Loading...
HomeMy WebLinkAbout2002-P05242 - new septic PERMIT CI���Y OF ORONO Permit Number: 2?50 Kelley Parkway - PO Box 66 P05242 Crystal Bay, Minnesota 55323 Permit Type: septi� (952) 249-4600 Date Issued: si3oi2oo2 SITE ADDRESS: 165 Crystal Creek Rd Long Lake,MN 55356 P I D: 33-118-23-33-0005 DESCRIPTION: Proposed Use: Residential Pernut Class: General Permit Type: Septic Permit Sub-type(s): New Septic System DETAILS: Approved per resolution#: Separate pernuts required: NOTICES/REMARKS: FEE SUMMARY: Permit Fee: $ 100.00 Valuation: $ 0.00 State Surcharge Fee: $ 0.50 TOTAL FEE: $ 100.50 APPLICANT: Hayes&Sons Exc. Inc. OWNER: Bob Heleited 263 82nd Street S.E. 165 Crystal Creek Rd Montrose,MN 55303 Long Lake,MN 55356 THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED AND AGREES TO DO ALL WORK IN SI'WCT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF MINNESOTA BUILDING CODE REQUIREMENTS. -�� �J - � sZ, S '�.- �C'� � ��� �� APPLICANT PERMI EE SIGNATURI; SSUED BY S[GNATURE Covies: 1-File(Sienitures Required), 1-Anplicant, 1-Monthlv Reports, 1-Assessine, 1-Finance Page 1 rr CITY OF ORONO SEP'TIC SYS'TEM PERMI'T APPLICATION Box 66 (2750 Kelley Parkway) Crystal Bay, Mn 55323 JOB SITE ADDRESS lU� C ►� S �- I � Y-e�--k-- Occupancy Type: Residential ✓ Commercial Other Permit Type: New or Replacement System $100.00 ✓"� Repair Existing System $ 50.00 (Tanks or Drainfield) $0.50 State surcharge added to above fees * See fee schedule for non-residential permit fees Owner's lr`ame: �� ✓1'��-���'�°-�� �_ �`��`A'��� J Phone Number: Mailing Address: City: Zip: . << ri Contractor's Name: � � y eS -.{ ��S Phone Number: ��:,5-- �{�y /��,���,1 �,� s fs--sz Mailing Address: •7�� 3 s 2=''35�_ 5 �� City;%���-���� Zip: �;�3�3 *** DO NOT MAIL PA�'MENT WITH THIS APPLICATION*** GENERAL INSTRUCTIONS 1. Applications for septic system permits may be mailed or submitted in person at the City Offices; however, pernuts will not be mailed out. The permit must be picked up in person at the City Offices and work must not begin unless the permit card is on the job site. 2. Permits will be issued only to contractors holding a Minnesota Pollution Control Agency(MPCA) Septic System Installers License. 3. All work must be done in accordance with the approved septic system design. Design reports are not considered approved unless accompanied by the "City of Orono Septic System Approval" cover sheet signed by the City Inspector. 4. The following inspections will be required for all septic systems: A. Pre-installation site inspection to include inspector, installer, and general contractor. B. Tank installation prior to covering. C. Drainfield trench installation prior to covering. For mounds, inspection is required after rough up but prior to sand placement(sand will be jar tested for silt content), and again during pressure distribution piping installation in the rock bed. D: Final inspection to verify proper final cover depths and to verify that all pump stations (where required) components aze functional and comply with codes. 5. Individual holding MPCA Installers License shall be present during a11 inspections. A 24-hour notice is required for all inspections. v� NOTE: Applicant must initial all spaces. Fill in all appropriate blanks and check all appropriate boxes. � 1. I have received a copy of the system design including the City of Orono Septic System Approval Cover Sheet. "�� 2. I will be installin following: A Tanks: Precast Concrete Other Manufacturer�� Tank Capacities: 1),%;��'v gal. 2)foc�; gal 3)l���� gal B. Pump Station(if required) � Pump make&model�o��t� L�a� �z �"�'` (atta.ch pump curve& literature); system design requires c� u gpm at � 2 feet of head. High water alarm make&model ��\��„„� . Outside electrical work to be completed by installer�/ electrician other. C. Treatment System: Trenches: s.f. �Mound Depth of rock below pipe " Rock bed dimensions��' x S�_ ' Drop Boxes Sand bed dimensions��' x��' Distribution Box Pressure Dist. Pipe Diam. / '% " Manifold Pipe Diam. Z " D. Final Cover/Topsoil to be: Y borrowed from site (show location on site plan) � trucked in The undersigned hereby applies to the City of Orono for issuance ofa septic system installation permit, agrees to do all work in strict accordance with ordinances of the City and the regulations of the State of Minnesota,and certifies that all statements made on this application are complete,true and conect. SignatureofApplicant - �---s Date: � � -.�? � � ���--- MPCA License No. � � � . Staf�'Review: Approval Denial Reviewer: " �`��-. " P���-c,.`^ � Date: S� �� }` � � Reason for Denial: � o� 0 0 CITY of ORONO r�1 `;�,;�f• ,�,� � E� MunicipalOffices �� ' ` G~ ` Street Address: Mailin Address: S 9�C'EggO�'� 2750 Kelley Parkway P.O. Box 66 Orono, MN 55356 Crystal Bay, MN 55323-0066 November 6, 2001 Robert Melamed Jr. GO Lakewood Development, Inc 165 Crystal Creek Dr Dear Mr. Melamed: This letter is regarding the septic location for lot 165 Crystal Creek Dr. After looking through the plat approval is shows that the septic locations were approved at the base of the hill as shown on the septic design plans by S-P Testing. These locations are above the floodplain so they did not have to meet the 75 foot setback from the wetlands. You have our approval to put the primary and secondary septic systems at the base of the hill 35 feet from the wetland as shown on the design plans. If