November 2, 2011
Leesa & Richard Anderson
3205 Crystal Bay Road
Wayzata, MN 55391
RE: Building Permit#20Q9-00911
In the process of closing out completed building permit project files, it was noted we have not
received an as-built survey and hardcover calculations for the home addition at your property.
We continue to hold an escrow of $2,500 pertaining to the project. In order to begin the process
for the release of the escrow, submittal of an as-buiit survey and hardcover calculations are
required so we may verify conformance with approved permit plans. Once our engineer
determines the property conforms to the approved building permit plans, approved grading plan,
etc. your escrow can be refunded. Please see the attached code section regarding our survey
requirements.
Also noted was no final inspection performed for the home addition. Piease cali 952-249-4600
to schedule the final inspection as soon as possible.
I can be reached at 952-249-4620 or at cmattson(a�ci.orono.mn.us if you have any questions.
Sincerely,
CITY OF ORNO
11 Yu1��"� NV 1�i7� �
Christine Mattson
Planning Assistant
Telephone (952) 249-4600 • Fax (952� 249-4616
wwv��.c�:.o1-ono.mn.us
.
November 2, 2011
3205 Crystal Bay Road
Page 2 of 2
Sec. 86-68. Permit application; information required.
(a) The application for a construction permit shall include such information as may be
required by the city, which may vary between types of construction projects.
(b) Surveys required:
(1) Initial survey. Any building or general permit application for construction of a new
structure or expansion of an existing structure shall be accompanied by a
certificate of survey prepared by a Minnesota Registered Land Surveyor unless
the building official determines the construction project is exempt from this
section. The certificate of survey shall conform to the standards on file in the
office of the building official.
(2) Foundation survey. A foundation survey shall be submitted to the city for review
and approval, unless exempted by the building official, upon completion of the
foundation work for all buildings and all additions to buildings. The foundation
survey, prepared by a Minnesota Registered Land Surveyor, shall certify the lot
dimensions; front, side, rear, lakeshore, and wetland setbacks; and foundation
elevation. A foundation survey must be submitted before proceeding with framing
or further construction. In lieu of a survey a letter prepared by a Minnesota
Registered Land Surveyor containing the same information as a foundation
survey may be submitted.
(3) As-built survey. An as-built survey, prepared by a Minnesota Registered Land
Surveyor, shall be submitted to the city for review and approval upon the
completion of alf buildings and all additions to buildings, unless exempted by the
building officiaf. The as-built survey shall certify the final topography of the site;
verify drainage patterns; and provide hardcover calculations for lots in the
Shoreland Overlay District. An as-built survey must be approved before the
issuance of a certificate of occupancy. In the event that weather or other
conditions prevent the completion of an as-built survey at the time the Certificate
of Occupancy is requested, applicant shall provide a sufficient financial
guarantee and establish an escrow agreement to ensure completion of the as-
built survey.
(Code 1984, § 12.02; Ord. No. 49 3rd series, § 1, 9-8-2008)