Loading...
HomeMy WebLinkAbout2000-P02333 - new septic � CITY OF RONO PERMIT O Permit Number: 2750 Kelley Parkway - PO Box 66 Po2333 Crystal Bay, Minnesota 55323 Permit Type: sept�� (612) 249-4600 Date Issued: ai�3ioo SITE ADDRESS: 195 Crystal Creek Rd LONG LAKE, MN 55356 P ID: 33-118-23-32-0004 DESCRIPTION: Proposed Use: Residential Permit Class: General Permit Type: Septic Permit Sub-type(s): New Septic System DETAILS: Approved per resolution#: Separate permits required: NOTICES/REMARKS: FEE SUMMARY: Permit Fee: $ 100.00 Valuation: $ 0.00 State Surcharge Fee: $ 0.50 TOTAL FEE: $ 100.50 APPLICANT: HAYES& SONS OWNER: PILLAR HOMES INC PO BOX 191 185 CRYSTAL CREEK RD MAPLE PLAIN,MN 55359 LONG LAKE MN 55356 THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED AND AGREES TO DO ALL WORK IN STR[CT COMPLIANCE WITN ALL CITY OF ORONO ORDINANCES AND STATE OF MINNESOTA BUILDING CODE REQUIREMENTS. ---�� ' �. ��, � �t � � APPLICANT PERMITEE S[GNATURE I� UED BY SIGNATURE � �/ Copies: City,Applicant, Assessor, Finance P, . . J Cr,,1-3�3 CITY OF ORONO S�PTIC SYSTEM PERMIT APPLICATION Box 66 (2750 Kelley Parkwav) Crystal Bay, MN 55323 JOB SITE ADDRESS: ; C� S �--�''�-1 S'� � �-`��k— Occupancy Type: Residential ✓ Commercial Other Permit Type: New or Replacement System, $100.00 �Y Repair Existing System, $ 50.00 (Tanks or Drain�eld) 0.50 State surcharge added to above fees *See fee schedule for non-residential permit fees Owner's Name: �; ( '�,r �,a n�� Phone Number: Mailing Address: City: 7ip: Contractor's Name: ���r.S -4-�W�5 Phone Number: �{��-����z /c��5-- 5 s 3 0 ��t�/ Mailing Address: ��;_�� ��`� 5�. s E City:�7af1 t.-�,;� Zip:�S�r� DO NOT MAIL PAYMENT WITH THIS APPLICATION GENERAL INSTRUCTIONS 1. Applications for septic system permits may be mailed or submitted in person at the City Offices; however, permits will not be mailed out. The permit must be picked up in person at the City Offices and work must not begin unless the permit card is on the job site. 2. Permits will be issued only to contractors holding a City of Orono Septic System Installers License. 3. All work must be done in accordance with the approved septic system design. Design reports are not considered approved unless accompanied by the "City of Orono Septic System Approval" cover sheet signed by the City Inspector. 4. The following inspections will be required for all septic systems: A. Pre-installation site inspection to include inspector, installer, and general contractor. B. Tank installation prior to covering. C. Drainfield trench installation prior to covering. For mounds, inspection is required after rough-up but prior to sand placement (sand will be jar tested for silt content), and again during pressure distribution piping installation in the rock bed. D. Final inspection to verify proper final cover depths and to verify that all pump station (where required) components are functional and comply with codes. 5. Individual holding MPCA Installer Certificate shall be present during inspections. A 24- hour notice is required for all inspections. a NOTE: Applicant must initial all spaces. Fill in all appropriate blanks, check all appropriate boxes. � 1. I have received a copy of the system design including the City of Orono Septic System Approval Cover Sheet. -�� �, 2. I will be installi�n the following: A. Tanks: ✓ Precast Concrete Other Manufacturer 1�,.� rw , -, Tank Capacities: 1)� o<� gal. 2) 3e.�c; gal. 3) �_ gal. B. Pump Station (if required) �/Z � �P � Pump make & model �v���i l ���1� (attach pump curve & literature); system design requires �_ gpm at feet of head. High water alarm make & model �,;,� j�,�".