you have any questions please call me. Sincerely, �Q� Matt Bolterman On-Site Septic Systems Manager Telephone(952)249-4600 • Fax(952)249-4616 www.ci.orono.mn.us ^�-7 l ���j ` V. � . , ' _ . � AJ � !A. �� J6. �L 1 � V' ���• � 951 KATYDID LANE � ST. MICHAEL, MN 55376 497-3566 Steven �. SChirmers ( �,'�} C r _-! S�_� �� � ��r'� � �1 September 28 , 1989 +�/ Al1an Carlson Lot 4 , Block 1 i-- ��u,� Crystal Creek �- �S� Orono, Henn. Co. , MN � V This system is Designed for a Type 1, four bedroom home and in accordance with the Minnesota Pollution Control Agency Chapter 7080 and local ordinances . The soils on this site ar'e typical of SCS soils mapped - LrB - Lester loam & L+B - LeSueur loam. A seasonally high water table was located at 18" , 20" , 32" , 34" & 66" , (mottled soil ) . Due to the seasonally high water table, a pressurized mound system will need to be installed. The bottom of the rock bed must be located at least 3 ' above the seasonally high water table . The soils at a depth of 12" & 18" have a percolation rate averaging 8 . 5 min/inch and are adequate for treating septic effluent. A pumping chamber will need to be installed to lift the effluent to the treatment area. The manifold and supply line pipe must have back drainage to the pumping chamber . The distribution pipes shall have their ends capped. Be sure the rock and sand fill material are clean. The sod layer below the entire mounded area must be turned over, just break up the sod, be sure not to over work. The power supply and switches must be located outside the manhole and pumping chamber in a weather proo£ enclosure. A warning device must be installed with a light and sound device , this is in case of a pump failure . (Mercury floats are a good method) . Al1 neighboring wells are . located more than 100 ' away from the proposed treatment area . Keep all heavy equipment off of the proposed treatment area before and after construction a� much as possible . The treatment area should be marked off before construction. . . � � �-�� � 1 � : uv CONT ' D Soil ared Percolation :''eats Septic System Design � + � / MOUND DESIGN WORKSHEET (For Flows up to 1200 gpd) A. FLOW Estimited Sew�aae Flow�in Gallo�s pa D�y(gp� Estimated l_o v gpd Nianba or measured � x 1.5 =- gpd. �°�n„ �'p`I �Yx It 'iype III �ry�rv 2 300 225 IBO bos 3 450 300 218 •r B. SEPTIC T�NK LIQtIID VOLLTMES 4 �o0 3�s zs� ,� � -/l��� g'�OI15 6 900 525 332 u,° 7 IUSO 600 370 �m, 8 1200 675 108 C. SOILS (refer to site evaluation) N,�� � � or �_. �.d,.r, 1. Depth to restricting layer = ��" - 3�.'' inches �e,� �„�, �, 2. Depth of percolation tests = �i" �� � inches `""`' `'""' 3. Percolation rate � •� mpi 2s a'� ,'o�oo i'.so 4. Land slope Co % �Q a � �o wa 9 See fi`.C-6 (z IS) D. ROCK LAYER DIlv�TSIONS 1. Multiply flow rate by 0.83 to obtain required area of rock layer:A x 0.83 = , C.av . gpd x 0.83 sq. ft./gpd = .��sq. ftt�n°��=��° 2. Select width of rock layer (10 feet or less) _ /� ft. 3. Length of rock layer= azea y width= Rock Bed S�7 sq. ft.+ �_ft. = ss� ft. ,.,.,.,.�.,.,.�.�.,.ti.,.,.,.,.,., l�t.t.l.l•J.J•1.t r•r•1•!•r•f•f. \•ti•ti�1•�•ti•ti•t•ti•ti�ti•\•tiK•�•ti•1 ti`4r1:ti�ti:'ti:�ti���{fti ti�'yr�r���r� idth <_10 ft. y1.ti•ti t•t•1•f•t•f•t•t•r•�•�•t•I•1•t•!• '�•ti.ti•ti•1.1.1•tiH•ti•tiK.�•ti.�•1•� .I.�.t.f.f.f.f��•f.r.r.�.f.r.r.f. E. ROCK VOLUME ~- �`�' -� 1. Multiply rock azea by rock depth to get cubic feet of rock; �sq:ft. x l.os ft. = s� cu. ft. 2. Divide cu. ft.by 27 cu. ft:/cu. yd. to get cubic yards; S��1 cu. ft. j 27=�,L cu. yd. 3. Multiply cubic yards by 1.4 to get weight of rock in tons; �.L cu. yd. x 1.4 ton/cu. yd. _� tons. F. ADSORPITON WIDTH "�`� �0�"''� �,w,a�,s�, Lble 1. Percolation rate in top 12 inches of soil is �•S mpi ��,,,ti�,�,� ��. �.�d M;,,t,4,pe�;xx1, Soil Texture p�,y„�� � '"`"ed ea�r (�� Ir �b.syeo� 2. Select allowable soil loading rate from table; Faster than 0.1 oarse Sand 1.20 l.00 � gpd/ft� 0.1 to 5 Sand 1.20 1.00 0.1 to 5 F'ine Sand" �•� Z•� 6 to 15 ndy Loam 0.79 1�2 3. Calculate adso tion width ratio b dividin rock la er 16 co�o �,o�„ o.bo 2.00 rP Y g Y 31 to 45 s�ie�m oso 2.ao loading rate of 1.20 gpd/ft2 by allowable soil loading rate; �to bo ctay[.o�, o.as 2.6� 61 t0120 Clay 024 �.00 1.20 gPd/ft2; .�gpd/ft� _ �.!.'� Slower than 120 Cla - - �soil tv.�in�sox a ma�e d fi:x a�Qy fux au,d 4. Multiply adsorption width ratio by rock layer width to get required adsorption width; �x�ft =aL•� ft G. DOWNSLOPE I��WIDTH 1. If landslope is�o �aiore, subtract rock layer width from adsorption width to obtain minimum downslope dike toe a�,� ft-�_ft =��_ feet 2. Calculate Minimum�mound size based on geometery: a. Determine depth of dean sand fill at upslope edge of rock layer: Separation /.; feet b. Multiply rock layer width by landslope ' r°°` t°".� to determine drop in elevation; : feot Ro ea Slope Dirfel'etICe seperot�on te�t �X�_%y 100 =��feet SIODe Oltterenee _� et UDs1oDe wlGttf c. Add depth oE clean sand for separation (2a) �-teet Roek 8ed wlatn at upslope edge,depth of rock layer (1 foot) to depth of �12_teet oownsiove wiacn cover (1 foot) to find the mound height at the upslope edge � �eet of rock layer; /•S ft + Ift + lft= 3.� feet d. Enter table with landslope and upslope dike ratio. Select dike multiplier of 3.