HomeMy WebLinkAboutconstruction completion report CA 32
�
PERCENTAGE OF COMPLETIOiJ REPORT
INS PECTION DATE P. I.D.#
BUILDING PERMIT � OWNER
DATE ISSUED I,EGAL DESCRIPTION
CONTRACTOR
CONSTRUCTION PF{ASE A B NOTES - PICTURES
Excavation 2 2
Forms Set 2
Foundation & or Blocks 7 3
Joists Set g 2
Subfloor 11 2
Framed 1 6
S eat ed 1' � 4
Roof shin led 25 4
Windoh�s Set 27
Sidin On 32 S
imne & Fire lace
Furnace Set & Connecte 44 7
Plumbin Rou he In 50 6
Wirin Rou hed In 52 2 , y _ 9 _�
Insulated 52.5 �.5 � f
Lathed 54. S 2
Plastered 59 .5 S
- Floors Laid 62. 5 3
Interior Trim & Cabinet 67. 5 �- �
Doors Hun 69.5 2 �
Water t� Ser;er Connected 71 . S 2
Basemertt Floor 73.5 2
Wirin Finished 75. 5 2
Plumbin Fixtures 78. 5 3 �
Linoleum Laid 80. 5 2
Exterior Concrete Wor 82. 5 2
Outside Paintin 85.5 3
Drive►,�a g�. S
Interior Decoratin 91 . S 4
Finish Hardware 92 .5 1
oors Finished 93 0.5
xtra & Misc. 100 7
COLU h4d A 2 �
��owru� a �
A-cur�.►t��zvE i
B-SINGLE UNIT 9�
M-MATE�IAL nh Fi�ND INDICATED �O 9� COMPLETE
P-WORK IN P20GFtESS
INSP£CTED BY:
10