� _ Outside electrical work to be completed by installer ��electrician other . Inside electrical work must be completed by electrician. C. Treatment System: Trenches: s.f. Mound Depth of rock below pipe " Rock bed dimensions 10 'x (�3 ' Drop Boxes Sand bed dimensions�'x�v' Distribution Box Pressure Dist. Pipe Diam. i '�i " Maniford Pipe Diam. Z �� D. Final Cover/Topsoil to be: borrowed from site �Show location on site plan) ✓ trucked in The undersigned hereby applies to the City of Orono for issuance of a septic system installation permit, agrees to do all work in strict accordance with the ordinances of the City and the regulations of the State of Minnesota, and certifies that all statements made on this application are complete, true and correct. � '�C� SignatureofApplicant: Date:� ��1� MPCA Certification No.: � �{- � Staff Review: A,�Sp va /ti Denial � Reviewer: ��r ���� Date• �- �� � C'' Reason for Denial: � � Westwood Profess�nn�l Cwvi�es, In� � 104 M.nty D�ivF,Su��tr� Huflalq MN 5531; Nu��cmhcr 3O_ 19�)9 Phone:612-682-2587 fax:61?681�2G39 Toll fie�e� 1-888�682-1587 Fina�l�wps��we•,n��oocus ir,r, ��1��31" HOI11eS 7�10 East Lake Street ��'ayzata, MN 5�391 RE: Septic System Site Plan for Lot 7, Block l, ofCrystal Geek, tlennepin County Section 33. To�vnship 1 18, Ran��e 23, Minncsota. Dear Steve: This proposed on-site septic system was designed for a 5 bcdroom home, with an estimated tlow of 7�0 gallons per day. Due to mottled soils at a depth of 26" in the primary site, the primary system will need t�� be a mound s��stem ���ith I?'� �t'sand under the rockbecl at the upslope side. The site in ���hich this s��;ten� is proposed has a a��era;��� e�istin�� �>round slopc of 6",,_ and perc��lation rates ran��in�, frc�m 7.9- 1 G '��]P1. The rock bed size ��ill hc 10 feet ���ide and 63 fect ion����ith the overall dii���nsions of the primar�� m��und bein�� 8� feet lon��and 38.7 fe�t wide. The mound s}�stem ���ill require t���o 1�0(� ��allon septic tanks and a 1300 «allon pump tank. � :�n alternate sepiic s��stciT� ha, h�en sho���n on the pian t�� ;h���� thn� th�r� is enou�h undi;tiirhed area on the lot to support anothcr ;eptie s��st�m. "l�his svstem ���ill aiso nce�1 t�� be a mound systein. Mottled s��ils were found at a depth of?6�� and the average slope of the area is 6%. This system will not need to be constructed unless the primar` mound fails. Certain precautions will need to be made to protect the areas in �vhich the above referenced septic systems are proposed. Both primary and alternate septic areas have been or will be staked off. [t is critical that tlle soil is not disturbed before, during, and after construction of the system. These systems should treat the septic effluent effectively if the sy�stems are installed properly and are maintained properl}'. It is recommenced that the septic tanks be pumped every two years. This will reduce the chance of solids reachin� the mound system. It is also recommended not to use ezcessive amounts of chlorine, soaps, and chlorine products which can kill bacteria in the septic tanks. This bacteria is needed to treat the septic eftluent. If yuu have any questions in re��ards to this design, I will be happ�� to ans���er them. I can be reached at (61?) 682-2587. Sinc�relv, � � � �-�- �;.