�'� e. Multiply dike multiplier by upslope mound height to find upslope dike width: 3.S x 3•� _ �.L_ feet f. Add depth of dean sand for slope difference (2b) at downslope edge, to the mound height at the upslope edge of rock layer (2c) to find the downslope height; 3•S ft+ , L ft =�_feet g. Enter table with landslope and downslope dike ratio. Select dike multiplier of S.�y h. Multiply dike multiplier by downslope mound height to get downslope dike width: y •1 x .�� _ �3 feet i. Compaze the values of step G.1 and Step G.2h Select the greater of the two values as the downslope dike width; _ �,� '_ o'Z� feet '�o5�oqe_aiatn I j. Total mound width is the sum of � -1-'-�°°� � ' � upslope dike (G.2e) width plus rock RP�R o.a ��a�� layer width (D.2) plus � �� ��••` UD51000 N�4�� UDC�ODB MIOI 3 � (eel � fEel downslope d.ike width(G.2i); o € ; ; �_ft+ /o ft + aa ft = t�. � feet � , ; ` ` k. Total mound length is the sum of +�3 °°w��°°"�°`� rea� upslope dike width (G.2e) plus rock layer length (D.3) plus upslope dike width (G.2e); �� ft + SS ft + i► ft = 22 feet 2.a. t S� -r �� = S g -� - Totellanptn own ope ps ope 3:1 L1 5:1 il 7:1 3:1 4:1 . S:1 &1 7:1 8:1 7.alope 0 3A l0 5.0 60 7.0 3.0 4.0 5.0 60 7.0 8.0 1 3.09 117 5.26 638 753 29t 3.5i 4.76 5.66 65/ 7A1 2 3.19 �S 556 682 S.lt 2b3 3.70 �54 536 614 6.90 3 330 t51 5&! 932 8.86 275 357 4.35 5.08 S.i9 6A5 4 3.t1 �6 675 7.69 9.T2 268 3.15 t.17 LM 5.�6 6176 5 39 5.00 6.67 d57 IOTI 26l 333 t.00 l.62 5.19 SJ7 6 366 52b 7.14 936 12P1 2Sd 3.73 3.85 l41 1.93 SAI 7 3�0 556 7b9 103� 1373 2d8 �.12 3.7D a23 1.70 5.13 8 3.% 5.88 833 115� 15.9t 242 3.Q3 357 lG5 d.t9 tB8 9 4.11 b.ZS 9.09 13.0� 18.92 236 29! 3A5 3.90 l30 465 10 �.29 G67 t0.0 15.00 233J 231 286 333 3.75 4.12 4.�4 il 4A8 7.14 11.11 17L5 30.l3 2.1b 278 323 3.61 3.95 616 � 12 4b9 7.69 12.50 21A3 6375 Z21 270 3.12 3.69 3.80 �.09 � , F-17 .',� F PUMP SELECTION PROCEDURE EIO FERFOR4TION OF • PfRFORaiED L�7ERa� A. Determine pump capadty: �._.�..., Gravity Distribution ,,,,,,, 1. Minimum sugge�sted is 600 gallons per hour(l0 gpm) to stay ahead of - ,:. ' «���w���� � wateruserate. �'"''s""""" ��""".'"^. �'"^"' �. �,' 2. Maximum suggested for delivery to a drop box of a home system is 2,700 ., , ����d��� �����•��� ��� � t� gallons per hour(45 gpm)to prevent build-up of pressure in drop box. , .,;„�, _., �,,,, ,:•,. .,,. I� •f Rx�1q.� . IrtirnMrv lo�i�M s� Pressure Distibution ��..�s.�.�.,,. M,�-^« �..^. 3.a. Select number of perforated laterals 3 on�...'s.0 rr.w.r s�,i�.. b. Select perforation spacing=�_feet ,,,�.,�,,,,�,,,�,,,, c. Subtraft 2 ft from the rock layer length. ��-2 fG=��feet d. Det r�rrune the number oE spaces bet�veen perforaHons. I„ength �.SFaciIlg=S ft.y-�_ft._�_spaces Requirad Perfoncon Diuh�Be e. j�spaces+ 1 =�perforations/latesal �n gzllons per a,ir,u�e(gpm) f. Muldply perforatiorLs per lateral by number of laterals to DH�d e ��.,P,, i Pa� get tocal number of perforadons.�; x �� ��_�_perforations. �f�� g. � X�p„r=�SP m. 1.Oa 0.56 0.74 SELECT'ED PUMP CAPACITY �-�D _gpm 2.0�j 0.8Q 1.04 B. Detezmine hea.d requirements: a. Use for single family homes 1. Elevadon difference between pump and point of discharge. b. Use for all other applications _�feet � 2. If pumping to a pressure distribueon rystem,five feet for pressure required at manifold if gravity s stem,zero. S� feet 3. Fricdon loss a. Enter friction loss table with gpm and pipe diameter. Pipe[-«�g�h �_ Read friction loss in feet per 100 feet from table. � Poini of Discha F.i_ _�l�`�ft./100 ft of pipe �u b. Deternvne total pipe length from pump to discharge Elcvation Diftertncc pointi Add 25 percent to pipe length for fitting p�p _�,�, loss,or use a fitting loss chart. Equivalent pipe length-1.25 dmes pipe length= �x 1.25 =��feet F-18b c. Calculate total friction loss by multiplying 1.S��c�b 2.o inch 3.0 v,�n friction loss in h/100 h by equivalent pipe length. �`�' �e10°n�v�v� Totai fricdon loss= a-L4 x G3 +100= Z- feet 10 0.69 0.20 12 0.96 0.28 4. Total head required is the sum of elevation difference, 14 1.28 0.38 special head requirements,and total fricdon loss. 16 1.63 0.48 I8 2.03 0.60 20 2.47 0.73 0.11 S + S� + Z- 25 3.73 1.11 0.16 (1) (2) (3c) 30 5.23 1.55 0.23 35 7.90 2.06 0.30 TOTAL NEAD 40 11.07 2.64 0.39 �_feet a5 1a.73 3.28 O.a8 � • 50 3.99 0.58 I 55 4.76 0.70 C. Pu.mp selection 6o s.6o o.az } 1. A pump must be selected to deliver at least _ '-1c� gpm (Step A) with at least 1'� feet of total head (Step B). ' L-13 ' C::R7'IFICATION # 00627 Logs of Soil Borings Location or Project Allan Carlson, Lot4 ,B1k. 1,Crystal Creek; Orono Borings made by S-P Testinq, Inc . Steve Schirmers _ Date �'25-89 , 9-11-89 Classifiction System: AASHU ; USDA-SCS X ; Unified ; Other Auger used (check two) : Hand X , or Power , Flight , or Bucket X Depth, Boring numbe,r 3 Depth, Boring number 4 in � in feet Surface elevation 1018 . 0 feet Surface elevation 972 ' 2 0 - 0 - Topsoil dark brown 1 - loam 1 - Topsoil dark brown loam 2 - 2 - 0 - 2-1/2 ' . 0 - 2 � 8�� Brown loam 2 ' 10"-MOTTLING 3 _ 2-1/2 ' - 3 ' 3 _ Brown clay loam Very dark gray loam 3 ' - - /2 ' 2 � 8�� _ 3 � ��� 4 - B n oam 4 - Dark gray clay \ loam 3 � 8�� 4 � 8�� 5 - -1�2 � 5 � 5 - Rusty gray loam 5-1 ' -MOTTLING Br wn sandy loam . . 