Loading...
HomeMy WebLinkAboutre as-built survey � t % � �\. ' � � ���, CITY of ORONO , , \ - ='- 11 Municipal Offices -�'�\ ;; y I�i r� ���a'�;��� ._ �,�� Street Address: Mailing Address: \`�'�� ���� 6,�h ,�,�'� 2750 Kelley Parkway P.O. Bo� 66 , ���P�„�,� G/ ,���a �,��.��g,�� Orono, MN 55356 Crystal Bay, MN 55323-0066 \� E��; November 2, 2011 Leesa & Richard Anderson 3205 Crystal Bay Road Wayzata, MN 55391 RE: Building Permit#20Q9-00911 In the process of closing out completed building permit project files, it was noted we have not received an as-built survey and hardcover calculations for the home addition at your property. We continue to hold an escrow of $2,500 pertaining to the project. In order to begin the process for the release of the escrow, submittal of an as-buiit survey and hardcover calculations are required so we may verify conformance with approved permit plans. Once our engineer determines the property conforms to the approved building permit plans, approved grading plan, etc. your escrow can be refunded. Please see the attached code section regarding our survey requirements. Also noted was no final inspection performed for the home addition. Piease cali 952-249-4600 to schedule the final inspection as soon as possible. I can be reached at 952-249-4620 or at cmattson(a�ci.orono.mn.us if you have any questions. Sincerely, CITY OF ORNO 11 Yu1��"� NV 1�i7� � Christine Mattson Planning Assistant Telephone (952) 249-4600 • Fax (952� 249-4616 wwv��.c�:.o1-ono.mn.us . November 2, 2011 3205 Crystal Bay Road Page 2 of 2 Sec. 86-68. Permit application; information required. (a) The application for a construction permit shall include such information as may be required by the city, which may vary between types of construction projects. (b) Surveys required: (1) Initial survey. Any building or general permit application for construction of a new structure or expansion of an existing structure shall be accompanied by a certificate of survey prepared by a Minnesota Registered Land Surveyor unless the building official determines the construction project is exempt from this section. The certificate of survey shall conform to the standards on file in the office of the building official. (2) Foundation survey. A foundation survey shall be submitted to the city for review and approval, unless exempted by the building official, upon completion of the foundation work for all buildings and all additions to buildings. The foundation survey, prepared by a Minnesota Registered Land Surveyor, shall certify the lot dimensions; front, side, rear, lakeshore, and wetland setbacks; and foundation elevation. A foundation survey must be submitted before proceeding with framing or further construction. In lieu of a survey a letter prepared by a Minnesota Registered Land Surveyor containing the same information as a foundation survey may be submitted. (3) As-built survey. An as-built survey, prepared by a Minnesota Registered Land Surveyor, shall be submitted to the city for review and approval upon the completion of alf buildings and all additions to buildings, unless exempted by the building officiaf. The as-built survey shall certify the final topography of the site; verify drainage patterns; and provide hardcover calculations for lots in the Shoreland Overlay District. An as-built survey must be approved before the issuance of a certificate of occupancy. In the event that weather or other conditions prevent the completion of an as-built survey at the time the Certificate of Occupancy is requested, applicant shall provide a sufficient financial guarantee and establish an escrow agreement to ensure completion of the as- built survey. (Code 1984, § 12.02; Ord. No. 49 3rd series, § 1, 9-8-2008)