�/ ,,` Rcrnie Miller Se�tic �ite Designer Desiynnig the Futu�e Today smre 191' � � MOUND DESIGN WORKSHEET � (For Flows up to 12U0 bpc�) A. �'�W E�[unucd ScaaRc Flow in C:allc�s per Day(gp�) Estimated �SO gpd N,a„�, — or �Yr�i ryv�ii iy�tii or measured __ x 1.5 = --- �;j'd. �i�«,m, �y��v 2 lcxl 2�5 I BO � B_ SI�:I'TIC TANK LI(2UID VOLUMES e bai iis zs6 � 5 7Sq �50 29d a-►300 A��0�1 5e j g�]p� 6 900 525 332 � 1 - r Soo 9allo•� P�v,,�p t.,�1� > >aso � 3�0 o�,e 8 1200 675 408 �`�' C SOILS (refer to site evaluation) 1. Depth to restricting layer = o� � �� inches h��� �� �,"" 2. Depth of pereolation tests = / Z " inc-hes `""�`' `""°"`' 3. Percolation rate �,q- ��, mpi �«� �so �.,u 4_ Land slope � % s a v i:so zz�so �«a z.000 3.000 wQ 9 See fig.C-6 (z 1.5) D. ROCK LAYER DIl�IEI�TSIONS 1. Multiply fl�w rate by 0.83 to obtain required area of rock layer: A x 0.83 = �So gpd x 0.83 sq. ft./gpd = �sq. ft. (6 30� 2 Select width of rock layer (10 feet or less) _ _ 1 U ft. 3_ Len�th of rock layer = area =u7idth = Rock Beei �� sq. ft. y �0 ft. � - ��__ f� ti-.�ti•�•�•�•.•.-ti•ti•.•�•.-�•.•�-�� 1'.{:t:tir�:�r'f'r''''"'r'r'''''r'� ti•ti•ti•ti•ti•�•1•1•ti•ti•ti� ti:L:ti:{:ti:ti:L:ti:ti:ti:ti:�,fti:tifti:ti:ti idth <_10 ft. ti ti�ti�ti�ti�ti�t�tifti�tfti�ti��fti 1fti?t .f.f.t.l.f.t.f.f.f.f.r.f.f.f.f.f. E. ROCK VOLUME � �S� � � 1. Multiply rocic area by rock depth to get cubic feet of rock; 6a3 �. ft. X�ft. = 6�3 cu. ft. (630� 2. Divide cu. ft. by 27 cu_ ft./cu. yd. to get cubic yards; �a3 �. ft. �- 2� = a3 �u. ya_ 3. Multiply cubic yards by 1.4 to get weight of rock in tons; �_cu. yd. x 1.4 ton/cu. yd. = 3 a tons. F. ADSORPTTON WIDTH � �,w,a�,s�, Tible 1. Percolation rate in top 12 inches of soil is �9 16 mpi Pelro,,ti�,R,� �a. A.md t�t;�,�,u,�II,a, Soi17'exture �,� '�`,a,�`e (mpJ ra.a .b�.wa. ad, 2. Select allowable soil loading rate from table; Faster than 0.1 oarse Sand i2o i.00 0.6o gpd/fr� o.� co� sana izo �.00 0.1 to� fiine Sand" �.� z-� 6 to 15 ndy Loam 0.79 1.�2 3. Calculate adsorption width rario by dividing rock layer 37 to 4 ssi�m o50 2-ao loading rate of 1.20 gpd/ft2 by allowable soil loading rate; �to�� Clav Loam o.as 2.6� 1_20 gpd/ftZ1 0•6Q d/ft� = a .0 p 6� co�Zo C�ay o.za �_oo gp Slower than 120 Clav ^5«!}uvv�t 5QR ar more d fu+e or very fine sand. 4. Multiply adsorption width ratio b}' rock layer width to get required adsorption width; .00 x t� ft = � ft � , I >t �lti N`,I � )I'1�. f�I�:I:M 1N11 � I i I � ���,�. � ,,.�,, � 1 l� l.�n�ltil��j,�� i�; 1'Y, or more, � �i�l�tr.3� t r����k lavc�r ��idtl� trc�n� .��1ti�,rf�ti,�n �,�i�11f� � . _ soe .� l�) <)1�1�7111 Ti111111TlUill (�ll���Ilti�O�� �� t R�xk !� �000 l' t'I-ill ill�' t ]��an'.an,i ao_ t t _►�— r�i = - lo r���t Na,,,,.,��.,,,� - _ �. r���,� :' t�.31� i�1.3tf> Minimum m<�u»�j ti»�� ,.m��„u . � f >��i��rn�u��� �j����th ��t ��1��.3n ti.�n�j f�ll ,�t ��,,.�,,,.. �,�,,,��� i i,,,w„�i„�,.��,���i�i� ,_ I il �'.�(l �t' C'l� ��' (lf TOCk lil l I - Atnor��rinn W�d�h -- { � }, y j '�� k„��.w�d��, `;c�,�aru��c�n. :�' a ft - � _ teet i • h r�d� depth ot clean san�i f��r se�ar.3ti��n (?��) at upslope edge, depth of rock layer (1 foot) t�� depth ��f ��,����r (1 foot) to find the mound height at the upslope ed�;< <>f r���}, laver; _Lft + lft + lft = � feet - - __-- --- — �. �nter ta e with landslope and upslopt berm Upslope W�dih ratio. Select berm multiplier of 3 � �� Uptilop�•�'�dth ��000POD�,�RockBed �000nb 4a U slo W�dth d. Multiply berm multiplier by upslope mound - a� �,�,�d� �e� P � 9�evG�Oao�� ,o Oo00➢b�g height to find upslo e berm width: QOoa�000 QP•�p¢th6DU Hu QeoQo Qo aD a i 3,a3 x 3 - 9. � feet L � _ � � e. Multiply rock layer width b�� 3 : lan��lc�pe to determine drop in ele�ati��n, � �o.,�io�w�a�, i o A2ztomnon 1�',dti� _1_r�_�� �r� = loo = �_ f��t i --- `_ :��'� u�_}tlt oi Clean saTld 1or Slc,��r i---- ------��� d=fierence (2e)at doivnslope edge, to 7°�'�ns`I` - the mound height at the upslope edge of rock layer (2b) to find the downslope