5 ' - 6 ' 4 ' 8" - 6 ' 6 - � � 6 - 7 - � 7 - 8 - 8 - End of boring at � 6 � feet. End of boring at 6 � feet. Standing water table: Standing water table : present at �eet of. depth, present at feet of depth, hours •after boring. hours after boring . Not present in hole X Not present in hole X Mottled soil : ; Mottled soil : Observed at5-1 2 ' f�et. of depth. Observed at 2 � lp�� feet of depth. Not present in hole Not present in hole Comments : ' Comments : � L-'3 , CERTIFICATION # 00627 Logs of Soil Borinqs � Location or Project_Al1an Carls�n. Lot4 .Blk. l ,�rystal Creek, Orono Bo�rings made' by �-p Testinq, Inc . Steve Schirmers Date 9-11-89 Classifiction System: AASHU ; USDA-SCS X ; Unified ; Other AugEr used (check two) : Hand X , or Power , Flight , or Bucket X Depth, Boring number 5 Depth, Boring number 6 feet Surface elevation 970 ' 9 feet Surface elevation971 . 6. 0 - 0 - Topsoil dark brown Topsoil dark brown loam loam 1 - 1 - 0 - l ' 8" 0 - 1-1/2 ' 1 ' 8"-MOTTLING 2 _- Dark gray loam 2 - Dark gray loam 1 ' 8" _ 2-1/2 ' 1-1/2 ' - 2-1/2 ' 2 ' 8"- OTTLING 2_1/2 ' - 3 ' c�arkl�a y Dark gray clay 3 - � Rusty 3 ' - 3 ' 4" °l�oamgra 3 - 2-1/2 ' - 3 � 4�� loam Rusty olive gray � . � sandy loam Rusty gray loam 4 - 3, 4�� _ 4 � 2�� 4 - Rusty olive gray 3 ' 4" - 4 ' 8-" 5 _ loam , 5 - Rusty olive gray , � loam 6 - _ 4 � 2�� 6 � 6 - 4 � 8�� _ 6 � 7 - , 7 - 8 - � 8 - End of boring at ; 6 ' feet. End of boring at 6 ' feet. Standing water table: Standing water table: present at feet of depth, present at feet of depth, hours •after boring. hours after boring. Not present in hole X Not present in hole X Mottled soil : Mottled soil : Observed at 2 � 8�� f�et of �depth. Observed at 1 ' 8" feet of depth. Not present in hole Not present in hole Comments : � Comments : � L-13 C'ERTIFICATIO� � 00627 Loqs of So�l �orings ' ' Location ^r Project Lot 4 , Block l�r�stal Creek_, Orono Borings made by S-P TestinQ , Inc . Steve Schirmers Date 12-8-89 Classifiction System: AAS�U ; USDn-SCS X ; Unifie� ; Other Auger used (check two) : HanG X , er Power , Flight , or Bucket X Depth, noring number � ! Depth , Boring number � feet Surface elevat�on 970 .1 �feet Surface elevation 971 . 7 i � 0 - � � � - � , Topsoil dark gray � � � loam ' � � T'vYSGll brown loam � _ I I 1 _ 1 0 - 1-1/2 ' -MOTTLING � ' , ! Rusty dark gray � 1 � p - 2 ' -MOTTLING 2 - loam � I 2 i Dark gray loam 1-1/2 ' - 2-1/2 ' i � 2 ' - 2-1/2 ' � � - Rusty dark gray clay 3 - Rusty olive gray ' j J � 2-1/2 ' - 3 ' 4" loam loam ' ' j � � Rusty brown clay loam 4 - � I 4 - � 3 � 4�� _ 4 � 2�� I2-1/2 ' - 4-1/2 ' � I � ` � ; Rusty olive gray t ' 4 Rusty olive gray 5 - silty loam i ` 5 - E loam 4-1/2 ' - 5-1/2 ' � � � Rusty olive gray loam 6 - 5-1/2 ' - 6 ' � j 5 - i 4 ' 2" - 6 ' � I i I I � I � � - ; � � - ; ( ! I i g - i ; 8 - i � � t ' E�d of boring at 6 ' feet. En� of boring at 6 � feet . Standing water table : Standing water tab'_� : present at feet of depth , present at feet of depth, hours �after boring . h��.:rs after boring . Not present in hole X I�ot present in hole X Mottled soil : :�:ottled soil : Observed at 1-1/2 ' � Observed at 2 � feet of depth . feet o_ depth . Not oresent in ho'_e ?Vot present in hole Commer.ts : Comments : • . CERT. #00627 ' . PERCOLATION TEST DATA SHEET ' , S—P Testin Inc. 9-12 -89 1 : 27 ".m. Pcrcolation test readinbs made by g� o� starting a� ���' id�«� Lot4,B�k. lCrystal Creek O�ono 4 9-11-89 Test ho;e locatio� ,f-lole number ,Date hole was prepare� � Depth of hole bo[tom 18 inches,Diameter of hole 6 inches Soil c!ata from tcst hole: Depth, inches Soil texture 0 — 18" , Topsoil dark brown loam Method of scratching sidewall ' Knife 2 Depth of gravel in bottom of hole inches � 9-11-89 ii• 30am 12 Date and hour of initial water Clling ,Depth of init�al water fillin,g inches above hole bottom tile!hod used to maintain at least 12 inches of water depth in hole for at least 4 hours AutomatlC s lphon 6 -. � , Maximum water depth above hole bottom during tese inches I Time Percolation ' Time interval, Measurement, Drop in watec rate, Remarks minutes , inches level, inches minutes per inch 1 : 05 � prefill 6 1 : 27 I 1: 37 " 3-7/8 2. 6 10 min 1 : 42 � 1 : 52 " 3-9/16 2. 8 " " 1 : 59 , 2 : 09 ' " 3-7/16 2. 9 " " 2 : 15 2 : 25 " 3-3/8 3 . 0 " " 2 : 30 � � 2: 40 " 3-3/8 3 . 0 " " � I i � ' I . � Percolation rate = 3 � � minutes per inch. . ' ' , � C�RT. #00627 . PERCOLATION TEST DATA SHEET � S-P Testing, Inc . 9-12-89 1 : 28 ``'�"' Percolation rest readings made by on starting a • p.m. , w��., Test hole location Lot4 ,B lk. 1,�rys�ta 1 Cre�le���r� 5 , Date hole was prepare� 9-11—8 9 Dcpth of hole boteom 18 inches,Diameter of hole 6 inches Soil data from test hole: Depth, inches . Soil texture 0 - 18" Topsoil dark brown loam Method of scratching sidewall Knif e • Depth of gravel in bottom of holP 2 �nches Date and hour of initial water fillin� 9-11—8 9 ��t���al water filling 12 inches above hole bottom �vle!hod used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon ,Maximum water depth above hole bottom durinb tese 6 in�hes � Time Percolation ' Time interval,. Measurement, Drop in water rate, Remarks minu[es inches level, inches minutes per � inch 1 : 05 prefill 6 1 ; 2g 1 ; 3g " 4 2. 5 10 min 1 : 41 I 1: 51 ' " 3-15/16 2 . 5 " " 2 : 00 2 : 10 " 3-7/8 2 . 6 " " 2 : 16 2 : 26 ' " 3-13/16 2. 6 " " 2 : 31 2 : 41 ' " 3-3/4 2 . 