Loading...
HomeMy WebLinkAboutre handrail issue , --_ � __:: ., � ���, ,,o ��_ o\�� �� � ;, I, �� ;� i� CITY of ORONO 11� I��� � �C1 �// �V"�+� �' � `��`�� '� � �' '� Municipal Offices �. � � c� „ � �� � �� ������ �`��� Mailing Address: � ��;,>>�,-,t;�,-, � , Street Address: �kESHO /' 2750 Kelley Parkway P.O. Box 66 = �� Orono, MN 55356 Crystal Bay, MN 55323-0066 June 23, 2008 Mark D. Williams Custom Homes 102 West 5�' St#1 Chaska MN 55318 Dear Mark: After our conversation on Thursday about the handrail issue for the front steps at 3215 Crystal Bay Road I pulled the house plans and the variance application submittal packet. ---�'he'c, rawing in the variance submittal packet shows a handrail installed on the front steps. The City of Orono Building Official Lyle Oman made a note on the building permit that a handrail was necessary for the front steps even though there was an existing concrete foundation there previously, as indicated on the plans At the time of the final inspection your crew was still working on the deck steps and landing area of the front porch and I assumed that the handrail would be taken care of. I was wrong in my assumption. The project is still not complete as to what was submitted for the variance and the notes on the building plans from the Building Official. Please take the necessary steps to install the handrail by July 7th, 2008 and arrange for an inspection of said handrail. If you have any questions concerning this matter, please feel free to contact me at 952-249-4626. Sincerely, -, _ � - (� � Y►�2 �(1�e-,-�� G4-l�t� s,e-�D ��,,�.!'./�-�r ���� .�.G,.�7 �.,,.,a�r� ��� I-i-��o rt�s-►� �,.v�,� Willie Gibbs ��s�-�� �'�-S� ,(��� Building Inspector ('� Telephone(952)249-4600 • Fax(952)249-4616 www.ci.orono.mn.us