height; 0,� ft + � {t - �feef �. Enter tahle �vith landslope and downslope berm ratio. Select berm mul�plier of .S . a�6 h. Multiply berm multiplier by downslope mound height to get downslope berm width: s,a 6 x��_� feet BERM SLOPE MUL'I'IPLIERS i. Compare the values of step�.1 10 and Step G.2h Ig_ �a DOWP;SLOPE UPSLOPE Select the greater of the two values as the ;oo� b"�@"m�s�or�arioas bcrm multip6«s for.arious bcrm slope ntios berm slope ntios downslope berm width; �� feet )� Total mound width is the sum of � ' ' � 5 � � � 4 � 5 � i � i s i ' uF�slope berm (G.2d) ° ;� a�� s.o b.o zo 3 o Q o s.o 6 0 �o s o i width plus rock layer width (D2) ' '°`' "% s'-6 a 3s �s3 z 9� ;as a�b s�c, b s., ��, -' 31� � ;` SS6 6S: 8.14 ?g: ;'IO a5a 536 61� 69(i plus downslope berm width(G2i), � � ft + �O_ f t + 1 Ci �� z 3 :(�� a sa 5 8k 7 32 8 86 '.7� �57 G 35 S pr �79 6 0 5 ' —i h = .�n'� feet ;�� � ,,, ,. ,, ,Q� a„ ,�,� ;�< a ,- :�, �,;� �>c�, }�. TOt31 mOUI1d IC'Il�l iS t�1�' Sum 02 u�SlOpt' S 3 S: < <w, �,c,' 8 S7 io_7� z 6i 3 3� a 00 a 6� 5 i4 5 7; berm wid th (G.2d) plus rock layer l��rls;th (D.3) �� ��� � ,,, - ;, �,n i�o� �sa a�; 3 as y„ ��: s�� plus up5lope bernl width (G2�); � ' �so � <<, �dv io 3a i3�3 z_ar z i� 3�o a zs a�o s i3 �_L ft + O � lt + �� ft - $� feet H ��� SKh H�Z 1154 1591 ?1? i0' 3S7 40S �dV 4Ht; v � I 1 h'� 9 c19 I 3 04 I 8 9? ?3t 'Ya 1 4 S 3 40 � 10 a b S - -- IU � '�; r,6: ;�1�x� IS-W 2333 '31 'bb ; 1� i�� a � ' �aa � Final Dimensions: �� „r � �: �� �� �,�, «,,, : :�, �,> >>� ,�� .�, � . . . �� X �O. �" �.� i�,�, ' �,� i�vi :lai aZ7S 2'i � 7�, 1i: �av �xr� �05 ---��---- ---- ----- � — ---- � " MA�NHOLES -� - - ��- �-- ---=�- �� �;�.°� ° - _- ,�.. - ----- ��7 � ------.r ,�� ; i �\\ � � �,�' �� � T P���� ' � - - , -� �.� i �; bl =----''___--, i��,-— -- ' " - - - - � �' � S U --- ---- ����� � _ _ _. __ _'—''- _. ,I �. II �" .. ` . __ _ . I _ �` '�'`'� � ��' � � , ; P !I �I I ' � ,� ;? I � __- :/' ----=-•,� - — , .� _ __ J SEPTIC �' P�!��''p�'��G a � I 300 yalb�5 TANK ,'r�" � 1.300 �a�lo�S _ � .��,� � Fur�P �OCATED iN PUh-1PING �-,'� '�i� REOWOOD, CED OR WATER TIGHT & LOCKAB�E ELECTRIC B�X TREATED POST�4 x 4 min ) PLUGS OR ELECTRIC CONNECTIONS � �� NSIDE BOX�C CONNECTIONS MADt 2u PVC CONDUIT SCHEDULE 84 --� pS ACF LOOP OF MANHO�E COVER CHAINED & LOCKED 6 P SETTLEMENTER CORO FOR S�ALED MANHOLE RINGS � FINAL GRADE � - AT LEAST 12" ' � ��� BELOW GRADE � � W1 RE FROM P01NER SUP�'`Y ��v �/� s PIPE fS LAID ON A UNIFORM SLOPE FROM �. �UMP STATION UP TO SOIL TREATMENT AR=a ►� . OR pROPER DRAINBACK SEALED TANK COVER �-- IF PIPE AT TANK MUST BE LOWER THQtJ UNION. TO GET ELEVATION FOR DRAINBACK, PLASTIC ROPE OR CHAIN A �/4 INCN WEEP HOLE MUST BE USED WITH ANCHOR WEEP HOLE ALARM FLOAT ON SEPARATE I ELECTRICAL CIRCUIT ` NOTES� EI.ECTRiCAL WIRE FF?OP�1 PO'J��tR SUPP�� STAR�T l„�yF,� � _ � Ml1ST NOT RUN OVER ANY TANKS BU� - - - �'� ^ MUST BE l.1aiD BESIDE OTHER TANKS , 7S-188 �� . ;;,�',� �e� 3"� �� AND MUST 8E PL.aCED �N CONou�T ; Cyci� se� G-+ ��yc�Qs PQ� day ALONG POST SHUT - OFF LEVEL,� _ _ _ ELECTRICAI. CORDS FROM PUMP QND � FLOATS MUST BE RUN THROUGH ' COND�)IT. WIRES CANNOT HAVE GROUNC ' PUMP CONTROL FLOAT CONTACT. �0� � � Fi<_7 ure F-k PRESSURE DISTRIBUTION SYSTEM Geotext�Ie(abric 1. Select number of perforated laterals 3 ' uarter inch rforations s aced�3' 12 2. ���lect perfc�rati�n spacin�; _ __ 3 _ feet. 9-�f r�ck 3. 5ince perf�>rations sh��uld nc�t be placE�d cic>sc�r th��n l ft. t�� ['erf S�z;n�;7/32'� - ]/�.. - the ed �� of the rock la er 5ec dia rram � �'��rf 5p�c;n�; t_5•-s $ y (,� �, ), subtrart � ft. frc�m the rock layer length. K�,�k ia— �,�r�� - 2 ft. _ � � feet. -�. Dct��rmine thc nurnbcr e>f spa�c� betwecil perf��r,�ti��rz�. H';i';'r���'„!.