7 " " � � � I � , ; � Yercolation rate = 2 • 6 minutes per inch. CERT. #00627 . PE�COLATION TEST DATA SHEET ' a.m. Percolationtestreadingsmadeby S—P Testing, InC. o� 9-12-89 • startinga 1 : 29 � p.m. , f Jwe) Tescholelocacion Lot4 ,Blk. l�x'ystal Creel� Oro�o 6 9-11-8 , ole num er , Date hole was prepare�l Depth of hole bottom 18 inches,Diameter of hole 6 inches Soil data from test hole: Depth, inches Suil texture 0 — 18" Topsoil dark brown loam Method of scratching sidewall Knif e 2 , � Depch of gravel in bottom of hole inches. � 9-11-89 �l • 3(�am 12 Date and hour of initial water fillin,� , epth o inuial water filling inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatie s iphon 6 � . � ,Maximum water depth above hole bottom during tes� inches Time � Percolation ' Time interval,' Measurement, Drop in water rate, Rc;marks minutes inches level, inches minutes per inch 1 : 05 prefill 6 1 : 29 1: 39 '. " 3-3/4 2 . 7 30 min 1 : 40 1: 50 , " 3-9/16 2 . 8 " " 2 : 01 2 : 11 " 3-3/8 3 . 0 " " 2 : 17 � 2 : 27 " 3-1/4 3 . 1 " " 2 : 32 2 : 42 " 3-1/8 3 . 2 " " � , � � � Percolation rate = 3 � 1 ►ninutes pe�inch. � ' CERT. #00627 . PERCOLATION TEST DATA SHEET • .m. Percolation test readings made by �—p Te s t i nc�.., T nc . on 12—9—8 9 starting ac 1 1 : 5 2 P,m. IdurN Test hole locatio�'ot 4 ,B 1 k. 1,C ry s ta 1 C r ee k Hole number�, Date hole was prepare� 12—8—8 9 Depth of hole bottom 18 inches, Diameter of hole 6 inches Soil data from test hole: Depth, inches Soil texture 0 — 18" Togsoil dark �-ay loam Method of scratching sidewall Knif e 2 Depth of gravel in bottom of hole inches Date and hour of initial water filling 12—8—8 9 , Depth of initial water tilling 12 inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic s iphon 6 � ,Maximum water depth above hole bottom during tes► inches Time Percolation Time interval, Measurement, Drop in water rate, Remarks minutes inches level, inches minutes per inch 1 1 " — 1 �� �� �� �� �� 1 . , �� �� �� �� �� Percolation rate = 2 ' 6 minutes per inch. „ ' , . CERT. #00627 . PERCOLATION TEST DATA SHEET � - a.m. Percolation test readings made by S—P Te s t inq, I nc. o� 12—9—8 9 ctarting ar 11 : 5 3 P m i�,u TestholelocationLot4 ,B1k. 1 Crystal CreekHolenumber 8 , Dateholewasprepare� 1?-8—fi9 Depth of hole bottom 18 inches, Diameter of hole 6 inches Soil data from test hole: Depth, inches Soil texture 0 — 18” Topsoil dark brown loam Method of scratching sidewall Knife 2 Depth of gravel in bottom of hole inches ' Dare and hour of initial water filling 12—8—8 9 ,Depth of initial water filling 12 �nches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Au�tomatiC s iphon 6 � - , Maximum water depth above hole bottom during test inches - Time Percolation Time interval, Measurement, Drop in water rate, Remarks minutes inches level, inches minutes per inch 11 : 40 prefill 6 11 : 53 12 : 08 " 4-3/16 3 . 6 15 min 12 : 11 12 : 26 " 4 3. 8 " " 12 : 29 12 : 44 " 3-7/8 3 . 9 " " Percolation rate = 3 ' 8 minutes per inch. ,, , � , CERT. #00627 PERCOLATION TEST DATA SHEET a.m. Perculation test readings made by �—P TPsting, IN� on L2-9-8._9—starting a► � 1 -3 d `p"-in. ��«, Test hole location LOt 4 ,B 1 k. 1�ry S ta 1 Creekf j�le number 9 , Date hole was prepared 12—8—8 9 6 Depth of hole bottom 18 inches, Diameter of hole inches Soil data from test hole: Depth, inches Soil texture 0 — 18" Topsoil dark gray loam Method of scratching sidewall Knl f e Depth of gravel in bottom of hole 2 inches �2-s-s9 i2 Date and hour of initial water fillin , Depth of initial water filling inches above hole botrom Automatic siphon Method use�to maintain at least 12 inches of water depth in hole for at least 4 hours 6 , Maximum water depth above hole bottom during tes► inches Time Percolation Time interval, Measurement, Drop in water rate, Remarks minutes inches level, inches minutes per inch 11 : 40 prefill 6 11 : 54 12 : 09 " 4-1/4 3 . 5 15 min 12 : 10 12 : 25 " 3-15/16 3 . 8 " " 12 : 30 12 : 45 " 3-3/4 4 . 0 " " Percolation rate = 3 • 8 minutes per inch. . ' . F-8 � ;: REOW00�, CEDA� OR WATER TIGHT 8� �OCKABLE ELECTRIC BOX� TREATED POST (4 x 4 min) ' PIUGS OR EIECTRIC CONNECTtONS---� /-INSIDE 80X IC CONNECTIONS MADE 2' PVC CONDUIT SCHEDULE 80 6.SP� LOOP OF POWER CORD FOR MANHOLE COVER CHAINED B� LOCKED SETTLEMENT SEALED MANHOLE RINGS .FINAL GRADE �` AT LEAST 12' ' � ��� BEIOW GRADE WIRE FROM POWER SUPPLY - ' PIPE IS LAIO ON A UNIFORM SIOPE FROM � /}� . FOR PROPER NORAINBACK Il. 7REATMENT MEA SEALED TANK COVER �--IF PIPE AT TANK MUST BE LOWER THAN UNION. TO GET ELEVATION FOR ORAINBACK, PLASTIC ROPE OR CHAIN A �/4 INCH WEEP HOLE MUST DE USED WITH ANCHOR—� — yyEEP HOLE ALARM FLOAT ON SEPARATE ELECTRICAL CIRCUIT NOTES� EI.ECTRICAI.WIRE FROM POWER SUPPLY . S�RT l,_._FV�9__ � _ MUST NOT RUN OVER ANY TANKS BUT r' - MUST BE LAID BESIDE OTIIER TANKS 3"� � `� AND NtUST 8E PLACED IN CONDUIT AIONG POST _ SF{UT-O�F�,EV�ILQ_ _ _ ELECTRICAL CORDS FROM PUMP AND FLOATS MUST BE RUN THROUGH CONOUIT. WIRES CANNOT HAVE GROUND PUMP CONTROL:FLOAT CONTACT. 0�� : :� Figure F-8 METAI. � COVER � �., _.�;, .� -!�- �� � y.• _k � . (9 ' �`�' ,, �.v:,..y i .�_,. r: � . i . ' I, ' I � i � I ' � �i4:r•._�_�. i ► CONCRETE �zf�' I MANHOLE , RING i 'i METHODS OF SECURING MANHOLE COVER TO PREVENT UNAUTHORIZED ENTRY Figure C-14 . , ' �4 .' VERTICAL SIDEII�ALL SEPTIC TANK -�� /—FINISHED GRADE -AT I.EAST 6`TO 12" SOIL AT LEAST 4" DIA. COVER 4� ��A•� � AT LEAST I" � � AT LEAST I" r,nir� I_ j �.. •:.-,. . .. _ �.... � . , +. � —� T � A DIMENSIONS FOR TANKS WITH VERTICAL SIOES A WIDTH. W 24' MINIMUM ' LENGTH, L 2 TO 3 TIMES THE _WI�TH B DIAMETER 60� MINIMUM _ : � � DEPTH, D 30' MINIMUM: 76� MAXIMUM C A 0.2 0 � r — -AT LEAST g �� 6" MINIMUM• 0.2 D MAXIMUM _ 6" _ 3" �_. C 0.4 D -- ------ - --AT LEAST 4 FEET--- � —'" Hp1E5: � 1. SN�iI/JiYIECSATLftiST�INGIE51NDtAAAElf.t1 �. ►wuu'�ECOvERSS�N1l�lOUtE0wil�ir+i�u+c��EA 2. 