 0.0 0 n/a n/a n/a n/a
i - _ _ - -- - - - _ - - - --
' Sensible Gain Total: 9,897 �
� Temperature Swing Multiplier. X1.00
I Zone Load Totals: 23,381 1,322 9,897 11,219 I
_ - - - _ __ _ _ _ - - __ _ __ __ __ I
Check Figures
, Supply CFM: 464 CFM per square foot: 0.188
Square feet of room area: 2,464 Square feet per ton: 2,208.193
Zone Loads
Total heating required with outside air. 23,381 Btuh 23.381 MBH �
! Total sensible gain: 9,897 Btuh 88 % ,
Total latent gain: 1,322 Btuh 12 %
Total cooling required with outside air: 11,219 Btuh 0.935 Tons (based on sensible + latent)
1.116 Tons (based on 77% sensible capacity) ,
_ _-_ __ __ _
Monday, May 17,2004
�(-� v
� D�ITE TIME
CITY OF ORONO CALLED IN ��
INSPECTION N E SCHEDULED a d f- �► ?
PERMIT NO. � COMP�ETE
ADDRESS �
G'
OWNER CONTR. D
TELEPHONE N0. �1v3 �7� ����
� DESCRIPTION �/'��5���-e /��� !� �`�� ���f�;�u
�
l� 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
� 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORENVETLANDS
�
03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
� 04 WA�L BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Z
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
� 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
W 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
= 10 PLUMBING FINAL ✓ 36 FOUNDATION/REMOVAL
J
� OWNERICONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
W
C
j �
O `
o C � '� �C
W
� (7
Q
�
Z
W
�
W
�
j
d
W ❑W RK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
� CORRECT WORK&PROCEED '- ISSUE CERTIFICATE OF OCCUPANCY
W
O ❑ C RRECT WORK,CAIL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
C INSPECTION REQUIRED.CALI TO ARRANGE ACCESS.
Cali for the next inspection 24 hours in advance. �952� Z49-46��
OwnerlContractor on i
Inspector.
White Copyllnspector's File Canary CopylSite Notice
J/' !� O —' DAT TIME "
` d- Z�
CITY OF ORONO CALLED IN =_�� �
INSPECTION T C SCHEDULED
PERMIT NO. COMPLETED
ADDRESS v
OWNER CONTR. D�
TELEPHONE NO. ?li�� " T 70 —7�8
� DESCRIPTION , �—�V ��
l� 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
� 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
�
Q 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP O6 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
� 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
= 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
W
a
�
�
O
>.
�
O
�
W
�
Q
�
Z
W
�
W
�
j
d
W ORK SATISFACTORY:PROCEED !� PROJECT COMPLETE
� ❑CORRECT WORK&PROCEED ^_ ISSUE CERTIFICATE OF OCCUPANCY
W
� ❑Ct�RRECT WORK,CALI FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑ CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN
INSPECTOR WlLL RETURN � CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Cal1 for the xt inspection 24 hours in advance. (Q52� 249-46��
OwnerlContr� ite:
Inspector. C..e �
White Copyllnspector's F e Canary CopylSite Notice