`�°„�","o`°`�"," ,��� ,h���,,; Divide the length above by perforation spacing and round °�'"`F" � <<' Head �l^"r"' ����r,� down to nearest whale number. `�"Q 1.Oa 0.56 0.74 Length perf. spacing = 6 � ft. = 3 ft. _ � spaces 2.Ob 0.80 1.04 �3� �2� a.Use for single family homes b.Use for all other applications 5. Number of perforations is equal to one plus the number of perforation spaces . ad � Maximum numt;i�:��f�uarter uuh pertc�ration� S�c"3CE'6 + 1 = _� �JPifOI'd�lOItS��dfeI"d� lateral t���ua;i:_nree;10%dischar�e��aria.�� Perforation j 6. Multiply perforations per lateral by number of laterals to Spadn� , � ct�t� 1 � 1 z 2 get total number of perforations. 2.5 14 18 2g 3 a 1 3.0 13 17 26 laterals X perfs/latera] �� perforations. 3.3 12 16 25 7. Determine required flow rate by multiplying 4.0 11 15 23 number of perforations by flow per perforation 5.Q 1Q 14 22 � X �m/�� -�gplll• MANIfp�D LOCATED 41 ENO OL PRE55�/RE p5TH18VTpN $1'�'� nr�° S. If laterals are connected to header pipe as shown on upper � ��.Y �.�� example, to select minimum required lateral diameter; enter r - %� � table with perforation spacing and number of perforations '// '��, "-� �d��rr per lateral. Select minimum di<�meter for ' � �erf��rated lat�ral = _�__ inches. ' .., � a nre.auim r�v� i.ire.�.e i.� r++isi�..i o�sinrevr�o.. w..o.,wi, `n..vu cn nu�KD„ ,��� 9. If perforated lateral system is attached to manifold pipe near �= a`w"'"�"�'�` '>^"'"'� �� � r..h..�wo the center, lower diagram, perforated lateral length and - ���. ��� number af perforations per lateral will be approximately one '° ����..,---� �```r-,-� �-.-� half of that in step b. UsinK these values, select minimum ' ,' i`°�- � ., h . "' �� diameter for perforated (ateral = � inches. � �_. .- • � �„�.��°` ,,,,�. `� ,,,�,. �UMP �ELEC'T10N��x���,xL A. Determine pump capacity: Gravity Uistribution 7 Minimum suggestcd iti 2O��,m + 2 Ma�imum sug�ested i�45 �J�ni Pcrfontion DischarRes in GI'�1 11rad 1'rr(�iriUiin diameti�� I'rctitiur�� Uistlbulion (tcrt) inrh��ti) � .�. tirle�rt numberof perforatrd I.itrr.�l� _ __ _ _ 7/3� t/a h tic�l��ct perforation spacin�; _ _ _ feet. t a, o.5r; a_�a � �ubtract 2 ft. from thc rocl. layrr Irn};th 1.5 ���,y ��yi� N.���.,,•��,.�,,n-2 ft. = feet. 2.ob o.sn �_oa �j. �.�CI�rLIl1I1(ffle I1ll1T1�7Cf Oj S�7diC'� ht'iN�l'CIl }�CffOC3l1011ti_ 3 UsP 1.11 Iui�1 tiin};li�I��imi�, �_t'Il�;�l �EIf. S�JaC1Il� _ __ }L - ---- �L = ---SpICCti ���kr�'.11 I�'i•1 lur.�m'l�i�nh rl>r. �� _. _ <paces + 1 = _ perforations/lateral f_ Multiply per(orations per laterai by number of laterals to �et total number of perforations_ �_ x ���_ _p�rforations. � - � x ��--gpm. SELECTED PUMP CAPACITY gpn, B. Uetermine head requirements: 1. Elevation difference bet�a�een pump and point of discharge. feet 2. If pumping to a pressure distributi�,n s��stem, five feet for pre�sur�� �� �. �.��.�,��.,.�,. rc�c�uired aY manifold if gra��ity ����tcm, zer��. r.,.—�,.-a -�- - �; ---- __ t�:ci ���.. , „ , ,- ' � Friction loss � a. Enter fnction loss table with gpm and pipe diameter. w<< ,- -- FJevahon Diftrrt•ncc /�` Read friction loss in feet per 100 feet from table(F-14). �"� �� i F.L. = ft./100 ft of pipe � " - � t � • : b. Determine total pipe length from ptimp to discharge �--��----------- -- - point. Estimate by adding?5 percent to pipe length for fitting loss,or use a fitting loss chart (F-15 feet). Equivalent pipe length- 125 tirnes pipe length- x 1.25 = feet c. Calculate total friction loss by multiplying Friction Loss in Plastic Pipe friction loss in ft/100 ft by equivalent pipe length. Nominal Total fricrion loss = � x �100= feet p�pe dia 4 Total head requued is the sum of elevation difference, Flow Rate 1.5" 2" 3" special head requirements, and total friction loss. gPm 20 2.47 0.7_, 0.11 + + 25 3.73 l.11 0.16 �l� (?) (3c) 30 5.23 1.55 0?3 35 6.96 2.