11 If f1E 51 W L UC 0�1E 0�11.�d IE MN�qlFS.20'lFAST If TI�E 1.W111U1E l4 Mllil W NX NCI�E!OF 111[SUfYAC:E n�1,(jNON/J�LOCA1FnYA����N6fEEfO�HLITNlK 1iE00vEi��wJ5f0ESfCU[070MEVUiIACCf5.4 wni.is ` b. Scruv���+uisriv+cEOEtwfENFix)oFr+�Errre�wu �. hNrts�ECtqNt`Y'EO��TI,F.HSf�W���ESD�N.�(:1Eii NEu�EsirOr�tOr�O�f�tE�v�LLl1ENOLEs41�w+cwc��fs Ot1 A WJJ IOIE S�Hll HF tOCAI E0 CNEn DO1 H 11 E Iri E T Of1 NO At��E T1 1N�t 2 NC��ES MJOOUIlLiOGVICYS.I�+ECFJ�lEI1lwCO�ll�t�9'kClqil 6. FOf11101tlZ(XII/yCYlI1fX1GL7M1K,^,011ACIJSKJNAISO.t:A f`V+[5 SI Nil OE TI iC SM.f/S 71IE UNIL't11�NE fY 1ME ANn OII.F,NSION C I,^i 0.75(1. ON f LE Oi'C1+wC5 d 15NU I N IY 1 CE 5.A 11 Yf1U W SI'EC i�ON � f'1•C�115t RE IOCI�ItuEtilWCf.N 71tE tAEt M1UtlllllEi Mf flES. — , � PENClL � M�iF2KS •.t ' � .�,�- 6 N �.r. �.,� MANHOIE �� M t, . � � � . . � � INLET ` SCUM �. �; pU7�ET -� .,,�_ . _ _ ,. i .. �, . �;,:�;011fLET LEVEI_ ��}:3;+�-i I .��` Y ''r. —.. --•- — _ — �;� r — SCUM CLEAR SPACE —= CLEAN OUT TM1K WF{EN� � r�� �;. —.. — — __-� _.. _ ••:• _ � 'T' 'k\IS 3' OR I.ESS OR _ �� g 8�IS 12�OR LESS � a , �r � Y� ���;i�.'••�'�''.'�''. ' '• ' • ' : . '. . �•�. •� . , ��,.:;'.{:'.'.�.• '•�� :- ..;: BIACK COIAR �' �'i.'��:�•:�'••�.' • SLU�GE • i� �� DISTINGUISHES SLUDGE 's. �•;. .•,. ., �, LAY� FROM l.10U10 � �.69.7. ''i: .. . . .. :��. ..., t�;,: � :�'� �.'ubn' .�.y'.i MEASURE SCUM AND SLUDGE ACCUMULATIONS I N THE SEPTIC TANK PERFORATED l.OAMY SAND CAP LAYER OF GEOTEXTILE LATERALS FABRIC PERFORATEO �A7ERAL - ��~,,,r�~` =��� ';�^•. ..____ .„., GRA55 COVER 6 INCHES sarvoY �onrn soi� -;/'� ' `� ` ��""+.'.•;+•:-�'��': TOPSOIL , �" r' , ��•^ `~� CLEAN SAND FII.L ,`,' I'�. � •';,.�:.� J. . � � .'�..�, }��. MAXI 3 TO SLOPE-- IAYER OF GEOTEXTILE ���� �'� EAN HOCK a' FABRIC OR 4 INCHES OF " '� ' / '�y.� y� ,.� •!�� TOPso�� si. �r�b 2�iz INCNES ,� , PlAWEO OR /. SL0 HAY COVERED BY l .' , � j' ois►cE0 SURFnCE BUILDING PAPER .y?��,,' -�j��/, / z �� ueso�� • I�/z-� OR 2� ,..:,:��'" �f ����� � +� CROSS SECTION A-A PIPE FROM PUMP `;���•? ' �� i j`�,'� ,� '� �J,,: ,�. ;/,%` � � jr !'' .;�, / PtPE fROM 3/ �Z�/ i' ', �/ / ,�� >� �� GUMPING CHAMBER CLEAN dOCK '��. � '��!•'� �'` � ��� � OIVERSION FOR . ..:: •�%' .� ,J J� SURFACE WATER w ' 6' TOPSOII.� /� • � � �� � o � � �! . .•�;�� � � �. i/' >�` �r•— — — _��`..��.'��` 'l�"� i� f i� �7�' � ; '�� ��,� . � •� 3 ��� — PERFOR4TED : � � '� � - � ._ r9�'/ � MAx. I ,.,�- L'ATERALS � � I �s• w�a�. � `;{r` 1 ��` •�� ~1 � �w•i� �'��.7. ".'/.1,/�Ai\ �..' � I S��p� :;•�;;;;;. :�M;lra,;, i ; I� sa IEqN _. �^--� • •�?i;,;:;►:�:��: . I ; ; � _ .... . ,� (�Jp FIl $O 36.. .\�,(�:_'.��''•'' . BED AREA I � ' I Z . � t'� � � e � �AY ''1' +� �`�;;�>:. � W . R�k FR _� �- . - �----�'• � �- f N UP ,���'�� � ;��.���` _ � , � o :_ N � BaRRAERRA� , . ~ , ' a . � � � ; W ; � m . ° �qYER ~ ' _, - - � ' ? ' ? ? � — � . �,�o#..,o ' � • INCHES I � 'f � � � INCHE$ ._. LAYOUT OF PERFORATEO PIPE LATERALS FOF2 _ � ; � ; I PRESSURE D1STR18UTION IN MOUNO —• ' ; ' —� �—'— — —� I PERFORATED P�ASTIC PIPE _ OIKE �0 FEET�_p�KE MAX. � • TOTAI W IOTH � SpACING . . � �1 '1' � END 5 ZE EMnE BE�n ORiTION• \ . � P�R�ORAr��N I PLAN vlEw . VIEW pp ��,'. l6 2�MANIf'OLD � END PERFORATION OF A PERFORATEO LATERA� PIPE ^ Groa� Cova PERFORATIONS ON BOTTOM OF '; PLASTIC PIPE r.w.0 Qp., `—s� t�,-s�� .,.,,, .... , .a r� � �" a of Gwlullb foDAc Iw Iw- / � =r'(ALTERNATE IOCATION ' V°^�s°M�'°yw• %..�b�'ur�h v'�j~°"cw«�o OF VIPE FROM PUMN1 � � P�rla lion Wi1�eJ Narliontally �� . • ,�Nio C p IMor Top END CAP 9�•. / L �/�P1u� —Ai lw�� 12'lo Eop• E�A o •Id RxM . :�' of RocM Loy�r [ LAr �:• . .1 . . ,v«�«ouun.��Lccu�.e u� fL� Bollaw ol Lal.rol �i �RA 2�PIPE fROM . Cban Saw l.oy.r ��/ ..0 PERf PUMPING CHAM�p . . . . , . . . . . �� ' . . � y .i s s � � . 1 lo'x SS goc.� ci�-.� o _ - `: _ J . . . � / � ' `S ' ' � � � D - To oP.SRf.�o . 3.S F.�.`q, �,�1.s y.3� . PLt!�1�-\ � � �v�/ r��o-c -<d sc.xx�� /� ' 9 �° �-� � � /o' i SET- BACKS . ��---------�1 �� ' HOUSE • System must be� � . Tank 3�� from property lines X - S��1d� gX�S�� w�oT�_. w�-�-- S3�SEms�.� ,�,�' from wells 3Q from b;dgs. . -t'°n�; . Treotment orea =�from lokes , 2� streoms`'w�'�"� Treotment areo �� from property lines NOTE�Power supply ond switches must be tocoted in a M�N�fo�S w,r�x.�."-��" �S�from wells weaiher proof enCbsure outside the pumping chomberand manhole . • L�ace F,�� �o 'from bidgs. I �— -� �a' from trees � � SO1L BORING ELEVATIONS i � r _�. . � I � � - ot1-� Lmin. . . � TH.'I EL.- Si-t�''G�-�►�i.� ' i �"d�a.su � �i e TH. 2 EL.- 'f1-�'�� -q�o.1 � I ; grode$.% Drop to Tonk Tonk Tank I PRESSURE DISTRIBUTION MOUND SYSTEM TH"3 EL.- ����-°�'1►•'� - � TH,"4 EL::i2�� '�l `�� -��v.L � Min. I��io 8� �p�mping TH'S EL-32:� ( Max.l��to4� � ���P '��l.a�S �l��A��oc�.) ELEVATiON al PROPOSED PUMPING ' Chamber CNAMBER-`�'��.o , 4�to 6��dio.pipe � - i SYSTEM DESIGN -MOUND �ya'���� �p��g 10� � � . � TYPE�., � BEDROOM , Averoge percolation rate `ds min./inch (desic�n.83 sq.ft treatment area per gal. of doily sewoge flaw) • ���2 gal./day x.83sq.ft�gol...�1`�sq.ft.of treatment area +t0% =�Z sq.ft. (.