�6 030 TOTAL HEA1_� feet �� 5.91 2.ba U 3y _ _ — 45 11 0" 3?� U•aR _ 50 ]�_4n 3_�l�e (I.?ti (�. Pump selection '�� a ��, i��c� h(1 :nl; t?�:' �� �4� 0 y� -�-�------ 70 7 4-a ] ll9 --- - --_— i -- ------- � 1. A pump must be selected to deliver at least � gpm (Step A) with at least feet of total head (Step B). � i z� O� �J � a w o� �� � oQ �'� � z Q LL U W � �a az Ja a� QO N� � � n �, , � o �� 1� J Z 2 �l � Q � v !i � � � << � F- � `�' � � d Z ? , � J `,` �' �, � �i � � � Z k� C C. �''. �t: �� J � O � �� �L� \ � ~ � �� � � m w � o lt1 - C N � Q � � w � � � � � � /� � � w ` � W � �'- a � O � . � � � W . � O W � �Z F- � (r � �� F- � F- � o►-_ - o , � v wQ � m O � Q p r� Z a >- Q d�� - p- ` Q � v'� `° a � w� ` J a v��`�' , � ,� 1'� Q Z w � �L� = � W O�m O E-- � O _ � � w � ��r ti �- ' � Q~Q � a �/ 0 ow�\_ ,, oa � � Q ��- � �, � � w wz_ � � w � a a a o cn o a u ,� J � o l ,- .-, ��� ��, o � � ,�� � �l� n : w �`, � i W � '� ��v , MANIFOLD LOCATEn AT END OF PRES5URE D(STR18UT10�'� SYSTEM . � ���Fx� -�""`� P I P E pIP{' �RCM PU►.IG r`, . � � �. � �Re� A� T�pNQT- ___. � � �_���o� � o-� �A � =R�ti1 PU�� � PER �E��' �I ► �'; n,rra �'_ 1 '' � • I lltit (1 �)1 �,f Olt x 1 ii I , i ��,�r,�Y �„�NO ��,1�� � n►�r,i� �,� ,: � � E�E i,� ���;ni � u i nii r�n� C�RA�S COV�f? � �_ _ (� WC}-�ES CLEAN `-�l1ND f I�L �y � , ;`� t / TOF'S011_ � -� , MAXIMUM ;LOPE - �5;�...L'�=.� o'_ `„- • -�r�', _�-'`� J,\,,4 � TO I - , " ' ��� -= . . ,�.,�t�� � . 4 1.�-.�:" . . . . . . . , � , _ . � . . _ . � - } � - {" - � 1 OP501� .. ` C L E_ !�N f�OCK�'r ' \ - '- �PLOWEO OR �!� TO � �/� Ir�Cr�E `; t .`_ — -- -- -- - — DiSKED SURFA�E -.:-. --�.- - ---- -___ � - ,----,-:-- SUBSOIL .� . �;- 1 /� SI..OPE ����� •� ;\ _ _ - CROSS SECTION A - � - PIPE FROM PUMPING CHAMBER �.\ \ \ 111 ': I i � � � � � � i _ w � ' � �' ' � � Y - �� ' , ; � � o - �� � i; I _ �; - ; - -- � I � � ' i - � ; ; � 11 PERFORATED ' ' T f �� �ATERALS � ; ; � �J _ - � � ! � � � , � �, � � ; � � ,i � � � i� . � � ' � � - � � , , , , BED AREA -� I � ; ; �-_- � � � 6 3� s�. F�� '---- ' ' � ' Z : � � - 1 � "'-i I � w 1 � � J . I � I � "_ � � � A _ i N � �. � Q - � � L�J � �yJ � I W A i = � _ ' m I ' 1 — — i Z ; Z � I � 20 � � ' � � 2O — INCHES , ��-o �` - _ � ' � � �INCHES -- � , - � � ' � � � � ; , � '_' �'- _'.- I I _-- �iKE ----�!� FEET � I - . . _ _ - `� - --1__- D i h E --- -- — TOTAL WIDTH -- y� � \ 38. � l ' , ; , ; ' I � ! 1 '` ' ', ';��--=- �-- ' PLAN vI Ew � ' ��� Westwood Professional Services, Inc L O G S )�- $�� L B O R i N G S ❑ 7599 Anagram Drive � 104 Marty Drive, Ste 3 � Eden Prairie. MN 55344 Buffalo, MN 55313 612-937-5150 612-682-2587 toll free 1-888-682-2587 FAX 612-937-5822 FAX 612-682-2639 L�icati<m�ir I'rujcct: Pillar Ffumcs 998U(1 l)at�: I 1:23%99 f3urines ma�l�b�: I�rcm�� I..ing Classification S��st�m: AASHO USDA-SCS X linitied Olhcr nugcr uscd(ch�ck t���o) Nrobc X or Po�ccr I lieht or E3ucket X Othcr D�pth [3oring\urnhcr 1 Ihpth 13oring Numh�r 2 in Surt:icc I:Iccation in Surfacc Elc�atiun f�et Munscll Chan fc�t Munseil Chan � �oU�:. �o�r�c3�� � c��, r y,r3 ., � lr -�--------��- Lou.,... I�`f�Cs/y � � , _ . - ---- �- --------,. —---- --- LE �U n�.�--- -- 2 S'J --- L p U w� j G 4/t S'��� ,� wr�r,�Sa�68�.�r. y/y 3 �-- ��u„-. Z•Sr 6 y 3 � --------- — ---------yo - " �.