= IOft,width=�,�ft.lenqth of bed area+side slope run�to I x�3 heighd= `�ff,x_�ft.lawn•area needed) , � Clean rock needed- 54�_sq.ft.treatment area x�•_°�depth of roc�c=S� y cu.ft=27=��cu.yds,(3/4��to 21/��dia. ,includes 2��of rock nbove pipe) � � � -��,� Clean sand fill below rock needed�cv.yds. opprox. , sondy loam bock fill��aa.yds.approx., topsoil 6����cu.yd. A�� Sx��a-o o�P-c�a I •`� • I ��c.2C1t��1_9 -C� aoo �.o��o -C� -r'oeso��.Fo� ����U��r��_Sw��`�3 cu�o_-«��� Number of tanks required 3_, Ist tonk �d gol. , 2nd tank�gal.minirxms PL.�s Pu m P�►...�� ����»��-�- , ���sE� 1�.-�g-�L , I Pumping chamber copocity- 25°/a of daiy sewoge fbw of�Qgal.= �s�gol.+reserve storoge of 15Ogh�/Bl�_C oo gol.+pipe bocic dro'u�oge— �' ���`����x�'4�S�_oIJ , PROPERTY OF� �-CR V ST'A L L'�-EE� ofl�gol./IOOIin.ft.of�Mdia. �PP�Y Pipe, Iin.ft.neededlL�, �gol.� manrfoldls�gol./IOOIiRftof a��dia.pipe,tn.ftneeded � � a gol. �jT y ��_� � total capocity needed Z2�gal.(Plus orea for P�mP) us� n„,�. /00 D ��,l.��,,�- � �'�o�-10 7'Y1 Y1 !�'��1-a - �n� Disiribution pipe �L3�da. , L�s�_lin.ft., ��� �dia. perforotions���oport Pump size ��hp. (pumpoble copacity��.gal. 4c,ycles/day) _ u;,E-v I S � �+�x�c ��E�s _��sc,�c��¢-Uc- 4 O ��,► 1 ,�„ n _ ,S—P TEST/NG / Note � When cons�n,cting bed �- , tnis oreo shoub be shoped Note= D�stonce trom treotment orea to neighbo�ing wetls— ( Designed 9y��� � S�' to d�vert run-off irom entering treatment orea. L��'����-� ��� 4-�' ��� � D01e ;����� � pH. 61 2-4 9 7-3 5 6 6 . � - �� '- . � � y , � ss � ro'_r�ss' _¢oc.� e��v _� o • � � � ----=—� - - ' �) '` ----� .—_ _ • �- ------ - `�`� � \ c�S �\ �..a:c��F��_`f:� , . 3-5;�-�F�`•_31�.�'`-1.I P�t�t t �/��i.J ►-�o-� -Cb s�a�� --- -- - �'-��- .�-�-��Q---_ _I �'� Sk.,) ---- --,<.tii -- - --�-- �_._ __6�0 - - SET- BACKS � - ��1-- - -- �' ��� --- - a`��--- �--_- - - �------ --- � HGl1yE _ . . . . System must be� ' _ Tank �� trom ���'�Ef1y Ii��ES �=c`�1-f 1���__���;� � �-`-W��-'t�'---. �ul_L $145� 6T'�T . ��"(rOm �rrel'.5 ao ir�m b'Ccs. , ,,.�c��.R�� . , ;-��"�,;,; , , Treotrnent ereo =�frorn lokes , � ��S NOTE� Po.4�er suppiy and switches rrx�st be tocoied in a Trecfinent orea � `rom proper`y lines Weather proof enc�cv,re oulside the pump�ng chomber ond manho!e � �"1/�NNr��s r,r,x.�•'-t�" '�S from we'!s ' . CAcrF,c� ao'',��m b!dgS: i- -, . � 10 ' from t�ees ,� �-F SOIL 8CR1NG F._I..EV:�.T'iG'�'S w�t� �o�-� �min. --�---�ti �jr - � �� t : . .. _�___ �(^ _--`— _ _ --- —1i TN�I EL. �- _ � � (� ' - -j i , _'.�N'a� -9 �l.(� _ (- • -.___-- .:�_.. ` , " � i � �' r I ,- � _ � da.s P�'��- - o � H. 2 ��. _ 2�� 7 q�D. l ..�--�_o;. g�ode._� /o �� � - '� ` -t y"45 �!� I.7 Tan�c i Tank ',� TH. 3 E�..-_` _. � ��� PRESSU`�E D►STRi�UTiON MOU�D SYS-rEM .. Crop to ?onk � j -----_— _— TH, 4 EL.-�.� �-rl-�;`6i �i']o. S� . , „ � L._—J '� . TH'S E�. ,�c�q . .�'�in. I fo 8 Puma�ng - Mcx.l��fo4� � ��-�P "(���`�S �`���L-oc� Chomber , ELEVAT,O\ ot FRC�SED Pl;`�1F�'��G , 4�10 6��dio.pipe . CHAv.BER-�t�S,ou�o -R,..�� g`9•a SYSTEM DESIGN -N'�OUND � • 7YPE-�, �. BEDROOM , Averoge percolotion raie `6•�min./inch (design.83sq.ft ireatmenl area per gal. of dai!y sewa� flew) . �go!./doy x.83sq.ft1gol.��sq.ft.of treatment area +10% = S _sq.fi. (-: {Ofi,width=��ft.length of bed area +side slope run�_to I x 3__:._�heigf,!= �_ft.x��ft,iown•ar2a needed) � C(ean rock needed- �2sq.ft.treatment oreo x .1��deplh af rock=�_cu.ft :-27= a� cu.yds,(3�� `0 2 V��dia. ,inch�des 2�of ra,k a�ve pipe) � Cofl�s� . a to soil 6�� _2S2--cuYd- -Ia���,. _:_�.�'�---��_�-�a�_J .� ��,sN�� Cle�n�ond fill beEow rock needed�3�cu.y� s. opprox. , sondy lc•�m bock fill as cu.yds.opp��ox., p �f.�_`���D �o �,J� �oE.� -�o ;'oes��� Ge� ��-�-�ti=�"a��YG=-`6-�# -_`"'��.`�"` Numberof tanks required�-, istionk 000gol. , 2ndionklos'?�ga►.m�ni�wns P��s Pu•n��>..�� �aYa����f=� . V��4o��'�io s''S� • "��v�s�p - 7a,-�-,'��- Pumping chember capacity- 25% of daily sewage f{cw of oo gal.=1�gal.+re�rve slcrage of 15 0�,�1/B��� gol.+p;�t,ock drninoge- � (� S L G �- PROPERTY OF:-.� C__k_T�_, �____:�_ of!�_�d_goi./IOO�in.ftof_+��._�dio. supply pi�e, iin.ft.needed�-Q_� �.you!.� monfiold 1.�gol./�OOlinftof a"dia.pipe,�n.ft.needc�2 , _�gvl. �,o-� �.} BL..�1 �_ lotal r.o;,ocity needed��.Lgal.(plus areo forpump) us� r,,�,-,. .[Q��a�.�«�o_ � Q��o tH1-1 . H�N� ._cd . _ Dislribution p�pe _L._'��dia. , l�lin.ft., �_��da, perforofions 3��opo:t --------- Pump size ���hp. (pumpob!e cc�,�city '��gol. 4cycles/day) _�_=��__j�.•_� �<-x�c _��_�G-�sT�sc.dAgu� yo_�o.l f►m,',�,__-_. �$-P ]"E.5'J-//1/G' //1� . No1e � When consiruci�ng bed -- , this areo shoub be shoped No'e� D�stonce trom treotment areo to ne�gh�ing we!ts- � Desi ned 9 �r p�t`�--�•����; ' U�Gs���� �N Ara J oo � 9 Y� to divert run-off f�om enfering treotment orea. ; Do�e �Lo/�/� , PH, 6�2-497-3566 - �-- _' , - ------ i ----� _- — � , , �,,5.,� - �s��'=___ � / ,�2 � 4 — �-� i � �,oJ �. ,� � �g , „ x� - � ���9�o.y . �� � `�� �i�S.1 �n/�'�L4L�'O / 9b-d //ig'13.i.- T`-���� � 'S`�PrY � � � �' �V'���'`}'ASIl7?-� � a( /�� \ . . � , // �� ,�� w8�, � �'9�Y.� r (I 1 / / > ' � - � ' ; � �v � � ', � x�,�s� � 1 a , �: � ' � " �7 /_ � ` ,l'x/ ^u t/�_ � % �1 j/ �✓��' � � . r�4o"YoS'E�p � PRd40�-O � 1 �a- a1�1'1 ../ 41o.�S-� �j(�W�+E1..�, '� 1 �i�, ��' �c'+� - - � � '�7�'% ! � � 1 , � y/, ;' - � �/ ���� 9 i� --" � , , �Y/ ` / � �` ` ` wo � ` 'ny.) � / J %' Y •/ � �,-,,� — z� � �. �' j � ', � , -_ll_�� M/ � SJ� � I ��7j��I \ ..1�vi�!�`— � X /� I I �! � �O'POS�LP � � ��.z. , � � 'Ss�Y-g 1� � �/. ' �t'R-v4os�op \ ��i ' -S°� 1 1 R�l'��Q)s�v / �'t'z'� '..j �� � �C�6 LHRvn4�i � J � -s , ; �,�s.q , , � , �: �r al�o.�I �� . ,, °�'1�L� �� s, � � x � _ �o40`sGp '� �� �,T� -�_J -�� A��1� �A-�T � o n — .