-- lo ( S 2 d-6 ma G`l L�a M w /o �F l rKa / �0 Y�C S�`/ UQ4 � -� � l "'_'_""'_ """""" 6 6 ------------ ------------ 7 7 ------------ ------------ x s End of I3oring at 40" fect_ End of Boring 3.0 feet. Standing��ater tahi�: Standing��ater[able: Present at feet of dcpth. Prc;�nt at fect of de�th. hours aftcr horine. hours a��tcr horin�. Not present in borina holc X tiot present in boring hole X 11ot!!ecl snil: 11uI!led.soil C)bscrved at ?G' of dcpth Ob,cr��cd at 36�� ul�1c�th Not present in burine hole: tiot present in boring hole: (�hsen�ations and comments: Obs�n�ations and comments: ------------------------------------------------------------ -------—----------------------------------------------- ' ' ' � � Westwood Professional Services, Inc. ❑ 7599 Anagram Drive � 104 Marty Drive. Ste 3 P E R C O L A T I O N T E S T S H E E T Eden Prairie. MN 55344 Buffalo, MN 55313 612-937-5150 612-682-2587 FAX 612-937-5822 FAX 612-682-2639 Test hole IoCation: Pillar F1om�s 99800 Depth of hole bottom: 12 inches Hole No.: 1 &2 Diameter of hole: 6-8 inches Date test hole was prepared: 11/22/99 Soil Dafa from Test Hole depth, inches soil texture soil color see logs Method of scratchirrg sidewall hub w!nails Depth of pea size gravel in bottom of hole 2 inches Hour of initial water filling: 11:00 AM Depth of initial water filling: 12 above hofe bottom Method used to maintain 12"of water depth in hole for 4 hours: Automatic siphon Percolation test conducted by: J Lang Percolation test started at 11:13 AM Maximum water depth above hole bottom during test: 8 inches Date 1123/99 � WATER WATER 1NTERVAL WATER DROP DROP PERC RATE TIME (Minutes) DEPTH (fraction) (decimal) CALCULATlON � �1��13 START 6 �lu' a,6a-S �d G_6-a-S-- ----_l_6__._ A ------ ---- )� : Z j O S � 1 �G TIME - DROP = PERC #' ��;.'�'�� REFILL I S G � � S S B - - � �-------- �----�------- TIME = DROP = PERC II •�10 REFILL I!, ! � / �ly / �S ��---- ���S �S��-- C — — � 1 ! �-------------- - - -- I i:S Y ' TIME - DROP = PERC �l: l� REFILL � lU O�U TS TIME---- _ --�0�-(_J_ _ .-PERC'y-- D tr�.3o 13 �-iQ ' �a �r.�y� REFILLI � � '�Ig �. ��S - -�--'�----- l. I aS .---�5'�---- E � TIME = DROP = PERC ►'��+q REFILL � 3/ S F - ----<<---- �---Q=-�-- ---�y-�--- /Z•,�p 'I 3 � y O� �S TIME - DROP = PERC A, B,C B,C, D l.u��r.r��,1.9iri' Snull.�oi a�,�,i6i� Lmg�-��co/Ht 7� �rn�dkv u ulli('h � (�.�O — A ��.��) — ��,�.,q:,�=„/JHr� S,rr,�lle.r v ol/ft'/� C, D, E D, E, F l,ut'c�i�„/��UF. .lnrulk.idn/(Y4: /.n�;r.�=�./l�hl� .A'rmJ/r.iq��JUl�J} `� O.�O -� A (�.�(� — .1�n�Jker a u!�7)h: .lbiulle�r a o/!N.l. DATE TIME CITY OF ORONO CALLED IN INSPECTION NQTICE SCHEDULED �'��'dv Z% O� PERMIT NO. l"0 2 333 COMPLETED ADDRESS � �l 5 C'►�sfw I Cr�ek OWNER CONTR. �T��'�-S TELEPHONE NO. � SS� �I SS� � DESCRIPTION SC/�?!� f-i n r}� l� 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING � 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS h 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP O6 PROGRESS � 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT J 07 DEMO-FINAL 15 INSTALL. 22 FOLLOW-UP 4Qi 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL = 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL J � OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � �- U W►D �►9�12 bC. � � � — V✓)OU�d C,�1��Z oIti �. � 0 � Q -- �e,i e�t A l.e�-� � z W � W � � GW ❑WORK SATISFACTORY:PROCEED �ROJECT COMPLETE � ❑CORRECT WORK&PROCEED ISSUE CERTIFICATE OF OCCUPANCY W � Ci CORRECT WORK,CALL FOR REINSPECTION TEMPORARY � BEFORECOVERING PERMANENT [1 CORRECTUNSAFECONDITIONWITHIN HOURS. ! PHOTOTAKEN INSPECTOR WILL RETURN CITATION ISSUED �'STOP ORDER POSTED.CALL INSPECTOR Cl INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. 