�-�Q A�•\.- 1�'�/aV`�( �Au�'Yr�c�+�T o�+F o� y =i1�?'�C T�FoVos�f�o . ��T.��„`� �-S F��FaQ-� � � _� M�-C�vR- Gv`}-t`s'�,F,3�)ON 'q�Y•'� a � 1�5� . _• "Q�JISEd IA-�1� �7fo / �Pescolotion Tests Scole�--� "_ -S�� �'�ERT`f CF����s-s�,� c-��.L r,5oil Borings Lo-f �l 'Ci�D��-�. �Bench Mark o�o�.�o M�. l-#��-�}+ . G�D • Note= This system is to be constructed to meet the Minneso�a Pollution Conirol Agency S—P�T�G/ C Chapter 7080 & Local Ordinance �' Note : Check all underground utilities ��'9^ed BY�-� C��- - Do'e L/c-/5�, '=ri.6t2-497-3566 DATE TIME CITY OF ORONO CALLED IN INSPECTION �T�IC��� SCHEDULED PERMIT N0. �� � COMPLETED 7-�����' ADDRESS �b� ��/ft�l C�t2f� �'� OWNER CONTR. �`�� S TELEPHONE NO. � DESCRIPTION,_,��1�+�. � � �� � � 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP O6 PROGRESS � 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT � 07 DEMO-FINAI 15 SEPTIC INSTALL. 22 FOLLOW-UP � 09 PLUMBING RI �PTIC FINAL 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL � OWNER/CONTRACTOR TO MEET YOU: YES_NO � COMMEN : � — �� p r ��1 5 C r� .,�-L r' � — ��4r►.. o _ � Mav � �— �.:1+�� o,. � t-�,.� �U�fi c zx��3� � Sr f r_ W � Q � � T ��� � , W � W � � GW �WORK SATISFACTOAY:PROCEED OJECT COMPLETE � ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W � ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. p pH0T0 TAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR O INSPECT�ON REQUIRED.CALLTOARRANGEACCESS. Call for the next inspection 24 hours in advance. (952) 249-46�� OwnerlContractor on site: Inspector. ��- '2J~'�---� White Copyllnspector's File Canary CopylSite Notice DATE TIME CITY OF ORONO CALLED IN INSPECTION N ICE ,.,, SCHEDULED PERMIT N0.� �� '" COMPLETED ""��'a� oZ" C� ADDRESS ��5 ���i S'C�\ �-C e c.� �CJ OWNER CONTR. ���2� TELEPHONE NO. � DESCRIPTION��-P '��L �`�� � v� � 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILUNG Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS � 03 INSULATIGN 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP O6 PROGRESS � 07 OEMO-SITE 2 SEPTIC MAINT. 21 COMPLAINT � 07 DEMO-FINAL 15 EPTIC INSTALL. 22 FOLLOW-UP = 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL � OWNER/CONTRACTOR TO MEET YOU%��CES_NO � COMMENTS: � SC�A��-� O� u � o -a ""C1.:�S�.� 5�.�� a � � oc� C � S; � 0 W __ I• 5- .S<i�c� d� V S 1 n z � Q � z W � W � � W� WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE W ❑C RRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY � O CORRECT WORK,CALL FOR REINSPECTION TEMPORARY � BEFOflE COVERING PERMANENT ❑CORRECTUNSAFECONDITION WITHIN HOURS. p pHOTOTAKEN INSPECTOR W{LL RETURN ❑STOP OROER POSTED.CAIL INSPECTOR ❑CITATION ISSUEO ❑ INSPECTIONREQUIRED.CALLTOARRANGEACCESS. Catl for the next inspection 24 hours in advance. �95Z� Z49-46�� OwnerlContra r on site: Inspector. aZ�C �_ White Copyllnspector's Ffle Canary Copy/Site Notice DATE TIME CITY OF ORONO CALLED IN INSPECTION N�J IC SCHEDULED �-13~��- ��_�— PERMIT NO. r � ���� COMPLETED '� 1 -0 \�.d J ADDRESS �� ��- S � ��+�K OWNER CONTR. ��(�S TELEPHONE NO. � DESCRIPTION__ S`� �`�- ��`��S � 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SiTE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP O6 PROGRESS � 07 DEMO-SITE SEPTIC MAINT. 21 COMPLAINT v 07 DEMO-FINAL 15 EPTIC INSTALL. 22 FOLLOW-UP = 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL � 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL Z OWNER/CONTRACTOR TO MEET YOU�YES_NO � COMMENTS: "" � � C o00 pG� �....• �. ��k� � �— C. le�,�v�.�- ��5�- �����,�e �,�u5e j d' o � S c ;v.. , cs � � "•� � �r�� � � — a d^ u;r, -r-�.�\� W Q �- Gvti�\� S ��2 � P � � ` J N- '�nK.. he�� M���. W � W � � � GW�/VORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE W �O CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. p pHOTOTAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Caii for the next ins cti 24 hours in advance. (952� 249-4600 OwnerlContra tor on site: �{�' Inspector. � White Copyllnspector's File Canary CopylSite Notice DATE TIME CITY OF ORONO CALLED IN INSPECTION NOT,�CE SCHEDULED -��--�� 3=�� PERMIT NO. �•Y Q � COMPLETED 1 '��� �-U C� ADDRESS �i� �-�� S `�\ Cs�c OWNER CONTR. I'�°��[�� TELEPHONE N0. � DESCRIPTION s� �-� Ro c 1� �� l� 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING � 02 FR,4MING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS h O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q OS FINAL 14 SEWER HOOK-UP 06 PROGRESS � 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT � 07 DEMO-FINAL �PTIC INSTALL. 22 FOLLOW-UP ? 09 PLUMBING RI T3�SEPTIC FINAL 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL � OWNER/CONTRACTOR TO MEET YOU:_YES_NO ° COMMENTS: O S� a Ue� � ba�� W — ��: . � o;� a � �'v d r ►�o v � ' �jYl � ��C� �Q j�),�-- Q� � ' i c�5 C` o� � �-=,�,� (�,1��5 �� � ' ��ti `� 3� SP��r ���c S W . � —' ���' -�-�5-t�- O Q Z — �� �� � q�l�cf�\� ( ba�c ` �; C�1 � W — .�`���I� C I.P��� O �r'�' �^ t� �a.'t� � r1C��t" �'('•�� j - � �v�ttKSATISFACTORY:PROCEED ❑ PROJECTCOMPLEfE W�CORRECT WORK&PROCEED ❑ ISSUE CERTIF�CATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. p pHOTOTAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED O INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Cali for the next inspectiop 24 ho s in advance. (952) 249-46�� OwnerlContrac on site: i� c� Inspector. White Copylinspector's File Canary CopylSite Notice