249-46�� OwnerlContr ct on si�: • l Inspector i White Copyllnspector's File Canary CopylSite Notice i ______,__ DATE ,� TIME CITY OF ORONO CALLED IN `/ INSPECTION TICE SCHEDULED z'Z��"'� � '� PERMIT NO. O Z 333 COMPLETED ADDRESS I�S C✓`�5�79- � C✓e��- '`�' OWNER �r I�� HVYn,c� CONTR. �7►4��¢S� J`-tn�.3' TELEPHONE NO. �----- � � DESCRIPTION ���- J lL 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING � 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS h 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS � 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT � 07 DEMO-FINA� 5 SEPTIC INSTALL. 22 FOLLOW-UP = 09 PLUMBING RI 23 SEPTI 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � lD � 3 � � 5 .x 0' Z.� 0 � ° � z a �i�-ls !N� ��o I�Q w � ` ' OG : Q � �� z W � W � � d � �ORKSATISFACTORY:PROCEED - PROJECTCOMPLETE W I]CORRECT WORK&PROCEED ISSUE CERTIFICATE OF OCCUPANCY O L;CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT [1 CORRECT UNSAFE CONDITION WITHIN HOURS. pHOTO TAKEN INSPECTOR WILL RETURN Cl STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED C 1 INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Call f xt i spe ion 24 hours in advance. 249-46�� OwnerlCont actor �it - Inspector. White Copyllnspector's File Canary CopylSite Notice DATE TIME CITY OF ORONO CALLED IN INSPECTION NO CE SCHEDULED 1"��'0� 5,3� PERMIT NO. �6 a►�3 � COMPLETED �^27 —d J ADDRESS � �5 C.- �' S��-I .2�=�� OWNER '��� CONTR. I�j'�"�P-5 TELEPHONE NO. � DESCRIPTION LL 01 FOOTING 1 MECH NICAL RI 18 EXCAV/GRADING/FILLING � 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS � Q 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q OS FINAL 14 SEWER HOOK-UP O6 PROGRESS � 07 DEMO-SITE 27 SEP T. 21 COMPLAINT J 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP Q ? 09 PLUMBING RI 23 SEPTIC FI 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W � j � O � � O � � `�' Q 1 � Q � Z W � W � j d `/ W� QCWORKSATISFACTORY:PROCEED C: PROJECTCOMPLETE � W ❑ CORRECT WORK&PROCEED ISSUE CERTIFICATE OF OCCUPANCY � ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY � BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. pHOTOTAKEN INSPECTOR WILL RETURN ❑ STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED ❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Call f th next in pe ion 24 hours in advance. 249-46�� OwnerlCon acto s�ite Inspector. White Copyllnspector's File Canary CopylSite Notice DATE TIME CITY OF ORONO CALLED IN `1 `Zb-''v 9�n� INSPECTION OTICE SCHEDULED `1-�-�� �U 3��'C PERMIT NO. ���3 COMPLETED ADDRESS �q5 ���I 5��� Cnt=�lc �l�al � OWNER �����1Z CONTR. N���S +� ��'1�� TELEPHONE N0. � DESCRIPTION J 1'9�'tkS lu 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING � 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS � O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS � 07 DEMO-SITE 27 SEP T. 21 COMPLAINT r�r ndAlN J 07 DEMO-FINAL 15 SEPTIC INSTA��, 22 FOLLOW-UP W 09 PLUMBING RI 23 SEP 35 HARD COVER REMOVAL = 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL J � OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W a � 3 -- l�oo G�-( ���; � ` � �re C�¢�5'� � 0 � w � Q � z W � W � � u �WORKSATISFACTORY:PROCEED PROJECTCOMPLETE �j��ORRECT WORK&PROCEED ISSUE CERTIFICATE OF OCCUPANCY 0 ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. pHOTOTAKEN INSPECTOR WILL RETURN C]STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED C� INSPECTION REQUIRED.CALL TO A ANGE ACCESS. Call fo e ext in pe tion 24 hours in advance. 249-460� OwnerlContr ctor n�site Inspector. White Copyllnspector's File Canary CopylSite Notice